Contents:
• Introduction
• Grid Balancing
• Power-to-Gas Energy Storage
• Thüga project
• Low Cost | Low Carbon | Clean Fuel
• Refuelling station projects
• Summary
COMPANY PRESENTATION DECEMBER 2014 | LONDON
RAPID RESPONSE
HYDROGEN ENERGY SYSTEMS
RAPID RESPONSE ELECTROLYSER
ITM Electrolyser
Clean Fuel
Energy Storage Wind Power
Grid
Scalable | Rapid Response | Self pressurising
GROWING WIND GENERATION
ENERGY STORAGE: THE NEED
HYDROGEN ENERGY SYSTEMS
• Evidence of grid balancing problems
from Germany and Denmark
• Problems start at 20% capacity
• UK hit this threshold at the
end of 2013
• Energy Storage is a Market Pull
Source: ITM Power plc, data from BWEA
THE NEED: GRID BALANCING
BALANCING SUPPLY AND DEMAND:
• A total of £725m paid for balancing services in 2010–11
• Estimates in 2020 are: circa £1.9bn – £5.9bn pa
• Tariffs already operational in the UK: FCDM response sub 2 seconds
HYDROGEN ENERGY SYSTEMS
REFUELLING STATIONS | P2G UNITS
HYDROGEN ENERGY SYSTEMS
RAPID RESPONSE ELECTROLYSER
Scalable | Rapid Response | Self pressurising
GRID
BALANCING
FREQUENCY
POWER-TO-GAS
THÜGA PROJECT
POWER GRID
Mechanical Inertia | Dynamic Coupling
• 3000 rpm | 50Hz
• Power | Frequency shedding
• Max 4% swing 48Hz|52Hz
• Obligation average 50Hz in 1hour
MECHANICAL INERTIA
POWER GRID OPERATION
THE NEED: GRID BALANCING
ENERGY STORAGE | CLEAN FUEL
BALANCING SUPPLY AND DEMAND: SECOND BY SECOND
THE NEED: GRID BALANCING
ENERGY STORAGE | CLEAN FUEL
BALANCING SUPPLY AND DEMAND: SECOND BY SECOND
Dynamic
Rising Frequency
Falling Frequency
Supply Side Balancing Action
Turn OFF a generator
Turn ON a generator
Demand Side Balancing Action
Turn ON a load
Turn OFF a load
ENERGY STORAGE | CLEAN FUEL
PRIMARY VS SECONDARY RESPONSE
RAPID RESPONSE ELECTROLYSIS
RAPID RESPONSE ELECTROLYSIS
ENERGY STORAGE | CLEAN FUEL
FREQUENCY CONTROL BY
DEMAND MANAGEMENT (FCDM)
• Deliver in less than 2 seconds
• Maintain demand reduction | increase for at least 30mins
• Demand greater than 3MW; which may be achieved by aggregating a number of small loads
• Have a suitable operational metering
• Provide output signal into National Grid’s monitoring equipment
WHY POWER-TO-GAS?
POWER-TO-GAS RATIONALE
Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid
Source: ITM Power plc
HYDROGEN ENERGY SYSTEMS
ENERGY STORAGE | CLEAN FUEL
ENERGY STORAGE TECHNOLOGIES
ENERGY STORAGE TECHNOLOGIES
Power-to-gas is efficient | long term | low energy cost
Source: ITM Power plc
P2G PLANT & VISITOR CENTRE
HYDROGEN ENERGY SYSTEMS
RAPID RESPONSE PEM ELECTROLYSIS
ENERGY STORAGE | CLEAN FUEL
From a responsive to a dynamic DS load
• £0.4m TSB (UK Gov) grant
• Joint with AEG
• Responds to frequency
• Responds in one cycle
RAPID RESPONSE | HIGH PRESSURE
CPUC Sets the energy storage mandate for the power sector
• Energy storage target of 1,325 megawatts
• Obligation on 3 major CA utilities by 2020
• Optimization of the grid, including peak reduction
• Integration of renewable energy
• Reduction of GHG emissions to 80% below 1990 levels by 2050
“This decision represents an important first step in encouraging
the storage market and supporting grid reliability,” Commissioner Carla J. Peterman, the lead Commissioner for this proceeding.
CALIFORNIA ENERGY STORAGE
1.3GW ENERGY STORAGE MANDATE IN CALIFORNIA
HYDROGEN ENERGY SYSTEMS
CLEAN FUEL
WHAT IS A FCEV
THE CARS
REFUELLING
FUEL CELL CARS
WHAT IS A FUEL CELL CAR?
An EV drive train that’s refuelled rather than recharged
• Refuel in 3 minutes
• Range 400 miles
• Managed export of
energy from the grid
HYDROGEN ENERGY SYSTEMS
HYUNDAI IX35 FCEV
Launched in 2013
California, Germany and UK
Lease $499/month
HYDROGEN ENERGY SYSTEMS
TOYOTA MIRAI FCEV
Launch in 2015
California, Germany and UK
Sale $57.5k
HYDROGEN ENERGY SYSTEMS
ENERGY STORAGE | CLEAN FUEL
UKH2MOBILITY
UK Government has committed £500m to ULEV
• Public consultation closed 9th January
• Industry call for evidence closed 9th January
• OLEV visited ITM Power and the CEC in California
• Initial roll out of 65 x 80kg/day stations | 50% electrolysis
• £11m first call announced
National Hydrogen Mobility Plans
ON-SITE HYDROGEN PRODUCTION
ENERGY STORAGE | CLEAN FUEL
80KG/DAY REFUELING SYSTEM
UK REFUELLING STATIONS
UK REFUELLING STATIONS
M1 Refuelling Station | AMP Sheffield
• ITM Power’s second public station
• Opening in March 2015
• Currently operating at ITM Power
HYDROGEN ENERGY SYSTEMS
UK REFUELLING STATIONS
UK REFUELLING STATIONS
EcoIsland (TSB)
1x80kg | 1x15kg
£1.5m
HyFive (EU)
3x80kg
€3.0m
OLEV £11m Call
6x80kg
Tender
H2Mobility
65x80kg
Tender
H2Mobility
1,000 Stations
Tender
Development of a UK Infrastructure Business
• Grant funded Capex and Opex
• Maintenance contract with each award
• OLEV £11m announced | OLEV £60m call in early 2015
• OLEV have indicated £100m allocated for hydrogen (un-announced)
HYDROGEN ENERGY SYSTEMS
Selected by the LHP as the 2013 HRS partner
• LHP Funded the ITM Power 2013 JTI submission
• 100 Fuel Cell Electric Vehicles from 5 OEMs
• ITM to build 3 refuelling stations in London
• Backing from the Mayor’s office
• €18m total EU (JTI) funding
• £2.8m to ITM Power
LONDON HYDROGEN PARTNERSHIP
HYDROGEN ENERGY SYSTEMS
WWW.HYFIVE.EU
HYDROGEN ENERGY SYSTEMS
FCH JU 2: 2014
FCH JU 2: 2014
HYDROGEN ENERGY SYSTEMS
FCH budget €1.4bn, managed by the New Energy World
• Development: 100% of the total eligible cost
• Demonstrations: 70% maximum will apply for profit making entities
EcoIsland (TSB)
1x80kg | 1x15kg
£1.5m
HyFive (EU)
3x80kg
€3.0m
P1: Transport
2014: €40m
Tender
P2: Energy
2014: €40m
Tender
FCH JU2
€1.4bn
Annual Tender
H2USA
ENERGY STORAGE | CLEAN FUEL
Hyundai, Chino 100% Renewable Hydrogen Station
CALIFORNIA REFUELLING STATIONS
CALIFORNIA REFUELLING STATIONS
2013 PON
Hyundai Chino
Won $1.3m
2014 PON
Riverside
Won $2.1m Bid
2015 PON
10x100kg
Tender
8 More PON’s
80x100kg
Annual Tender
California Hydrogen Infrastructure Deployment
• Fund of $200m for 100 hydrogen stations with up to $20m a year for 10yrs
• 2012: ITM Power Inc. established in California
• 2013: ITM Power Inc. wins H2 station award with 2 North American partners at Hyundai, Chino
• 2014: ITM Power Inc. wins H2 station award with 2 North American partners at the City of Riverside
HYDROGEN ENERGY SYSTEMS
Code Status Project Location Specification Funding Value Ownership
HRS 001 Operating Nottingham Univ of Notts 5kg/day 350 bar TSB (UK Gov) £275k Univ of Notts
HRS 002 Operating HOST Mobile refueller 15kg/day 350 bar TSB (UK Gov) £326k ITM Power
HRS 003 Operating Ecoisland marine Ventnor, Isle of Wight 15kg/day 350 Bar TSB (UK Gov) £326k ITM Power
HRS 004 Operating M1 vehicle M1 Junction 33 80kg/day 350Bar TSB (UK Gov) £1.2m ITM Power
HRS 005 In Build HyFive 3 stations in London 80kg/day 700 bar FCH JU (EU) £1.55m ITM Power
HRS 006 In Build HyFive 3 stations in London 80kg/day 700 bar FCH JU (EU) £1.55m ITM Power
HRS 007 In Build HyFive 3 stations in London 80kg/day 700 bar FCH JU (EU) £1.55m ITM Power
HRS 008 In Build CHINO Hyundai Chino, California 100 kg/day 700bar CEC £1.7m Hyundai
HRS 009 In Build Riverside Riverside, California 33kg/day 700 bar CEC £1.7m ITM Power
HRS 010 Development Hyundai London M4, A4 80kg/day 700 bar FCH JU (EU) £1.55m ITM Power
HRS 011 Development UK H2Mobility South East England 80kg/day 700 bar OLEV (UK Gov) £1.55m ITM Power
HRS 012 Development UK H2Mobility South East England 80kg/day 700 bar OLEV (UK Gov) £1.55m ITM Power
HRS 013 Development UK H2Mobility South East England 80kg/day 700 bar OLEV (UK Gov) £1.55m ITM Power
HRS 014 Development UK H2Mobility Mobile Station 33kg/day 350bar OLEV (UK Gov) £800k ITM Power
HRS 015 Development UK H2Mobility Mobile Station 33kg/day 350bar OLEV (UK Gov) £800k ITM Power
ITM POWER | REFUELLING STATIONS
REFERENCE PLANT | ASSETS
HYDROGEN ENERGY SYSTEMS
REFERENCE PLANT
REFERENCE PLANT | GERMANY | UK | USA
A major barrier to entry overcome
• NRE has been invested
• Products have been standardised
• Compliance in UK | EU | USA
• Power-to-Gas and Refuelling Stations
HYDROGEN ENERGY SYSTEMS
Commercial progress to date:
A Total of £7.87m of projects under contract
A further £1.3m of income already recognised in the period
All projects bid with a 50% upfront payment
Strongly developing pipeline of commercial sales and funded projects
COMPANY PRESENTATION DECEMBER 2014 | LONDON
COMPANY PRESENTATION DECEMBER 2014 | LONDON