THE SUM OF ALL MEASURES
INTENDED TO DETERMINE THE
ACTUAL CONDITION OF THE GAS
TURBINE, TOGETHER WITH THE
MEASURES REQUIRED TO PRESERVE /RESTORE THE SPECIFIED CONDITION
MAINTENANCE OF GAS TURBINE
-
7/31/2019 Hot Gas Path Inspection 1
4/27
IMPACT ON QUALITY OF MAINTENANCE
ADOPTING MANUFACTURERS RECOMMENDATION
PROPER PLANNING OF INSPECTIONS
AVAILABILITY OF DOCUMENTS AND INSTRUCTIONS
AVAILABILTY OF TOOLS
STOCKING AND PROCUREMENT OF SPARES
REPLACEMENT OF WORNOUT SPARES INSTEAD OF
REPAIR
WORKING CONDITIONS AND SKILLED WORK CREW
ACCESSIBILITY OF OEMS TECHNICAL SUPPORT
-
7/31/2019 Hot Gas Path Inspection 1
5/27
-
7/31/2019 Hot Gas Path Inspection 1
6/27
-
7/31/2019 Hot Gas Path Inspection 1
7/27
-
7/31/2019 Hot Gas Path Inspection 1
8/27
HOT GAS PATH INSPECTION
GT #11 06-12-2002 to 15-02-2003
GT #12 02-05-2003 to 27-05-2003
-
7/31/2019 Hot Gas Path Inspection 1
9/27
-
7/31/2019 Hot Gas Path Inspection 1
10/27
ROTOR
UPENDING
-
7/31/2019 Hot Gas Path Inspection 1
11/27
TIE ROD
COLLAR
-
7/31/2019 Hot Gas Path Inspection 1
12/27
-
7/31/2019 Hot Gas Path Inspection 1
13/27
CONSTRUCTION
Gas Turbine: SIEMENS make V94.2
Rating: 137.7 MW at ISO
Conditions
Turbine: 4 Stages
Compressor: 16 Stages
Combustion Chamber: 2 SILO type with
eight Burners in each
-
7/31/2019 Hot Gas Path Inspection 1
14/27
HOT GAS PATH INSPECTION
ORIGINAL INTERVAL : 25,000 EOH TO ENSURE
BASE MATERIAL WAS NOT DAMAGED AND
SUBSEQUENT REFURBISHMENT ALLOWED
REVISED INTERVAL: 33,000 EOH . MOVING ROW
1 AND 2 NO LONGER REFURBISHED
-
7/31/2019 Hot Gas Path Inspection 1
15/27
HGPI
INVOLVES
DISASSEMBLY COMBUSTION
CHAMBERSDISASSEMBLY OUTER CASING
REMOVAL OF TURBINE
STATIONARYBLADE CARRIERSREMOVAL OF TURBINE ROTATING
BLADES STAGE 1 AND 2
-
7/31/2019 Hot Gas Path Inspection 1
16/27
-
7/31/2019 Hot Gas Path Inspection 1
17/27
-
7/31/2019 Hot Gas Path Inspection 1
18/27
Activities to be carried out HGPI
Components Measure HGPI Major
inspection
1. Turbine blades
Moving blade row 1 & 2 Replacement Yes Yes
Moving blade row 3, stationary
blade rows 1 & 2
Refurbishment Yes Yes
Moving blade row 4, stationary
rows 3 & 4
NDE Yes Yes
-
7/31/2019 Hot Gas Path Inspection 1
19/27
Activities to be carried out HGPIComponents Measure HGPI Major
inspection
2. Compressor blades
Coated rows Refurbishment No Yes
Uncoated rows NDE, Visual
inspection
No Yes
Components Measure HGPI Major
inspection
3. Stationary bladecarriers
Turbine NDE, Visual
inspection
Yes Yes
Compressor NDE, Visual
inspection
No Yes
-
7/31/2019 Hot Gas Path Inspection 1
20/27
Activities to be carried out HGPIComponents Measure HGPI Major inspection
4. Casing hot gas
path boundary
items
Inner casing Regenerative heat treatment No yes
Mixing casing Regenerative heat treatment No yes
Combustion chamber tiles
(flame tube)
Replace in the event of negative
findings
Yes Yes
Components Measure HGPI Major inspection
5. Rotor (highly
stressed locations)
NDE, Visual inspection No Yes
6. Burners NDE, Visual inspection, boroscopicinspection, pressure/ leak test
Yes Yes
7. Control
equipment, piping
Function test, pressure/ leak test,
condition based repair or
replacement
Yes Yes
-
7/31/2019 Hot Gas Path Inspection 1
21/27
Magnetic Particle Inspection
Hirth Coupling of Turbine as well as
compressor disc
Compressor vanes and blades
Tie Rod
Matching grooves of Damping rings
Transition of aerofoil to bearing ofIGV
-
7/31/2019 Hot Gas Path Inspection 1
22/27
Ultrasonic Testing
Gas Distribution Pipings and SpiderArms
Transition of aerofoil to hook ofcompressor vanes
Inner casing & Mixing Chamber walls
-
7/31/2019 Hot Gas Path Inspection 1
23/27
Dye Penetrant Test
Bearings / Thrust Pads
K-Ring
All weld seams Tile Holders in combustion chambers
Stationary & Rotating blades of Turbine
Stage #3 & #4Grooves of Turbine Rotor Disc Stage #1 & #2
-
7/31/2019 Hot Gas Path Inspection 1
24/27
Major Observations
Cracks in turbine stationary vanes stage 3and stage 4 lower half
Coating abrasion in compressor bladesCracks in right side of inner casing
Dent marks in inner casing seal ring
Wear in cooling ring of mixing chamberGap in compressor stationary vane
transition hook has increased.
-
7/31/2019 Hot Gas Path Inspection 1
25/27
-
7/31/2019 Hot Gas Path Inspection 1
26/27
VIEW OF
DAMAGED
TILES AND TILE
HOLDERS
-
7/31/2019 Hot Gas Path Inspection 1
27/27
BOROSCOPIC
INSPECTION OF
FUEL OIL BURNER