ICTAD Procurement of Work ICTAD SBD 01-2007

80
::;:;:;; PROCUREMENT OF WORKS Institute for Construction Training and Development STANDARD BIDDING DOCUMENT

Transcript of ICTAD Procurement of Work ICTAD SBD 01-2007

Page 1: ICTAD Procurement of Work ICTAD SBD 01-2007

::;:;:;;

111!!1!mmgmiim~::;JI

PROCUREMENT OF WORKS

Institute for ConstructionTraining and Development

STANDARD BIDDING DOCUMENT

Page 2: ICTAD Procurement of Work ICTAD SBD 01-2007

APPRpVED BY NPAICTAD/SBD/Ol

Institllte for ConstructionTraining and Dt;velopment (ICTAD)

STANDARD BIDDING DOCUMENT

PROCUREMENT OF WORKS

.Second Edition - January 2007 . IMINISTRY OF HOUSING AND CONSTRUCTION

Page 3: ICTAD Procurement of Work ICTAD SBD 01-2007

Published byInstitute for Construction Training and Development (leTAD)'Savsirlpayat

123, Wije~ama MawathaColombo 07.

First Edition"':" January 2002Reprinted with amendments - January 2004First Edition (Revised) - January 2006Second .Edition - January 2007

Copyright reserved

No part of this publicationshall be reproduced ortransmitted in any form or byany means without permissionof the publisher.

Page 4: ICTAD Procurement of Work ICTAD SBD 01-2007

PREFACE TO THE SECOND EDITION

ICTAD Standard Bidding Documents were revised to be in line with the ProcurementGuidelines (Goods & Works) - 2006 of National Procurement Agency (NPA).

Mr. Jayontha De Mel, Procurement Consultant volunteered to serve as a resource personfor the revision and the ICTAD Sub Committee, comprising of Dr. E M G de Zylva(CEO/CIGF), Mr. H D Chandrasena (Snr. Quantity Surveyor), Mr. D R N Ferdinando (Snr.Engineer), Mr. J K Lankatilake (DG/lCTAD), Mr. K P W Rajasirl (D. Dev./ICTAD), Mrs. VajiraRanasinghe (DD/ICTAD) reviewed and recommended the revision to' the SteeringCommittee on ICTAD Publications.

The Steering Committee on leTAD Publications which consisted of representatives from theInstitution of Engineers Sri Lanka, Sri Lanka Institute of Architects, Society of StructuralEngineers Sri Lanka, Association of Consulting Engineers Sri Lanka, Institute of QuantitySurveyors Sri Lanka, Institute of Town Planners Sri Lanka, Institute of Project Managers SriLanka, National Construction Association of Sri Lanka, Ministry of Housing and Construction,Institute for Construction Training and Development, recommended this revision for theapproval of Board of Management of ICIAD.

The Board of Management of ICTAD approved the recommendations of the steering .Committee.

I wish to acknowledge the co-operation extended by Mr. Daya Liyanage, Chairman/eEO,National Procurement Agency in this endeavour. I take this opportunity to extend mygrateful thanks for the services rendered by the uNPA Task Force on Standard BiddingDocuments" at the. previous revision. In this connection the contributions made by Mrs.Kanika Jayathilake, former Senior Manager, Legal of NPA regarding the legal aspects of thecontents of the document is much appreciated.

I wish to take this opportunity to express my sincere gratitude to the resource person, themembers of the sub committee and the Steering Committee on ICTAD Publications for.thevaluable contributions made for the successful completion of t.his revision.

I appreciate the assistance rendered by Mrs. Dammika Gunasekara for the ~tacretarial workand the staff of the Development Division of ICTAD, who contributed in numerous ways inthe publication of this document.

I wish to present this Second Edition to the Construction Industry with confidenceconsidering the careful thinki~gand hard work put in by those involved.

/'VIDYAJYOTHI PROF. LAKSHMAN Al:.WISCHAIRMAN -ICTAD

01 sf January 2007

Page 5: ICTAD Procurement of Work ICTAD SBD 01-2007

- I

Foreword

To streamline the procurement process in Sri Lanka the Government has decided to

develop a series of Standard Bidding Documents for procurement of Goods and Works.

The Cabinet of Ministers has entrusted this task to NPA.. The Procurement Guidelines

(2006) requires that all PE shall use the appropriate SBDs approved by NPA.

Accordingly, as a joint effort ofNPA/ICTAD the SBDs published previously by ICTAD

were revised for conformity with the Guidelines.

This Bidding Docwnent for Procurement of Works shall be used for National

Competitive Bidding (NCB) within the limits specified in the SBD, for the contracts that

'are financed by Government of Sri Lanka. The publication is drafted to suit for foreign

funded contracts and is advised to use in such contracts with the concurrence of the

funding agencies.

These Bidding Documents for Procurement of Works, assumes that no prequalification

has taken place before bidding. However, for the domestic contractors leTAD

registration is a pre-reqnisite to eligible for contract award and for all contractors a

suitable post qualification should be carried out.

I take this opportunity to thank the following TASK force members appointed by NPA in

assisting to complete this endeavor:

Mr. J K Lankathilake ( DG - leTAD)

Ms. KJayathilake (Snr. Manager-NPA)

Ms. S M C S Samarakoon (Chief Engineer - Dept of Buildings)

Mr. Ravindra Ferdinando (GM SEC)

Mr. Nalaka Perera (SLIA)

~;a~'aJI~e--'--"­ChairmanJCEO

National Procurement Agency

11

Page 6: ICTAD Procurement of Work ICTAD SBD 01-2007

PREFACE to THE FIRST EDITION

The growing need to standardize procurement documents was"expressed from several sectors of the industry.It simplifies the prooess, and an attempt has been made to achieve these objectives with simplicity but withprecision. To achieve these objectives ICIAD commenced to develop new standard documents with theassistance of the lOA of the World Bank.

This task was carried out by Mr. Eddie de Zylva and Mr. Jayantha de Mel under the guidance of a SteeringCommittee and Sub Committee appointed for the review of ICTAD Publications.

. The first of the series of such documents is the Standard Bidding Document for Procurenlent of Works, whichwas largely based on the World Bank Standard Bidding Document for Smaller Contracts..This supersedes theleTADo Conditions of Contract for Works of Building &Civil Engineering (SCA/1) and is suitable for use both byInt~rnational Competitive Bidding (ICS) and by National Competitive Bidding (NCB) procedures. This documentmay also be used for works of higher values provided that the works are not of a complex nature. Substantiveinstructions have been given in order to ensure that contracts are carried out.in accordance with policies andprocedures laid down by the Government of Sri Lanka without qeviating from the general requirements of theinternational funding institutions. A notable feature is that the text is very precise and leaves very little room forambiguity. The contents are comprehensive and covers the procurement process from the invitation to bid uptothe execution &completion of the works.

..The steering committee I sub committee consisted of representatives of the following Professional and Policymaking organizations:

1. The Institution of Engineers, Sri Lanka2. Sri LanRa Institute of Architects3. Society of Structural Engineers, Sri Lanka4. The Association of Consulting Engineers, Sri Lanka5. Institute of Quantity Surveyors, Sri Lanka6. Institute of Town Planners, Sri Lanka7. Institute of ProJect Managers, Sri Lanka8. National Construction Contractors Association of Sri Lanka9. Ministry of Urban Development, Construction and Public Utilities10. Ministry of Finance and Planning11. Institute for Construction Training and Development (ICTAD)

I wish to acknowledge with grateful thanks the services of Mr. Eddie de Zylva and Mr. Jayantha de Mel and allthe members of the steering committee and the sub committee. Meanwhile my special thanks are also due toMr. G Somapala de Silva, 0 Rear Admiral K R L Perera, Mr. G J P Gunawardane, Praf. Lal Balasuriya,Mr. Y G Amaradasa, Mr. Patric Jayawardane, Eng. W MSC Piyadasa, Mr. H D Chandrasena,Mr. S A Karunaratne, Eng. Hemal A Pairis, Dr. T M Pallewatta, Dr. Gamini Kodikara, Mr. D Meemeduma,Mr. J K Lankathilake, Mr. K P W Rajasiri, Mrs. Vajira Ranasinghe and Mr. C Amarakoon who contributed innumerous ways in the publication of this document I also wish to appreciate the secretarial assistancerendered by Miss. Medhani IlIangasinghe.

I earnestly hope that the needs of a large cross section of the players in the Industry will be met by theadoption of this document and would also help to regularize the procurement system.

DR. ADC JAYANANDANACHAIRMAN • ICTAD2001/11/29

iii

Page 7: ICTAD Procurement of Work ICTAD SBD 01-2007

CONTENTS

Page

FORMATS FOR INVITATION FOR BIDS

GUIDELINES FOR USE AS A-BIDDING DOCUMENT

APPLICAD1LITY OF ICTAD STANDARD BIDDING nOrlJMENTS

81

83

77-79

85-90

65-76

59-63

31-57

21-29

5-19

1-4

VI

v

STAN°DARD FORMS [CONToRACT]

CONDITIONS OF CONTRACT

INSTRUCTIONS TO BIDDERS

BIDDING DATA AND CONTRACT DATA

FORM OF BID ANDQUALIFICATIION INFORMATION

ORAWINGS (Notes)

STANDARD FORMS [BID]

BILLS OF QUANTITIES (Notes)

SPECIFICATIONS (Notes)

SEC'TION 8

SECTION 9

SECTION 7

SECTION 6

SECTION 5

SECTION 4

SECTION 3

SECTION 2

SECTION 1

CHECKLIST FOR BIDDERS 91

iv

Page 8: ICTAD Procurement of Work ICTAD SBD 01-2007

Guidelines for Use as a Bidding Document

s Standard Bidding Document (SBD) is intended for use in measure and pay contracts.

ncludes many guidance notes to the user. Hen~e this publication is not intended to usea bidding document for a specific procurement. Procuring Entities (PEs) are advised to

~ Volum~ 1 and Volume 2, which are published separately as the bidding dOCllment for

pecific procurement. The users are advised to follow the directions given below:

(a) All the sections listed in the C.ontents·page are included in this publication.Since a colour system is used the PEs shall not use photo copies of

Volume 1 when inviting bids. Volume 1 is published separately for that

purpose. PEs may prepare Volume 2 based on the guidance given in thisdocument. Th~ Volume 2 is availabl~ in a CD form.

(b) Volume 1 consists of;

o Section 1 - Instructions to Bidders

• Section 2 - Stal1dard Forms (Contract)

• Section 3 - Conditions of Contract

Volume 2 consists of;• Invitation for Bidse Section 4 - Form of Bid and Qualification Information

• Section 5 - Bidding Data and Contract Data

• Section 6 - Specifications• Section 7 - Bills of Quantities

• Section 8 - Drawingse Section 9 - Standard Forms (Bid)

The foot notes in this publication are guidance for the PE, for the purposeof preparing of bidding documents. Volume 1 and Volume 2 which are

published separately will not contain foot notes except in the StandardForms..

(c) This SBD is suitable for all procurements of works financed under theconsolidated fund or private sector. The SBD is also suitable for NeB

procurements under foreign funded projects. Modifications or amendments

to the Volume 1 of this bidding document should not be done unless the)·are really essential. Any such changes should be provided only in theVolume 2, Section 5 - Bidding Data and Contract Data as amendmentsto Instructions to Bidders and Conditions of Contract respectively only withthe prior cOQsent of the Institute for Construction Training. andDevelopment (leTAD).

v

Page 9: ICTAD Procurement of Work ICTAD SBD 01-2007

APPLICABILITY OF ICTAD STANDARD BIDDING DOCUMENTS FOR PROCUREMENTOF WORKS

STANDARD BIDDING DOCUMENT PROCUREMENT OF WORKS FOR MINORCONTRACTS - ICTAD/SBD/03

(1 ) Recommend for use for works contracts up to Rs.l 0 million.

STANDARD BIDDING DOCUMENT FOR PROCUREMENT OF WORKS - ICTAD/SBDj01

(1 ) Recommended for use on works contracts between Rs. "10 million and

Rs. 100 million.

(2) May be used for works of higher values, which are not of a complexnature.

STANDARD BIDDING DOCUMENT PROCUREMENT OF WORKS FOR MAJORCONTRACTS -ICTAD/SBD/02

(1 ) Recommended for use on works contracts over Rs. 100 million and forcontracts of a lesser value, which are of a complex nature.

STANDARD BIDDING DOCUMENT PROCUREMENT OF WORKS FOR DESIGN AND BUILDCONTRACTS - ICTAD/SBD/04

Recommended to use for works contracts where the contractor is responsible forthe design and construction of the works on specified approvals obtained fromthe Employer. .

~~~ =Sib eeT~, qC))~ ecmir.JJd - ICTAD/SBD/05(~~mOl~)

(1) di.~ ~(;.j!S) 10 ~deJJ ~ ~~~ Cic)J51~)tSl ~eoJ ~~~ ~~ <3i~.

STANDARD BIDDING DOCUMENT PROCUREMENT OF WORKS FOR SHOPPINGPROCEDURE - ICTAD/SBD/06 (Under Preparation)

(1 ) Recommended for use on works c·ontracts not exceeding Rs. 5 million

when shopping procedure is used.

STANDARD BIDDING DOCUMENT PROCUREMENT OF WORKS FOR CONSTRUCTIONRELATED PLANT - ICTAD/SBD/07 (Under Preparation)

(1 ) Recommended to use when procuring construction related plant such ascentral air-condition systems, elevators, large generators etc. wheresubstantial installation is involved.

VI

Page 10: ICTAD Procurement of Work ICTAD SBD 01-2007

FORMATS FOR

INVITATION FOR BIDS

Note:

The relevant form shall be filled by the Procuring Entity andincluded in Volume 2 ofthe bidding documents.

1 .

Page 11: ICTAD Procurement of Work ICTAD SBD 01-2007

~

Ii

.:..PR:..:.O.::.C.;;,..U~R;..;.;E;;;.;;.M..;.E...;.'N_T_O,,;-.F_·w_O_R_KS ._..-__ l~,-·:::j};l·don for Bids

Invitation for Bids (lFB)

(GOSL FUNDED PROJECTS)

[All notes given inside the square brackets should be deleted when preparing the Volume 2 of thebidding document]

[insert: name of~ocuring Entity (i/relevant name ofthe Ministry)]

[insert: Title o/Contract & Contract (Bid) Number]

ow [state address] at or before [insert time and date]. Latened soon after closing in the presence of the bidders'

a~ 0 tai er m onnation from [insert name of Procuring Entity; insert.1of in charge] and inspect the bidding documents at the address

(Jr ss at end ofthis IF/J] from [inser~ affice hours].

7.

5.

The address(es) referred to above is(are):

6. A complet se Bidding Documents in English language may be purchased by interested bidderson the submission of a written application to the .[state addressee] from [state date ofcommencement ofissuing document] until [state date] from 0900 hrs to 1500 hrs. upon payment ofa non refundable fee of [insert amount in Rupees]. The method of payment will be [insert methodofpayment).

Name

Designation,

Address, fax number etc of the Procuring Entity

.8. All bids shall be accompanied by a [insert as appropriate, either "Bid Securing Declaration"l"Bid-Security, of (insert amount in Rupees ")]

4. Qualifications requirements tlegal and qther requiremen ~.

[Insert a briefdescription of the Works includi~g major quantities, location ofproject, and otherinformation necessary to enable potential bidders to decide whether or to respond to theInvitation. The construction period is {insert no. ofDays].

3. To be eligible for contract award, the success I hI dmeet the following requirements [list the requ e le

2. Bidding will be conducted through National Competitive Bi

1. The Chainnan~[insert MPCIDPCIPPCIR?C as appropr~ateJ on behalf of the [insert name ofProcuring Entity] now invites sealed bids from eligible and qualified· bidders for

*constructionlrenovationlrehabilitationlrefurbishrnentlrepair of [insert the title of the Works to beprocured] as described below and estimated to cost [insert relevant cost ofconstruction in the latestTeE (Total Cost Estimate))

• Select as appropriate

SECOND EDITION, JANUARY 2007 Institute for Construction Training and Development (ICTAD)

Page 12: ICTAD Procurement of Work ICTAD SBD 01-2007

.:...P:.::.RO=-C,;:.;U:;.:R~E:.:.:M..:.;:E::.:..N~T.....;;O~F.......;W~O;;:;.;R;:.;.;;K;.;;;;;S~ l.:l ..~·~.~~i:ion for Bids

Invitation for Bids (IFB)

(FOREIGN "FUNDED PROJECTS)

[All notes given inside the square brackets should be deleted when preparing the Volume 2 of thebidding document]

[insert: name ofProcuring Entity (ifrelevant n'ame ofMinistryJ[insert: name ofProjectJ- [insert: loan / credit number

{insert: Title ofContract &: Contract (Bid) Number]

1. The Democratic Socialist Republic of Sri Lanka '[has received/hasappliedfor/intends to ~pp{v for]a [loan/credit} from the [insert name of the foreign funding agenc}'1 towards the cost of [insertname'of the Project}, and intends to apply part of the proceeds of this [loaitlcredit} to paymentsunder the Contract for [insert name/no. ofContract} ,

2. The Chairman [insert MPCIDPC/PPC/RPC as appropriate] on behalf ofProcuring Entity] now invites sealed bids. from. :eligible andconstruction/renovationJrehabilitation/refurbishmentlrepair of [insert titprocured] as described below and estimated to cost [insert relevant st if.coTeE (Total Cost Estimate)]

{Insert a briefdescription of the Works, includininformation ne..cessary to enable potential bidde ~

Invitation to Bidders The construction pe is in rt

3. fu hi shall not have been blacklisted and shalleTAD registration]

4. r contract award include: [insert key technical, financial,

5. a .ootain further infonnation from [insert ~ame of Procuring Entity; insertname, address -mail of officer in charge] and inspect the bidding documents at the addressgiven below [state address at end ofthis IFB] from [insert office hours}.

6. A complete set of Bidding Documents in English language may be purchase4,.by interested bidderson the submission of a written application to the [state addressee] [state date ofcommencement ofissuing document} until (state date)'from 0900 hrs to 1500 hrs. upon payment of a non r~fundable

fee of[insert amount inRupe~rnethod ofpayment will be [insert method ofpayment).

7. Bids shall be delivered tola. '. ~.1w [state address] at o.r before [l.·nsert time and date]. Latebids will ~ rejected; Bid\,will be~lened soon after closing in the, presence of the bidders'representatives who choose to~. ',.'.. '

8.. All bids shall be accompanied by a {insert as appropriale, either "Bid Securing ,Declaration"/"Bid-Security, of (insert amount in Rupees ")J

The address(es) referred to above is(are):

NameDesignation,Address, fax number etc. ofthe Procuring Entity

. ··Se/eet as appropriate

4

II

SECOND EDITION, JANUARY 2007 Institute for Construction Training and Development (leTAD)

Page 13: ICTAD Procurement of Work ICTAD SBD 01-2007

l

S.r

"~I

I

~

Section -1

INSTRUCTIONS TO BIDDERS

Notes:

Instructions to Bidders shall he read in conjunction with Bidding Data under Section 5

(Volume 2). Matters governing the performance of the Contractor, payments under the

Contract, or matters affecting the risks, rights, and obligations of the parties under the

Contract are included under Section 3 - Conditions ofContract (Volume 1) and Contract

Data under Section 5 (Volume 2). However, some information is reproduced in this

section to facilitate the bidders to price their bids.

Instructions to Bidders will not be a part ofthe Contract and will cease to have effect once

the Contract is signed

-

5

Page 14: ICTAD Procurement of Work ICTAD SBD 01-2007

_.!

Table of Clauses

INSTRUCTIONS TO BIDDERS

- .-

A. Genel~al, 9 D. Submission of Bids, 13

1. Scope of Bid, 9 19. Sealing and Marking of Bids, 13'

2. Source of Funds, 9 20. Deadline for submission of Bids, 14

3. Ethics, Fraud and Corruption, 9 21. Late Bids, 14

4. Eligibility and Qualification of the 22. Modification and Withdrawal of Bids, 14

Bidder, 9

5. One Bid per Bidder, 10

6. Cost of Bidding, 10 -7. Site Visit, 10

E. Bid Opening & Evaluation, 15

B. Bidding Documents, 10 23. Bid Opening, 15

24. Process to be Confidential, 15 .

8. Content of Bidding Documents, 10 25. Clarification of Bids, 15

9. Clarification of Biddiilg 26. Examination of Bids and DeterminationDocuments, 10 ofResponsiveness, 15

10. Amendment of Bidding 27. Correction of Errors, 16Documents, 11. 28. Currency for Bid Evaluation, 16

29 Evaluation and Comparison of Bids, 16

30 Prefe~nce for Domestic Bidders, 17

F. Award or Contract, 17

C.. Preparation of 'Rids, 11 3'-1. Award of Contract, 1J

32. Employer's Right to Accept any Bid and to11. Language ofBid, 11 Reject any or all Bids, 1812. Documents Comprising the Bid, J1 33. Notification of Award and Signing of13. Bid Prices, 11 Agreement, 1814. Currencies of Bid, 12 34. Performance Security, 1815. Bid Validity, 12 35. Advance Payment & Security, 1916. Bid Security and Bid-Securing 36. Adjudicator, 19

Declaration, 12

17. Pre-Bid Meeting, 1318. Fonnat and Signing of Bid, 13

7

Page 15: ICTAD Procurement of Work ICTAD SBD 01-2007

. .~ ...".. ..•.-:. ::.

"':'/

'.\-'

.!'.: j

.. ~ ..;

:::-'

. ~ .

Page 16: ICTAD Procurement of Work ICTAD SBD 01-2007

_________S....ec.......ti.-...on____..I- Ins!t~g~t.~-Dns to Bidders

44_

A. -General

1.1 The Employer as defined in the Bidding Data invites Bids for theconstruction of Works, as described in Section 5, Bidding Data.

D~~ :

2. Source of Funds 2.1 Works will be financed by the source given in Bidding Data.

3. Ethics, Fraudand Corruption

3. I The attention of the bidders is drawn to the following guidelines ofthe Procurement GUidelines published by National ProcurelnentAgency:

D Parties associated with procurement actions., namely.,suppliers/contractors and officials shall ensure that they maintainstrict confidentiality throughout the process;

11 Officials shall refrain from receiving any personal gain from anyProcurement Action. No gi'fts or inducement shall be accepted.Suppliers/contractors are liable to be disqualified from thebidding process if found offering any gift or inducement whichmay have an effect of influencing a decision or impairing theobjectivity of an official.

3.2 The attention of the bidders is also drawn to the Sub-Clause 59.2(g)of the Conditions of Contract (Section 3) which shall apply to anybidder.

.~~)~111t~g~1

i~~~~i~~~~It1!~~~~('

SECOND EDITION. JANlIARY 20079

Institute for Construction Training and Development (ICTAD)

Page 17: ICTAD Procurement of Work ICTAD SBD 01-2007

PR()CI1REi\IENT OF WORKS Section 1 - Instruction '; ;:0 Bidders

50 One Bid perBidder

5.1 Each b·idder shall stlbmit only ~ one Bid, either individually or as apartner in a joint venture. A bidder who submits or participates inmore than one Bid (other than as a subcontractor or in cases ofalternatives that have been permitted or requested) .will ca~se all the,proposals with the bidder's participation to be disqualified. '

Institute tor Construction Trait:ling an~ pevelopment (I~!.AD)10

B. Bidding Documents

Volume 1:Section 1 Instructions to Bidders

Section 2 Standard Forms {Contract]

Section 3 Conditions ofContract

6.1 The bidder shall, bear:, all costs ass9ciated with the preparation and"submissi'on 'of: ~i~. Bid, ,,~and the. Employer wil1 in no case beresponsible or' I'iable for those 'costs regardless of the conduct oroutcome of the bid~ing,~rocess~, .

'J~.l-.

.. . \ . : .' ,: ..; ': . :,.. ~, :. \ -

Volume 2:Invitation to Bid

Section 4 Form of Bid and Qualification Information

/~·--sectlon 5 Bidding Data and Contract Data

t\/~@1,,,,:,~~o?~ 67

." Specificationsse~oJ Bills ofQuantities>.i "

.''''-..seGt1Bn 8 Drawings

Section 9 ,Standard Fonns'[Bid]

8.1 The set of bidding documents comprises the documents listed belowand add~nda. issued in accordance with Clause 10:

SECOND EDITI~N~JANUARY 2007

8. Content ofBiddingDocuments

6. Cost ,of Biddi~g

Page 18: ICTAD Procurement of Work ICTAD SBD 01-2007

2.P~R~()~C~.ll.:.:R~E:.:.::M:.::::E~N-=-T..,:;;:O;..;.F......;\...;...;VO.;::...R;..;;.;K;..;;;·S~ S_e_c.....t.o....;;io..o...;.n.-;..l_-~ln.......structi~~L:i2 Bidders

10. Amendment of 10.1BiddingDocuments

10.2

Before the deadline (or submission of Bids, the Employer maymodify-the.b.iddingdoc.uments .by .issuin.g addenda.

Any addendum thus issued shall be a part of the bidding documentsand shall be communicated in writing (to' be acknowledged in writing)to all those who have purchased the bidding documents.

11. Language ofBid

10.3 Prospective bidders shall be given a reasonable time of not less than07 Days to enable them to prepare their Bids in accordance with theaddenda.

c. Preparation of Bids

11.1 All documents r~'~ting to the Bid shall be in the language stated inthe Bidding Data. .. .

__.t~.~Z;-Y;0IIt~~rtlf~~~lfii~0~~~r~j~~~Q~'~Pfi,~?!~e;f9nOWi~~:(!igl~~ili§~jifltli¥.~Bv~ji5~.k.idJ~tORlGINA:i.'~' ;

13.1 The Contract shall be for the whole of the Works, as described inSub-Clause 1.1, based on the priced Bills of Quantities submitted bythe bidder.

Sr.:COND EDITION" JANUARY 200711

Institute for Construction Training and Development (ICTAL))

Page 19: ICTAD Procurement of Work ICTAD SBD 01-2007

• 1

PROCURf.J\'IENT OF WORKS Section 1 - Instructions to Bi,.:\iers______________________--:":'__..a...- _

14. Currenciesof Bid

14.1 The unit rates and price~ shall be quoted by the bidder entirely in SriLanka Rupees~lessotherwisel'rovided in the Bidding Data.

1,~siJ~·5~(I.I\I.~i~i~'li'~~I~~/_~{~~e~~~;15.2 In exceptional circumstances" the Employer may request that the

bidders extend the period ofvalidity for a specified additional period.The request and the bidders' responses shall be made in writing. Abidder may refuse the request. A bidder agreeing to the request willnot be required or permitted to otherwise modify the Bid, but will berequired to extend the validity of ~e Bid and bid security for theperiod of the~eXtension, "and in compliance with Clause -16 "in all "respects. If a bidder 4oes.not .agree- for an unconditional·extension ofthe 'validity'.ofhis Bid,his';Bid shall be rejected without forfeiting thebid' $ecurlty or executing the bid-sec.uring declarion as appropriate.

16.4 The bid security or the· bid-securing declaration of unsuccessfulbidders shall be returned promptly upon the success'ful bidderfurnish~ng the performance security.

12SECOND EDITION, JANUARY 2007 Institute for Construction Training and Development (leTAD)

Page 20: ICTAD Procurement of Work ICTAD SBD 01-2007

-!P~R~O~(~:tI~R~E:.!.!~l!.!=E~N~T~O~F~W~O~R~K~·S~ ---.;;S~ec~..t.;..;;.io__.n....;.1_-1nstruct~·Dn:) ~o Bidder~

II

16.5 The bid security may. be forfeited or the bid-securing declarationexecuted:

(a) if a ·bidder withdraws its bid during the period of bidvalidity specified by the bidder on the Form of Bid; or

(b) if the bidder does not accept the correction of its bidprice pursuant to ITS Sub-Clause 27; or

(c) .if' the successful bidder fails within the specifiedtime to:

(i) sign the Contract; or(ii) furnish the required performance security .

17. Pre-BidMeeting

17.1 The bidder's designated r~presentative is invited to attend a pre-bidmeeting which, if conven·ed and stated so in the Bidding Data, willtake place at the venue and time stipulated in the Bidding Data. Theminutes of such pre-bid meeting shall be made available to aUbidders within a reasonable time prior to the closing date of the Bid.Such minutes should be included by the bidder in his Bid.

17.2 The purpose of the meeting will be to clarify issues and to answerquestions on any matter that may be raised at that stage. The bidder isrequested, as far as possible, to submit any questions in writing or byfax to reach the Employer not later than one week before the meeting.It may not be practicable at the meeting to answer questions receivedlate.

D. Submission of Bids

13SECOND EDITION"JANlJARY 2007 Institute for Construction Traini'ng' and Development (ICTl\D)

Page 21: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCllREMENT OF WORKS Section I - Instructions to Bidders....:...::.:...:::.:..:..:..:=:..::=:...:...:....:..:...~:..::..:.:.=----------------_.:-! ----

,19.4~ The. in'rier,'andollt~r, ~riy~:19P~s·,:~~all;1..: .,._~ ....~~." ::;,~L,':. ~·~:;.::;;;~~.'.:!E'.:..l:~~L;.::':; ::.:'~.':'~,:;:;">:" ..;~ ;'':''::'~:~~.:1~,•..;..:...-~:',.,,_:':. ,:-D,:7;"'~"':'

(ft~!:••~\05"~~~L~m.~I~r~I~e'~lf!i~;:Pi2~~g];i~._the

~Jl.I~.fillr&i1~J!t~~1~~!"~~~,m~~~99i~~~~.•·as'

g~JS11IIfJ[ell~l4i~j~~~~II.~ll~[~J;/

(!ir~O'.I=lli~;~il.~!:sfLItl!;~M2;~ate

r,

.~

20.2 The Employer may extend the deadline for submission of Bids byissuing an addendum in accordance with Clause 10, 'in \vhich case alJrights and obligations of the Employer and the bidders previouslysubject to the original deadline will then be subjected to the newdeadline.

SECOND EDITION, JANUARY 200714

Institute for Con~truction Training and Development (leTAD)

Page 22: ICTAD Procurement of Work ICTAD SBD 01-2007

r"""'~~:- -.I:

I

III

PROClIREi\tQENT OF WORKS

23. Bid Opening 23.1

S~ction I - Instru:;·:.~:..:~~~: to Bidders

E... Bid Opening-and Evaluation

The Employer. wilt' open $e. bids, including modifications madepursuant to Clause 22, in the presence of the bidders' authorizedrepresentatives who choose to .~ttend at the time and in the placespecifieQ in the Bidding Data. The bidders' representatives who arepresent shall sign therr aitenrlanc-e. .

.24r'~.;JlrOceSs.to·:be·5=iC~i'qg~~~!lI~~I:'

25. Clarification ofBids

23.2 Envelopes' marked "WITHDRAWAL" shall be opened and read outfirst. Bids for which an acceptable notice of withdrawal has beensubmitted pursuant to Clause 22 shall not be opened..

23.3 The envelope marked as "Original" will be opened. Ifno envelope ismarked as "Original" the Employer may open one of the envelopes.If the required documents are available in that envelope, Employer":lay mark it ~ the "Or!ginal" and the unopened envelope as the"Copy". If so the envelope marked as copy will remain unopened.If any of the required document is missing in the envelope openedfirst, the Employer may open the other envelope to search suchmissing information transfer such documents to one envelope andmark it as "Original" and resealed the other envelope and mark as"Copy".

23.4 The bidders' names, the bid prices, or any discounts, Bidmodifications and withdrawals, the presence or absence of bidsecurity / bid security declaration and such other details as theEmployer may consider appropriate, will be announced by theEmployer at the opening. No bid shall be rejected at bid openingexcept late bids.

23.5 After announcing and completing the other procedures, the Employershall reseal all the opened envelopes in the presence of the bidder'srepresentatives.

24~·:·1: .I' .•'~ " .• i.""':- -

~../25.1 To assist in the examination, evaluation, and comparison of Bids, the

Employer may, at the Employer's discretion, ask any bidder forclarification of the bidder's Bid, including breakdowns of unit rates.The request for clarificatio.n and the response shall be in writing butno change in the price or substance of the Bid shall be sought~

offered, or. permitted except as required to confirm the correction ofarithmetic errors discovered by the Employer in the evaluation of theBids in accordance with Clause 27.

J}SECOND EDITION, JANUARY 2007

15Institute for Construction Training and Development (IC1~A.D)

Page 23: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCtJREl\'lENT OF WORKS

26.2

Section 1- )nstructions ~c B~dders

r

28. Currency forBid Evaluation

29. Eva11lation and, Co~parison of

.,,\·~id$ ,".

27.1 Bids determined to be substanti1111y responsive will be checked by theEmployer for any arithmetic errors. Errors will be corrected by theEmployer as 'follows:

(a) where there is a discrepancy between the amounts in figures and inwords, the amount in words will govern; and

(b) where there is a discrepancy between the unit rate and the line itemtotal resulting from multiplying the unit rate by the quantity, the unitrate as quoted will govern, unless there is an obvious gross

" ' misplacement of the decimal point in the unit rate, in which case the'line item total as quoted will govern, and the unit rate .will becorrected.

(c) if the bid price changes by ~e above procedure, the amount stated inthe Form of Bid shall be adjusted with the concurrence of the Bidderand shall be considered as binding upon the bidder.

~unless specified in Bidding Data.

29.1 The Employer will evaluate and compare only the Bids determined tobe substantially responsive.

29,.2 In evaluatin'g the bids,<the Employer will determine for each bid theevaluated bid price by adjusting the bid price as follows:

(a) excluding pr()~i~i~n~i sums and the provision, if any, forcontingencies in the Bills of Quantities, but including Dayworks,where priced comp~titively;

(b) making any correction for errors pursuant to Clause 27;

16SECOND EDITION. JANUARY 2007 Institute for Construction Training and Development (ICTAI)

;'t: !

Page 24: ICTAD Procurement of Work ICTAD SBD 01-2007

(c) maki.!lg.l'!Ppr_<?P!iate_.!1~j~s~me,:!!~asdescribed below to ref1~C~discounts ~r other price ..modifications offered in accord~nce WIt

Sub-Clause 22.5,

31.1 Subject to procedures if provided under Sub-Clause 31.1 under. ·B~dding Data and subject to Clause. 31.2 and Clause 32 belo\v, the

Employer will award the Contract to the bidder whose Bid has beendetennined to. be substantially responsive to the bidding d~cumentsand who has offered the lowest evaluated bid price, provl~ed th~tsuch bidder has been determined to be eligible and qualified In

accordance with the provisions of the bidding document.

31.2 Even though the bidders meet th~ eligibility and qualification criteriaspecified they are subjected to disqualify if they have:

17

Institute for Construction Training and Devei'O'iJment (leTAD)

I. If discounts. are offered to limited items it should beapplicable to such items;

ii. If the discount offered is to the total bid price as apercentage it shOl;lld be applicable to all the items at t.he

, · nClespercentage discount offered, excluding for conunge cl 11and provisional sum items before the contract awar a·rates and prices shall be adjusted to suit the discount;

iiL.. If the. disco~.111t .offered .is to the total bid price as a lumpsum, ~~ch lump sum amount should be considered forevaluation an~ before the award of contract such l~u~Psum .amount .shall be uniformly distributed to ateitems, excluding fo~ contingencies and provisional sums.

(d) making an appropriate adjustment for any other acceptablevariations, deviations.

(e) converting to a common currency if appropriate.

29.3 The Employer reserves the right to accept or reject any variati?".deviation, or alternative offer. Variations, deviations., and alternatIveoffers and other factors which are in excess of the requirements of t~ebidding documents or otherwise result in unsolicited benefits for t eEmployer will not be taken into account in bid evaluation.

29.4 The estimated effect of any price adjustment conditions under Cla~se47 of the Conditions of .Contract, during the period of imple~entatlonof the Contract, will not be taken into account in bid evaluatIon.

29.5 If the Employer detennines that the bid is unbalanced and hen~e thebidder may fail in the perfo'nnance of his obligations in some It.emswithin the quoted rates, a higher performance security as determinedby the Employer may ·be req~ested to mitigate such risks

(/-~d unless specifiedin Bidding Data.

~ ~g&@ )\ /"" /'

'----', F. Award of Contract

PROCIIREf\l1ENT OF WORKS

i'·;·~~1:;~:::

J.~COND EDITION, JANUARY 2007

t~>"":iJ:~ti~O. Preference for

1,:':.- ~~~:iC:§~~i?;;

r

Page 25: ICTAD Procurement of Work ICTAD SBD 01-2007

PR()CliREMENT OF WORKS

32. Employer'sRight toAccept any Bidand to Rejectany or all Bids "

33. Notification ofAward andSigning ofAgreeme~t

Section) - Instructions to Bidders

(a) made misl~adjrig or false rep~·esentation in the 'forms, statements'. and' attach-ments- ,s'ubm-i-tted--in'proof of ,the eligibility alld

qualification requirements; or

(b) participated in fraud and corrupt practice.

(c) record of poor' .performa'nce in previous "contracts, such asabandoning the works, inordinate delays resulted in payment ofliquidated damages up to the maximum limit specified in thecontr~ct etc; "

32.1 The Employer reserves the right 'to -accept or reject any bid, and tocancel the bidding process and" reject ~II ~ids, at any time prior to theaward of Contract, without thereby incun'ing any liability to theaffected bidder or bidders or any obligation to infonn the affectedbidder:or bidders of the grounds ~or the Employer's action.

33.1 Prior to expiration of the' bidvali4ity period, the Employer will notifythe .~~ucces~ful bidder that 'his bid has b~en accepted. This letter(hereinafter and in th~ ,Conditions of ,Contract called the "Letter ofAcceptance") will state the sum that the Employer will pay theContractor in consideration of the execution, completion, andmaintenance of the Works by the Contractor as prescribed by theContract (hereinafter and in the Contract called the "Initial ContractPrice")

33.2 The notification of award will" constitute the formation of theContract.

33.3 The agreement will incorporate the memorandurn of understanding ifany between the Employer ~nd the successful bidder, and shall besigned by the Emp)oy~r and the successful bidder.

33.4 Upon the furnishing by the successfl:J1 bidder of the performancesec~rity, the Employer will, prqmptly notify the other bi"dders thattheir bids have been ~nsucces~fuL"

33.5 At the same time that the Employer notifies the successful bidder that/""~d has been,accepteq, the Employer will prepare the agreement in

~/ the rm provided in the bidding documents, in~orporating allnf~ ents between the Parties. , 0

U0U~~ , ..

3 6 The mployer shallnQtify the successful bidder the date, time and~-- ven'uefor the signing of the agreement. The agreement shall be

signed within 28 D~yso ofthe Le~~r of Acceptance.

.~ "~":~r'"~til~~·~~I~~

...·}£.k,<,~;f;;t;~ ~~'6,~.;;£~. "~"'lli~;;-g:J({t

III

35.

36.

SECO~D EDITION. JANlJARY 20071-8

Institute for Construction-o,Training and Development (leTAD)

Page 26: ICTAD Procurement of Work ICTAD SBD 01-2007

r~fW""" P~OClIREMENTOFWORKSSection 1 - Instructi~~:E:_.i9 Bidders

r'

I

SECOND EDITION" JANlJARY 200719

Institute for Construction Training and Development (leTAD)

Page 27: ICTAD Procurement of Work ICTAD SBD 01-2007

Section .. 2

STANDARD FORMS [CONTRACT]

11 Letter ofAcceptance

• Agreement

liI Performance Security

• Advance Payment Security

• Retention Money Guarantee

21

Page 28: ICTAD Procurement of Work ICTAD SBD 01-2007

Section 2 - Standard Forms [Contract]

Notes 011 Standard Forms:

• The successful bidder will be required to provide these securities in compliancewith the requirements herein or as acceptable to the Employer.

Bidders should not complete the Form ofAgreement at the time ofpreparationa/bids.

• The Form of Performance Security, Form of Advance Payment Security andForm nfRetention Money Guarantee should not be completed b.v the bidders atthe time ofsubmission ofbids.

• Any co"ections or modifications· to the accepted bid resulting from arithmeticcorrections, acceptable deviations, or quantity variations in accordance withthe requirements of the bidding documents should be incorporated into theAgreement.

• ~~ successful bidder w;/l.ee required to Sip" the Form ofAgreement, after the.awardofcontract.

SECQND EDITION, JANUARY 200723

Institute for Construction Training and Development (ICTAD)

Page 29: ICTAD Procurement of Work ICTAD SBD 01-2007

'II

PR.()('\IRF:!\'lENT OF WORKSP.

Notes on Form ofLetter oj'Acceptance

Section 2 - Standard F,JfH1S rContract]

The Letter ofAcceptal1ce will be the basis/or/ornlatioll o.fthe Contract as descrihed in Cl/ause33 of the Instructions to Bidders. This Form of Letter ofAcceptance should be filled in llndsent to the suc~essful bidder only after evaluation of Bids and after obtaining approval fr0l11

the relevant authority.

.. .

FORM OF LETTER OF ACCEPTANCE

---------------------------------------- [Gfate]

[LETTER HEADING PAPER O~ THE PROCURING ENTITY]

lro: ---------------------------------------------------------------------------------------------------------------------[name and aadress ofthe Confractor}

This IS to notify you that your bid dated ----------~----:---- [insert date] foP'\ the construction andremedying defects of the ---------------------------------------------------.;.(~::.-..\--\-----.[nanle of the

. \ "\ \ 1Co'!!rq~.t.and identification number] for the Contract price of ---/·~---·~r---~~--\[nalneofcurrency J----:.:~,~:~~!:.~~~---------------------------------;-----[amount in figures and\wo\?sJ ~s ~orr~ted in accordancewith-'lnstructions to Bidders and / or modified by' a M~rrlo\ana~.lIrl'-/qf lJn~rst~nding2, is herebyaccepted ,.,/'\ \ \ \ ,,/ \. \ .\,.....,

. . . ("\ \ \~ \. \ \ \~:) \/ .. .The adjudicator shall be --------------------------~--~'\----'r--1\[n~n1e..arid' address of the Aajudzcalor. (fa[{reed] I shaH be appointed by the Instt¥f'ffr \on'tru~i~f\Jta{ningand Development (leTADi.

You are hereby instructed to;p;~eed\W~'t;'~ e\Jtio';;'~f the said Works in accordance with theContract documents. /r~'~\ \ V\ \ \) ,.

\' \\ \ \ ( \,._..,,;/The Start DSlttrs~11 ~e: \~-i----~--~~:}--------(fill the date as per Conditions ofContract).

(G'::::. \ \ \//. .The aITIount...Qf Pe"'9rn\an~e Security is : ------------------- (fill the date as per Conditions oj"Contract).

. '0e ~~rform~~Jecu:~:p~~ubmitted on or before --------------------- (fill the date as per. (.ondlllons ofContract). r r(~ lr/A\rol \, \ U" .. UlJ"\~) J ..

\ I 'Authorized Signature : ",,,--------7,,/-------------------------------

",......_..,--,'

Name' and title ofSignatory: ---------------------------------------------------------------

Name of Agency: ----------------------------------------------------------------------------

((nZlIItiple currencies are involved indicate amounts under each currency separated with the word 'and' benveen then1

[)elete "corrected in accordance with ITB and/or " or "and/or modified by a Menlorandum ofUnderstanding". ifnot applicahle!Jelele 'whichever inapplicable or delete both ifnot applicable

25Institute for Construction Training and Development (lGTAD)

Page 30: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCliREf\t1ENT OF WORKS

AGREEMENT

STANDARD FORM: AGREEMENT

IN WITNESS whereof the parties thereto have caused this Agreement to be executed the day and yearaforementioned in accordance with laws of S~i Lanka. .

26Institute for Construction Training and Deyelopment.(I.CTAD)SE(:OND EDITION. JANlJARY 2007

3.

1.

2.

The Common'Se;al of " /"'-':"---""was hereunto affixed i,o--:~,;-:~¥-~-·-r~-S-~n)f~~:-10-f-:-----------------

\ U~/ UL~ J\ '

" /Signed. Sealed, and Deliv~oy'the said ----------------------in the presence of: -----------------------------

WHEREAS the Employer desires that the Contractor execute ------------------------------------[name andidentification number of Contract] (hereinaft~r called "the Works") and the Employer has acceptedthe Bid by the Contractor for the execution and completion of such Works and the remedying of any

.r\

defects therein. . . /~ \ \\ '\\ \

..."', \ '\ \

NOW THIS AGREEMENT WITNESSETH as follows: ('/<) \' \....,~ \ \...."'\ \.~ \

In this Agreement, words and expressions shall h~(he ~m~ m~in~ ~\ale respectively.~~Si~n,ed to them. in the Conditions of c~ac,t\her~~ft~rr~er'F~ toY an,d. they shall bedeemed to form and be read and con~~d '\ P\rt 1.~~ 1f'em~"'_." . .

In consideration of the payments tl~m\deby~e ~m~'e;\otheContractor as hereinaftermentioned, the Contractor~by~~~ts ~itl\th~mployer toe~ecute and c.o~plete theWorks and remed~ dJfec~he~m~ crnfORrftty In all respects wIth the provISIons of theContract. ( \,_ \ .../ '\ /

\\ \ .. {

- \ \ \ \ '---\ 'v ' \ \,r"",The E~9Y~.he~by/oven\n~-tbpay the Contractor. in consideration of the, execution andcomple :o~~he ~Ofks anathe remedying of defects wherein the Contract Price or suchother su n:arb~e payable under the provisions of the Contract at the ~im~s and in themanner p~s~lb,d by the Contract. . ,. ,

'-._..,/.. .

Binding Signature of Employer

Binding Signature of Contractor--------------------------

This AGREEMENT, made the ----------[dayJ· day of ---------;--[month] 20-------- [year] between------------------------------------[name and address ofEnlployer} (hereinafter called "the Employer") ofthe one part, and --------------------------------------------------------- [name and address of Contractor1(hereinafter called "the Contractor") of the other part.

Page 31: ICTAD Procurement of Work ICTAD SBD 01-2007

., ~ : . T. ' '

FoRM OF PERFORMANCE SECURITY(Unconditional)

. 27

•... ~ .. ~~

Section 2 - Stand(lx~~.t· ~);d7iS [Contract]

Institute for Construction Training and Development (leTAD)

------------------------------

:::r-:~. ': ' ,"":~f::f' ..' . . _. __~-------------------------- ..-------------------------------------------~- llssuing·~~~;~~:~--;,----------d--A--;;dress ofIssuing Branch or-Office] . ..•.,~l!/~ S iVame, an .':. '

:~'\:":~~~

~ji~fici;l~: -------------------------------------------------------------------------------" [lValne anGf

:,~r~ss ofEmployer]

~(\\ \. \\\ \-:\ \\. '\ \,

iW~y~"': :bd6i1" informed" that ,,-----------------~------------------~--;.0--f [~m,f "of Contractor]exe;ffiiift:er called "the contractor) has enter~d Into Contra~i~lp. -\---\;:::}---\--~"':;-"'";.'7--- [reference.'i#?~~~:ofthe contract) dated ------------------ with you, for1l1'\\-,.--\----\---\:/ [ii~irr"construction "]

.;~7_-----~--'--------------------------~------------~--.~a~iA. ~f aen~act }mGf brief Gfescription of~.. :'.·:-.(,hereinafter called "the contract ). -, \ \ \"~,\'~\ \ /n' . .' /.. \ "\\ "~\)

~ot:e, we understand that,~di~t~cO~li~n~~ ~ontract, a performance guarantee·:ire<J.' "'.. . \\( \ \ ('\" 'y)' ',..,. .. . .;., "" ."" ~ \" D,l " .~~~~est ~f the c~~r, \e \/\--~.:l~~-~------------------:----~---------- [name ~fAgency]j~e~~7a~fiin,d~~eJfpay,yo~y ~um or sums not exceed109 m total an amount . of

-;~~:~~1~~ytsW~~~;~-~;-d~~~~~-i~-~i;i~~-~~~~~~-;~i~d-~;--~-~~i~e~w;~:e~~....,:.·~:·.,~.~,..-~fthe c '. ~'Sir is-fn breach of Its obhgatton(s) ~nder the C::0ntract, without your needing toiQfto show ou;fs·for your demand or the sum specIfied thereto. .J.}':.-" . .

~~~antee sha:lfexpire, nO later than the .... day of -------- 20---~ [insert Gfate, 28 Gfays beyonGf thei ..tlCornpletion Date] and any demand for payment under It must be received by us at this

':~Q.ri or before that date.~~.~~~.~}:. . . ;: !~.: .~i· I •

fi'ii" . l ..r~P~ ....".s~,-;~---- -----:--=:~,~:,~,(,..f,i(:,~l~~U) "\

:_ "'~... ,.,~..•~;;f'~;,\,.,. ,~.i{'

·'!~~~~~~~.~.~:Y.J\iP:r!l'··

Page 32: ICTAD Procurement of Work ICTAD SBD 01-2007

FORM OF ADVANCE PAYMENT SECURITY. , .' '. '. ... . .-.. .~... ., ,-..

PROCUREMENT OF WORKS Section 2 - Standar'!f,:~~L~ ~Contract]f-

------------------------------------------~-~-------~----------------------------------- [ lVanne anti aGfliressofAgency, and Address ofIssuing Branch or Office]

Beneficiary: -.--------~------------------------------------------:------:-----------------rName and Addre~~' 'ufEmployer]

Date: ---------------------------------- . ,

ADVANCE PAYMENT GUARANTEE No.: ---------------------------

Consequently, any demand for payment under this guarantee must be received by us at t~is office onor before that date.

Institute for Construction Training and Development' (leTAD')'" \?:.i

The Guarantor shall insert an amount representing the amount ofthe advance payment and denominated either in thecurrency(ies) ofthe advance payment as specified in the Contract.

SECOND EDITION, JANUARY 2007

4

[signature(s)]

We have been informed that --------~---------;-------------------:----_::--------~----[name of,C.ontractorJ(hereinafter called "the Contractor") has entered into Contrarct No. ------------------------ [referencenumber ofthe contract] dated ---------------------- with you, for the -------------r-y -- construction of -­--------------------------------------------- ,[name ofcontract and briefdes~~(hereina~er cal\ed

~t::::::::I:e understand tha~ a~C~rding t:"ilie cOnd~~fth~~~~ance' payment i.~,:.',"·~the sum. ------------------~-- [amount In figures] (----f"--\\-----\----\---'v\---~,---------,-) (am,ount znwords] IS to be made agamst an advance payme~ar\t~~ \ \ ,\ / ,'!' .. ,!" """', ': •. i !

~\\ \~~\V "At the request of the Contractor, we -~---r\--\---~--\----\--~\)-~----------- [name ofissuing agency]hereby irrevocably undertaket~ y a\i\vs'~m r s~msWt e~ceeding in,total an amount of -----.--­---------- [amount in figures] ~---~---- ---\+,--- - -------.-----------------) [amou.nt in ~ord~f uponreceipt by us ofYOU~de~~ in \rifiiJo/accompanied by a written ,statement ~tating that theContractor is in breac'\t o~ts\obl~aio in'repayment of the Advan<;e paym~nt under ilie, Contract. " "

The maxim~~un~f~s gu antee sh~U be progressi~ely reduced 'by ~I;t~ ~mount ~,filie advan,ce :,::~",paymentrep~ ~e ~actor. ' ,

This gtiarante~xPire on -.:-~----------------------[ Insert the date, 28 ,days be;~nd th~' Intended . ,I

Completion Date]

Page 33: ICTAD Procurement of Work ICTAD SBD 01-2007

tli

.r-I

".;;'.

0 ••:)

.~~,.,'

_P-R-O-C-ll-R-E-M-E-N-T-O-F-W-O-R-K-rS-------------- S_ec_t_io_n_2_-_S_tan_dar~L:~~ ~ .. ::S l Contract]

Beneficiary: ,.--------------------------------------------------------------------------- [Name and AddressojEmployer]

---------------------------------------------------------------------------~--------------------[lssuin~Name, and Address ofIssuing Branch or Office] ,

Date: ---------------------

Agency's

RETENTION MONEY GUARANTEE No.:

Insert amount equivalent to the second halfofthe Retention Money

[signature(sJ]

. 29Institute for Construction Training and Development (lCTAD)SECOND EDITION, JANUARY 2007

We have been informed that ----------------------------------------------- [name of Contractor](hereinafter called "the Contractor") has entered into Contract No. ---------~---------- [referencenumber ,of the contract] dated --------------- with you, for the execution o~-L:-\---------- [name ofcontract and briefdescription ofWorks] (hereinafter called "the Contract").\ ~ \

/\ \ \ \.r' ~ \ "I

Fu.rthermore, we understand that, according to.the conditions,-et th\ ~tra~~,~e~ the works havebeing tak,en over and the first half of the RetentIon Mo~n~.b~n oort~ed r~r~ayfuent, payment ofthe second half of the Retention Money may be made a ins ,a\R~ent\on M?neyguarantee.

. ~\ \ \:'~ \ \ ./\'\ ~\ \ \ . ..-.,,-1" ,

. \ \ \ \\ \ \,r

At the request ofthe Contractor, we -----~.;.-.:::-...:----\---~---1--CtV------------------ [name ofagency]hereby irrevocably.undertake to pay you atf){~ <\ sl\msn~mtceeding in total an amount of --------­-----------------(amount in .figur.~--L--\-:7r---\--j----~---""-------------------) [amount in words1,5

. upon receipt by us of yourJ1rst e d in ~tin'g ac'e6mpanied by a written statement stating that theContractor is in breacJrb~ts\obr a' n u~ye Contract because the Contractor has not attended tothe defects in~dan\e wit9 tht\C~act.. .

~'" rV,( \/ '- T~iS, gu.~r.~.t~'.~~p\re.V:t.t the latest, ------------------------------[insert 28 Da;:s after the end ofthe.De!~cts Lwbl .~ ~1oa1v-tonsequently,any demand for payment under this guarantee must be

',' receIved by us ~t t spffice on or before that date.'-..~

0'; .'

0° o-:.~

Page 34: ICTAD Procurement of Work ICTAD SBD 01-2007

I

f

,-

Section - 3

CONDITIONS OF CONTRACT

Conditions of Contract shall be read in conjunction with Section 5 - Contract Data inVolume 2, which shall take precedence over the Conditions of Contract

31

Page 35: ICTAD Procurement of Work ICTAD SBD 01-2007

I

Ii

l]

--I

Table of Cia'uses '

CONDITIONS OF CONTRACT

A. General, 35 c. Quality Control, 45

1. Definitions, 35 33. Identifying Defects, 452. Interpretation, 37 34. Tests, 453. Language and Law, 38 35. Correction of Defects, 454. Engineer's Decisions, 38 36. Uncorrected Defects, 465. Engineer's Representative, 386. Communications, 38 ..D. Cost Control, 467. Subcontracting, 388. Other Contractors, 38 37. Bills of Quantities, 469. Personnel, 39 38. Changes in the Quantities, 4610. Employer's and Contractor's Risks, 39 39. Variations, 461I. Employer's Risks, 39 40. Payments for Variations, 4712. Contractor's Risks, 40 41. Cash Flow Forecasts, 4813. Insurance, 40 42. Payment Certificates, 4814. Site Investigation Reports, 40 43. Payments, 4815. Queries about the Contract Data, 41 44. Compensation Events, 4816. Contractor to Construct the Works~ 41 45. Change in Law, 5017. The Works to be Completed by the 46. Currencies, 50

Intended Completion Date, 41 47. Price Adjustment, 5018. Approval by the Engineer, 41 48. Retention, 5119. Safety,. 41 49. Liquidated Damages, 5220. Discoveries, 41 50. Bonus, 5221. Possession of the Site, 41 51. Advance Payment, 5222. Access to the Site, 41 52. Securities, 5223. Instructions, 41 53. Dayworks,5324. Dispute Resolution, 42 54. Cost of Repairs, 5325. Procedure for Adjudication, 4226. Arbitration, 43

E. Finishing the Contract, 53

B. Time Control , 44 55. Completion, 5356. 'raking Uver, 53

27. Programme, 44 57 Statement at Completion, 5328. Extension of the Intended 58. Operation and Maintenance

Completion Date, 44 Manuals, 5429. Accel~ration, 44 59. Tennination, 5430. Delays Ordered by the Engineer, 1/5 60, Payment upon Termination, 55310 Management Meetings, 45 61. Property,5532. Early Warning, 45 62. Release from Perfonnance, 55

63. Provisional Sums andN~minated Sub-contracting, 55

64. Sus ension of Works, 56 ·

33

Page 36: ICTAD Procurement of Work ICTAD SBD 01-2007

Note - Conditions of Co~tTt!-Ct.shall be reat! i~ cl!njunction "'ith Contract Data

The Contractor's Bid is the completed bidding documentsubmitted by the Contractor to the Employer.

",...-~,/'/ "-

I . n-g.~Contract Price is the price stated in the Letter of Acceptance( ~@lfl~ thereafter as adjusted in accordance with the provisions of the\ Co~act. ..'-.'---/

Costs shall be deemed to include overhead costs whether on or offsite but without profit.

PROCllREl\tlENT OF WORKS

35

Section 3 - Cond\ti0\r~~ uf ('cntracl

Institute for Construction Training and Development (lCTAD)

A Defect is any part of the Works nQt completed in accordancewith the Contract.

Dayworks are varied work inputs .subject to payment on a timebasis for the Contractor's employees and Equipment, in addition topayments for associated Materials and Plant.

Days are calendar days;

Compensation Events are those defined in Clause 44 hereunder.

The Contractor is a person, corporate body, partnership,proprietorship or jojnt :venture whose Bid to carry out the Workshas been accepted by the Employer.

The Contract is the Contract between the Employer and theContractor to execute the Work~ and shall include the documentslisted in Clause 2.3.

The Completion Date is the date of completion of the Works ascertified by Engineer, in accordance with Sub-Clause 55.1.

Completion shall mean when in the opinion of the Engineer the,Works have been completed to an extent to be consideredfunctional for the intended purpose.

A. General

The "Adjudicator~' is the person appointed in accordancewith Sub-Clause 25 jointly by the Employ~rand the Contractor orby the Institute for Construction Training and Development(IC'I'AO) as the case may be, fur d~lenl1ination of the disputes inthe first instance, as provided for in Clause 24 & 25.

Certificate of Completion is the certificate issued by the Engineeron completion of the Works.

Bills of Quantities means the priced and completed Bills ofQuantities forming part of the bid.

Boldface type is used to identify defined terms.Definitions1.

,. SECOND EDITION.JANlIARY 2007

II

Page 37: ICTAD Procurement of Work ICTAD SBD 01-2007

Letter of Acceptance means the letter signed and issued by the/'-~ loyer accepting the Bid submitted by the Contractor for the

(

. exe tion and completion of the Works.~i~lA\@ . .U L'"j&t rials are.all suppli~s, .including consumables, used by the

"'----C tractor for Incorpurallun III lht: Wurk.s.

PROClIREMt:NT 0." WORKS

SE(:OND EDITION, JANUARY 2007

Section 3 "- Conditions of C"onlrul:t "

· The Defects Liability Period is the period n.amed in the ContractData and ~alculated from the Completion Date.

Drawings include calculations and other information provided orapproved by the Engineer for, the execution ofttte Contract.

The, Employer is.the' Party named in the Contract Data, whoemploys the Contractor t~ c~rry ,out the Works.

The Engineer is the person named in the Contract Data (or anyother cOJ1lpetent person appoi.nted by the Employer and notified tothe Contractor) who is responsible for administering' andsupervising the execution of .~he work. Such person may be anengineer, architect or any other technical person. In the absence ofsuch appointment the Employer himself.

The Engineer's Representative .. means a person appointed fromtime to time by the Engineer under Sub-Clause 5.1 of theseconditions.

Equipment is the Contractor's machinery and vehicles broughttemporarily to the Site to construct the \Vorks.

Final Certificate is the certificate issued by the Engineer after theDefects Liability Period and on correction of the Defects by theContractor.

The Initial Contract Price is the price stated in the Letter of"Acceptance.

The Intended Completion Date is date on which it is intendedthat the Contractor shall, complete the Works. The IntendedCompletion Date is specified in the Contract Data." The IntendedCompletion Date may be revised only by the Engineer by issuingan extension of time or an acceleration order.

Party means either or both the Employer and the Contractor as thecontext requires.

Plant is any integral part of the Works that shall have amechanical, electrical, chemical, or biological function.

The Site· is the area defined as such in the Contract Data.

Site Investigation Reports are those that \\,ere included in thebidding documents and are factual and interpretative reports aboutthe surface and subsurface conditions at the Site."

36Institute for Con6truction Training and Development (lCTAD)

Page 38: ICTAD Procurement of Work ICTAD SBD 01-2007

-I

II,

PROCllREMENT OF WORKS Section 3 - Conditic.', ,'~' Contract

Specification means the Specification of the Works included in.the Contract and any modification or addition made or approvedby the Engineer.

The Start Date is given in the Contract Data. It is the latest datewhen the Contractor shall commence execution of the Works. Itdoes not necessarily c.olnclde with (\ny ot the Site PossessionDates.

c) A: reference to a natural person includes any company,/~:rthei-ship, trust, joint venture, association, corporation or

! ;l?fi\rm ,her body corporate and any authority ;(~@IJ' A ref~ren~e to ~ document includes an amendment or~, /~uppleinent to, or replacement or innovation of, that document

----"but disregarding any anlendment, supplement, replacement orinnovation made in breach of this Contract; and

SECOND EDITION.. JANllARY 2007

2. Interpretation 2.. 1

A Subcontractor is a person or corporate body who has aContract with the Contractor to carry out a part of the work in theContract, which includes' work on the Site.

Temporary Works are works designed, constructed, installed,and removed by the Contractor that are needed for construction orinstallation of the Works ..

A Variation is an instruction given by the Engineer whi,ch variesthe Work~, \vhich is instructed or approved as a Variation underSub Clause 39.4 ..

The Works are what the Contract requires the Contractor toconstruct, install, and hand over to the Employer, as defined in theContract Data.

In the interpretation of these Conditions of Contract, unless thecontext otherwise requires:

a) Headings are for convenience only and do not affect theinterpretation of this Contract;

b) Words impol1ing the singular or the gender shall include the,; ~"'.plural and the other gender and vice versa.. Words have theiri~"nonnal meaning under the language of the Contract unless

::,.l·specifically defined;

e) A reference to a Party to any document includes that Party'ssuccessors and permitted assigns.

Any clarification of,these Conditions of Contract will be providedby the Engineer.. :

If sectionil1 completion is specified in the Contract Data,references in the Conditions of Contract to the Works.. theCompletion Date, and the Intended Completion Date apply to anySection of the Works (other than references to the CompletionDate and Intended Completion Date forthe whole of the Works).

. 37Institute for Construction Training and Development (ICTAD)

Page 39: ICTAD Procurement of Work ICTAD SBD 01-2007

• J,

Institute for Construction Training and Development (lCTAD)38

The Contractor shall cooperate and share the Site with othercontractors~ public authorities, utilities, and the Employerbetween tbe dates given in the Schedule of Other Contractors,as referred to in the Contract Data. The Contractor shall alsoprovide facilities and services for them as described in theScheduJe. The Employer may modify th~ Schedule of otherContr~tors, and shall notify the Contractor of any suchmodj{~ation.

Section 3 - Condition3 ·Jf Contract

The documents fanning the Contract shall be interpreted in thefollowing order of priority:

(1 ) Agreement,(2) L~tter of Acceptance,(3) Memorandum of understanding (if any)(4) Contractor's Bid,(5) Contract Data,(6) . Conditions of Contract,(7) Specifications,(8) Drawings,(9) Bills ofQuantities"

(lO) any· other document.' listed in the Contract Data as formingpart of the Contrac~. ~, .

5.2 The Engineer may delegate any of his duties and responsibilitiesto Engineer's Representative or others, except to theAdjudicator, after notifying the Contractor, and may cancel anydelegation after notifying the Contractor.

5.1 The Engineer's Representative shall be appointed by and beresponsi~le to the Engineer and shall carry out such duties andexercise such authority as may be delegated to him by theEngineer under Sub-Clause 5.2

4.1 Except where otherwise specifically stated, the Engineer wilidecide c~ntractual \rmatters between the Employer and theContractor·in the role representing the Employer.

3.1 The language of;' tne Contract shall be English.. The lawgoverning the 'Con~r:aGt is' the law of the Democratic SocialistRepublic of Sri Lank.a_..

6.1 Any verbal communication between the Parties including anyinstructions given, shall be deeme~ to be duly given for thepurposes of this sub-clause, if either Party within seven (7)Days, confinns to the other Party in writing of such verbalommunication or instructions. If the recipient Party does not

nf0i9r;\rn! tradict such confirmation in writing within seven (7) Days. itU\~ .lll~h 11 be deemed to ha:ve been accepted.

. e Contractor may subcontract with the approval of Engineer,1;>ut shall not assign the Contract without the approval of theEmployer in writing. Subcontracting shall not alter theContractor's obligations. .

2.3

Other Contractors 8.1

r \ ••

SECOND EDITION. JAJ'1,. ..~a~ 2007

7. >.,,:)Sub Contracting

6. Communications

8.

3. Language andLaw

4. Engineer'sDecisions

5. Engineer'sRepresentative

PROClJREMENT OF WORKS

Page 40: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCiIRE:MENT OF WORKS Section 3 - Con~!.i.'~t:··.o ..:o:~o' Contract

11.2 From the Completion Date until the Final Certificate has beenissued, the risk of loss of or damage to the Works, Plant, andMaterials is an Employer's risk except loss or damage due to;

10.1 The Employer carries the risks which this Contract states areEmployer's risks, and the Contractor carries the risks which thisContract states are Cdntractor's risks.

(b) The risk of damage to the Works, Plant, Materials andEquipment to the extent that.is due to :

(i) a fault of the Employer or the Employer~sdesign

Institute for Construction Training and Development (ICTAD)39

a Defect which existed on the Completion Date,

an event occurring before the Completion Date, whichwas not itselfan Employer's risk, or

the activities of the Contractor on the Site after theCompletion pate.

(iii) riot, commotion or disorder within ~he country andwhich is not caused by or due to thOe employees ofthe Contractor

(ii) due to war, hostilities, rebellion, revolution,insurrection, radioactive contamination within thecountry

(c)

(a)

(b)

11.1 From the Start Date until the Final Certificate has been issued, thefollowing are Employer's risks:

(a) The risk of personal injury, death, or loss of or damage toproperty (excluding the Works, Plant, Materials, andEquipment), which are due to;

(i) use or occupation of the Site of the Works or for thepurpose of the Works, which is the unavoidableresult of the Works or

(ii) negligence, breach of statutory dut)'·, or interferencewith any legal right by the Employer or by anyperson employed by or contracted by him except theContractor.

Q '2 If the E.ngineer asks the Contractor to remove a person '~/ho is amember of the Contractor's staff or work force., stating thereasons, the Contractor shall ensure that the pers<;>n leaves the Sitewi~~in seven Days and has no further connection with the work inthe ·Contract.

9. 1 The Contractor shall employ the key personnel if named by theEmployer in the schedule of key personnel, as referred to in theContract Data, to carry out the functions stated in the schedule orother personnel approved by the Engineer. The Engineer mayapprove any proposed replacement of key personnel only if theirrelevant qualitications and abilities are substantially equal to orbetter than those of the personnel listed in the schedule.

;;:: !~

!~'.J.::.\';~;~~;.~{. ,:~@lflNID)"'l;.:~~~~~?r: .. .~~ I ~:.\~.'~ ~

,:,;~:;o~h'; ° ° 'iL'o;~,~n ~

Employer's Risks

Employer's andContractor'sRisks

SECOND EDITION.JANlIARY 2007

~o.

11.

9. Personnel

Page 41: ICTAD Procurement of Work ICTAD SBD 01-2007

SECOND EDITION, JANUARY 2007

Site InvestigationReports

PROCVREMENT OF WORKS

40Institute for Construction Training and Development (leTAD)

14.1 The Contractor, in preparing the Bid, shall rely on any SiteInvestig.ation Reports referred to in the Contract Data,supplemented by any infonnation available to the bidder.

(a) liability for personnel injury or death of workmen or other~mployees of the Contractor. The Contractor's liability forpersonal injury or death of workmen shall be as providedfor in the Workmen's Compensation Act and any otherstatutory modifications or amendments thereto.

13.1 The Contraet(lr c;hall provide, in the joint names of theEmployer an~.the Contractor, insurance cover from the Start Oate tothe end of tile Defects Liability Period, in the amounts anddeductibles stated in the Contract Data for the follo\ving events:which are due to the Contractor's risks:

. (a) loss of or damage to the Works, Temporary Works, Plantand Materials.

(b) 'oss ofor damage to Eq~.ipment;

(c) loss of or damage to property of third parties and that of theEmployer; (except to Works, Temporary Works, Plant,Materials, and Equipment) in connection with the Contract~

(d) personal injury or death to any person of a third party andincluding employees of the Employer and other personsengaged by the Employer in connection with the Contract~

1'.":'--:';

13.2 The Contractor shall provide insurance cover from the Start Date tothe end of the Defects Liability Period, in the amounts stated inthe Contract Data for the following event which is due to theContractor's risk:

13.6 Both Parties shall comply with any conditions of the insurancepolicies.

13.5 Alterations to the terms of an insurance shall not be madewithout the approval of the Engineer.

12.1 From the Start Date until the Final Certificate has been issued,the risks of personal injury, death, and loss of or damage toproperty (including,' without limitation, the Works, Plant,Materials, and Equipment) which are not Employer's risks areContractor's risks.

-., 13.3 Policies and certificates for insurance shall be delivered by' the'Contractor to the Engineer for the Engineer's approval before

. the Start Date. All such insurance shall provide for

~."". . c.o..:m.... ,pe.n.sation ~o be pay~ble in the types and.. proportions of~(~/A\®rnclesreqUired tp rectifY the loss or damage Incurred.

\n~.:~~ff!"~he: co.ntractor does not provide "any of the policies and~,~rtificates required, the Employer may effect the insurance

;' which~i the 'Contractor should have provided and recover thepremiums .the· Employer has paid from payments otherwise dueto the Contractor rOf, if no payment is due, the payment of thepremiums shall be a debt due.

Contractor'sRisks

Ihsuranc~IJ.

12.

14.

Page 42: ICTAD Procurement of Work ICTAD SBD 01-2007

20. Discoveries 20.1 Anything of historical or other interest or of significant valuediscovered on the Site shall be the property of the Employer.The Contractor shall notify the Engineer of such discoveries

/r'---'~dcarry out the Engineer's instructions for dealing with them.

21. Possession of the ( ~@1fiiQ}l Employer shall give possession of all parts of the Site to theSite "C);trootor. The Employer if required may give possession of

,,·'-------"1he Site in accordance with the approved programme. Ifpossession of a part is not given by the date stated in theContract Data, the Employer will be deemed to have delayed thestart of the relevant activities, and this will be a CompensationEvent.

SECOND EDITION" JANUARY 200741

Institute for Construction Training and Development (ICTAD)

23.1 Th~ Contractor shall carry out all instructions of the Enginee~which comply with the applicable laws where the Site islocated.

22. 1 The Contractor shall allow the Engineer and any personauthorized by the Engineer access to the Site and to any placewhere work in connection with the Contract is being carried outor is intended to be carried out.

18.5 All Drawings prepared by the Contractor for the execution ofthe Temporary or Permanent Works, are subject to priorapproval by the Engineer before use.

19.1 The Contractor shall be responsible for the safety of allactivities on the Site.

18.4 The Contractor 'shall obtain approval of third parties to thedesign of the Temporary Works, where required.

18.3 The Engineer's approval shall not alter the Contractor"sresponsibility for design of the Temporary Works.

18.2 The Contractor shall be responsible for design of TemporaryWorks.

18.1 The Contractor shall submit Specifications and Drawingsshowing the proposed Temporary Works to the Engineer, whois to approve them if they comply with the Specifications andDrawings.

17.1 The Contractor may commence execution of the Works on theStart Date and shall carry out the Works in accordance with theprogramme submitted by the Contractor, as updated with theapproval of the Engineer, and shall complete them by theIntended Completion Date. .

16.1 The Contractor shall construct and install the Works inaccordance with the Specifications and Drawings andEngineer's instructions.

15.1 The Engineer will clarify queries on the Contract Data.

Instructions

Access to theSite

Safety

Approval by theEngineer

Queries about theContract Data

The Works to beCompleted by theIntendedCompletionDate

Contractor toConstruct theWorks

23.

22.

19.

18.

17.

16.

15.

PR()CJ.lREl\JIENT OF WORKS

Page 43: ICTAD Procurement of Work ICTAD SBD 01-2007

PR()CIIREMENT OF WORKS

24. DisputeResolution

25 Procedure forAdjudication

24.1 Any dispute of whatever nature arising out of or in relation tothis agreement shaH in the first instance be attempted to beresolved by way of adjudication in accordance with theadjudication procedure set forth in Clause 25.

25.1 EitlJ~t"~;nP:wtY may initiate the reference of a dispute to theAdjijscficaior by giving 07 Days notice to the 'other Party. : .'

25.2 The Adjudicator shall be appointed by agreement between theParties. In the event the Parties are unable to reach agreel~ent

on the appointment of the Adjudicator within fourte~1i (14)Days from the date of such request, either Party may'make anapplication to the Institute for Construction r.raining andDevelopment (JeTAD) to appoint an Adjudicator.

25.3 The Adjudicator shall be a professional with experience relevantto th'e Works and in the interpretation of contractual documents.Such Adjudicator shall have no interest financial or otherwise inthe Employer, the Contractor or the Engineer nor any financialinterest in the Contract, except in respect of his professionalfees.

25.4 The Adjudicator's fee shall be agreed by both Parties and shallbe borne by both Parties in equal amounts.

25.5 The Adjudicator shall give the determination in writing within28 Days or such other period of receipt of a notification of adispute. The Adjudicator shall detennine procedures as he seesfit ensuring that each Party is given a reasonable opportunity tomake representations including written submissions and/orhearing of witnesses in person.

25.6 With the prior concurrence of both Parties the Adjudicator maytake advice and assistance from independent professionaladvisorls or other person/s to enable him to reach adetermination on the dispute. Such costs shall be borne by bothParties in equal amounts.

(

25.7 ch of the Parties shall upon and in accordance ,\\,ith a request~@ll&lID'y the Adjudicator supply him fre~ .of charge such information

a documents as he shall require for the purposes of the~,.,." ference to him. That information and those documents shall be

kept confidential by him and by the Parties.

25.8 The Adjudicator shall not act as an Arbitrator. The decision ofthe Adjudicator shaH be deemed final and binding on the Partiesif neither Party refers the dispute to arbitration in aCb'ordance'with Sub-Clause 26.1 within twenty eight (28) Days of theAdjudicator's determination.

25.9 Replacement ofAdjudi~ator

Should the Adjudicator resign or die or is removed by agreementof the Parties on the basis of his unsatisfactory performance,. theParties may jointly appoint another Adjudicator and such anappointment shall be made within fourteen (14) .Days after the

SECOND EDITION, JANlJARY 200742

Institute for Construction Training and Development (ICTAD)

Page 44: ICTAD Procurement of Work ICTAD SBD 01-2007

.....:P_R...;..;;O~(;....;;~l_rR.:..;.;E_M.....;;;E~N.....;;.T-.,;O;..;.F_W_O_R_KS~ Se_c_ti_on} - Condt~~~::.:~ 'Jf Contrac.;t

SECOND EDITION, JANlJJ\RY 2007

26 Arbitration

resignation or death or removal of the Adjudicator. If the Partiesare unable to reach agr,eement on the appointment of a newAdjudicator then the Adjudicator shall be appointed by theInstitute for ,Construction Training and Development (leTAD)at the request of eith~r Party with in fourteen (14) Days of receiptof such request.

26.1 (a) Any dispute of whatever nature arising from, out of or inconnection with this agreement, on th~ interpretationthereof: or the rights, duties, obligations or'liabilities of anyParty, or the operation, breach, tennination, abandonment,foreclosure or invalidity thereof, shall be' referred to byeither Party to arbitration for final settlement, in accordancewith the Arbitration Act No. 11 of 1995, or any amendmentthereof,

(b) Pending the :award In any arbitration proceedingshereunder,(i) this Contract and the rights and obligations of the

Parties shall remain in full force and effect and

(ii) each of the Parties shall continue to perform theirrespective obligations under this Contract. Thetermination of this Contract shall not result in thetermination of any arbitration proceedings pending atthe time of such tennination nor otherwise affect therights and obligations of the Parties under or withrespect to such pending arbitration.

(c) Any award rendered by the arbitral tribunal shall determinethe extent to which the cost of arbitration is to be borne byeach Party. The arbitration centre charges (if any) and thecompensation to the arbitrator shall be equally shared bythe Parties initially.

26.2 Composition of the Arbitral Tribunal:

/,..~The arbitral tribunal shall consist of a sole arbitrator who shall

(u appointed in the manner provided in Sub-Clause 26.3.

nrM?fA\fm\U~g!~fetion Procedure: .

" /

·"---..-'/The Party desiring arbitration shall nominate three arbitratorsout of which one to be selected by the other Party within 21Days of the receipt of such nomination. If the other Party doesnot select one to serve as Arbitrator within the stipulated periodthen the Arbitrator shall be appointed in accordance with theArbitration Act No. 1] of 1995, or any amendments thereof.

26.4 Venue & Language:

The venue of arbitration sha-1I be in Sri Lanka.

Unless otherwise agreed to by the Parties the proceedings shallbe conducted and the award shall be rendered in the Englishlanguage.

43Institute for Construction Training and Development (leTAD)

Page 45: ICTAD Procurement of Work ICTAD SBD 01-2007

~/28.2 he Engineer shall decide whether and by how much to extend

n~fA\fi\\t e Intended Completion Date within 21 Days of the Contractor;': ~; / U~·U~a ing the Engineer for a decisiQrI upon the effect of a

," . .. . .. nlp~llsaliulI EVt:llt or Variation and submitting full supporting' ..~ 'Information. If the Contractor has failed to give early warning of

a delay or has failed to cooperate in dealing with a delay asforeseeable by an experienced contractor, the delay by thisfailure shall not be considered in assessing the new IntendedCompletion Date.

SECOND EDITION" JANUARY 2007

PROClIREMENT OF WORKS

27. Programme

28. Extension of the.Intended

,_ Completion pate···.t·,~ '~.. ~

29. Acceleration

Section 3 - Con<!i!~.:.::~::, of Contract

B. Time Control

27.1 Within the time stated in the Contract Data, the Contractor shallsubmit to the Engineer for approval a programme showing theg~IJ~&~:J;':,:!m.~$.~~8~, arrangements, order, and timing for all theactiv1tii~s~4iti'tlltfWorks.

27.2 An 'update of the programme shall be a programme showing~,the

actual progress' achieved on each activity and the effect of theprogress achieved on the timing of the remaining work, includingany changes to,~he sequence of the activities.

.1,

27.3 The Contractor' shall submit to the Engineer for approval anupdated programme at intervals no longer than the period statedin the Contract Data.

27.4 If the Contractor does 'not submit a program in accordance withSub-Clause 27.1 above or an updated programme in accordancewith Sub-Clause 27.3 above, within the periods specified, theEngineer may withhold the amount stated in the Contract Datafrom the next payment certificate and continue to withhold this ._amount until the next payment after the date on which theoverdue programme has beet:t submitted.

27.5 The Engineer's approval of the programme shall not alter theContractor's obligations. The _Contractor may revise theprogramme and submit it to the Engineer again at any time. Arevised programme shall show the effect of Variations andCompensation Events.

28.1 The Engineer shall extend the Intended Completion Date if aCompensation Event occurs or a Variation is issued whichmakes it impossible for completion to be achieved by theIntended Completion Date without the Contractor taking steps toaccelerate the remaining work, which would cause theContractor to incur additional Costs.

29.1 When the Employer wants the Contractor to finish before theIntended Completion Date, the Engineer will obtain pricedproposals for-~achieving the necessary acceleration from theContractor. .If the Employer accepts these proposals, theIntended Compl~tion Date will be adjusted accordingly andconfirmed by both the Employer and the Contractor.

44Institute for Construction Training and Development (leTAD)

Page 46: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCllREl\-lENT OF WORKS Section 3 - Conditio;:'" 0'/ Contract

c. Quality Control

33. IdentifyingDefeC~~~e Engineer shall check the Contractor's work and notify the\ u!SU~cfn~acto~ of any Defects that are fou~d and shall specii! a time\ wJthln which the defects are to be rectified. , Such checking shall"", Alot affect the Contractor's responsibil ities. '('he Engineer may

instruct the Contractor to search for a Defect and to uncover andtest any work that the Engineer considers may have a Defect.

SECOND EDITION, JANUARY 2007 Institute for Construction Training and Development.(JCTAD)45

35.1 The Engineer shall give notice to the Contractor of any Defectsbefore the end of the Defects Liability Period, which begins atcompletion, and is defined itl the Contra~tData.

34.1 If the Engineer instructs the Contractor to carry out a test whichis not specified in the Specification or Bills of Quantities insufficient detail to enable the Contractor to have priced orallowed for the same in the Bid and the test shows that theworkmanship or Material is defective then the Contractor shallpay for the tests and samples. If there is no def~ct the test shallbe a Compensation Event.

32.2 The Contractor shall cooperate with the Engineer in making andconsidering proposals for how the effect of such an event orcircumstance can be avoided or reduced by anyone involved inthe work and in carrying out any resulting instruction of theEngineer.

32.1 The Contractor shall warn the Engineer at the earliestopportunity of specific likely future events or circumstances thatmay adversely affect the quality of the ~'ork, increase theContract Price or delay the execution of the Works. TheEngineer may require the Contractor to provide an estimate ofthe expected effect of the future event or circumstance on theContract Price and Completion Date. The estimate shall beprovided by the Contractor as soon as reasonably possible.

3 1.2 The Engineer shall record the business of management meetingsand provide copies of the record to those attending the meetingsand 'to the Employer. The responsibility of the Parties for actionto be taken shall be decided by the Engineer either at themanagement meeting or after the management meeting andstated in writing to all who attended the meeting and to theEmployer.

31.1 Either the Engineer or the Contractor may require the other toattend a management tneeting. The business of a managementmeeting shall be to review the progranlme/progress for theremaining work.

30.1 The Engineer may instruct the Contractor to delay the start orprogress' ofatiy activity within the Works.

29.2 If the J Contractor's priced proposals for an acceleration areaccepted by the Employer, they are incorporated in the ContractPrice and treated as a Variation.

35. Correction ofDefects

34. Tests

32. EarlyWarning

31. ManagementMeetings

30. Delays Ordered bythe Engineer

Page 47: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCI JREMENT OF WORKS Section 3 • CondH}.~.~~~~~. ui' Contract

SE(:O~D EDITION, JANlIARY 200746

Institute for Construction Training and Development (ICTAD)'

39.3 ':Th~ Contractor shall execute and be bound by each Variation,."';;-I·(ilnless·:the Contractor promptly gives notice to the Engineer with. supporting documents to establish that he cannot obtain the

necessary Equipment, Materials, Plant & Temporary Works or anyof them as appropriate, required for the Variation. Upon receivingthis notice, the Engineer' shall re-confirm, vary or cancel theinstruction·:

39.2 Variations may be ordered by the Engineer provided thecumulative value of all such variations issued does not exceed a

:.:( sum specified in the Contract Data. Any variation ordered above, this limit would need the prior approval of the Employer.

38.2 The Engineer shall not adjust rates arising from changes inquantities if thereby the Initial Contract Price is exceeded exceptwith the prior approval of the Employer.

37.1 The Bills of Quantities shall contain items for the construction,installation, testing, and commissioning work to be done by theContractor.

37.2 The Bills of Quantities is used to calculate the Initial ContractPrice. The Contractor is paid for the quantity of the work done atthe rate in the Bills ofQuantities for each item.

D. Cost Control

38.1 If the final quantity of the work done differs from the quantity inthe Bills of Quantities for the particular item by more than 25percent, provided the change exceeds one (1 ) percent of the InitialContract Price, the Engineer shall re-examine the rate based onmarket conditions and adjust the rate to allow for the changedquantity exceeding the 25 percent.

36.1 If the Contractor has not corrected a Defect within the timespecified in the Engineer's notice, the Engineer will assess thecost of having the Defect corrected, and the Contractor 'will paythis amount.

35.3 On completion of the Defects Liability P~rjod and correction ofDefects in' accordance with Sub-Clause 35.2 or 36.1, and oncertification of the final payment, the Engineer shall issue theFinal Certificate to the Contractor.

35.2 Every time notic.e of a Defect is given, the Contractor shallcorrect the notified Defect with'in the length of time" specified by'the Engineer's notice. . . . ,!~

38.3 If requested by the Engineer" the Contractor shall provide theEngineer with a detailed cost breakdown of any rate in the Bills of

uantities.

~~&@Y iations may be initiated by the gngineer at any time prior tois uing the Certificate of Completion for the Works, either by an

, ·nstructio~ or by a request for the Contractor to submit a proposal.

39. Variations

38. Changes in theQuantities

37. Bills of 'Quantities

36. UncorrectedDefects

Page 48: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCllREMENT OF WORKS Section 3 - Condi~.i.o~l'::. ·~·f Contract

SECOND EDITION, JANUARY 2007

40. Payments forVariations

39.4 Each Variation may include:(a) changes to the quantities of any item of work included in the

Contract (however, such changes may not necessarily arise froma written order);

(b) changes to tbe quality and other characteristics of any item ofwork;

(~) ~hRne~S to the levels. ,positions and dimensions of any part ofthe Works;

(d) omission of any work other than work intended to be carried outby others;

(e) any additional work, Plant, ~v1aterials or services necessary forthe Works, including any associated Tests on Completion,boreholes and other testing and exploratory work; or

.39.5 The Contractor shall not make any alteration and/or modificationof the pennanent Works, unless and until the Engineer instructs orapproves a Variation.

39.6 All Variations shall be included in updated programmes producedby the Contractor.

40.1 . The Contractor shall provide the Engineer with a quotation forcarrying out the Variation when requested to do so by theEngineer within 07 Days or such extended time given by theEngineer. The Engineer shall assess the quotation before theVariation is ordered, taking into consideration the provision givenin the Contract Data.

40.2 If the work in the Variation corresponds with an item descriptionin the Bills of Quantities and if, in the opinion of the Engineer, thequantity of work within the limit stated in Sub-Clause 38.1 or thetiming of its execution do not cause the cost per unit of quantity tochange, the rate in the Bills of Quantities shall be used tocalculate the value of the Variation. If the cost per unit ofquantity changes, or if the nature or timing of the work in the

//""-iriation does not correspond with items in the Bills ofI n~h\r£ antities, the quotation by the Contractor shall be in the form of\ U~U~Ie rates for the relevant items of work.\ / ..

'~O.3/tf the Contractor's quotation is unreasoilabJe, the Engineer may;order the Variation and make a change to the Contract Price,which shall be based on the Engineer's own forecast of the effectsof the Variation on the Contractor~s Costs. The contractor mayrefer the matter to the adjudicator if he disagrees with the ratedecided by the Engineer.

40.4 If the Engineer decides that the urgency of varyjng the worl<would prevent a quotation being given and considered withoutdelaying the work, no quotation ~hal1 be given and the Variationshall be treated as a Compensation Event.

40.5 .The Contractor shall not be entitled to additional payment forCosts that could have been avoided by giving early warning.

47Institute for Construction Training and Development (leTAD)

Page 49: ICTAD Procurement of Work ICTAD SBD 01-2007

PR()ClIREMENT OF WORKS Section 3 - Conditl.c:~~:~ of Contract

41.- Cf'sh FlowForecasts

41 .1 When the Pro~amme is updated, the Contractor shall provide thehngloeer with all ulJl1dl~d cll!h flo\\' for~c3rt.

43.2 If an amount certified is increased in a later certificate or as aresult of an recommendation by the Adjudicator or an Arbitrator,

/ the Contractor shall be paid interest upon the delayed payment as

~s out in this clause. Interest shall be calculated from the date

~~I4\~P n which the increased amount would have been certified in~h absence ofdispute. ,.

~Unless otherwise stated. all payments and deductions will be paidor charged in the proportions of currencies comprising the

.I" Cbntract Price.. r L,' i .U " ,', ~:{ :~ H

48Institute for Construction Training and Development (leTAD)

i,1

42.6 The Engineer may exclude any item certified in a previouscertificate or reduce the proportion of any item previouslycertified in any certificate in the Iight of later information.

43. 1 Payments shall be "adJusted for deductions for advan.G~.;,pa)lr;,entsand retention. The Employer shall pay the Contractor theamounts certified by the Engineer within 14 pays of the date ofeach certificate. If the Employer makes a late payment theContractor shall be paid interest on the late payment in the nextpayment. Interest shall be calculated from the date by which thepayment should have been made up to the date when the latepayment is made at the rate of interest of 1% over the prevailinglending rate of the Central Bank to Commercial Banks.

42.5 The value of work executed shall include the valuation ofVariations and Compensation'Events and the 80% of the value ofthe Materials brought to the Site for the pemlanent Works butnot incorporated in such Works.

42.4 The value of work executed shall comprise the value of thequantities of the items in the Bills of Quantities completed.

42.3 The value of work executed shall be determined by the Engineer.

42.2 The Engineer shall check the Contractor's monthly statement andcertify the amount to be paid to the Contractor within 21 days ofthe receipt of the Contractor's statement.

42.1 The Contractor shall submit to the Engineer monthly statementsof the estimated value of the work executed less the cumulativeamQ~nt:~ertifiedpreviously,.

41..1. T~~t ~~lIo.wing'shall 0 b,~ C9~.pensation Events:~ .:.,. '. .~ ." ':. . ..' .. ': -. - .

", (a)"t~e Employer does not give access to a part of the Site by thesite possession date stated in the Contract Data.

~:'; ... :~:,1l~:4 Items of the Works for which no rate or price has been entered in;","ill n~oi 'be paid for by the Employer and shall be deemed

:., 'bov€:redby other rates and prices in the Contract..~!\:. .

(b) the Employer modifies the .~cheduleofother contractors in away that affects the work of the Contractor under theContract:

. f

i . ~ .~ ;~c.- r.

44. Compe'o'sationEvents

SECOND EDITION, JANUARY 2007

43. Payments

I.

42. PaymentCertificates

Page 50: ICTAD Procurement of Work ICTAD SBD 01-2007

--,

PROC\IREMENT OF WORKS Section 3 - Conditio~?:.yfContract

(c) other c'ontractors, public authorities, utilities, or the Employerdoes not work within the dates and other constraints stated in theContract, and they cause delay or extra cost to the Contractor.

(d) the Engineer orders a delay or does not issue Drawings,Specifications, or ,instructions required for execution of theWorks on time, inspite of the Contractor requesting for suchinformation in advance.

(e) ground conditions at the time of issuance of the Letter ofAcceptance arc substantially more adverse than cuuld reasonablyhave been assumed from the infonnation issued to bidders(including the site investigation reports) and from informationavailable publicly and from a visual inspection of the Site at thetime of closing of the Bid.

(t), the Engineer gives an instruction for dealing with an unforeseencondition, caused by the Employer, or additional work requiredfor safety or other reasons.

(g) the advance payment is delayed.

(h) the effects on the Contractor of any of the Employer's Risks.

(i) the Engineer delays issuing the monthly paylnent certificatesunreasonably.

0) the Engineer unreasonably delays issuing a Certificate ofCompletion.

(k) the Engineer instructs the Contractor to uncover or to carry-outadditional tests upon work, which is then found to have nodefects.

(I) the Engineer instructs the Contractor to suspend progress of partor all of the Works, in accordance with Sub Clause 64.1 and thecause of suspension is not the responsibility of the Contractor.

/~her Compensation Events described in th~ Contract Data or

(~©lf&[Q)e rmined by the Engineer. _

4\? If a C mpensation Event would cause additiona.l CosLs or would", r t the work being completed before the Intended Completion

Date, the Contract Price shall be increased and/or the ,IntendedCompletion Date shall be extended. The Engineer shall decide whetherand by how much the Contract Price shall be increased and whetherand by how much the Intended Completion Date shall be extended.

44.3 As soon as information demonstrating the effect of each CompensationEvent upon the Contractor's forecast Costs has been provided by theContractor, it shall be assessed by the Engineer, and the Contract Priceshall be adjusted accordingly". If the Contractor's fprecast is deemedunreasonable, the Engineer shall adjust the Contract Price based on theEngineer's own forecast. The Engineer will assume that the Contractorwill react competently and promptly to,the event.

. 49SECOND EDITION. JANlJARY 2007 Institute for Construction Training and Development (leTAD)

Page 51: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCUREMENT OF WORKS

44.4! ;Th~¥ C6ntractor shaH not be entitled to compensation to the extent thatthe: 'Em'ployer's interests are adversely affected by the Contractor not'hav·ing giyen early warning or not having' cooperated with theEngine:er~..:..'.... .

45. Change in Law 45.1 The Engi~$~?~~{:'~~~~J;k;~.a~Justthe Contract Price for any Change in Lawduring the 'penod commencing 28 Days prior to the closing date of.Bids and. ~~~ing on the date of issuance of the Certification ofCompletion;"p:r~~Tminationpursuant to Clause 59. The adjustment shallbe the change in: the a~ount of tax, duties and other levies payable bythe Contractor provided such changes are not already reflecteci in theContract Price. or are a result of Clause 47.1 or otherwise.

Institute for Construction Training and Development (leTAD)

For purposes of this sub clause, Change in Law means the enactmentof any new LaW or':a--c~~nge to' existing legislation and the repeal of , ormodification r6f;ex·istin·g;.ta~sof the country, including any regulationsmade, and/or 'directives is~ued thereunder, or a change in the judicialinterpretation and the application of any Law by a competent Court ascompared to such interpretation or application by a Court prior to thedate of this agree~ent,..and which relates to taxation or imposition ofrationing, proscribing "any;: activity or relates to duties and otherimport/export levies which in each case is beyond the control of theContractor and mater·ially~ffects the performance of the Contractor'sresponsibilities under the Contract.

50

No other adjustment of the Contract Price on account offluctuations of inputs shall be made, notwithstanding the fact thatthe contractor has to pay additional amount und~r specialcircumstances.

(a) The adjustment to the payritent certificates in respect of Changesin Cost and Legislation ..~hall be determined frOln following

~rmula: ..

(n~f6\lfIll 0.966 (V - YnJ . ~.. "~.~,Px Ux.£-=-.lx.Jll\ U~ U[;£V 100 AH>J.!lputs I Xb

~ere:

F = Price adjustment ~f~:~he period concerned.V = Current valuatiori ~(workdone for the period.Vna Value of non adjustable element or value of work not

considered for pric~ variation.Px Input percentag~.. of\nput named X.1xc Current indice~:of.itlput X.1xb Base indices of input X.

47.1 Unless otherwise stated in the Contract Data the amounts computedfrom the formula given under this sub-clause in respect of the rise orfall in the cost of labour, Material, Plant and other inputs to theWorks, shall be added to or deducted from the payment to theContractor.

46.1 Where payments are mad~:~n currencies other than Sri Lankan Rupees,the exchange rates used for calculating the amounts to be paid shall bethe exchange rates stated in the Contract Data.

SECOND EDITION. JANUARY 2007

47. PriceAdjustment

46. Currencies

Page 52: ICTAD Procurement of Work ICTAD SBD 01-2007

SECOND EDITION, JANUARY 2007

'---Il

PROCl!REMENT OF WORKS

48. Retention

Section 3 - Conditior.',', :·r Contract

(b) The "Input Percentage" means the percentage proportionatecontribution of any input in terms of cost of the construction based

" . on the prices prevailing on one month prior to submission of theBid and listed under Clause numbered 47 in Contract Data.

(c) The "Non:,adj~~~8:Q;le,elements" means,

(i) The work done under the BOQ items that shall not beconsidered for valuation of price adjustment which are listedunder Clause 47 in Contract Data.

(ii) Extra work or additional work carried out by the Contractoron orders of the Engineer and are valued under Clause 40based on the prices prevailing at the time of execution.

(iii) Works done under Dayworks rates.

(iv) The "Current Valuation" means the gross value of workexecuted during the current valuation period and w.ill includethe cost of Materials the contractor has purchased or delivered.to site but were not consumed for the physical work done.

(v) The "Indices" means the monthly indices published byInstitute for Construction Training and Development fordifferent Inputs.

(vi) "Base Indices" means the indices for the input, prevailing onemonth prior to the latest date for submission of Bids.

(vii)In the case of first interim bill, the current indices for thepurpose of calculation of price adjustment shall be taken asthe indices prevailing on first month after the commencementof the Contract. For any other interim claim or for the finalclaim the current indices shall be taken as the indicesprevailing for the calendar month, one month after theprevious valuation was done.

If the Contractor fails to complete the Works within the time for/----....~ompletion prescribed under Clause 17 or 28 the price adjustlnent

(

fo~the work performed after the due date of completion as~©lJlA\~s ribed above shall be ~ade using the current indices prevailed

I rul&t e due date for completion./ -

'--fhe weightings for each of the Inputs of'cost given in thisClause sh"all be adjusted it: in the opinion of the Engineer, theyhave been rendered unreasonable, unbalanced or inapplicable as aresult of varied or additional work already executed or instructedunder Clause 39 or for any other reason.

48. 1 The Employer shall retain from ~ach payment due to the Contractor theproportion stated in the Contract Data subject to the limit of retentionstated in the Contract Data..

48.2 'On Completion of the whole of the Works, first half the total amount. retained shall be repaid to the Contractor and second half when theDefects Liability Period has passed and the Engineer has certifie-d'thatall Defects notified by the Engineer to the Contractor before the end ofthis- period have been corrected.

51Institute for Construction Training and Development (lCTAD)

Page 53: ICTAD Procurement of Work ICTAD SBD 01-2007

SECOND EDITION, JANllARY 2007

~ 48.3

BM *

PROClJREMENT OF \VORKS

49. LiquidatedDamages

so. Bonus'

51. AdvancePayment

52.. Securities

Section 3 - C{Jnditip~~;:~. ~f Contract

As an alternative upo~ the i"ssue of the Certificate of Completion theContractor may' submit an unconditional, on demand guaranteeacceptable to the Employer to a value equal to the second half of theretention money, and valid up to 28 days beyond the end of DefectLiability Pe~i(),p,., .. iOn receipt of such guarantee the Employer shallrepay the second half of the retention money.

49.1 The Contractor s~.~J1 pay liquidated 'damages to the Errlployer at therate per Day staled in the Contract Data for each Day that theCompletion Date is later than the Int~nded Completion Date. The totalamount of liquidated danlages shall not exceed the amount defined in

,the Contract Data. The Employer may deduct liquidated damages frompayments due to the Contractor. Payment of liquidated damages shallnot affect the Contractor's liabilities.

49.2 If the Intended Completio.n Date is ~xtended after liquidated damageshave been paid, the Engineer shall correct any overpayment ofliquidated damages by the Contractor by adjusting the next paymentcertificate.· The Contractor shall be paid interest on the overpayment,calculated from the date' of payment to the date of repayment, at therates specified in Sub-Clause 43. 1.

5~:..1 The Contractor shall not be entitled to a bonus unless otherwise statedin the Contract Data .

51.1 The Employer shall make advance payment to the Contractor in anamount equivalent to 20% of the Initial Contract Price excluding

, provisional sums and contingencies, within 14 Days after furnishing ofan unconditional guarantee in a fonn and by a bank or a companyacceptable to the Employer. The guarantee shall remain effective until

o the advance payment has been repaid, but the amount of the guaranteeshall be progressively reduced by the amounts repaid by the Contractor.Interest will not be charged on the advance payment. 0

51.2 The Contractor is to use the advance payment only to pay forEqUipment, .Plant, Materials, and mobilization expenses required

/" · catty ·f().r execution of the Contract. The Contractor shallI. demonJ1ate that advance payment has been used in this way by(~~~in copies of invoices or other docu~ents to the Engineer.

5~ The vance payment shall be repaid by deducting proportionateamounts from payments otherwise due to the Contractor, following theschedule of-completed percentages of the Works on a payment basis.The advance payment shall be repaid in fu 11 when the total certifiedvalue of work reaches 90% of the Initial Contract Price. No accountshall be taken 'of the advance payment or its repayment in assessingvaluations of work done, Variations, price adjustments, CompensationEvents, Bonuses, or Liquidated Damages.

52.1 0 The pe~ormance security shall b~.provided to the Employer no laterthan the date specified in the Letter. of Acceptance and shall be issuedin an amount specified in Contract Data and in the form of aunconditional guarantee acceptable to the Employer. The performancesecurity shall be valid until a date 28 Days beyond the IntendedC~mpletion Date as specified under Sub-Clause .17 and Sub-Clause 28.

52Institute for Construction Training and Development (lCTAD)

Page 54: ICTAD Procurement of Work ICTAD SBD 01-2007

54. Cost of Repairs 54.1 Loss or damage to the Works or Materials to be incorporated in theWorks between the Start Date and the end of the Defects LiabilityPeriod shall be remedied by the Contractor at the Contractor's Costs ifthe loss or datnage arises frolll the Contractor's acts or omissions.

SECOND EDITION, JANUARY 2007

E. Finishing the Contract

53Institute for Construction Training and Development (leTAD)

The Contractor shall supply the Engineer an account of the tinalamount that the Contractor considers payable under the Contract, afterCOITPQtion of all De.fects notified and within 7 Days after the end ofDefect Liability Period. The Engineer shall certify any payment that isdue to the Contractor within 42 Days of receiving the. Contractor~saccount if it is correct and complete. If it is not, the Engineer shallissue within 14 Days a schedule that states the scope of the correctionsor additions that are necessary. If the final account is stillunsatisfactory after it has been resubmitted, the Engineer shall decideon the amount payable to the Contractor and issue a payment

57.2

57.1 The Contractor shall supply the Engineer with a detailed account ofthe amount that the Contractor considers payable under the Contractwithin 21 Days after issuing of Certificate of Completion. TheEngineer shall certify any payment that is due to the Contractor within42 Days of receiving the Contractor's account if it is correct andcomplete. If it is not, the Engineer shall issue within 14 Days a

/'" c ule that states the scope of the corrections or additions that are( necess . If the account is still unsatisfactory after it has been(n~i ed, the Engineer shall decide on the amount payable to the, U~<!:!~c,or and issue a payment certificate. The Employer shall pay the~contr~or the amount certified within 28 Days of the issue of

Etrgfueer's certification on the amount due. The contractor wi 11 beentitled to interest rate and in the same manner as stipulated in Clause43.1 if payments as stipulated herein are delayed.

56.1 The Employer shall take over the Site and the Works within 7 Days ofthe Engineer's issuing a Certificate of Completion.

55.1 The Contractor shall request the Engineer to issue a Certificate ofCompletion of the Works, and the Engineer will do so upon decidingthat the work is completed. Upon completion of the Defects LiabilityPeriod the contractor shall request the Engineer to issue a FinalCertificate and the Engineer shall issue the Final Certificate upon beingsatisfied that the Contractor has rectified the Defects.

53.3 The Contractor shall be paid for Dayworks subject to'obtaining signedDayworks fonns.

53.2 All work to be paid for as Dayworks shall be recorded by theContractor on forms approved by th-e Engineer. Each completed formshall be verified and signed by the Engineer within tw'O days of thework being done.

53.-1 If applicable, the Dayworks rates in the Contractor~sBid shall be usedfor small additional amounts of work only when Engineer has givenwritten instructions in advance for additional work to be paid for in thatway.

57 Cl Statement atCompletion

56. Taking Over

55. Completion

53. Dayworks

PROClIREl\'IENT OF WORKS

Page 55: ICTAD Procurement of Work ICTAD SBD 01-2007

PROClIREMENT OF WORKS .

58 Operation andMalntenKllceManuals

59. Termination

certificate. The Employer shall pay the contractor the amount certifiedwithin 35 Days of the issue of Engineer's certification on the amountdue. The contractor will be entitled to interest rate and in the samemanner as stipulated in Clause 43.1 if payments as stipulated herein aredelayed.

58.1 If "as built" Drawings and/or operating and 1l1aintenance manuals arer8quired, the Contractor shall supply them by the dates stated in theContract Data.

58.2 If the Contractor does not supply the Drawings and/or manuals by thedates stated in the Contract Data, or they do not receive the Engineer'sapproval, the Engineer shall withhold the amount stated in the ContractData from payments due to the Contractor.

59.1 The Employer or the Contractor may terminate the services under theContract ·if the other Party causes a fundamental breach of theContract.

59.2 Fundamental breaches of Contract shall include, but shall not belimited to, the following:

(a) the Contractor stops work for 28 Days when no stoppage of workis shown on the current progr.amme and the stoppage has notbeen authorized by the Engineer;

(b) the Employer or the Contractor is made bankrupt or goes intoliquidation other than for a restructuring or amalgamation;

(c) a monthly payment due to the Contractor is not paid within 91Days from the submission of the Contractor's statement;

(d) the Contractor does not maintain the performance security,which is required;

(e) the Contractor has delayed the completion of the Works by thenumber of Days for which the maximum amount of liquidateddamages can. be paid as defined in the Contract Data; and

/ ..~---~

(' . I~f) . th,e Engineer instructs the Contractor to suspend the progress of~@lj~®th~whole of the Works, and the instruction is not withdrawn in~jcordance with the provisions of sub-clause 64.4; .

(g) The Contractor has engaged in corrupt or fraudulent practices, incompeting for or in executing the Contract,

For the purpose of this Sub-Clause:

·"corrupt practice" means the offering, giving, receiving or soliciting of~ny thing of value to influence the action of a public official in theprocurement process or in Contract execution;

"frau.dulent practice" means a misrepresentation of facts in order toinfluence a procurement process or the execution of a Contract to thedetnment of the Employer, and includes collusive practice amongbidders (prior to or after bid submission) designed to establish bidprices at artificial non-competitive levels and to deprive the Employerofthe benefits offree and open competition.

SECOND EDITION. JANljARY 200754

Institute for Construction Training and Development (JCTAD)

Page 56: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCllREMENT OF WORKS Section 3 - Condit~r:':;:.)Y Contract

59.4 Notwithstanding the above, the Employer may terminate the Contractfor convenience.

59.3 When either Party to the Contract gives notice of a breach of Contractto the Engineer for a cause other than those listed under sub-clause59.2 above, the Engineer shall decide whether the breach isfundamental or not.

Institute for Construction Training and·Development (leTAD)

60.2 If the Contract is terminated for the Employer's convenience orbecause of a fundamental breach of Contract by the Employer, theEngineer shall issue a certificate for the value of the work done.,Materials ordered, the reasonable ·cost of removal of Equipment,repatriation of the Contractor's personnel employed solely on theWorks, and the Contractor's Costs of protecting and securing theWorks, and less advance payments outstanding up to the date of thecertificate. The Contractor shall be entitled to claim for any loss ofprofit or other loss or damage sustained by the Contractor as a resu It ofthe termination.

55

63.1 Provisional Sum means a sum included in the Contract and soz- desi~nated in the Bills of Quantities for the execution of any part of

the. Works or for the supply of goods~ Materials, Plant or services~

which sum may be used, in whole or in part or not at all, on theinstructions of the Engineer.

61.1 All Materials on the Site, Plant, Equipment, Temporary Works, andWorks shall be deemed to be the property of the Employer if theservices of the.Contractor under the Contract is terminated because of

/"~ontractor'sdefault. Co"ntractor's Equipment thus retained will/' ...

~/ be re~lsed to the Contractor only upon the payment of all the debt~~ e Employer. During such period the Employer may use such

\.':,}~Pl ent for the completion of Works at his discretion.

62.~ Contract is frustrated by the outbreak of war or by any otherevent entirely outside the control of either the Employer or theContractor, the Engineer shall certify that the Contract has beenfrustrated. The Contractor shall make the Site safe and stop work asquickly as possible after receiving this certificate and shall be paid forall work carried out before receiving it and for any work carried outafterwards to which a commitment was made.

60.1 If the services of the Contractor under the Contract is terminatedbecause of a fundamental breach of Contract by the Contractor, theEngineer shall issue a certificate for the value of the work done andMaterials ordered less apvance payments remaining to be recovered atup to the date of the issue of the certificate and less the percentage toapply to the value of the work not completed, Additional liquidateddamages shall not apply. If the total amount due to the Employerexceeds any payment due to the Contractor, the difference shall be adebt payable to the Employer.

59.5 If the Contract is terminated, the Contractor shall stop workimmediately, make the Site safe and secure, and leave the Site as soonas reasonably possible.

61. Property

62. Release from.Performance

63. ProvisionalSums andNominatedSub-

. Contracting

SECOND EDITION, JANlIt\RY 2007

60. Payment uponTermination

Page 57: ICTAD Procurement of Work ICTAD SBD 01-2007

PROClJREMENT OF '\fORKS Section 3 - Conditic~s.~:.~:)f Contract

63.4 In the Contract "nominated subcontractorl1 means a subcontractor:

63.2 For each provisional sum, the Engineer may instruct:

56Institute for Construction Training and Development (ICTAD)

(a) the work on Plant or delivery of Plant and/or Materials has beensuspended for more than 28 Days, and

64.3 The Contractor shall be entitled to payment of the value (as at the dateof suspension) of Plant and/or Materials which have not been deliveredto Site, if:

64.2 If the Contractor suffers delay and/or incurs Costs from complyingwith the Engineer's instructions under Sub-Clause 64.1 and/or fromresuming the suspended work, the Contractor shall give notice to theEngineer and shall be a Compensation Event.

64.1 The Engineer may at any time instruct the Contractor to suspendprogress of part or all of the Works. During such suspension, theContractor shall protect, store and secure such part or the Worksaga· st any deterioration, loss or damage.

~@8 ineer may also notify the cause for the suspension. If and to theextent that the cause jinotified and is the respon~ihility of the

'~ actor, the following Sub-Clauses 64.2, 64.3 and 64.4 shall notapply.

63.7 The Contr~ctor will be entitl~d to a payment of an amount of 8% ofthe amount certified by the Engineer as payment due to nominatedsubcontractor, as attendance fees.

(~) who is' stated in Contract as befng nominated subcontractor~ or

(b) whom the Engineer instructs the Contractor. under Clause 39, toemploy as a subcontractor.

(a) . Work ~9 be executed (including Plant, Materials or services tobe supplied) ';'by the Contractor and valued under Clause 40~

and/or ~'

(b) Plant, Materials or services to be purchased by the Contractor,from a nominated subcontractor as define under Sub-Clause 63.4or otherwise.

I'

63.6 If the Works is executed by a nominated sub-contractor the Contractorshall pay to the nominated subcontractor the anl0unts which theEngineer certifies to be due in accordance with the subcontract.

63.5 The Contractor shall not be under any obligation to employ anominated subcontractor against whom the Contractor raisesreasonable objection by notice to the Engineer as soon as practicable,with supporting particulars.

63.3 If executed by the Contractor, the total sum paid to the Contractorshall include only such amounts, for the work, supplies or services towhich the provisional sum relates, as the Engineer shall ,haveinstructed.

SECOND ED}TION.. JANUARY 2007

64 Suspension ofWorks

Page 58: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCIIRE1\'IENT OF WORKS Section 3 - Conditions of Contract-:....:.~~~..;.::.:..-:.....;=-----.,;;.~~------_._---,---------------

~l

I

(b) the Contractor has marked the Plant and/or Materials as theEmployer's property in accordance with the Engineer'sinstructions.

64.5 After the permission or instruction to proceed is given, the Contractorand the Engineer shall jointly examine the Works and the Plant andMaterials affected by the suspension. The Contractor shall make goodany deterioration or defect in or loss of the Works or Plant orMat~rials, which "has occurt~ed during the suspension.

~-.......,/ .\

(~@Lr&@)'''-----',;/'

64.4 If the suspension under Sub-Clause 64.1 has continued for more than84. Days, the Contractor may request the Engineer's permission toproceed. If the Engineer does not give pernlission within 28 Days afterbeing requested to do so, the Contractor may, by giving notice to theEngineer, treat the suspension as an omission under Sub-Clause 39 ofthe affected part of the Works. If the suspension affects the wholeof the Works, the Contractor may give notice of termination underSub-Clause 59

57Institute for Construction Training and Development (IC'rAD)SECOND EDITION .. JANlJARY Z007

l

Page 59: ICTAD Procurement of Work ICTAD SBD 01-2007

Section .. 4

FORM OF BID AND QUALIFICATIONINFORM·ATION

Note:

The Form of Bid and Qualification Information included in thispublication are samples. The Procuring Entity may modify theQualification Information and include the Form of Bid andQualification Information as Section 4 in Volume 2 before issumlce ofthe Bidding Documents.

Note:

Bidders are advised to consider the information printed in bluecolour in the document as a..checklist, when submitting their bids.However, it is the responsibility of the bidders to comply lvith allthe requirements given ill the bidJill~ ducufnefli.

59

Page 60: ICTAD Procurement of Work ICTAD SBD 01-2007

Witness

Address

NalTIC ot~ COlltract:* .

61

Section 4 - Form of Bid and Qualification Information

Institute for Constructiotl Training and Development (lCTAD)

Form of Bid

We understand that you are not bound to accept the lo'\vest or any liid you Inay receive.

Having examined the Standard Bidding Document - Proc.urement of Works [leTAD/SBD/O I- Second Edition. January 20071~ Specifications" Drawings and Bills of Quantities andAddenda for the execution of the above-n~med Wt1~ks" \-ve the undersigned, offer to executeand complete such Works and remedy any defect therein in confornlity \vith the aforesaidConditions of Contract, Specifications, Drawings, Bills of Quantities a9P fa~enda for the sumof Sri Lankan Rupees ~ (LKR ) or\su~1 o\~ler SUlllS as maybe ascertained in accordance with the said Conditions. ~,/r"/:\ \ '\. \

\ ( \ \ \/r'"\ \ \ /-" \ \\, \

We acknowledge that the Contract Data forms pa~tfu: ~id. \ •(~ \ \~\,/)\ \ \ \ \ \ ' ..r''. 'v/

We undertake, if our Bid is accepted, to ~h1.plet\ce~i\e\~\rks\ai~pulated in the ContractData, and to complete the whole oj.-tQ~ ~or\s c\m~ri~~d In tile Contract within the timestated in the Contract Data. ((\ \ \ \ \ \\vr'\ \,,/

I \ \ \ \ \ \ '/r'/\ \ \ v/ \ ~ 'y/r'

We agree to abide by thi£Bic(for t\te ~~"f, o~ (insert number ofD(~vs in accordgpt1!ll'ith\Su1.9f-"la~stJl~lof l11strucjiol1S 10 Bidders) Days from the datefixed for receivr\lg ~r ~ny 'rx~ed"perlod and it shall remain bind ing upon us and may beacceptet'ilfa»y ~ilne1>pforethe 9piration of that period.

t (\,/".) \ \ V~ ~-, \ \

Unless 'and u~l a\fobnaI agreenlent is prepared and executed this Bid" together with yourwritten a~t,ce rtlereot~ shall constitute a binding contract between us.

,_........

We accept / "ve do not ac<;ept the Adjudicator.

Name ofthe Procuring Entity

SECOND EDITION, JANllARY 2007

6

Signature

7.

[)ated this day of 20 in the capacity ot duly authorized to sign It:l1u~rs (UI

alld 011 behalf" of .

(IN BLOCK CAPITALS)

5.

6.

4.

1.

3.

Note: l)rior to issue ofthe bidding doclllnenLs, the E111plo}'er should insert relevant data/or all itell1.\'

n1arked l1-'ith t.m iJsterisk (*).

Gentlenlan,

To:* [insert na~e <?/·Emplo.verlj

PROCllREMENT OF WORKS

Page 61: ICTAD Procurement of Work ICTAD SBD 01-2007

(* if requested only)

leTAD Re2istrationRe~jstration number (attach copies ofrelevant pagesfrol1l the registration book)

--,'

Grade

Speciality

Expiry Date

BacJdisted ContractorsHave you been declared as a defaulted contractor by NPA or any other Agency? (Yes/No)

IF yes provide details

VAT Registration }'Jumber

/It

Construction Program· (attach as annex) /'\.\ \...A \ ~ \

Legal status (attach relevant status copies, as annex)-('" ~ \ \ \Value of Construction works (attach copies ofcert~c~~r~~t~~t;,nt~ocumentsperformed in last S years* such as profit-loss and lne e n tur st e en

~ \

Year ..... (\ \ \' ~ \ \ //\ \..--"

Year ..... ,,/\ \ \ \ \\ \' \\ \\ \\./, \.

Year ..... ( \\~ \ \ \ \, 'v'"/\ \ ,/

Year ..... " (? \

\~\ \ ) ~\ \

Year ..... ~ \ ~ \ \) )V'

Value of similar wor~p~~eit) 1.~~

Year .................in last 10 years (ind~~IY e ~ 2. e Year ...............three largest projec s)~ , \ 3. Value Year ................

-~ \ V (attach copies ofCertificate ofCompletion etc., as annex)~\ )

..~.,::~ ~...t~~: -~~;~~~ :t~~:~: .~~:":,:;~::~ ~~:!~:!~~.~ ~:":\~}\\: :·:~}~:~:~;l~·':·: ~;:~}~! ~:·::~1~; :~:'~?~ ~\'::··;~;2~:·!~:}:~&::~:~:~;4:~ ~:~:~\,~:~:;·~r~: .~:~~:'i/:~ :;~·::r':·:~.~:5 ·~:~~:·:~:~L:·: ..~;:~:·::.':: .1:;".;..~.::" :L~ .;~.~:'::. ~ -:': t\

"-"Major items of construction 1. type Capacity ..................equipment proposed* 2. type Capacity ..................

,_.3.~e Capacity ....................

l'""i'"z:~ Capacity ...................s..ne

\Capacity ...................

l ~i;Wl.r;:~ .(.-':1. "if,

~~. £i ,~J M

Qualification and experience of k~~. Tech~al:staff- Site & Head Office ";,~" ,l;~~~":#'

(Permanent, Contract basis & 2.Consultants) * 3.

~

Managerial:] .2.

"3. ~. ,

Other information requested underITB Clause 4.1 *.

(To be completed and submitted by the bidder, with the Bid)

Procuring Entity sl].all.include only the requirement listed in the Bidding Data under ITB C/a~se .4.3

63

Section 4 - Form of Bid and Qualification" Infonnation

Institute for Construction Training and Development (lCTAD)

Qualification Information*

SECOND EDITION, JANlIARY 2007

PROCllREMENT OF WORKS

Page 62: ICTAD Procurement of Work ICTAD SBD 01-2007

Section - 5

BIDDING DATA AND CONTRACT DATA

Note:

The Bidding Data and Contract .Data included herein are Specimen. TheProcuring Entity may fill the necessary information and include them asSection 5 in .Volume 2 before issuance ofthe Bidding Documents.

65

Page 63: ICTAD Procurement of Work ICTAD SBD 01-2007

67

Section 5 - Bidding Data ~~2.:~ ~;JntractData

Institute for Construction Training and Development (leTAD)

The registration requiredlS

Specialty

Grade

~he Bid forms will be issued until l3 _

The source of funds is 14----------

located at ------"""'-I,p....-.-J,---Jp......lt-~_+_____\.-~------

This section should befi//ed by the Procuring Entity before issuance ofthe bidding documentName ofthe Legal entity to sign the ContractBrie/summary; including name, identification number, relationship to other contracts under the project etcInsert Contract period in days (refer Procurement N/anua/ 4.2.2)Specify name, designation and address for collection ofbidding documentsShall be a fee to cover the cost ofa set ofbidding documentsInsert times and dates ofissuing ofbidcljng documents; shall be one day prior to the deadlinefor submission ofbidsInsert GOSL or name ofthe funding agency

/3 Shall be same as Invitation to Bid; Guidance may be obtainedfrom Procurement lv/anual Section 5.3.5;

J.J

/z

J1

7

10

SECOND EDITION7 JANUARY 2007

13

8

9

(2.1)

(1.3)

(1.2)

G. Bidding Data'.

Address:

The Works consists of ~

Instructions to BiddersClause Referenc·e

(1.1) The Employer is

PROClJREi\'IENT OF WORKS

Page 64: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCliREl\J!ENT OF WORKS " SC'.::.~9j1 5 - Bidding Data and Contract Data

SECOND EDITION, JANUARY 2007

• ~ ~~tt~~~rutd~ rl :<~

Guidance may be obtainedfrom ~o!a;e~t\~~nualSection 5.3.4: Select only the appropriate documents from thelist provided, and add any other i~atio.'!fie requirements shall not be restrictive. Since ICTAD registration isincluded as a eligibility criteria, thefa~nsideredfor registration need not to be repeated.Only ifspecialized equipment neededSelect only relevant criteria and add any other relevant criteria,' the informatiun requested under Bidding Data clause4.3 should be amended to suit the specified criteria; if nothing is selected leave Bidding Data clause 4.4 blank;Guidance may be obta-;ned from Procurement J.,/anual Section 5.3.4. Special care must be taken for no~ to includerestrictive requirements ' .Amount should not be less than 1.5 times the annual value ofthe proposed work. Annual value ofthe proposed ~Vork iscalculated by dividing the twelve times the estimated value ofthe contract by contract duration expressed in A10nths.

(4.4)18

/7

/8

19

The following information shaH b~ prt:"vld~d in Section 4:

* leTAD Registration;. Registration number

Grade

Specialty

Expiry Date

* VAT Registration number

* Construction Programme

* Legal Status (Sole proprietor, Partnership, Company etc. )

* Total monetary value of construction work performed for each of thelast five years; (\

* Expe.rience in works of a similar nature and siz~e~ch of the lasttenyears; 0 \ . \ .

* Major items of constructbn equ~enf.\ pfof.\?Se~ ~\c~ out theContractl7

• /\S i \. (" \ \ v' ,

* Qualificat;ons and eXMen~ Oir'~~' ~te ~m~t and technicalpersonnel proposed fO~\\thth~ Co'~~t; \ \

* any other. ~) ~ \ \\ v'~ \ \\ . V .

* Ave g~fth~~~ v~ e of construction work performed in the-' It.. e~s h~)¥ b at least (state the amount19

)

\ \\ ' -t:\ ~ '1:: eri n~e' the construction of at least one contract of a nature and\ ~ \ omple' equivalent to the Works over the last 10 years (to complY'"- \. \jith this requirement. works cited should be at least 70 percent(~ completed);. ~. ...

~ * Proposals for the timely acquisition (own. lease. hire. etc.) of theessential equipment listed in the Bidding Data clause 4.1;

'7;;P~"'~>f~J':;'...~ '\.

:~~ :~

Institute for Construction Training and Development (leTAD)

-...- ._ .._-------_._-~------------~~

1

L

\

L

Page 65: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCllREMIENT OF ~~YORKS

69

s. e amount writtenver VAT component

Institute for Construction Training and Development (IeTAD)

~.

e a Bid-Securing Declaration using the form included in

E-mail

ed to bid in foreign currencies for following itemsforeign

Option 1

Bid shall include a Bid Security using the form included in Section 9.

VAT component shall notin the Fonn of Bid shall bshall be shown sep a el at

Employer's address for the purpose ofclarification is ;Name

Address

FaX

~(\'\ , \ \

The la~,guage of the bidding document shall be~ish\ " \.. \G .,,\

Any oth~r . \ \

* The minimum amount of liquid assets and/or credit facilities net ofother contractual commitments and exclusive of any advancepayments which may be made under the contract shall be not lessthan Rs.20

---

Usually estimated payments flow-over a period of3 months at the average (straight line distribution) construe/ion rate.Refer Procurement Manual 5.3.4.lYlandatory for any contract where the construction period exceed three monthsSelect "is" or "is not" .Insert only ifbiddt:rs are allowed to bid in foreign currencies under Clause J4. J.Shall be same as Invitation to Bid refir procurement manual 5.3./0Th~ per/uil should be reallslLc. Usually the pertod is Y1 - J4/ Uays jrom submission Dj·Bids.Select one ofthe options and delete the other .

* Fopowing technical and managerial Staff:

1.

2.

3..

SECOND EDITION, JANUARY 2007

(16.1)26

(12.0)

(13.4)21

(13.3)

(15.1)

(11.1)

(9.1)

20

2/

22

23

24..... '..

2S

26

Page 66: ICTAD Procurement of Work ICTAD SBD 01-2007

9

PROCl.IREI'WENT OF WORKS Section 5 • Bidding Data and Cl,.;nl(aci Data

(16.2)27 Bid Security shall be:'!"~

• for an amount ,[insert amount,4 should be the same as providedin the Invitation·to Bid].

• Valid until_' [insett the date, 28 Days beyond thevalidity ofthe Bid]

70

time ----

Institute for Construction Training and Development'(ICTAD)

Pre Bid meeting - venue date29

The Eruployer's address for the purpose of Bid submission is30

• issued by an agency acceptable to Employer using the form forbid security (unconditional guarantee) included in Section 9,Standard Forms.

Responsive bids will be classified into the following groups:

Group A: Bids offered by domestic bidders; andGroup B: all other Bids.

/\//~\ '. \

Contract name: \ \ \ \.\ '\\ \

//\ \ ,,\Contract no. \ (" \ \. \

r/\ \ \,/\ \ .\'\. \:Ni b Jl \ ,) \ \\,/j-\\ e \ \. \\7, \w ",)

For evaluation and compariso, 0 Bi s d ~b-~e 29.2, rates andprices quoted in fore~'c~en ie by he i ~rs will be converted to SriLanka Rupee~ing •i~';xc a e t ublished by the Central Bankof Sri Lank~ o~e te\rJay pr or to date ofclosing of Bids.

D~o~~o'~i~ors~ible for a 10% margin of preference in the/:~o a~jt 0 ~ids with those of bidders who do not qualiry for the( (~re~' e~e. To ligfule for domestic preference the bidder shall:\ ---... ' \"'--./i:\ \ '~a)\ be registered in Sri Lanka~ ('l5) have more than 50% ownership by nationals ofSri Lanka;

The following procedure win be used to apply the margin of preference:

JI

32

Delete ifbid securing declaration option is selected under 16. JInsert only ifpre-bid meeting will be conveyed'

29 Allow sufficient time to circulate the minutes ofthe pre-bid meeting and the bidders to consider the contentsofthe minutes in preparation ofthe bid

30 ,Shall be SUI1lt!. tJ.J Invitation to BidShall be minimum of21days from the noticeinsert only ifbidders are allowed to bid inforeign currencies under Clause 14./insert only ifforeign bidders are aI/owed to bid and source o/funds is not World Bank or Asian DeveloplnentDunk, ifutjod, modijjl thp qualification i'lformation under clause 4. / to suit.

SECOND EDITION, JANUARY 2007

JJ

28

27

(20.1)

(28.1)32

(19.2) b

(19.2) a

Page 67: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCVREi\tlENT OF WORKS Section 5 - Bidding Data an~...: ·~·tnfact Data

(31.1)34 If the p:rocurement is within the authority lilt'it ofa CAPe:

SECOND EDITION, JANUARY 200771

of the Initial Contract

Institute for Construction Training and Development (lCTAD)

The SecretaryAppeal BoardPresidential SecretariatColombo

Address: ------------ji...·"'''~shDeposit : Rs. 25,000.00

.l' ',~ ,~,l>.'.:~31;(I;.%~\:\The aipOitii~~tiJ>dformance Security iS

35

price·\"k::,::~jfThe Adjudicator proposed by the Employer is . _

After evaluation of Bids in 'accordance with the procedures describedunder Clauses 25, 26, 27, 28, 29, and 30, the Employer will inform to allthe bidders in writi~g the selection "of the successful bidder and theintention of contract award to such bidder. The unsuccessful bidders ifthey so wish, within one week of such notice may make representation tothe Procurement Appeal Board at the address given bel,?w. Suchrepresentation shall be self-contained to enable the Appeal Board toarrive at a conclusion and a cash deposit to amount given below shall bemade. The Appeal Board may request the bidder who had maderepresentation to submit further evidence during the investigations. Thecash deposit will be forfeited unless the Employer change the originalcontract award decision in favour of the bidder who has made suchrepresentation.Address:

Fees and types of reimbursable expenses to be paid to the Adjudicatorshall be on a case to· case basis and shall be shared by the Contractorand the Employer.

~./,.A\~. /'. \

. /\ \ \/'\Cash Deposlt: Rupees 50,OOO.n~ \ \ ()

/'\\, \ \ \,\ \\ \ \ ; \,/\

Ifthe Procurement is within ty~thO(i~~i~t ~{a'rgJJ:After evaluation of ~ii\ a~o~an~~~~e procedures describedunder Clauses 26,~-2~~ 2~~an~ 30y-the Employer will inform to allthe bidders i~ Iting\th~~ sel~etio"n of the successful bidder and theinte~f ~on ct awa'tii ~ such bidder. The unsuccessful bidders if

. they..~o\'ri~, ~itliin on~ of such notice may make representation tot:'ti.Je ~ec¥~ t~·t~ Line Ministry at the address given below. Suchl \::~re~tion si\rtibe self-contained to enable the Secretary to arrive at a"- CO~lU io and a cash deposit to amount given below shall be made. The

m 10 r may request the bidder \vha had made representation to submit~. her evidence during the investigation of such representation. The cash

deposit will be forfeited unless the Employer change the original contractaward decision in favour of the bidder who has made such representation.

Deletefor DPC, PPC and RPC; For CA PC and At/pc select appropriatelyGenerally 5%insert name and address36

3-1

35

(34.0)

Page 68: ICTAD Procurement of Work ICTAD SBD 01-2007

J

The relevant information shall befi/Jed by the Procuring Entity before issuing the bidding documentDepends on the complexity ofthe Contract; /4,21 or 28 Days may be appropriateInsert ifrequired onlyIfother contractors are not engaged state "None"

SECOND EDITION, JANUARY 200773

Section 5 - Bidding Dat~}~.'l.! ~ontract Data

Institute for Construction Training and Development (leTAD)

The Works con~~ \--\-\~\--.;-~~~ _

({ \ \(\ \7\

Name: /~\ \

Address: r"'\\\ \/'\ '\ . '& \

/ \ ' '\.( ~.,J \ • \

'. ( \ \/\ \ \.'\ \ \\ \~, \ \ " \ \~~

Name of Engineer's Represent\: .. \~ \ \ \ \v \ \)\ ,\\ \1 \ \ \

\ ' '\ \. \ " /

The Start Date shall be __ Days38 from the Letter ofAcceptance.

The ~Wbtgdocuments also fann part of the Contract:,.\ .'

1. ! .U"'~}D~ .:11l ;'1 '~..lf ~ ;·...·\i( ,~2 l .. ;!\'. ~ ...~ J

· ~~;~ ·7"...,~~p~Schedule ofother contractors40

:

Name Period

The Engineer is

Name of Authorized Representative: _

Th.e Employer is

Name:

Address:

Contract Data 37

(Please note that the Clause nos. given hereunder are that ofCondition8 ofContract)

(8.1)

(1.1)

(1.1)

(2.3)39

(1.1)

(1.1)

(1.1)

PROClIRENIENT OF WORKS

37

311

39

....J()

Page 69: ICTAD Procurement of Work ICTAD SBD 01-2007

PROCl.JREl\'IENT OF WORKS

(9.1)

S~ction 5 - Bidding Data and Contract Data

Schedule of Key Personnel:

Minimum persons with qualifications and experience to be defined,(a) Technical ·

T·"5····.. ·······;··:·". ,,';r

I!I

,I

/.

II

74Institute for Construction Training and Development (leTAD)

The Contractor shall submit a programme for the Works within________Days of del ivery of the Letter of Acceptance.

(b) Manager

The minimum insurance covers shall be :

(a)· The minimum cover for insurance of the Wo~ and of Plantand Materials iS41

.' ('\\ \

/""" \ '\ \• The maximum ~ed~ctible ~or'~nsSra~ of~h~\W~rks and of

Plant and Matenals IS42,/\ \ \ \ ( \ \ \ ....\ \\ \ \ \ \.-.....\ ./

(b)· Themi(~ c~~o1o,~teaie~~qUiPment is43

__

• ~m~'(i~~,?ed\!ct\ble\J ~surance of Equipment is44

\ ,../ \ \ / \ \ ,J,\ . \ \ \/

/{cY't't \The in~u~ver for insurance of other property (other than

/\\ \\ '0) ~e · ) is -

\ ~ . (d\The m nimum cover for personal injury or death,'-\\\ V· for third party and employees ofthe Employer and other personsCJ . engaged by the Employer in the Works is __ per event

(a) The minimum cover for personal injury or death,e for the Contractor's workmen is per event

SECOND EDITION, JA~UARY2007

(27.1)

(21.1) shall be46__ Days from Letter of

-11 Generally 110% ofInitial Contract Price.11 Generally j~o ofInitial Contract Priceoil

Depending on the type ofequipment to cover the replacement cost.I.J May be 5% o/the minimum coverfor equipment015 Ifdifferent dates are specified/or completion ofthe ~Vorks by section ("sectional completion "). these dates should be

listed ...

-/6 Shall be a date prior to Start dale

~ Contractor's employees other than workmen is __ per event

(17.1) Date tor the whole of Works shall be45

(13.2)

(13.1)

Page 70: ICTAD Procurement of Work ICTAD SBD 01-2007

Month/y, quarterlyGenerally an amount equivalent to 2% ofthe Initial Contract PriceInsert the contingency sum in the latest TeEifrequired only

Generally bllsed on the selling rate ofconversion determined by the Central Bank as ai 28 Days prior to the date ofclosing ofBids. " ... .Delete ifprice adjustment is applicableGenerally 10%Generally 5%

SECOND EDITION. JANUARY 2007

percent of the

Days.

Input Percent~ge

______ percent of the Initial

75Institute for Construction Training and Development (lCTAD)

The retention from each payment shall beS3

certified work done.

....... ., , -, -, .

The Defects Liability Period is

Section 5 - Bidding Dat:::..:.:~~~~ ~:O!1tract Data

The period between Programme update iS47

_

Total 90%Non adjustable element shall be:BOQ Item Numbers: , ~ , , , ,

Engineer may order variations up to a total cumulative value of notd' R 49excee Ing s. _

The amount to be withheld for late submission of a Programme is

Rtlpees48

-----------

The following events shall also be ,Compensation Events:

1. (\f\2. ~ \ '\ \

\ ~ \ \The exchange rate used for uta ing\ the,..)8-m~~ be paid In

currencies other than Sri Lan an u~ S51 \ is\-'\ v. (\ \ \-~. \ \ ..~--­

/;_._'- \ \ \ \\)\)The ~actr~~)is\no\su~ted to price adjustment52

\.( \ \( \ \)-'\V-eig'tirtgk oflnpUlV

\) \ ~~--~

S:~:~::~~:' :::~~:~~;:~~~e

The limit· of retention shall be54

_____-=tract Price.

(48.1)

(47.1)

(46.1)

(35.1)

(27.4)

(27.3)

(44.1)50

./H

-/9

50

5/

52

53

5./

./7

PROClIRE~IENTOF WORKS

Page 71: ICTAD Procurement of Work ICTAD SBD 01-2007

PROClIREl\'IENT OF WORI(S

(49.1)

(50..1)

Section 5 - Bidding Data aEE.Contract Data

l'he liquidated darl1ag~~ for the VY'hole of the Works shall be55

____"per Day.

The maximum amount of liquidated damages for the whole of theWorks shall be56

__ percent of the Initial Conft-act Price

(52.1) The Pertonnance Security shall be57

Contract Price.percent of the Initial

(58.1)

(60.1)

Schedule of operating and maintenance manuals. r\The perc.entage to apply to th~. valu~the\~\ot COr.1pIeted,~e~resentmg the Employer's addl~al ~ostJ~r;J;~et~g the Works,

IS • n\' "\ \ ~ \)v,/\ \ \'\ \ \ \ ,/\ '-. \ ~ \\ \ \,,/

/ r"'--', \ \\ \\)\\ \ \ )((\.\ \ \ v~r

\ \V~ \)\ \(, \

\ ~.J J

~./

55 Depends o~ the urgency ofthe project. Generally 0.05 % o/the lnitial Contract Price may be appropriate56 Generally 10%., .

57 Generally 5% ofInitial Contract Price5X Genera/(v 25~~ ofInitial Contract Price

76SECOND EDITION" ,JANUARY 2007 Institute for Construction Training and Development (ICTJ-\D)

Page 72: ICTAD Procurement of Work ICTAD SBD 01-2007

Section - 6

SPECIFICATIONS

77

Page 73: ICTAD Procurement of Work ICTAD SBD 01-2007

For drafting specifications the Employers are advised to use the following standard

specifications published by leTAD.

TJle~e notes are intended o'flly as informatioDfor the-Employer or theperson drafting the bidding documents. The)} should not be includedin the final bidding documents.

A set of precise and clear specifications is a pr~-requisite for bidders to respond realistically

and competitively to the requirements' of the Employer without qualifying or conditioning

their bids. The specifications must be drafted to permit the widest possible competition and, at

the same time, present a clear statement of the required standards of workmanship, materials,

and performance of the goods and services to be procured. Only if this is done will the

objectives of economy, efficiency, and fairness in procurement be realized, responsiveness of

bids be ensured, and the subsequent task of bid evaluation facilitated. The specifications

should require that all goods and materials to be incorporated in the works be new, unused, of

the most recent or current models, and incorporate all recent improvements in design and

materials unless provided otherwise in the Contract.

79

S~CliUtl 0 - SpecttlCatiOns

Institute for Construction Training and Development (leTAD)

Section - 6SPECIFICATIONS

Notes for preparing Specifications

Irrigation & Land Drainage

Water Supply Sewerage & Storm Water Drainage

Reclamation Works

Ground Water Exploration & Exploitation

Building Works (Vol I) ./

Building Works (Vol 11)

Roads & Bridges

Coastal Harbour Engineering Works

Electrical & Mechanical Works

Board & Cast In-Situ Reinforced Concrete Piles

Site Investigation for Building Works & Sample Bill ofQuanfities

Any other Standard Specifications approved by the Government

SeAl3/l

SCAJ3/2

SCA/3/3

SCA/1/4

SCA/4

SCA/4/II

seAlsSCAl6

SeAl8

ICTAD/DEV/16 ­

ICTADIQEV/17 -*

*

*

**

*

*

**

*

*

*

SECOND EDITION, JANUARY 2007

PROClIREl\1ENT OF "tORt'S

Page 74: ICTAD Procurement of Work ICTAD SBD 01-2007

J

Section -7

BILLS OF QUANTITIES

Notes: In preparation o/the bidding document the users are advised to;

(1) Include appropriate Preliminary Bill items as Bill No. 01 inaccordance with ICTAD Publication No. ICTAD/IDI04.

(2) Allow provision/or the bidders to include the VAT Componentseparately and instruct them not to carry the VAT componentto the Form afBid

(3) Advise the bidders that any discount offered will not beconsideredfor Provisional Sum Items.

81

Page 75: ICTAD Procurement of Work ICTAD SBD 01-2007

Section - 8

DRAWINGS

Insert here a list ofDrawings

83

Page 76: ICTAD Procurement of Work ICTAD SBD 01-2007

,-----1

\

Section - 9

STANDARD FORMS [BID]..,.----

• Bid Security

11 Bid Securing Declaration

85

Page 77: ICTAD Procurement of Work ICTAD SBD 01-2007

Notes oft Standard Forms:

• The successful bidder will be required to sign the Form ofAgreement, after theaward ofcontract.

a Bidders should not complete the Form ofAgreement at the time ojpreparationofbids.

87

Section 9 - Stand~5.rd Forms [Bid]

Institute for Construction Training and Development (leTAD)

• The Form of Performance Security, Form oj Advance Paym.ent Security andFor171 ofRetention Alonc}' Guarantee should not be completed bJ} the hidd~rs atthe time a/submission o/bids.

• ., The successful bidder will be required to provide these securities in compliancel-l'ith the requirements herein or as acceptaBle to the Employer.

• Any corrections or modifications to the accepted bid resulting from arithmeticcorrectionst acceptable deviations, or quantity variations in accordance withthe requirements of the bidding documents should be incorporated into theAgreement.

• Bidders shall submit the completed Form of Bid Security/Bid SecuringDeclaration as appropriate in compliance with the requirements ofthe biddingdocuments.

Note:

The bidders are advised to use the information printed in blue in this volume as a checklist when submitting the bid. However, it is the responsibility of the bidders to complywith all the requirements given in the bidding document. Failure to non compliancewith any ofthem may be a reason/or rejection ofthe Bid.

SECOND EDITION. JANUARY 2007

PROClJREMENT OF WORKS

Page 78: ICTAD Procurement of Work ICTAD SBD 01-2007

PR{)(:{lREJ\1ENT OF WORKS

FORM OF BID SECURITY

[this Guarantee form shall ke filled in accordance with the instruciions indicated in br~~ket~! ._________________---------------------------------------------~------------- --------------------------- [Insert lSS lllngagency's name, and address ofissuing branch or officeJ

l3eneficia~: . ------------------------------------------------------------------------------------------------------[insert (by PE) nanle59 and address ofEmployer]

Date: ---------------------------- [insert (by issuing agency) date]

BID GUARANTEE No.: -------------------------- [insert (by issuing agency) number]

We have been informed that --------------------------------------------...--------------------------------- [insert(by issuing agency) nanle ofthe Bidder] (hereinafter called "the Bidder") has submj~d to you its biddated -------------------[insert,(by issuing agency) 'date] (hereinafter called "the ~i~) f~r the executionof [insert nanle of Contract] under Invitation for Bids No. -------------;".[1fse~tJP;P ~umber} ("theIFB''l) (' ,/,' \ \

. //\ \ ,-,,\ \ \" \-Furthermore, we understand that, according to your con¥o",~, \B~s it,tus(~,e s~p~6rted by a BidG .t . ,'\ \ ~ \ .,.

uaran ee. (\ \ \ 'I ~,\ \//)/,---" \ \ \ \\ \ \ \. , \ \ \ \. \ \ \\//. . .

At the request of the BIdder, we --------1--t~---\----t---T---~--~~~~~--------[Insert name of IssuIngagency] hereby irrevocably undertake'lq pai' y'Ql1"J.qy svm\or ~s not exceeding in total an amount

~~1~-l~;t--;~-~~;d;j ~;~~r~~~uJfr;~'1u~~J-d~~~~d-i~-~;~i~;-~~-~~~~~~i~d-b;-~ ~~:;~st~tement stating th~!J~e F\idc\~r ~ in\br~ o¥it{obligation(s) under the bid conditions, because theBidder: / :h, \ \ ,,/ \ //,r

\ \~~.. \ \ '1."

(a) has with&a-~"\it~\Bi~(jJ.}ring the period of bid validity specified; or

Cb) does not ac\e~tJMe correction of errors in accordance with the Instructions to Bidders(hereinafter "the ITB") ; or

(c) having been notified of the acceptance of its Bid by the Employer during the period of bidvalidity, (i) fails or)"efus~~o execute the Contract Form, jfrequired, or (ii) fails or refuses tofurnish the Perfo~~c:,S~~ity, in accordance with the ITB.

I n, .;,;\,0\ IThis Guarantee shall ex~r~~::J IlU\' the Bidder is the successful bid.ger, upon our receipt of copies ofthe Contract signed by th~.~der ~mi of the Performance Security issued to you by the Bidder; or (b)if the Bidder is not the succesSTu1 bidder, upon the earlier of (i) the successful bidder furnishing"theperformance security, otherwise it will remain in force up to ---------~------ (insert date60

)

Consequently, any demand for payment under this Guarantee must be received by us at the offic.e onor before that date.

[fJ;gnofure(~) ofaUfhorizl?d reprl?sentative(s) ]

59 Nanle ofthe Employer as given in Sub-Clause 1. J ofthe Instructions to Bidders60 Insert date in accordance with Sub-Clause J6 ofInstruction to Bidders

S.:C()ND EDITION~JANllARY 200789

Institute for Construction Training and Development (leTAD)

Page 79: ICTAD Procurement of Work ICTAD SBD 01-2007

PR(){:(:REi\IENT OF WORKS

FORM OF BID SECURING DECLARATION

To: -------------------------------------------------------------------------------------------- [insert the nan1e ofthe Enlployer preferably PE tofi/l before issuing the bidding document]

[If required, the Bidder shall fill in this form in accordance wJth the instructions indicated inbr{.lckets: * delete as appropriate]

90Institute for Construction l'raining and Development (IC'rAD)SEC()i'lD EDrrION'lJANlIARY 2007

.....--..../" '",

Signed [insert signature(~folauth~~,drepresentative]

In the Capacity of[inse.r4~&~Name [insert printed orty~me1

Dated on [insert day] day of [insert month], [insert year]

I/We*, the undersigned, declare that: ~ l"'/\. ,,'" \ ~

1. I/We* understand that, according to instructions to bidders (herein~ftel\"th@ ITB'''), bids must besupported by a bid-securing declaration; . (--,,,,//..) \ ~ \ .

. . ,~//\ \ \/\ \ '\\ \2. l/We* accept that we shall bC'suspended from beir!g.~'~gib·~e fOr cQ-rttract\ a~-d in any contract

wh~re .bids hay: being invit~d by any of the .,PrOfurih'o \E~.ity\as \d~nar in th~ Procu~ementGUIdelines pUbl~shed by NatIonal procurem~t~gepc~\t~\SI\. ~a~~.a,~. for the perIod of tIme ofthree years startmg on the latest date~rc Sl~g Of,b~s 'f.!~IS bid, If I/We:

/ ("\ \ \ \ '\ /'

(a) withdraw our Bid duriogi1\e pkri~6tAbid\ahdi~<s~~~ified; or(b) do not accept the corr~ctro\"n of'err~(si~ aC~..Grtlance with the Instructions to Bidders

f h -dd· .n"'~ \ 1/'\ \ \ \ Jo t e BI In~'uOC\lmeJlts; pr \ v .(c) having~en \lotwe~ ot\thJ~ce~ of our Bid by you, during the period of bid validity,

(i) fjlf1(~r)efu~et9~e'xe.c~e~ Contra~t Form, if required, or (ii) fail or refuse to furnish theperl\0rman.~e s~~r~ty, In accordance wIth the ITB.

\. \ \ \--. , \/"

3. I/We* und~s~n~ if We are' not the successful bidder, this bid securing declaration shall expireupon the eSdi.er/of (i) the successful bidder furnishing the performance security; or (ii) twenty­eight days after the expiration of the validity of the bid.

Nalne of contract --------------------------------------------------------------------------- [insert nan1e by PElContract Identification N°: ------------------------------------------[insert number by PEl

Invitation for Bid No.: ---------------------------------------------- [insert 1Junlber by PE]

Page 80: ICTAD Procurement of Work ICTAD SBD 01-2007

Check List for Bidders

~II

Bidders are advised to fill the followin table:ITEM YES

tickREFERENCE

12All the documents given in ITB Clause 12enclosed in the original and copy?

Signed?

Addresse~ to the Employer? 18

Completed? 18

Signed? 18

I

11

Ii'!

Addressed to the Employer? . 16

Fonnat as required? 16

\ . Issuing Agency as specified? 16I

Amount as requested? 16

16

I

I

]

ITB Clause 19 followed before

Sealing the Bid Package?19

91