apital of Tartastan, Kazan is located 800 km to the East of Moscow, on the confluence of the Kazanka and Volga rivers. With its 1.3 million inhabitants, the city decided, in 1997, to equip itself with an urban metro network. The project aims to commission an overall network of 42.3 km, spread over 3 lines. The works, which began in 1997, are due to be completed in 2023. The first line was put into service in 2005 on the occasion of the 1,000th Anniversary of the City. At that time, the mayor of Kazan called on MÜHLHÄUSER to supply a 5.89m. diameter tunnelling machine. This machine, already used for the Copenhagen Metro, was entirely renovated for it to perfectly adapt to the new boring conditions: new cutting head, increase in size of the front shield, change of the intermediary and rear end panel shields for the installation of 22 thrust cylinders. In 2008, Kazmetrostroy (the authority in charge of the construction of the Kazan Metro) ordered a second machine from MÜHLHÄUSER, similar to the first. This tunnelling machine, entirely built at the Le Creusot workshops, will be delivered to the client in July 2009. KAZAN METRO 2 EARTH PRESSURE TUNNELLING MACHINES 5.89 m Ø C Structure of the project THE PARTICIPANTS : Client: Kazmetrostroy End customer: Kazan City Work carried out using the TBM > Excavation lengths : 1,790 m and 2,000 m > Geology: clay, sand, loam > Coverage : 20 to 30 m > Minimum radius of curvature: 250 m > Maximum slope: 4% > Inner diameter: 5.1 m > Characteristics of the segments : Number: 7 + 1 key Thickness: 250 mm Width: 1 m (Kazan1) 1 m and 1.4 m (Kazan2) Max. weight : 1.7 t Once completed, the first line will have 10 stations, thus covering almost 15 km. At present, the construction project anticipates 2 phases : Phase 1 will comprise 5 stations spread over 7.2 km (2005). Phase 2 foresees an extension to 2 stations, Victory Avenue to the South (2007) and Zarechnaya to the North (2009). The first tunnelling machine supplied by MÜHLHÄUSER excavated a tunnel of 1,790 m between the stations Kremlevskaya and Polash Tukaya, thereby completing phase 1 of Line 1. The second tunnelling machine will be used within the framework of the extension to this Line 1: it will excavate the 2,000 m which separate the stations Kozya Sloboda and Moskovskaya, to the west of the city. Sections excavated by the MÜHLHÄUSER SAS tunnelling machines TUNNELLING MACHINES LINE 1 OF KAZAN METRO

Transcript of Kazan MFR 03.2019 - EN · apital of Tartastan, Kazan is located 800 km to the East of Moscow, on...

Page 1: Kazan MFR 03.2019 - EN · apital of Tartastan, Kazan is located 800 km to the East of Moscow, on the confluence of the Kazanka and Volga rivers. With its 1.3 million inhabitants,

apital of Tartastan, Kazan is located 800 km to the East of Moscow, on the confluence of the Kazanka and Volga rivers. With its 1.3 million inhabitants, the city decided, in 1997, to equip itself with an urban metro network. The project aims to commission an overall network of 42.3 km, spread over 3 lines. The works, which began in 1997, are due to be completed in 2023. The first line was put into service in 2005 on the occasion of the 1,000th Anniversary of the City. At that time, the mayor of Kazan called on MÜHLHÄUSER to supply a 5.89m. diameter tunnelling machine. This machine, already used for the Copenhagen Metro, was entirely renovated for it to perfectly adapt to the new boring conditions: new cutting head, increase in size of the front shield, change of the intermediary and rear end panel shields for the installation of 22 thrust cylinders. In 2008, Kazmetrostroy (the authority in charge of the construction of the Kazan Metro) ordered a second machine from

MÜHLHÄUSER, similar to the first. This tunnelling machine, entirely built at the Le Creusot workshops, will be delivered to the client in July 2009.

KAZAN METRO 2 EARTH PRESSURE TUNNELLING MACHINES

5.89 m Ø

C

Structure of the project

THE PARTICIPANTS : Client: Kazmetrostroy End customer: Kazan City

Work carried out using the TBM

> Excavation lengths : 1,790 m and 2,000 m > Geology: clay, sand, loam > Coverage : 20 to 30 m > Minimum radius of curvature: 250 m > Maximum slope: 4% > Inner diameter: 5.1 m > Characteristics of the segments : Number: 7 + 1 key Thickness: 250 mm Width: 1 m (Kazan1) 1 m and 1.4 m (Kazan2) Max. weight : 1.7 t

Once completed, the first line will have 10 stations, thus covering almost 15 km. At present, the construction project anticipates 2 phases : Phase 1 will comprise 5 stations spread over 7.2 km (2005). Phase 2 foresees an extension to 2 stations, Victory Avenue to the South (2007) and Zarechnaya to the North (2009). The first tunnelling machine supplied by

MÜHLHÄUSER excavated a tunnel of 1,790 m between the stations Kremlevskaya and Polash Tukaya, thereby completing phase 1 of Line 1. The second tunnelling machine will be used within the framework of the extension to this Line 1: it will excavate the 2,000 m which separate the stations Kozya Sloboda and Moskovskaya, to the west of the city.

Sections excavated by theMÜHLHÄUSER SAS tunnelling machines

TUNNELLING MACHINES

LINE 1 OF KAZAN METRO

Page 2: Kazan MFR 03.2019 - EN · apital of Tartastan, Kazan is located 800 km to the East of Moscow, on the confluence of the Kazanka and Volga rivers. With its 1.3 million inhabitants,

THE TUNNELLING MACHINES

> Type: EPB > Cutting head: 6 arms > Cutting tools: Kazan 1 : cutting tools with overcut tool Kazan 2 : cutting tools or roller cutters with overcut tool > Motorisation: Kazan 1 : hydraulic, 7 variable speed motors Kazan 2 : hydraulic, 6 variable speed motors > Shields: 3 (front, intermediary, rear end panel) > Evacuation of the excavation muck : screw conveyor and belt conveyor > Erector: capacity of 32 kN. Ring gear drive with mechanical gripper

CHARACTERISTICS OF THE MACHINES

Kazan 1 Kazan 2

> Shield diameter:

> Length of the shield:

> Weight of the shield:

> Head motorisation:

> Main thrust:

> Articulation:

> Head rotation speed:

> Maximum nominal torque:

> Maximum advance speed:

5.89 m

9.2 m

295 t

1,360 kW

29,000 kN with 22 cylinders

8,700 kN

0 to 5.1 rpm

3,800 kN.m for 2.2 rpm

80 mm/min.

5.89 m

9.09 m

335 t

945 kW

30,000 kN with 22 cylinders

8,400 kN

0 to 3.75 rpm

4,850 kN for 1.15 rpm

80 mm/min.