International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on...

23
International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Nairobi, 13-17 August 2012) SIP/2012/ASBU/Nairobi- WP/4

Transcript of International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on...

Page 1: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

International Civil Aviation Organization

Global ATM Operational Concept

Saulo Da Silva

Workshop on preparations for ANConf/12 − ASBU methodology(Nairobi, 13-17 August 2012)

SIP/2012/ASBU/Nairobi-WP/4

Page 2: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

““Do we know where to go?”Do we know where to go?”

2ICAO SIP 2012 - ASBU workshops

Page 3: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

YES.YES.

3ICAO SIP 2012 - ASBU workshops

Page 4: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

““Vision without Action is a day-Vision without Action is a day-dream,dream,

Action without Vision is a Action without Vision is a nightmare.”nightmare.”

4ICAO SIP 2012 - ASBU workshops

Page 5: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

The GapThe Gap

5ICAO SIP 2012 - ASBU workshops

Page 6: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

ObjectiveObjective

To present the ICAO vision and the steps/actions towards the implementation of the “future” Air Navigation System focusing on the global drivers expressed in the GANP.

6ICAO SIP 2012 - ASBU workshops

Page 7: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

Presentation OutlinePresentation Outline

• History and Background• Vision• Expectations• How to get there

7ICAO SIP 2012 - ASBU workshops

Page 8: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

History and BackgroundHistory and Background

• FANS• Tenth Air Navigation Conference• Global Air Navigation Plan for CNS/ATM Systems

(Doc 9750)• Planning and Implementation Regional Groups

embarked on an extensive effort• SARPs, PANS, Guidance material• Eleventh Air Navigation Conference.

8ICAO SIP 2012 - ASBU workshops

Page 9: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

Vision statementVision statement

To achieve an interoperable global air traffic management system for all users during all phases of flight, that

• meets agreed levels of safety;• provides for optimum economic operations;• is environmentally sustainable; and• meets national security requirements.

9ICAO SIP 2012 - ASBU workshops

Page 10: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

Guiding principlesGuiding principles

10ICAO SIP 2012 - ASBU workshops

• Safety• Humans • Technology• Information• Collaboration• Continuity

Page 11: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

Concept componentsConcept components

11ICAO SIP 2012 - ASBU workshops

• Airspace organization and management(AOM)• Aerodrome operations(AO)• Demand and capacity balancing(DCB)• Traffic synchronization(TS)• Airspace user operations(AUO)• Conflict management(CM)• ATM service delivery management(ATM/SDM)

Page 12: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

TransitionTransition

• Technology is not an end in itself

• Based on clearly-established operational requirements

• Integrated system

12ICAO SIP 2012 - ASBU workshops

Page 13: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

IntegrationIntegration

13

People Systems

Concept components

Management

ATMService provider

Aircraft operations

Maintenance Engineering

ATM service delivery management

Communications

Navigation

Surveillance

Airspace User

AerodromeOperator

Conflict Management

Information rich environment

Traffic synchronisation

Aerodrome operations

Airspace useroperations

Demand capacitybalancing

Airspaceorganization

and Management

ICAO SIP 2012 - ASBU workshops

Page 14: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

ExpectationsExpectations

• Access and Equity• Capacity• Cost-effectiveness• Efficiency• Environment• Flexibility• Global interoperability• Participation by the ATM community• Predictability• Safety• Security

14ICAO SIP 2012 - ASBU workshops

Page 15: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

Global SystemGlobal System

15ICAO SIP 2012 - ASBU workshops

Page 16: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

Global SystemGlobal System

meeting safety objectives operate along preferred 4D trajectoriesenvironmental objectives other business requirements

16ICAO SIP 2012 - ASBU workshops

Page 17: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

How to get thereHow to get there

• The GANP as a catalyst for change

• Provides a global interoperability framework

• Allows adaptation to efficiently meet regional and local needs

17ICAO SIP 2012 - ASBU workshops

Page 18: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

How to get thereHow to get there

• Partnering with industry

• Delivering transitional benefits while we continue our evolution

18ICAO SIP 2012 - ASBU workshops

Page 19: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

How to get thereHow to get there

• Modules• Elements as options for improvements• Result in direct performance enhancements• Based on Industry Roadmaps and current

regional activities• Bring near- and medium-term benefits

19ICAO SIP 2012 - ASBU workshops

Page 20: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

GANPGANP

20

•Represents the initiatives that will contribute to attend the expectations of the aviation community

•Main drivers towards the seamless system.

ICAO SIP 2012 - ASBU workshops

Page 21: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

SummarySummary

• We needed a vision: the operational concept

• Gap

• Address the KPAs

• Lots of ongoing work

• GANP one of the main drivers.

21ICAO SIP 2012 - ASBU workshops

Page 22: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

We know where to go, but…We know where to go, but…

““Vision without Action is a day-dream,Vision without Action is a day-dream,Action without Vision is a nightmare.”Action without Vision is a nightmare.”

22ICAO SIP 2012 - ASBU workshops

Page 23: International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,

23