Hre0061 Hotel Elizabeth Ipa 143 5483 6101 Sid Rev a

33
Econet Zimbabwe SWAP SITE INSTALLATION DOCUMENTATION HRE0061 Hotel Elizabeth

description

Sample fo Site ID

Transcript of Hre0061 Hotel Elizabeth Ipa 143 5483 6101 Sid Rev a

  • Econet Zimbabwe SWAP

    SITE INSTALLATION DOCUMENTATION

    HRE0061

    Hotel Elizabeth

  • CAPTION LIST Document List 1Document No.

    001 53-IPA 143 5483 UenDate Rev.

    A

    Site Documents 2

    Plant Specification 3

    Cabling Diagrams 4

    External Alarms 5

    Checklist 7

    Test Documents 6Hotel Elizabeth

    Econet Zimbabwe

    SWAP

    900/1800 & 2100MHz

    Ericsson's GSM/WCDMA

    System

    2014-10-29

    HRE0061

    A 2

    01

    1-0

    1-2

    1

    SITE INSTALLATION

    DOCUMENTATION

    ATTENTION This documentation must be updated on site. All the documents must be corrected, where changes have occurred, and signed by the Installation Supervisor. This documentation must then be returned to Installation Engineering for preparation of the Radio Site Design Documentation.

  • DOCUMENT LISTPrepared (also subject responsible if other) Document No.

    ASL/ORL/I Lefa Lasapo 001 51-IPA 143 5483 UenDoc respons/Approved Checked Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    Document name Document number Rev.

    RADIO & SITE 001 53-IPA 143 5483 Uen A

    INSTALLATION DOCUMENTATION

    1. DOCUMENT LIST 001 51-IPA 143 5483 Uen A

    2. SITE DOCUMENTS

    1/127 04-IPA 143 5483 Uen A

    Equipment Layout (Outdoor Layout) 193 05-IPA 143 5483 Uen A

    Floor Plan Drawing 193 24-IPA 143 5483 Uen A

    Antenna Placement Information 153 12-IPA 143 5483 Uen A

    3. PLANT SPECIFICATION

    1/127 11-IPA 143 5483 Uen A

    4. CABLING DIAGRAMS

    Block Diagram GSM/WCDMA/LTE (Power, Signal & Earthing)1/193 18-IPA 143 5483 Uen A

    Allocation Drawing (RBS Layout) 2/193 18-IPA 143 5483 Uen A

    Allocation Drawing (BBS Layout) 3/193 18-IPA 143 5483 Uen A

    DU/Antenna/RRUS/AIR Connection Diagram 4/193 18-IPA 143 5483 Uen A

    Antenna Block Diagram 5/193 18-IPA 143 5483 Uen A

    5. EXTERNAL ALARMS

    Allocation Table 1/193 19-IPA 143 5483 Uen A

    6. TEST DOCUMENTS

    Test Report (RBS) 1/153 83-IPA 143 5483 Uen A

    7. CHECK LISTS

    Site Inspection List 1/153 11-IPA 143 5483 Uen A

    A 2

    011-0

    1-2

    1

    2014-10-29

    Configuration Data (RBS)

    Plant Specification (RBS)

  • 4(26)CONFIGURATION DATA (RBS)Prepared (also subject responsible if other) Document No.

    ASL/ORL/I Lefa Lasapo 1/127 04-IPA 143 5483 UenDoc respons/Approved Checked Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    1 GENERAL SITE DATA

    1.1 Geographical coordinates(WGS 84) Long : 2 ' 46.72 " / X =

    Lat : 49 ' 59.55 " / Y =

    1.2 Region Hotel Elizabeth

    1.3 Location Harare

    1.4 Type of Site

    1.5 Equipment room

    2 TECHNICAL DATA RBS

    2.2 RBS Type RBS6101

    2.3 No. of Cabinets 1

    2.4 No. of Cell 6

    2.5 Site Configuration 4+4+4 G900, 8+8+8 G1800, 2+2+2 UMTS 2100

    2.6 Weight of one Radio Cabinet 180kg

    3 ELECTRICAL DATA

    3.1 Voltage range for specific performance 200-250V AC, -48V DC

    3.2 Fuses recommendation for maximum selectivity 63Amp

    3.3 Power Consumption The total Average power consumption: 3333 W

    3.4 DC Power Cabinet Type

    3.5 BBS

    3.6 No. of battery back up hour 8.2 Hours

    3.7 Battery back up (Ah) 170Ah x 3

    4 HEAT DISSIPATION

    4.1 Maximum Heat Dissipation 4800 Watt with fully equipped

    5 RBS ANTENNAS & OPTICAL FIBER (900/1800MHz)

    5.1 Antenna height (m.a.g.l.) A= B= C=

    5.2 Antenna directions A= 90 B= 180 C= 320

    5.3 Electrical Tilt, deg A= 6 B= 3 C= 4

    5.4 Mechanical Downtilt, deg A= 5 B= 2 C= 4

    5.5 Quantity of Antenna 3 pcs

    5.6 Type of Antenna

    5.7 Antenna dimensions (mm) 2856 x 282 x 182 mm

    5.8 Wind load of one antenna (N) (at 150 km/h)Frontal:1160, Lateral:500, Rearside:1210N

    5.9 Weight of one antenna (kg) 24 kg / 26 kg (clamps incl.)

    5.10 No. of optical fiber 6

    5.11 Total fiber length/ cell (m) A= B= C=

    6 RBS ANTENNAS & OPTICAL FIBER (2100MHz)

    6.1 Antenna height (m.a.g.l.) A= B= C=

    6.2 Antenna directions A= 90 B= 180 C= 320

    6.3 Electrical Tilt, deg (2100) A= Remote B= Remote C= Remote

    6.5 Mechanical Downtilt, deg (2100) A= 6 B= 5 C= 5

    6.7 Type of Antenna KRE 101 1985/1

    6.8 Antenna dimensions (mm) 1595 x 172 x 92 mm

    6.9 Wind load of one Antenna (N) (at 150 km/h) Frontal:330N,Lateral:90,Rearside:340N

    6.10 Weight of one Antenna (kg) 6.5 kg / 8.5 kg (clamps incl.)

    6.11 Quantity of Antenna 3 pcs

    6.12 No. of optical fiber 3

    6.13 Total fiber length/ cell (m) A= B= C=

    7 ANTENNA SUPPORT STRUCTURE

    7.1 Type of tower/mast

    7.2 Tower/mast height (m.a.g.l.)

    7.3 Leg Profile

    40

    40 40

    32 32

    Guyed Mast

    A 2

    011-0

    1-2

    1

    12

    BBS 6101

    2014-10-29

    Roof Top

    17

    OUTDOOR Cabinet: Initial Indoor

    31

    PBC05

    12

    40

    30m

    12

    KRE 101 1917/1

    32

    40

    O Profile

    40

    31.0463100

    17.8332090

  • SITE LOCATION MAP

    HRE0061

    Hotel Elizabeth

    Econet Zimbabwe SWAP

  • 6(26)PLANT SPECIFICATION (RBS)

    Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/127 11-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    ITEM DESCRIPTION PRODUCT CODE QTY / UNIT

    1. RBS 6000 Equipment

    1.1 RBS 6101- 4+4+4 G900, 8+8+8 G1800, 2+2+2 UMTS 2100 0

    1.1.1 EQUIPPED CABINET/RBS 6101;AGO .301/BFM901302 1

    1.1.2 CABLE/SIGNAL CABLE ..RPM5131104/00120 3

    1.1.3 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM77701/00500 2

    1.1.4 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM77701/01000 2

    1.1.5 CABLE WITH CONNECTOR/DC POWER CABLE ..RPM777193/00800 5

    1.1.6 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM777340/00800 2

    1.1.7 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM777340/01100 2

    1.1.8 PROCESSOR UNIT/DUG 20 01;Digital Unit ..KDU137569/1 4

    1.1.9 PROCESSOR UNIT/TCU 02 01;Transport Conne ..KDU137739/1 1

    1.1.10 DELIVERY UNIT/Partly Equipped, RBS 6101 ..BFX90157/08 1

    1.1.11 DISTR. EQUIPMENT/PDU 01 01,Power Distrib ..BMG980336/2 11.1.12 FILTER UNIT/PFU 01 01; Power Filter Unit ..KFE1011162/1 1

    1.1.13 FILTER UNIT/PCF 01 03; Power Connection ..KFE1011165/1 1

    1.1.14 SET OF MATERIALS/SMOKE DETECT KIT ..NTM2013331/2 1

    1.1.15 LOCK/LOCK/KEY, CABINET ..SMB102103/1 1

    1.1.16 ASSEMBLED PARTS/Airplate Medium flow ..SXK1091601/2 1

    1.1.17 BAG/ANTISTATIC 150X250 ..1/RTK81503 1

    1.1.18 DESIGNATION LABEL/INFO.TECHN.EQU.(see R- ..4/SVH279006 1

    1.1.19 COVER/Cover DC Filter ..SXK1099314/2 1

    1.1.20 ASSEMBLED PARTS/TM/OPTO inlet ..SXK1250682/1 1

    1.1.21 OVERVOLTAGE ARRESTER/OVP-ALM 8 ..NFD30234/08 1

    1.1.22 CABLE WITH CONNECTOR/SIGNAL AND POWER CA ..RPM777429/00950 1

    1.1.23 ALARM UNIT/SAU 02 01;Support Alarm Unit ..ZHY60119/1 1

    1.1.24 ASSEMBLED PARTS/SAU dummy ..SXK1099439/3 1

    1.1.25 MECHANICAL COMPONENT/Internal fan air gu ..SXA1343936/2 1

    1.1.26 MECHANICAL COMPONENT/6101 side cable hol ..SXA2154169/1 1

    1.1.27 ASSEMBLED PARTS/COVER SPD/OVP right asse ..SXK1250492/1 1

    1.1.28 ASSEMBLED PARTS/Bracket wall (OVP) ..SXK1250684/1 1

    1.1.29 MECHANICAL COMPONENT/Guide Rail DUX ..SXA2154174/1 4

    1.1.30 ADAPTER/DUX Adapter ..SXK1099320/1 2

    1.1.31 DISTR. EQUIPMENT/PCU DC 08; Power Connec ..BMG980392/1 1

    1.1.32 CABLE WITH CONNECTOR/POWER CABLE ..RPM777343/01200 1

    1.1.33 CABLE WITH CONNECTOR/SIGNAL AND POWER CA ..RPM777308/1 1

    1.1.34 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM77701/00500 1

    1.1.35 ASSEMBLED PARTS/Cable pole ..SXK1099433/1 1

    1.1.36 DUMMY/Dummy unit (Power Subrack) ..SXK1098257/1 5

    1.1.37 MARKING LABEL/Product identity marking ..SVF191499/2 1

    1.1.38 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM777296/00500 4

    1.1.39 CONNECTOR/D-SUB STRAPPING PLUG 90 OHM ..RPT403805/01 1

    1.1.40 MECHANICAL COMPONENT/Dummy 31 (Plastic v ..SXA1342193/2 2

    1.1.41 LABEL/LABEL RBS 6101 (EU and rest), 100A ..SVB154600/26 1

    1.1.42 MICROCIRCUIT/FLASH ATA 256M 5.5V 3.3 ..KDR10961/6256 4

    1.1.43 CABLE WITH CONNECTOR/SIGNAL CABLE ..RPM777143/01800 2

    1.1.44 ASSEMBLED PARTS/SHU holder ..SXK1091052/1 1

    1.1.45 HANDLE2/Lock handle .SXK1072465/1 1

    1.1.46 TRANSCEIVER/RRUS 01 B8;Radio Unit .KRC11871/2 3

    1.1.47 TRANSCEIVER/RRUS 12 B3;Radio Unit, Type .KRC161282/2 3

    2014-10-29A 2

    01

    1-0

    1-2

    1

  • 7(26)PLANT SPECIFICATION (RBS)

    Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/127 11-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    ITEM DESCRIPTION PRODUCT CODE QTY / UNIT

    2014-10-29A 2

    01

    1-0

    1-2

    1

    1.2 SPD for DC RBS6101 for 9xRRUS support & TCU

    1.2.1 CABLE WITH CONNECTOR/DC POWER CABLE .RPM777193/00550 0

    1.2.2 CABLE WITH CONNECTOR/DC POWER CABLE .RPM777193/00800 1

    1.2.3 CABLE WITH CONNECTOR/SIGNAL CABLE .RPM77701/00500 1

    1.2.4 PROCESSOR UNIT/TCU 02 01;Transport Conne .KDU137739/1 1

    1.2.5 DISTR. EQUIPMENT/PDU 01 04; Power Distri .BMG980336/7 1

    1.2.6 SET OF MATERIALS/Grounding plate Hybrid/ .NTM1012478/1 1

    1.2.7 ASSEMBLED PARTS/Hybrid connection plate .SXK1091576/1 1

    1.2.8 ASSEMBLED PARTS/TM/OPTO inlet .SXK1250682/1 1

    1.2.9 ASSEMBLED PARTS/Bracket wall (OVP) .SXK1250684/1 1

    1.2.10 Surge Protection Device, SDP -48V NFT 304 59/2 31.2.11 PDU 01 04; Power Distribution Unit BMG980336/7 1

    1.3 PBC 05, GSM 900 2/2/2 + DCS 8/8/8 + WCDMA 2/2/2, BBS 6101, 8Hrs_2

    1.3.1 SUPERVISION EQUIPM.2/SCU controller .BMP210104/1 1

    1.3.2 CIRCUIT BREAKER/Circuit breaker 10A 1 PO .NFS8151321/010 1

    1.3.3 CIRCUIT BREAKER/Circuit breaker 16A 1 PO .NFS8151321/016 2

    1.3.4 CIRCUIT BREAKER/Circuit breaker 25A 1 PO .NFS8151321/025 3

    1.3.5 SENSOR/Tempsensor 12m .KET10948/1 1

    1.3.6 ACCESSORIES/Install.frame kit,seismicZon .BMY301130/1 1

    1.3.7 COMBINED UNIT/PBC 05-V2 Power Cabinet .BMK90584/2 1

    1.3.8 MAINS PROTECT. ADAPT/SPD; Surge Protect .NFT30419/2 1

    1.3.9 RECTIFIER/High effiency V-2 .BML161187/1 3

    1.3.10 CABLE/TEL3016005/004 20m SPOOLED C .TPM1010011/20M 1

    1.3.11 MAINS DISTR. UNIT/Service outlet EU .BMG980421/1 1

    2. BBS 6101, 8Hrs_2

    2.1.1 ACCUMULATOR/4 x (12V/190Ah) .BKC90106/123 3

    2.1.2 ACCESSORIES/Gas collection kit for SBS19 .BKY90144/2 3

    2.1.3 SET OF MATERIALS/Battery string 2, kit .NTM1011834 2

    2.1.4 POWER EQUIPMENT/AGO for BBS 6101 Main Ca .BMK90188 1

    2.1.5 POWER EQUIPMENT/BBS 6101 w active coolin ..BMK901115 1

    2.1.6 HEATER/BBS 6101,CLU Heater ..BPD90146/1 1

    2.1.7 MELTING FUSE/200A,170VDC,100KA,UL ..NGG9106/200 1

    2.1.8 CABLE/TEL3016004/4 15m SPOOLED .TPM1010010/15M 1

    2.1.9 HANDLE2/Lock handle .SXK1072465/1 1

    2.1.10 LOCK/LOCK/KEY, CABINET .SMB102103/1 1

    2.1.11 CABLE/TFK 103 006/08, 50mm?!, 20 meters c .TFK90160/3 1

    2.1.12 CABLE SET/Cable lug set, 50mm?! .NTM503113/2 2

    2.1.13 CABLE SET/Grounding cable set, 35mm?!, 13 .NTM503112/1 1

    2.1.14 Power Cable, 2x6 mm2, 500m TFL 492 324/500M 1

    3. Site Materials

    3.1 GSM (444 + 888) RBS6101 Installation Materials

    3.1.1 CABLE WITH CONNECTOR/2F LC(FullAXS)-LC S .RPM2531610/50M 3

    3.1.2 OPTICAL TRANSCEIVER/SFP CPRI & 1000BASE- .RDH10247/2 12

    3.1.3 JUMPER CABLE/Commscope 1/2" jumper cable .TSR95170/2 12

    3.1.4 ASSEMBLED PARTS/MOUNTING KIT (MK mast br .SXK1250245/1 6

    3.1.5 SET OF MATERIALS/Fiber Clamp, 3 fiber-3 .NTM2014156/3 6

    3.1.6 TIE STRAP/TIE STRAPS B=9,5 L=457 RFST .SET145095/457 50

    3.1.7 SEALING SET/Sealing of Connectors,Outdoo .NTM2012426 6

    3.1.8 SET OF MATERIALS/Cable Winder Box .NTM2013729/1 6

    3.1.9 MARKING SET/Main-Remote GSM .NTM2013767/2 2

    3.1.10 INSTALLATION KIT/Retrofit Tube Kit 10m, .NTM2013929/2 6

    3.1.11 EARTHING CABLE/16mm2,GNYE,5m,with 1 lug .RPM1191648/5 6

    3.1.12 Optical fiber cable, single mode, LCD-LCD, 50 M RPM 253 3512/50M 3

    3.1.13 Grounding Material, Grounding Wire Kit, 40m/35mm2, Outdoor 9/NTM 201 230/1 1

    3.2 RBS 6101 Common Installation Material

    3.2.1 GBF 6101 base frame, side inlets BYB 911 39/1 1

    3.2.2 Cabinet and Cable Ladder Fastening Set (Screws, Washers & Plugs) NTM 201 257 1

    2.5.3 Shield Ancor Set, M12x90mm, Expanderbolts (Set of four, Spit) NTM 201 2977/2 1

    2.5.4 Cable Kit 2m/35mm2 YL/GR 5/NTM 201 201/4 1

    2.5.5 Outdoor Cable Straps, 50 pcs, black, 6007.6 mm NTM 203 156/1 1

    2.5.6 Installation Kit, Common Installation Material 7/NTM 201 201 1

    2.5.7 CABLE/TFK 103 007/08, 70mm, 14 meters c TFK 901 61/4 1

    2.5.8 Power Cable, 2x6 mm2, 500m TFL 492 324/500M 1

  • ALLOCATION DRAWING Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Document No.

    ASL/ORL/I Lefa Lasapo 3/193 18-IPA 143 5483 UenDoc respons/Approved Checked Date Rev.

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    Du

    mm

    y

    DU

    G-2

    0 0

    1

    TC

    U

    TC

    U

    Du

    mm

    y

    Dummy

    DU

    W-2

    10

    0

    Du

    mm

    y

    DU

    G-2

    0 0

    1

    PD

    U 0

    1 0

    4 B

    PD

    U 0

    1 0

    1

    ALM & TRM OVPs

    PD

    U 0

    1 0

    4 A

    External Fan

    SCU Internal Fan

    PF

    U

    Du

    mm

    y

    Du

    mm

    y

    DUmmy

    Du

    mm

    y

    SA

    U

    SH

    U

    DU

    G-2

    0 0

    1

    A 2

    011-0

    1-2

    1

    2014-10-29

    Du

    mm

    y

    Dummy

    Du

    mm

    y

    RBS 6101

    PC

    U

    BASE FRAME

    DU

    G-2

    0 0

    1

  • 9(26)ALLOCATION TABLE Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/193 19-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project: Econet Zimbabwe SWAP

    Site: Hotel Elizabeth (HRE0061)

    Severity Level

    01

    18

    A 2

    011-0

    1-2

    12014-10-29

    Alarm Inlet Designation I.D. Type(closing/breaking)

    03

    02

    05

    06

    07

    08

    09

    10

    11

    12

    13

    14

    15

    16

    17

  • 10(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    1. TEST RECORD COMMISSIONING AND INTEGRATION

    Site Name :

    Site ID:

    Testing Date : RBS6101

    900/1800 & 2100MHz

    Ericsson Supervisor: Client Representative:

    Cabinet: M1 M2

    TEI Value:

    Stand alone/Cascade:

    Software package:

    Cell A CI LAC BSIC

    Cell B CI LAC BSIC

    TS4 TS5 TS6 TS7dTRU TRU CAB ARFCH POWER dB

    TS6 TS7dTRU TRU CAB ARFCH POWER dB TS0 TS1

    TS0 TS1 TS2 TS3

    A 2

    011-0

    1-2

    1

    2014-10-29

    Hotel Elizabeth

    HRE0061 Region: Hotel Elizabeth

    Type of RBS:

    Configuration:

    TS2 TS3 TS4 TS5

  • 11(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    Cell C CI LAC BSIC

    Ericsson Representative: Client Representative:

    Name:.. Name:..

    Sign:. Sign:.

    Date:. Date:.

    TS3 TS4 TS5 TS6 TS7dTRU TRU CAB ARFCH POWER dB TS0 TS1 TS2

  • 12(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    2. TEST RECORD

    CELL A CELL B CELL C

    Test Call PSTN to MS:

    CELL A CELL B CELL C

    Test Call MS to PSTN:

    Handover Test: 900

    Remarques:

    Ericsson Representative: ECONET Representative:

    Name:..

    Sign:.

    Date:.

    C to B B to AA to B B to C C to A A to C

    A B C

  • 13(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    3. BTS Antenna System Test

    Date: Type et Configuration du RBS :

    Tester: TMA:

    ddTMA:

    Serial Number of the siote master Antenna System

    (According to SIR value)

    Cell A Cell B Cell C OK

    Visual Check: Antenna Directions: Deg

    Antenna EL. Tilt: Deg

    Feeder swap checked: Antenna Mec.Tilt: Deg

    Antenna Height: m

    VSWR Limits Check:

    OK

    OK

    Antenna Type: Antenna Caracteristique:

    Cell A

    Jumper/Feeder Marking:

    VSWR:

    Return Loss: RL > 16.5 dB

    Indoor Jumper Length: m

    Outdoor Jumper Length: m

    Feeder length m

    Cable Attenuation: < 3 dB

    TMA/ddTMA Insertion Loss < 0.6 dB

    Cell B

    Jumper/Feeder Marking:

    VSWR < 1.4 or According to Antenna

    DX1 TX1 RX-A DX2 TX2 RX-B

    Antenna VSWR Limit tested with out feeder

    VSWR < 1.4 or According to Antenna

    VSWR Class 2.0 :

    VSWR Class 1.5 :

    DX1 TX1 RX-A DX2 TX2 RX-B

    OK

    OK

    OK OK

    OK OK

    Yes NO

    New Existing Extended

    NOK

    Yes NO

  • 14(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    VSWR:

    Return Loss: RL > 16.5 dB

    Indoor Jumper Length: m

    Outdoor Jumper Length: m

    Feeder length m

    Cable Attenuation: < 3 dB

    TMA/ddTMA Insertion Loss < 0.6 dB

    Cell C

    Jumper/Feeder Marking:

    VSWR:VSWR < 1.4 or According to Antenna

    Return Loss: RL > 16.5 dB

    Indoor Jumper Length: m

    Outdoor Jumper Length: m

    Feeder length m

    Cable Attenuation: < 3 dB

    TMA/ddTMA Insertion Loss < 0.6 dB

    Remarques:

    Ericsson Representative: ECONET Representative:

    Name:.. Name:..

    Sign:. Sign:.

    Date:. Date:.

    VSWR < 1.4 or According to Antenna

    Characterestics

    Antenna VSWR Limit tested with out feeder

    VSWR < 1.4 or According to Antenna

    TX1 RX-A DX2 TX2 RX-B

    Characterestics

    Antenna VSWR Limit tested with out feeder

    VSWR < 1.4 or According to Antenna

    DX1

  • 15(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    3. Power Supply Test 230 V AC/ 24V DC (Back-up system)

    Date: Type et Configuration d RBS:

    Tester:

    Test Items Notes

    1. Measurment of DC Voltage system

    2 Measurment of AC voltage system

    3.Disconnection of the distribuation breaker

    4. Disconnection of main breaker in the BFU 1

    5. Disconnection of main breaker in the BFU 2

    Ericsson Representative: ECONET Representative:

    Name:.. Name:..

    Sign:. Sign:.

    Date:. Date:.

    4. BTS COMMISSIONING & INTEGRATION Test

    RBS TYPE: .

    FREQUENCE: .

    Date: RBS Configuration

    Tester:

    N/A Remarks

    N.B. All the results of Antenna's tests (Site Master) will be added to this report

    Value N/A OK Fail

    OK/FAIL

  • 16(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    POWER:

    POWER SUPPLY TEST

    FAN UNIT TEST

    BATTERY BACKUP TEST

    FIBER OPTIC TEST

    BTS Recovery after power break

    COMMISSIONING:

    DEFINE TMA PARAMETERS

    DEFINE VSWR ALARM LIMITS

    FAULT STATUS READING

    EXTERNAL ALARM TEST

    DEFINE PCM PARAMETERS

    CONFIGURE THE IDB

    SAVE IDB

    BTS Recovery after PCM break

    BTS Recovery after BCCH Reocovery

    Remarks:

  • 17(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    Ericsson Representative: ECONET Representative:

    Name:.. Name:..

    Sign:. Sign:.

    Date:. Date:.

  • 18(26)

    TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

  • 19(27)TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Site Name :

    Site ID:

    Date : RBS6101

    Ericsson Supervisor: Client Representative:

    OK = Correctly installed

    N/A = Not applicable

    A. MECHANICAL INSTALLATION COMMENTS

    1 Assembly and alignment of cabinet

    2 Fastening of cabinet

    3 Assembly and alignment of frame(outdoor)

    4 Radio cabinet jumpers connection and laying

    5 Transmission cables and connection

    6 Alarm cables and connection

    7 Dc power cables and connection

    8 Ac power cabling and connection

    9 GPS cable and connector installation(WCMA)

    B. Equipment in cabinet/Transmission and alarm COMMENTS

    1 Magazine/Modules/PCB Installation

    2 Internal cabling

    3 Power/Fuse connection

    4 AC Mains key setting

    5 Fan units in cabinet

    6 Terminal block properly fixed

    7 Wire connection in terminal block

    8 Cable running and laying inside DF or Magazine

    9 Transmission and Alarm cables sheild connection in DF

    10 Label

    11 Over voltage protection for transmission and alarm(OVP)

    12 Sensors connection

    OK N/A

    OK N/A

    Type of RBS:

    A 2

    011-0

    1-2

    1

    2014-10-29

    Hotel Elizabeth

    HRE0061 Region: Hotel Elizabeth

    INSTALLATION CHECK LIST, RBS 6000

    OUTDOOR INSTALLATION

  • 20(27)TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    OK = Correctly installed

    N/A = Not applicable

    C. EARTHING INSTALLATION AND CONNECTION COMMENTS

    1 Incoming Earthing and lightning system

    2 Earthing principles

    3 Earth connection for AC power distribution

    4 Cables lugs and C- clamps

    5 Earth connection of cabinets and magazines

    6 Feeder/Fibre cable earthed at outside Cable lead-in.

    7 Feeder/Fibre cable earthed at Tower Bottom.

    8 Feeder/Fibre cable earthed at 30m in case the Tower height is more then 60m.

    9 Cable ladder earthed

    10 No drip loop for Earthing kit

    11 Feeder cable earthed all along the length as required.

    D. RBS/MICROWAVE ANTENNA INSTALLATION COMMENTS

    1 Verify the Antenna direction,height and tilt angles

    2 Antenna fittings tightened

    3 Antenna support according to specification

    4 Earthing of antennas

    5 Antenna installed according to configuration

    6 Installation of ASC,TMA,RET,TMF,Combiner andFilter

    7 Earthing of ASC and TMA

    8 Installation of RRU/AIR(Remote Radio Unit)

    9 RRU/AIR DC power cabling and connection

    10 RRU/AIR optical cabling and connection

    11 RRU/AIR Earthing

    E. FEEDER CABLE INSTALLATION AND CONNECTION COMMENTS

    1 Feeder bending radius

    2 Feeder running and laying on cable ladder

    3 Feeders fixing and clamping

    4 Space between feeder clamps in tower/mast

    5 Feeder/jumper marking

    6 Connectors sealed and secured

    7 Antenna ASC jumper fixing and clamping

    8 Protection for feeders on horizontal ladder outdoor

    9 Installation and sealing of feeder inlet

    10 Drip loop on feeders before cable inlet

    F OTHER DEFECTS COMMENTS

    N/AOK

    OK N/A

    OK N/A

    OK N/A

  • 21(27)TEST PROTOCOL (RBS) Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 83-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)A 2011-0

    1-2

    1

    2014-10-29

    COMMON

    G DOCUMENTATION/GENERAL COMMENTS

    1 Installation as per IE installation binder.

    2 Update the IE documentation (Red Marking, if required)

    3 Record of antenna sweep test

    4 Site area cleaned from debris and excess material

    5 Correct Tools & PPE

    All installation activities have been completed NO YES (if no, specify below)

    Remarks:

    Ericsson Representative: Client Representative:

    Name:.. Name:..

    Sign:. Sign:.

    Date:. Date:.

    OK N/A

  • 22 (26) SITE INSPECTION LIST Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 11-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    1. Site Installation Documentation OK N/A RemarksNOK Remarks

    1.1 Site Configuration

    1.2 Site tables/drawings

    1.4 Test Records

    2. RBS Installation OK N/A RemarksNOK Remarks

    2.1 Mounting of equipment as per SID

    2.2 Base frame/cabinet mounting

    2.3 Levelling of RBS cabinet

    2.4 Grounding of RBS with 35mm2 ground cable

    2.5 External cable connections

    2.5.1 Alarm cables installation

    2.5.2 PCM cable installation

    2.5.3 ESB cable installation

    2.5.4 ESB terminator installation

    2.5.5 DC cable installation

    2.5.6 AC cable installation

    2.6 Connection of jumper cables to RU ports

    2.7 Jumpers and external cables labeled

    2.8 Crimping of C-clamps and lugs

    2.9 Trimming of excess cable tie(sharp edges)

    Mark the box with an "X" for OK if Correctly installed, "X" for NOK if not correctly installed, and N/A if Not

    applicable.

    2014-10-29A 2011-0

    1-2

    1

  • 23 (26) SITE INSPECTION LIST Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 11-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    2014-10-29A 2011-0

    1-2

    1

    3. Antenna System Installation OK N/A RemarksNOK Remarks

    3.1 Assembly of antenna accessories

    3.2 Installation of panel antenna

    3.3 Installation of RRUs

    3.4 Bearing of panel antenna

    3.5 Tilting of panel antenna(Electrical/Mechanical)

    3.6 Jumper cable installation

    3.7 Tightening of connectors

    3.8 Waterproofing of connectors

    3.9 Cover of unused antenna port

    3.10 Cover of electrical tilt

    4. Preparatory to Vacate Checkpoints

    4.1 Check all equipments passed functional tests

    4.2 Check all cabinets, racks, & boxes are clean

    4.3 Observe cleanliness in site premise & cabin floorings

    4.4 Check all equipments are working before leaving

    4.5 Prepare Materials Return to Store for excess materials

    OK N/A NOK Remarks

  • 24 (26) SITE INSPECTION LIST Uppgjord (ven faktaansvarig om annan) - Prepared (also subject responsible if other) Nr - Document No.

    ASL/ORL/I Lefa Lasapo 1/153 11-IPA 143 5483 UenDoc respons/Approved Kontr - Checked Datum - Date Rev. File

    EZM/OHC/C (Abel Jaratina) A Hotel Elizabeth (HRE0061)

    Project : Econet Zimbabwe SWAP

    Site : Hotel Elizabeth (HRE0061)

    2014-10-29A 2011-0

    1-2

    1

    5 Outstanding Item List

    Critical

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    All installation activities completed and accepted NO YES (if no, specify below)

    Remarks:

    Ericsson Representative: ECONET Representative:

    Name:.. Name:..

    Sign:. Sign:.

    Date:. Date:.

    Comments, Item Minor Major

  • Radio Site: Hotel Elizabeth

    Issued at . on the day of , 2014, which

    is the Date of Final Acceptance

    This Certificate has been duly signed by the Parties in two (2) originals and the

    Parties have taken one each

    For: ECONET (Buyer) For: Ericsson (Contractor)

    (Contract responsible) (Contract responsible)

    Name: .. Name: ..

    Position: .. Position: ..

    PRELIMINARY ACCEPTANCE CERTIFICATE

    Contract between ECONET WIRELESS and Ericsson - Zimbabwe

    This Final Acceptance Certificate certifies that the Contractor has fulfilled the scope of

    supply and other obligations in order to reach Acceptance as specified in the Contract.

    Acceptance has been performed in accordance with the conditions defined in the

    Contract and as detailed in the Acceptance Plans.

    The supplied System is suitable to be placed into service or (Soft Launch).

    The Final Acceptance Certificate (FAC) milestone is passed.

    Any remaining outstanding items are not of sufficient severity to delay passing the

    FAC milestone or to prevent payments as defined in the Contract.

    Warranty period as defined in the Contract commences from the date of this

    certificate.