Integrated Workflow · 2019-02-15 · 1 2 4 5 8 8 9 10 11 12 3 7 6 Steel Plate Cutting and Welding...

1
1 2 4 5 8 8 9 10 11 12 3 7 6 Steel Plate Cutting and Welding Shop Structural Assembly Hall Pipe Spool Fabrication Shop Piping NDE Shop Pipe Spool Paint Blast Shops Ambient/Temperature Controlled Warehouse Administation/ Engineering Offices #2 Paint Blast Shops Outfitting and Pre-Assembly Area 300m x 120m Outfitting and Pre-Assembly Area 350m x 120m Outfitting and Pre-Assembly Area 300m x 280m Outfitting and Pre-Assembly Area 325m x 230m Outfitting and Pre-Assembly Area 300m x 230m #1 Paint Blast Shops Pipe Spool Laydown 180m x 160m Assembly Area 680m x 520m Integrated Workflow Receipt and storage of all equipment and materials Cut steel plates and shapes move into the structural assembly workshop Completed structural blocks move from the assembly workshop into the structural blast and paint shops Pipe spool fabrication Pipe spools move into pipe blast and paint Completed pipe spools move to laydown area. Painted structural blocks move to the pre-assembly area for pipe spool and outfitting installation Complete sections move from the pre-assembly area to primary assembly area for final assembly and pre-commissioning #3 Skidway (2 skid rails with nominal capacity - 12,000MT) #2 Skidway - (4 skid rails with nominal capacity - 25,000MT) #1 Skidway - (3 skid rails with 312 MT/m capacity) Quayside loadout via skidways or SPMT (14m water depth) 1 2 3 4 5 6 7 8 9 10 11 12 © 2019 COOEC-Fluor Heavy Industries Co., Ltd. All Rights Reserved. HO20190033-001

Transcript of Integrated Workflow · 2019-02-15 · 1 2 4 5 8 8 9 10 11 12 3 7 6 Steel Plate Cutting and Welding...

1

2

4

5

8

8

9

10

11

12

3

7

6

Steel Plate Cutting and Welding Shop

StructuralAssembly Hall

Pipe SpoolFabrication Shop

Piping NDEShop

Pipe SpoolPaint Blast Shops

Ambient/TemperatureControlled Warehouse

Administation/Engineering O�ces

#2 PaintBlast Shops

Out�tting andPre-Assembly

Area300m x 120m

Out�tting andPre-Assembly

Area350m x 120m

Out�tting andPre-Assembly

Area300m x 280m

Out�tting andPre-Assembly

Area325m x 230m

Out�tting andPre-Assembly

Area300m x 230m

#1 PaintBlast Shops

Pipe SpoolLaydown

180m x 160m

AssemblyArea

680m x 520m

Integrated Workflow

Receipt and storage of all equipment and materials

Cut steel plates and shapes move into the structural assembly workshop

Completed structural blocks move from the assembly workshop into the structural blast and paint shops

Pipe spool fabrication

Pipe spools move into pipe blast and paint

Completed pipe spools move to laydown area.

Painted structural blocks move to the pre-assembly area for pipe spool and outfitting installation

Complete sections move from the pre-assembly area to primary assembly area for final assembly and pre-commissioning

#3 Skidway (2 skid rails with nominal capacity - 12,000MT)

#2 Skidway - (4 skid rails with nominal capacity - 25,000MT)

#1 Skidway - (3 skid rails with 312 MT/m capacity)

Quayside loadout via skidways or SPMT (14m water depth)

1

2

3

4

5

6

7

8

9

10

11

12