International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO...

27
International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012-WP/8 Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi, 21-25 May 2012)

Transcript of International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO...

Page 1: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

International Civil Aviation Organization

System of Systems(DRAFT)

To be approved by the ICAO Council

SIP/ASBU/2012-WP/8

Workshop on preparations for ANConf/12 − ASBU methodology(Bangkok, 14-18/Nadi, 21-25 May 2012)

Page 2: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

International Civil Aviation Organization

Council BriefingWinter Session, Safety Week

Page 3: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

ICAO's Safety Framework

Policy & Standardization– GASP Update

Safety Monitoring– USOAP to Continuous

Monitoring

Safety Analysis– Establishes Priorities

Implementation– Annual Safety Report

3

Page 4: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

4

Aviation’s System of Systems

Page 5: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

5

Safety and Air Navigation Framework

Page 6: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

The GASP formalizes partner-agreed safety targets as well as the collaboratively determined Global Safety Initiatives (GSIs) designed to achieve those targets. Tactical annual adjustments to the GASP work programme are made based on the safety trends reflected in ICAO’s yearly State of Global Aviation Safety report.

Policy

6

Safety Framework

Standardization efforts are undertaken as needed

Standardization

Conducted in collaboration with industry partners, regional and State safety organizations. Higher-level coordination of their initiatives is achieved via ICAO’s Regional Aviation Safety Groups (RASGs). The RASGs also serve to aggregate the regional reporting of annual safety monitoring results that are relayed to ICAO Headquarters and shared with ICAO’s aviation partners.

Implementation

Surveillance activities intended to detect implementation of SSP and SMS protocols by States and industry partners, respectively. Operational audits are under-taken primarily by industry, while the status of State over-sight capabilities is continuously monitored under the ICAO Universal Safety Oversight Audit Programme (USOAP).

Monitoring

The integration of global safety indicators and regional safety outcomes received through the RASGs. Output is shared with ICAO’s aviation partners to create a comprehensive assessment of safety risk. Safety results are used to update the annual ICAO State of Global Aviation Safety report, to begin the cycle anew.

Analysis

Page 7: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

ICAO’s Global Air Navigation Plan (GANP) establishes sectoral ATM Policy objectives. These are based largely on the Aviation System Block Upgrade (ASBU) ATM modernization strategy developed collaboratively with ICAO’s aviation partners.

Regional work programmes will be derived from the GANP. Tactical adjustments to the programmes will be made annually and reported online regionally and globally through the Global Air Navigation Report. More significant policy revisions to the GANP are prepared for review and agreement by the ICAO Assembly once every three years.

Policy: ASBUs

All Standards for Block 0 have been completed and implementation is underway.

Block 1 Standards and Recommended Practices (SARPS) will be initiated after the 12th Air Navigation Conference.

Standardization

Conducted in collaboration with aviation partners and ANSPs at the State and Regional level. Higher-level coordination of these initiatives is achieved via ICAO’s Planning and Implementation Regional Groups (PIRGs).

Implementation

The PIRGs also serve to aggregate the regional reporting of annual ATM monitoring results from ANSPs that are relayed to ICAO Headquarters and shared with the Organization’s aviation partners.

Monitoring

Analysis of reporting data is carried out collaboratively with ICAO’s partners. Results are then published in the annual ICAO Global Air Navigation Report (GANR), which then helps determine the tactical regional work programme’s annual adjustments to start the cycle again.

Analysis

7

Air Navigation Framework

Page 8: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

8

Strategic Plans for the Future

Stressing:

PartnershipPrioritizationTransparency

DOC XXXX

Page 9: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

DOC XXXX

9

Safety Partnerships

Project title (Insert, Header & Footer)

Stressing:

PartnershipPrioritizationTransparency

99

Page 10: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

Air Navigation Partnership

10

Page 11: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

11

Global Implementation Priorities

Loss of Control InflightLoss of Control Inflight

Controlled Flight into TerrainControlled Flight into Terrain

SAFETY PRIORITIESSAFETY PRIORITIES

Runway RelatedRunway Related Performance Based NavigationPerformance Based Navigation

Continuous Climb OperationsContinuous Climb Operations

AIR NAVIGATION PRIORITIESAIR NAVIGATION PRIORITIES

Continuous Decent OperationsContinuous Decent Operations

Page 12: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

12

FOCUS ON POLICY:

2012 GASPCHAPTER 1Current State of Aviation Safety

• Global Priorities

Page 13: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

13

FOCUS ON POLICY:

2012 GASP CHAPTER 2

Global Aviation Policy

• Aviation System of Systems

• Progress through Partnership

• Practising Safety Management

• Next Generation of Aviation

Professionals

Page 14: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

14

FOCUS ON POLICY:

2012 GASP CHAPTER 3

Standardization

• New Safety Annex

• Aviation SystemBlock Upgrades (ASBUs)

Page 15: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

15

FOCUS ON POLICY:

2012 GASP CHAPTER 4

Monitoring

• Evolution of USOAP to CMA for Regulators

Page 16: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

16

FOCUS ON POLICY:

2012 GASP CHAPTER 5

Analysis • Aviation Safety Report• Aviation Safety Index

through data sharing agreements: EU, US, IATA, ACI and CANSO• Safety Data Tools

Page 17: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

17

FOCUS ON POLICY:

2012 GASP CHAPTER 6

Implementation:Ideas into Action

• Regional Aviation Safety

Groups (RASGs)

• Integrating Industry Roadmap

• Special Support to MARB

States

Page 18: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

18

FOCUS ON POLICY:

2012 GASPCHAPTER 7Contingency, Crisisand Capacity

• Contingency Planning

• Crisis Management

• Disaster Recovery

• Capacity Building

Page 19: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

19

FOCUS ON POLICY:

2012 GANPCHAPTER 1Overview of Global Air Navigation and Growing Challenge

DOC XXXX

Page 20: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

20

FOCUS ON POLICY:

2012 GANP CHAPTER 2

Global Air Navigation Policy

• Aviation: System of

Systems• Integrated Planning

• Progress thru Partnership

DOC XXXX

Page 21: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

21

FOCUS ON POLICY:

2012 GANP CHAPTER 3

Standardization: Aviation System Block Upgrades

• Block ‘0’ Introduction

• Block ‘1’ – Module by Module

• Technology Roadmaps

DOC XXXX

Page 22: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

22

FOCUS ON POLICY:

2012 GANP CHAPTER 4

Continuing R&D

• Block ‘2 ’ – Module by Module

• Block ‘3’ – Module by Module

DOC XXXX

Page 23: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

23

FOCUS ON POLICY:

2012 GANP CHAPTER 5

Implementation:Near-term Action Plan• Planning and Implementation

Regional Groups (PIRGs)

• Special Projects

• Block ‘0’ Module roll outs

DOC XXXX

Page 24: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

24

FOCUS ON POLICY:

2012 GANPCHAPTER 6AviationSystem Performance

• Annual Global Air Navigation Report

DOC XXXX

Page 25: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

• GASP and GANP

POLICYPOLICYGANP and

GASP

STANDARDIZATIONICAO Website

Standards Look Ahead

MONITORING Significant

Safety Concerns tothe Public

ANALYSISSafety Reports(2011 Forward)

Annual Air Navigation Reports

(2012 Forward)

IMPLEMENTATIONOnline Reporting

for Priorities: each Regional

Office

25

• Public Safety Site – Look Ahead

STANDARDIZATION

• A mechanism for the sharing of significant safety concerns (SSCs) with the public • (C-WP/13801)

MONITORING

• Progress report on the Electronic Filing of Differences (EFOD) System • (C-WP/13803)

ANALYSIS

•A Mechanism for the Sharing of significant Safety Concerns with the Public (C-WP 13801)•Consolidated Report on the Planning and Implementation Regional Groups (PIRGs; C-WP 13802)•Progress Report on the Electronic Filing of Differences (C-WP 13803)

Discussing This Week

TransparencyTransparencyPOLICYGASP and

GANP

STANDARDIZATION

ICAO Website Standards

Look Ahead

MONITORING Significant

Safety Concerns to

the Public

ANALYSISSafety Report (2011 Forward)

Annual Air Navigation Report

(2012 Forward)

IMPLEMENTATIONOnline Reporting

for Priorities: each Regional

Office

Page 26: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

26

Bottom line:Bottom line:− This forward leaning framework for Safety and

Air Navigation provides ICAO, its states and partners the strategy, methodology and transparency to enable high level aviation decisions for the foreseeable future

Page 27: International Civil Aviation Organization System of Systems (DRAFT) To be approved by the ICAO Council SIP/ASBU/2012 -WP/8 Workshop on preparations for.

27ICAO SIP 2012- ASBU WORKSHOP