Page 1: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street
Page 2: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Massachusetts Water Resources Authority

Cover

Page 3: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Field Operations Maintenance

5000

6000

7000

8000

9000

10000

11000

12000

13000

14000

15000

16000

Cre

w H

ours

Maintenance Backlog in Crew Hours

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

$350,000

$400,000

$450,000

Ove

rtim

e ($

$)

Overtime Spending

FY16 OT Budget

OT Actual

Page 4: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Operations Division Metering - Miles Surveyed for Leaks

134.93

0

20

40

60

80

100

120

140

160

180

200

J A S O N D J F M A M J

Monthly Cumulative Target

Page 5: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Water Distribution System Valves

0

250

500

750

1000

1250

1500

July August September October November December January February March April May June

# of

val

ves

Main Line Valves Exercised

Target = 1,100 main line valves annually

0

100

200

300

400

500

600

July August September October November December January February March April May June

# of

Val

ves

Blow-Off Valves Exercised

Target = 500 blow off valves annually

Type of Valve Inventory # Operable Percentage

FY16 to Date FY16 Targets

Main Line Valves 2,159 96.30% 95%

Blow-Off Valves 1,317 94.30% 95%

Air Release Valves 1,380 92.80% 95%

Control Valves 49 100.00% 95%

Page 6: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street
Page 7: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Massachusetts Water Resources Authority

MWRA Projects in Stoneham

May 11, 2016

Page 8: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

8  

MWRA Projects In Stoneham

Page 9: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

9  

Stoneham High School Parcel

Page 10: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street
Page 11: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Massachusetts Water Resources Authority

Beacon Street Line: Water Pipeline Repair -

Brookline

Construction Contract 7458

May 11, 2016

Page 12: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

12  

Beacon Street Line – Bid Tabulation

 Contractor Bid Amount Engineer’s Estimate $1,475,000 R. Zoppo Corp. $1,566,178 P. Gioioso & Sons, Inc. $1,688,500 P. Caliacco Corp. $1,691,815 RJV Construction, Corp. $1,718,000  

Page 13: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

13  

Beacon Street Line - Brookline

•  Constructed in the1870s, it is part of MWRA’s Boston Low Service System

•  48-inch diameter cast iron pipe

cement mortar lined in 2000 •  A significant portion of it is located

underneath the MBTA’s Beacon Street Green Line tracks

•  The Beacon Street Line water main provides important service to the Longwood Medical area

Page 14: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

14  

Beacon Street Line - Brookline

Page 15: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

15  

Beacon Street Line - Brookline

 2013  Leak/CFRP  Repair  

Page 16: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

16  

Beacon Street Line – Carbon-Fiber Reinforced-Polymer (CFRP) Installation

•  CFRP installed from within pipe •  Multiple layers of carbon fiber

mesh with a resin mixture forms high strength structural lining

•  Primary access pit located at

previous cleaning & lining 8-ft spool pipe 1,400-ft from repair area

•  New chambers installed at access pits

Page 17: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

17  

Beacon Street Line - Brookline

Emergency Egress Pit / Ventilation Primary Access Pit for Labor and Materials

Page 18: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street
Page 19: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Massachusetts Water Resources Authority

Southern Extra High Pipeline

Section 111 (Boston)

Construction Contract 6454

May 11, 2016

Page 20: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

20  

Section 111 (Boston) – Bid Tabulation

   Contractor Bid Amount

 Engineers  Es)mate      $13,500,000    Baltazar  Contractors  Inc.    $10,880,000*    P.  Gioioso  and  Sons,  Inc.    $11,770,000    RJV  ConstrucEon  Corp.    $11,915,000    Fed.  Corp.        $12,837,560    Albanese  Brothers  Inc.    $14,374,735    Revoli  ConstrucEon  Co.,  Inc.    $14,608,000  

     *  The  contractor,  Baltazar  Contractors  Inc.,  has  requested  to  withdraw  their  bid  due  to  a  bid  error.        

Page 21: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

21  

Southern Extra High Pipeline – Section 111 (Boston)

•  5.4  mile,  36  inch  diameter  •  DCR  Roadways  •  Dedham  ResidenEal  •  Mother  Brook  Crossing  •  Walnut  Street  Bridge  Crossing  •  MBTA  Crossing  •  Route  95  Crossing  

Page 22: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Section 111 - Construction Sequencing

CONTRACT  645411,000’

Approx.  $11.8MNTP  5/16

CONTRACT  750410,000’

Approx.  $10.7MNTP  9/16

CONTRACT  75056,800’

Approx.  $7.3MNTP  12/16

Contract 6454

Contract 7504

Contract 7505

Page 23: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street
Page 24: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Massachusetts Water Resources Authority

Section 4 Webster Avenue Pipe and Utility Bridge Replacement

Somerville

Contract 7335, NEL Corporation

May 11, 2016

Page 25: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

25  

Northern Low Service System

WEBSTER  AVENUE  WATER  PIPE  &  UTILITY  BRIDGE

Page 26: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street

Redesign Drawing

Page 27: Massachusetts Water Resources · PDF file• CFRP installed from within pipe ... spool pipe 1,400-ft from repair area • New chambers installed at access pits . 17" Beacon Street