Illinois Environmental Protection Agency - Energy … Presentations/Il EPA P2...prior to the start...
Transcript of Illinois Environmental Protection Agency - Energy … Presentations/Il EPA P2...prior to the start...
Illinois Environmental Illinois Environmental Protection AgencyProtection Agency
The Office of Pollution Prevention The Office of Pollution Prevention conductsconducts……
•• Educational OutreachEducational Outreach
•• Technical AssistanceTechnical Assistance
And coordinates theAnd coordinates the……
•• Pollution Prevention (P2) Internship Pollution Prevention (P2) Internship Program Program -- Now includes P2 and E2Now includes P2 and E2
Technical AssistanceTechnical Assistance
Walk through siteWalk through site--visitsvisits focus on:focus on:•• Source Reduction/Pollution PreventionSource Reduction/Pollution Prevention•• Energy EfficiencyEnergy Efficiency•• OnOn--site recycling as opposed to offsite recycling as opposed to off--site site
recyclingrecycling SiteSite--visit will take 1visit will take 1--2 hours to conduct;2 hours to conduct;
is dependent on the size of the facilityis dependent on the size of the facility FreeFree and and voluntaryvoluntary
Technical Assistance (continued)Technical Assistance (continued)
OPP has four technical staff members OPP has four technical staff members located in the IEPA regional offices:located in the IEPA regional offices:•• Marion, Brian RodelyMarion, Brian Rodely•• Collinsville, Andy JankowskiCollinsville, Andy Jankowski•• Springfield, Richard ReeseSpringfield, Richard Reese•• Des Plaines, Chris PucciniDes Plaines, Chris Puccini
The The site visits are notsite visits are not regulatory regulatory inspections or compliance auditsinspections or compliance audits
Technical Assistance (continued)Technical Assistance (continued)
Post sitePost site--visit:visit:•• You will receive a report summarizing our You will receive a report summarizing our
recommendationsrecommendations•• We can provide additional assistance for We can provide additional assistance for
implementation that includes:implementation that includes:–– Assisting in the US DOE ESA performed at your facility Assisting in the US DOE ESA performed at your facility
prior to the start of the summer internship.prior to the start of the summer internship.–– Placement of a summer intern student at your company Placement of a summer intern student at your company
to focus on P2/E2 project (s) or focus on one or two to focus on P2/E2 project (s) or focus on one or two major ESA findingsmajor ESA findings
–– Collaborative effort with a major state university to assist Collaborative effort with a major state university to assist in problem definition followed up by a senior design in problem definition followed up by a senior design project of three to four engineering studentsproject of three to four engineering students
US DOE US DOE –– Energy Saving Energy Saving Assessments (ESA)Assessments (ESA)
Website location:Website location:http://www1.eere.energy.gov/industry/sahttp://www1.eere.energy.gov/industry/sa
veenergynow/assessments.htmlveenergynow/assessments.html
University Senior Design ProjectsUniversity Senior Design Projects
We are piloting a senior design project as a We are piloting a senior design project as a continuation of one of our summer interncontinuation of one of our summer intern’’s s work at a central Illinois facility.work at a central Illinois facility.
Several colleges require that a senior Several colleges require that a senior design project must be completed before design project must be completed before they graduate. We will be investigating this they graduate. We will be investigating this option for future endeavors.option for future endeavors.
Pollution PreventionPollution Prevention Internship ProgramInternship Program
In 1988In 1988……The Illinois Chamber of Commerce made initial The Illinois Chamber of Commerce made initial request to the IEPA for assistance.request to the IEPA for assistance.
In 1989In 1989……The Agency responded by placing two interns at The Agency responded by placing two interns at two separate electroplating facilities in Chicago.two separate electroplating facilities in Chicago.
P2 Internship ProgramP2 Internship Program
In In 19891989, there were , there were 22 internsinterns……
In In 19971997, , …………………….. .. 27 27 ………………....
In In 20062006, , …………………….. .. 2020 ………………....In In 20072007, , …………………….. .. 15 15 ………………....In In 20082008, , …………………….. .. 17 17 ………………... ...
P2 HierarchyP2 Hierarchy
Source Reduction/ Pollution PreventionSource Reduction/ Pollution Prevention
OnOn--site Recyclingsite RecyclingOffOff--site Recyclingsite Recycling
TreatmentTreatment
DisposalDisposal
P2 terminologyP2 terminology…………
•• Source ReductionSource Reduction•• Waste MinimizationWaste Minimization•• Life Cycle AnalysisLife Cycle Analysis•• SustainabilitySustainability•• Green DesignGreen Design•• Design for the Environment (Design for the Environment (DfEDfE))•• Process or Plant EfficiencyProcess or Plant Efficiency
Actual InternshipsActual Internships
One (1) week of trainingOne (1) week of training+ Eleven (11) weeks at facility+ Eleven (11) weeks at facility________________________________________________Total = Twelve (12) weeksTotal = Twelve (12) weeks
ALARYALARY
The salary is under consideration for being The salary is under consideration for being increased. Presently we are paying:increased. Presently we are paying:
Undergrads Undergrads -- $2,100/month and w/relocation + $2,100/month and w/relocation + $400/month$400/month
Grad. Students Grad. Students -- $2,300 / month and w/relocation + $2,300 / month and w/relocation + $400/month$400/month
Salaries are paid bySalaries are paid by……
First requestsFirst requests…………..………………………………. IEPA 100%. IEPA 100%
Second Second ……………………Company 50% : IEPA 50%Company 50% : IEPA 50%
Third Third ………………………….Company 75% : IEPA 25%.Company 75% : IEPA 25%
Fourth, onFourth, on……………….Company 100% : IEPA 0%.Company 100% : IEPA 0%
Participating SchoolsParticipating Schools
•• IIT, ChicagoIIT, Chicago•• U of I, ChicagoU of I, Chicago•• U of I, UrbanaU of I, Urbana--ChampaignChampaign•• Bradley, PeoriaBradley, Peoria•• SIU, CarbondaleSIU, Carbondale•• SIU, EdwardsvilleSIU, Edwardsville•• Northern Illinois University, DeKalbNorthern Illinois University, DeKalb•• Northwestern University, EvanstonNorthwestern University, Evanston
Revised Revised Time FramesTime Frames for the Summer of 2009for the Summer of 2009
October 24October 24thth, 2008, 2008•• Student applications dueStudent applications due•• OnOn--campus interviews will be conducted by the campus interviews will be conducted by the
end of Fall Semesterend of Fall Semester
December 1December 1stst, 2008, 2008•• Company applications due along with a P2/E2 Company applications due along with a P2/E2
project or bothproject or both
January 15January 15thth through May 15th through May 15th •• Student selection; notify companiesStudent selection; notify companies•• Conduct site visitsConduct site visits•• Establish contracts for payment to studentsEstablish contracts for payment to students
Time Frames (Continued)Time Frames (Continued)
May 18May 18thth –– May 22ndMay 22nd (week prior to Memorial Day)(week prior to Memorial Day)
•• Training is conductedTraining is conducted
May 26May 26thth (the day after Memorial Day)(the day after Memorial Day)
•• Intern starts working at the host companyIntern starts working at the host company
August 10August 10thth
•• Last day of the InternshipLast day of the Internship
P2 Intern TrainingP2 Intern Training
Pollution Prevention topics include:Pollution Prevention topics include:
•• What is P2 ? Process Efficiency ?What is P2 ? Process Efficiency ?•• Process MappingProcess Mapping•• Waste AuditingWaste Auditing•• P2 Internship 101P2 Internship 101•• Intern ethics and requirementsIntern ethics and requirements•• General safety guidelinesGeneral safety guidelines
P2 Intern TrainingP2 Intern Training
Energy Efficiency topics include:Energy Efficiency topics include:
•• Energy auditingEnergy auditing•• LightingLighting•• Air Compressor systemsAir Compressor systems•• Boilers, steam traps, condensateBoilers, steam traps, condensate•• Motors, VFDsMotors, VFDs•• HVAC, refrigeration, chillersHVAC, refrigeration, chillers
P2 Intern TrainingP2 Intern Training
Training includes aTraining includes a……•• Facility onFacility on--site waste and energy audit at a site waste and energy audit at a
nearby facilitynearby facility•• Brainstorming session on recommendations for Brainstorming session on recommendations for
that specific facilitythat specific facility
Training concludes withTraining concludes with……•• Each intern making presentations on the Each intern making presentations on the
specifics of his/her projectspecifics of his/her project
P2 InternshipP2 Internship
Instruments available to internsInstruments available to interns……•• Ultrasonic leak detector (2)Ultrasonic leak detector (2)•• Thermal imaging gunThermal imaging gun•• I/R temperature gunsI/R temperature guns•• Lumen metersLumen meters•• Windvane anemometerWindvane anemometer•• Ballast checker, Sylvania flicker checkerBallast checker, Sylvania flicker checker•• Fluke clampFluke clamp--on power meteron power meter
Instruments that we may purchaseInstruments that we may purchase……•• Data LoggersData Loggers
Company ResponsibilitiesCompany Responsibilities include providing include providing ………………..
•• Workers compensation insurance Workers compensation insurance coverage for student while oncoverage for student while on--sitesite
•• An onAn on--site assigned supervisorsite assigned supervisor
•• Facility specific safety trainingFacility specific safety training
•• Any miscellaneous expensesAny miscellaneous expenses
IEPA Responsibilities IEPA Responsibilities includeinclude……………………..
•• Recruiting and training studentsRecruiting and training students
•• Attending initial onAttending initial on--site visit with site visit with studentstudent
•• Establishing contractsEstablishing contracts
•• Researching project beforehandResearching project beforehand
Intern ResponsibilitiesIntern Responsibilities includeinclude………………..
•• Attending TrainingAttending Training
•• Working normal hours at facilityWorking normal hours at facility
•• Submitting semiweekly progress Submitting semiweekly progress reportsreports
•• Writing a final written reportWriting a final written report
•• Attending final presentationsAttending final presentations
Company Benefits Include:Company Benefits Include:•• Fresh perspective with focus on a Fresh perspective with focus on a
specific P2 or E2 projectspecific P2 or E2 project
•• Low cost resourceLow cost resource
•• Reduced releases & liabilitiesReduced releases & liabilities
•• $$$ Savings $$$, reduced overhead $$$ Savings $$$, reduced overhead costscosts
•• Greenhouse gas emission reductionGreenhouse gas emission reduction
Intern Success Stories Intern Success Stories 19991999……Motorola, Arlington HeightsMotorola, Arlington Heights•• First undergraduate studentFirst undergraduate student•• Retraining at 3 facilities Retraining at 3 facilities -- $500,00 + saved$500,00 + saved
2003/042003/04……Keystone Steel & Wire, PeoriaKeystone Steel & Wire, Peoria•• Recycle slag and refractory brick Recycle slag and refractory brick -- savings in savings in
excess of $900,000excess of $900,000
20032003…….City of Champaign .City of Champaign -- Public WorksPublic Works•• Errors on energy bill Errors on energy bill -- collect $77,000 et alcollect $77,000 et al
Intern Success Stories Intern Success Stories 2005...Mitsubishi Motors NA, Normal2005...Mitsubishi Motors NA, Normal•• Total savings of $60,000 from recovery of waste heat from air Total savings of $60,000 from recovery of waste heat from air
compressors, lighting, etc.compressors, lighting, etc.
20062006……Big Big ““MM”” Manufacturing, TaylorvilleManufacturing, Taylorville•• Research into the generation of refrigeration from a corn Research into the generation of refrigeration from a corn
burner furnaceburner furnace
2006/07/082006/07/08……Ahlstrom Engine Filtration, Ahlstrom Engine Filtration, TT’’villeville•• Economizer on package boiler Economizer on package boiler –– savings of $25,000savings of $25,000•• Thermal oxidizer upgrade Thermal oxidizer upgrade -- $3 MM capital project implemented $3 MM capital project implemented
next summer, potential savings in excess of $1.5 MM.next summer, potential savings in excess of $1.5 MM.•• Dewater paper fines and sell to broker for $. This would Dewater paper fines and sell to broker for $. This would
eliminate material that is now sent to landfill. eliminate material that is now sent to landfill.
Intern Success Stories Intern Success Stories
20072007……SIU, Carbondale FarmsSIU, Carbondale Farms•• Research biodiesel production from canola seedResearch biodiesel production from canola seed•• Awaiting funds to construct portable biodiesel Awaiting funds to construct portable biodiesel
production processproduction process
2007...Cadbury Adams, Rockford2007...Cadbury Adams, Rockford•• Lighting upgrades Lighting upgrades –– savings over $100,000savings over $100,000
Intern Success Stories Intern Success Stories 20082008……Carlisle Carlisle SynTecSynTec, Inc. , Inc. -- GreenvilleGreenville•• Boiler replacement for a properly sized unit can have a savings Boiler replacement for a properly sized unit can have a savings of of
$120,000 with a 3$120,000 with a 3--year paybackyear payback
2008...Caterpillar U.S. Operations, E. Peoria2008...Caterpillar U.S. Operations, E. Peoria•• 5% of motors replaced with 5% of motors replaced with EPActEPAct motors can result in $125,000 motors can result in $125,000
savings in electrical usagesavings in electrical usage•• A $37,000/year savings in radiant heating can be replicated in 5A $37,000/year savings in radiant heating can be replicated in 5 other other
buildingsbuildings
2008...City of Olney2008...City of Olney•• Install Install VFDsVFDs on two motors can save $26,000 per year and have a 6 on two motors can save $26,000 per year and have a 6
month paybackmonth payback•• Retrofit the aeration system at the sewer plant with fine bubbleRetrofit the aeration system at the sewer plant with fine bubble
diffusers can lead to savings of $58,000/year. The ROI is 1.9 ydiffusers can lead to savings of $58,000/year. The ROI is 1.9 years.ears.
P2 Internship ProgramP2 Internship ProgramCOORDINATORSCOORDINATORSRichard Reese Phone: (217) 786Richard Reese Phone: (217) 786--74897489EE--mail: mail: [email protected]@illinois.gov
Brian Rodely Phone: (618) 993Brian Rodely Phone: (618) 993--74587458EE--mail: mail: [email protected]@illinois.gov
How do I apply?How do I apply?
The application form to host a student is The application form to host a student is posted yearposted year--round. The Website is :round. The Website is :
www.epa.state.il.us/p2/internshipswww.epa.state.il.us/p2/internships
Students can apply until October 24Students can apply until October 24thth
•• Must attend a university in the stateMust attend a university in the state•• Have at least completed the junior year prior Have at least completed the junior year prior
to the start of the internshipto the start of the internship•• OutOut--ofof--state students with permanent state students with permanent
residency statusresidency status