Transcript of Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lashis-Gele RC Tank (500m3)
Part of Lanchkhuti City Water Supply System
Existing RC Tank Status
Originally planned repairs of existing RC Tank by cleaning or plaster and ironing of walls & roof slab - not implemented due to deteriorated condition of the Tank. Photo: Lack of concrete cover for roof slab re-bars caused corrosion & disconnection leaving the re-bars to hang from the Columns.
Existing RC Tank Status
Multiple leakages recorded, previous repair attempts by plastering of surface not successful.
During the original construction of existing Tank – concrete cover has not been provided for roof slab re-bars, instead – plaster was applied, which has falling off repeatedly. High moisture environment caused severe corrosion of steel reinforcement.
Planned Construction Method
Existing Tank shell to be used for construction of new RC Tank
Preparation for Demolition Works
Soil Cover (30cm) & remaining hydro-insulation removal
Existing RC Tank – Roof Slab Demolition
To enable entry for construction of new RC Tank
Existing RC Tank – Roof Slab Demolition
Existing RC Tank Shell – Roof Slab Demolition
Removal of debris
Existing Tank Shell
Leakages mostly present on construction joints between wall’s horizontal segments. Originally – no water stop was used between wall’s segments during concrete pouring
Existing RC Tank Shell – sealing of leakages
RC Tank - New Outlet Piping
Pipeline supporting structures in erection
RC Tank - Outlet Structures
-Shutter Chamber; -Manual Valve – CL meter Shaft; -Ultra-sonic Flow Meter Shaft
New RC Tank – Base Slab Reinforcing
Works
New RC Tank – Base Slab Concrete
Installation
Quality Control – Slump Test
Slump test on each mix-truck concrete delivery as standard concrete workability control.
Quality Control – Concrete Temperature
Control
Quality Control – Concrete Molds
Compressive Strength Test molds for each structural concrete installation.
New RC Tank – Wall Reinforcement Works
New RC Tank Wall Reinforcement /
Formworks
New RC Tank Wall Formworks
Right upper corner – new Double Bunker Type CL gas Chlorinator Building construction on Tank’s inlet section.
New RC Tank Wall Formworks
New RC Tank Wall Concrete Pouring
Shutter Chamber and Outlet Pipelines
New RC Tank – Columns Formwork
New RC Tank – Columns Formwork
New RC Tank – Roof Slab Formwork
New RC Tank – Roof Slab Formwork
New RC Tank – Roof Slab Reinforcing
Works
New RC Tank – Hydro Insulation
New RC Tank – Hydro Insulation
New RC Tank – Interior
New RC Tank – Interior
New RC Tank – Interior
New RC Tank – Interior
New RC Tank – Interior
New RC Tank – Interior
New RC Tank – Final Status
Ventilation Pipes, Access Manholes, Light Posts installed. Right - Chlorine Gas Chlorination Building (Double Bunker Type).
New RC Tank – Final Status