Improving light rail systems in Asia: new vehicle, traction power, and train control technologies |...
-
Upload
joffrey-lauthier -
Category
Engineering
-
view
840 -
download
3
Transcript of Improving light rail systems in Asia: new vehicle, traction power, and train control technologies |...
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
IMPROVING LIGHT RAIL SYSTEMS IN ASIA NEW VEHICLE, TRACTION POWER, AND TRAIN CONTROL TECHNOLOGIES
JOFFREY LAUTHIERHEAD OF SALES, ASIA PACIFICRAIL CONTROL SOLUTIONS
MALAYSIA RAIL 2015KUALA LUMPUR, AUGUST 26, 2015
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
ELECTRIC TRAMWAYS1890-1930: TRAMWAY CONSTRUCTION BOOM ACROSS ASIA
1905 Electric Tram in PenangElectric tram system in George Town: 2½ miles, 8 vehicles
PAGE 2 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
10cities
1900
37cities
1910
55cities
1920
76cities
1930
Cumulated number of cities in Asia over time with electric tramways
Cities considered: Akita, Asahikawa, Bangkok, Beijing, Busan, Chennai, Colombo, Dalian, Delhi, Fukuoka, George Town, Gifu, Hachiōji, Hakodate, Hanamaki, Hanoi, Harbin, Hiroshima, Ho Chi Minh City, HongKong, Ichinomiya, Ise, Iwakuni, Jakarta, Kagoshima, Kanazawa, Kanpur, Kawagoe, Kitakyūshū, Kobe, Kōchi, Kolkata, Kumamoto, Kure, Kurume, Kuwana, Kyoto, Mandalay, Manila, Matsumoto, Matsushima,Matsuyama, Mito, Mumbai, Nagasaki, Nagoya, Naha, Narita, Nikko, Odawara, Oita, Okayama, Okazaki, Ōmuta, Osaka, Pyongyang, Saga, Sapporo, Sendai, Seoul, Shanghai, Shenyang, Shimizu, Shimonoseki,Shizuoka, Singapore, Surabaya, Takamatsu, Tianjin, Tokyo, Toyama, Toyohashi, Wakayama, Yangon, Yokohama, Yonago.
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
* based on today’s Australian dollar value (Net Present Value or NPV)Source: ACT Capital Metro Business Case Overview capitalmetro.act.gov.au
CANBERRA LRTFORECASTED TO CREATE ALMOST $1 BILLION* WORTH OF ECONOMIC BENEFITS
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
Australian dollar value Source: ACT Capital Metro Business Case Overview capitalmetro.act.gov.au
CANBERRA LRTTHE ESTIMATED CAPITAL DELIVERY COST IS $610M + $173M CONTINGENCY
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
BOMBARDIER FLEXITY VEHICLES3,500+ TRAMS AND LRVS IN REVENUE SERVICE OR ON ORDER
TRAMS Integrated into urban traffic Small curve radius between 12m and 18m 100 % low-floor and conventional wheel-set bogies Easy access and increased passenger comfort High running stability, noise reduction
LIGHT RAIL VEHICLES Segregated tracks Curve radius between 20m and 25m Ability to use Mainline infrastructure
PAGE 5 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
GOLD COAST LRT, AUSTRALIABOMBARDIER DELIVERED FULL TURNKEY MECHANICAL & ELECTRICAL
PAGE 6 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
Gold Coast University Hospital to Broadbeach through Southport andSurfers Paradise
Revenue service: 2014
13 km double-track alignment
16 stations
14 vehicles
Expected to carry 50,000 passengers per day
100% low floor vehicles
18-year Public Private Partnership
Bombardier provides operations and maintenance services (27 year contract)
GOLD COAST, AUSTRALIA FLEXITY 2 LIGHT RAIL TRANSIT SYSTEM
System alignment map:
PAGE 7 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
FOCUS ON PASSENGERS VEHICLE INTERIOR
PAGE 8 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
Maximum use of the space
High flexibility in terms of layout and colouring
High capacity, large number of comfortable passenger seats
Very low pedestal, no steps obstruct passenger flow
Aisle width up to 740 mm with 2+2 seating
Optimised cross section and arrangement for agreeable perception of space
Generously dimensioned articulation portal gangway
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
HIGH FLEXIBILITY AND CUSTOMISATION TAILOR-MADE VEHICLES
Vehicle configuration flexibility
Customers given virtually unlimited scope in customizing the exterior design
Interior design is a balanced mix of simple, standardized solutions and individual features
– Colours
– Materials
– Seat-cover fabric
– Lighting
– Seats and stanchion arrangement
– Onboard racks for bicycles or luggage
PAGE 9 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
FLEXIBLE VEHICLE ARRANGEMENTCONFIGURATION
5 modules 7 modules
2 motor bogies 3 motor bogies
1 trailer bogies 1 trailer bogies
32m long 43m long
2.30m / 2.40m / 2.65m wide 2.30m / 2.40m / 2.65m wide
CM: cab moduleBM: bogie moduleSM: saloon module
PAGE 10 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
BOOSTING CUSTOMER COMPETITIVENESSENERGY SAVINGS AND POWER SUPPLY OPTIMIZATION
Storing energy while braking Using stored energy during acceleration
Energy savings up to 30% for light rail systems
Boost to the vehicle’s speed when line current or engine power are limited
Optimization of power supply
Reduced infrastructure investment
Catenary-free operation for short distances and as a part of the PRIMOVEsolution also for longer distances
ENERGY STORAGE DEVICE ENERGY STORAGE DEVICE
PAGE 11 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
SUSTAINABLE COMMUTING FOR GREENER CITIES CATENARY-FREE OPERATION
Technology based on inductive power principle which enables contact free operation
Operation possible under any weather condition
No risk of power loss due to contact break
No danger of electric hazard as all electric devices are fully isolated
PAGE 12 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
THE FUTURE OF E-MOBILITY PRIMOVE TECHNOLOGY CAN BE APPLIED TO ALL TYPES OF VEHICLES
Unlimited mobility– Continuous contactless, inductive energy transfer combined with efficient on-board energy storage systems
No recharging hassles– Both dynamic and static charging possible
For all types of vehicles– The same infrastructure, which is compatible at high efficiency levels from 3 to 1,000 kW
Zero emissions and low maintenance– No local emissions; no wear on parts and components due to contactless power transfer
Safe, invisible and tamper-proof– Hidden underground; reliable in adverse weather and ground conditions; energy transfer only active when
induction segment is completely covered by the vehicle
PAGE 14 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
NANJING, HEXI AND QILIN TRAMWAY LINESCATENARY-FREE OPERATIONS
PAGE 15 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
NANJING, HEXI AND QILIN TRAMWAY LINESCATENARY-FREE OPERATIONS
PAGE 16 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
WAYSIDE ENERGY STORAGETEMPORARY BRAKING ENERGY STORED IN SUPERCAPACITORS
PAGE 17 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
Simple interface No house power No communications connection Only connections to traction power
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
SUZHOU LRT LINE 1CITYFLO 150 TRAIN CONTROL
PAGE 18 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
Accurate preemption
Effective signal priority
Faster tram speed
Reduced CAPEX and
OPEX
Reduced road traffic
impact
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
POINT CONTROLLEREBI LOCK 400
Route setting commands
Center Control Room: from ATS via backbone network
Train: from driver’s remote control command via train to wayside loop
Local: from driver’s command via local wayside button
Automatic route release after Train passing over
Supports route cancelation Supports emergency route release Control point heaters
PAGE 19 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
EBI Link wayside equipment
EBI Com radio block centre
EBI Track train detection
EBI Lightsignals
EBI Switch point machines
EBI Screen control room
EBI Star vehicle telematics
EBI Gate level crossings
EBI Drive driver assistance system
EBI Lock computerised interlocking
EBI Cab ATC onboard equipment
EBI Tooldesign and maintenance
PAGE 20 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
RAIL CONTROL SOLUTIONSCOMPLETE RANGE OF IN-HOUSE SIGNALLING PRODUCTS
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
PAGE 21 | MALAYSIA RAIL 2015 | IMPROVING LIGHT RAIL SYSTEMS IN ASIA: VEHICLES, TRACTION POWER AND TRAIN CONTROL
DRIVER ASSISTANCE SYSTEMOPTICAL 3D SENSOR SYSTEM TO AVOID COLLISIONS
Driver support in critical situations Increased active safety for
passengers, drivers, pedestrians, cyclists
Reduced collision follow-up costs for operator
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.
TRAMWAYS: BACK TO ASIA
Low-floor, fast, comfortable feeder to MRT
Catenary-free aesthetic
Sophisticated train control and road traffic optimisation
Built as integrated systems
PRIV
ATE
AND
CO
NFI
DEN
TIAL
© B
omba
rdie
r Inc
. or i
ts s
ubsi
diar
ies.
All
right
s re
serv
ed.Q&A?
Joffrey LauthierHead of Sales, Asia Pacific
Bombardier Transportation | Rail Control Solutions3354/16-19 Manorom Building, Rama IV Road
Bangkok 10110, Thailand
+66 843 879 [email protected]