November 2005 Karachi, Pakistan Integra Consult A/S
Safety AssessmentSafety AssessmentProjectsProjects
Karachi, PakistanKarachi, Pakistan
Integra Consult A/SIntegra Consult A/S
November 2005 Karachi, Pakistan Integra Consult A/S
RegulatorRegulator
• Regulator will, through the Regulator will, through the Regulatory Framework require that:Regulatory Framework require that:
– The ANSP demonstrate that an The ANSP demonstrate that an acceptable level of safety will be met acceptable level of safety will be met and users have been consulted.and users have been consulted.
November 2005 Karachi, Pakistan Integra Consult A/S
Regulatory RequirementsRegulatory Requirements
• Before we startBefore we start– Acceptable levels of safety needs to be agreed Acceptable levels of safety needs to be agreed
(Safety Objective Classification Scheme - SOCS)(Safety Objective Classification Scheme - SOCS)– Appropriate SSA process needs to be agreed Appropriate SSA process needs to be agreed
tailored to the type and complexity of the changetailored to the type and complexity of the change
• HowHow– ANSP proposes an appropriate SSA process and ANSP proposes an appropriate SSA process and
associated SOCS prior to commencement of a associated SOCS prior to commencement of a procurement / change projectprocurement / change project
– Regulator approveRegulator approve
November 2005 Karachi, Pakistan Integra Consult A/S
Regulatory RequirementsRegulatory Requirements
• When we finishWhen we finish– ANSP demonstrates that an acceptable ANSP demonstrates that an acceptable
level of safety will be achieved considering:level of safety will be achieved considering:•EquipmentEquipment
•PeoplePeople
•ProceduresProcedures
– ANSP demonstrates that measures are in ANSP demonstrates that measures are in place for post-implementation monitoringplace for post-implementation monitoring
November 2005 Karachi, Pakistan Integra Consult A/S
Regulator
ANSP
User
Project
RegulatoryRequirement
SSATargetsProcess
RegulatoryApproval
Procedure
SMS
FHA PSSA SSA
SystemReq.
Systemdesign
Imple-mentation
Accep-tance
SystemSafetyCase
RegulatoryApproval
SystemSafety
Endorsement
Transition
TransitionSafetyCase
RegulatoryApproval
SystemCertifi-cation
SSAPlan
FHAReport
PSSAReport
ICAOProvisions
2.26.2 As of 27 November 2003, the acceptable level ofsafety and safety objectives applicable to the provision of ATSwithin airspaces and at aerodromes shall be established by theState or States concerned.
2.26.5 Any significant safety-related change to the ATC system, including the implementation of a reduced separation minimum or a new procedure, shall only be effected after a safety assessment has demonstrated that an acceptable level of safety will be met and users have been consulted.
When appropriate, the responsible authority shall ensure that adequate provision is made for post-implementation monitoring to verify that the defined level of safety continues to be met.