Hinduja Group An Overview
Transcript of Hinduja Group An Overview
11
Hinduja Group – An Overview
• Founded in 1914• Trans-national conglomerate• Presence in 100 countries
with more than 70,000employees
• Sales revenue - $25 billion(~ Rs. 170,000 Crore)
GUIDING PRINCIPLES:
• Work to Give
• Word is a Bond
• Act Local Think Global
• Partnership for Growth
• Advance Fearlessly
Banking & Finance
Chemical/Lubes
PowerInformation Technology
Real EstateMedia HealthcareProject
DevelopmentTrading
Automotive
22
Truck
• Long Haul
• Mining & Construction
• Distribution trucks
Bus• City Bus• Suburban Bus• Inter City Bus• School & Special Bus
Light Vehicle
• Dost• Partner• MiTR• BADA Dost
Specialty Vehicle
• Bulker• Fire brigade trucks
Power Solution
• Generator sets• Marine Application• Harvester Combine
Ashok Leyland - Product Portfolio
• Over 700,000 trucks keep the wheels of Indian economy moving
• Every year Ashok Leyland buses transport over 26 billion people
(equal to 3.5 times of world’s population)
33
Hosur Unit II plant (ALH2)
•Vehicle Manufacturing plant located on Bengaluru- Chennai Highway
•Plant Capacity : 121,000 trucks/annum (M&HCV:56,000 and LCV:65,000)
•ALH2 Sales Revenue :$ 1251 Mn(FY19)
(31.3 % of Ashok Leyland turnover)
Low investment plant with significant contribution to company’s turnover
*Conversion ratio 1 $ : INR 73
44
Self DeclarationHand Washing
Vehicle disinfection
Doctor verification Mask Distribution
Aarogya Setu App Checking Thermal Scanning
Social Distancingat Canteen
Office fumigation
Entry at Gate
We have resumed our operations with effect from 11th May 2020 after obtaining appropriate approval from District Collector, Krishnagirivide his letter dated 5th May 2020 with guidelines to adhere the conditions as prescribed by the Ministry of Home Affairs and the StateGovernment.
2.Impact of COVID-19
55
3.Specific Energy Consumption…
2,709
2,020
1,719
1,379
1,306
1,201
1,068
1,1771,205
1,2451,147 1,239
642610
646 647 638
562 520 512 501
2500
2500
2000
1429
1290
1100
1100
1050 1050 11001080
1108745
704
610 610 610
581 523 510 510
0
500
1000
1500
2000
2500
3000
FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21
EN
ER
GY
/ H
EC
U (
kW
h)
ENERGY PER HECU -TREND
Actual kWh/HECU Target (kWh / HECU)
Better
74% of reduction YoY
Long trend
66
3.Specific Energy Consumption…
Last 3 years trend
520 512 501
523 510 510
200
300
400
500
600
700
800
900
1,000
2018-19 2019-20 2020-21
EN
ER
GY
/ H
EC
U (
kW
h)
ENERGY PER HECU -TREND
Actual kWh/HECU Target (kWh / HECU)
Better
13% of reduction YoY
1.3
1.25 1.24
1.32
1.29
1.26
1.2
1.22
1.24
1.26
1.28
1.3
1.32
1.34
2018-19 2019-20 2020-21
Ther
mal
En
ergy
in G
J /
HEC
U
Axis Title
Thermal Energy / HECU Trend
Actual GJ/HECU Target GJ/HECU
Better
77
4.Bench marking
Internal
➢ Benchmark of same unit which won “1st Place in National Energy Conservation Competition-
2014” in the Automobile Sector conducted by BEE
➢ Process differs from plant to
plant & local conditions
➢ Difference in outsourcing level
➢ Product of different
specifications
➢ Various levels of system buying
External / Global
1221 12501198
940999
1289
1148
15001463
520 512 501
0
200
400
600
800
1000
1200
1400
1600
2018-19 2019-20 2020-21
kWh / HECU
PantNagar Unit Hosur unit-1 Ennore Unit Hosur Unit-2
88
5. Energy Saving projects implemented in last three years
Sl.No
Project descriptionPictorial
representation
Annual Electrical savings Annual Thermal savings
Investment in Rs. MillionKwh
Cost Savings in Rs.
Million
Qty
Cost Savings in Rs.
Million
1
One of the conventional Reciprocating compressor (which is having 200kw motor for the generation of 1250CFM of compressed) air replaced with Energy Efficient Screw compressor of 160kw motor.The heat generated in the screw compressor recovered and used to pre-heat the water for the hot water generating process.
950400 6.17 78 kL 4.68 60
2
All the shop floor lightings, of 150Watts HPSV high bay lamps converted into 118Watts LED lightings all over the plant.
409500 3.152 NA NA 27.6
Major ENCON project implemented in FY19
99
5. Energy Saving projects implemented in last three years
Sl.No
Project descriptionPictorial
representation
Annual Electrical savings Annual Thermal savings
Investment in Rs. MillionKwh
Cost Savings in Rs.
Million
Qty
Cost Savings in Rs.
Million
3
Ambient temperature reduction initiatives inside compressor room ✓ 1.Layot modification of heat
generating equipment’s inside the compressor house to avoid heat radiation from neighbor equipment
✓ 2.Extended ventilation for the compressor house for better cross ventilation
✓ 3.Exclusive ducting’s for the compressors to vent out the heat from the compressor house
✓ 4.Introduction of turbo ventilators in the roof of the compressor house
186200 1.44 NA NA 0.2
Major ENCON project implemented in FY19
1010
5. Energy Saving projects implemented in last three years
Sl.No
Project description Pictorial representation
Annual Electricalsavings
Annual Thermal savings
Investment in Rs. Million
Kwh
Cost Savings in Rs.
Million
QtyCost
Savings in Rs. Million
1Energy efficient compressors installation - 1450 CFM - 1 no
576000 4.435 NA NA 0.18
2 Energy efficient Drier installation 65520 0.505 NA NA 0.42
3Replacement of ceiling fans (80 watts) with BLDC ceiling fans (40 watts) - 145 nosas 1st Phase – SUPERFAN
21700 0.16 NA NA 0.55
Major ENCON project implemented in FY20
1111
Sl.No
Project description Pictorial representation
Annual Electricalsavings
Annual Thermal savings
Investment in Rs. Million
Kwh
Cost Savings in Rs.
Million
Qty
Cost Savings in Rs.
Million
4
Automatic sprinklers in place of tractor driven supply of water for greenerymaintenance
NA NA96000
Lit67.21 0.26
5
Replacement of conventional centrifugal pumps of 7.5 replace with Energy Efficient “GRUNDFOS” make pumps of 5.5kW -2 nos at OHT water lifting
10440 0.08 NA NA 1.2
6LED lightings : RSO finished truck stock lights, Peripheral Street/Lawn lightings
27240 0.209 NA NA 0.89
5. Energy Saving projects implemented in last three years
Major ENCON project implemented in FY20
1212
5. Energy Saving projects implemented in last three years
Sl.No
Project description Pictorial representation
Annual Electricalsavings
Annual Thermal savings
Investment in Rs. Million
Kwh
Cost Savings in Rs.
Million
QtyCost
Savings in Rs. Million
1BLDC Motor Driven Blowers introduction of cabin paint shop.
1382400 10.71 NA NA 0
2Propane Introduction instead of Diesel for paint shop burner
NA NA 3745 kL 218.04 32
3LPG introduction for Boiler Operations at Canteen & ETP process (8000Lits / Month)
NA NA 96kL 6.72 8
Major ENCON project implemented in FY21
1313
6. Innovative Projects implemented
✓ Introduction of “BLDC” motor driven Air Handling Units for Paint Shop
✓ Intelligent Water Management system
✓ Integrated RBT in assembly line…. first time in commercial vehicle industry
1414
6. Innovative Projects implemented
✓ Integrated RBT in assembly line…. EOL (End Of Line) testing Process
Past Process:
Manual Wheel Alignment
Roller Test Bench
Brake TestABS Test
Off Track from Assy Conveyor
800mts by road
12Mins 15Mins
6Mins4Mins
Avg.Cycle time :35min/Vehicle
Diesel : 1.8 Liters/ Vehicle
SALES
7Mins
1515
6. Innovative Projects implemented
✓ Integrated RBT in assembly line…. EOL (End Of Line) testing Process Idea & Objective:➢ Integrated Automated Contactless test Booth for Wheel alignment & Roller Brake test-
M/s.DURR, German➢ To be positioned next to off-track stage of Conveyor➢ Cycle time/ Tact Time to be inline with Conveyor (7 Mins/ Vehicle)Current Process:
Off Track from Assy Conveyor
Integrated EOL
Avg.Cycle time :6.5min/Vehicle
Diesel : 0.4 Liters/ Vehicle
7Mins
7Mins
1616
6. Innovative Projects implemented
✓ Integrated RBT in assembly line…. EOL (End Of Line) testing Process
1. Productivity improvement by 74%
2. Energy Conservation reduction by 1714285 units/ Annum
✓ Energy cost saving : Rs.12.0 Millions
3. Diesel Conservation upto : 28658 Lits / Annum
✓ Diesel cost Saving : Rs.20.06 Millions
4. Set benchmark of “End of Line Testing Process” cycle time matched with “Assembly Conveyor Cycle
Time”
5. Horizontal deployment in “DOST” assembly line in FY21
6. Elimination of “Vehicle Test Shop” process
✓ Benefits
Special Note:1. 1st of its kind in a commercial vehicle industry to Completed EOL tests at end
of conveyor2. 1st of its kind to meet cycle time inline with conveyer cycle time.
1717
7. Utilization of Renewable Energy Sources
Roof Top SOLAR (inside plant) Energy contribution FY21 : 6.75%
Wind Mill Energy contribution : FY21 : 29%
Captive SOLAR ( outside plant)Energy contribution FY21 : 31.25%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
FY 19 FY 20 FY 21
Power Mix
SOLAR WM IEX GCP DG TNEB
67% Green Energy
1818
8. Waste Utilization & Management
Ashokleyland, Unit-2,HosurPre-processor
M/s.GGEPIL,RanipetFuel for cement Kiln
M/s.Ultratech Cements,Karur
267
196
76.27
0
50
100
150
200
250
300
FY19 FY20 FY21
Qty
. in
MT
Year Wise paint sludge disposal as Fuel
Qty. disposed in MT
Industrial Waste Management
1919
8. Waste Utilization & Management
Domestic Waste Management
Canteen wastages like food, egg shells,vegetable peels etc being converted as manure in Organic Waste Composter-500Kg/Day Capacity
2020
9. GHG Inventorisation
9450
7293 72626631
59395308
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Ton
nes
of
CO
2e
Scope 1 emissions : Emissions from fossil fuel usage within the premises
12828
4694
1230123
0
2000
4000
6000
8000
10000
12000
14000
Base line FY 18 Scope 2 - FY21 Power mixbalancing - Solar
& Wind FY 22
Green Energy inleft over slots -
FY 23
Ton
ne
s o
f C
O2
e
Scope 2 emissions : Emissions from to fossil fuel usage due to (TNEB, IEX, CPP power usage)
22278
11987
6971 6340 5649 5618 5048
1584477
-155
-5000
0
5000
10000
15000
20000
25000
Scope 1 +2emissions Base
line
Scope 1 +2emissions FY 21
Existing carbonsink - 1.32 Lakh
trees
100 % propanein paint shop FY
22
DG avoidanceusing 110 KV
Waste heatrecovery
projects FY 22
Carbon sinkwith 15 K trees
Power mixbalancing -
Solar & WindFY 22
Green Energy inleft over slots -
FY 23
Solar basedheating systemfor Oven FY 25
Ton
nes
of
CO
2e
Scope 1 +2 emissions (6k +6k each from M& HCV and LCV)
Carbon negative with – 155 t CO2e -FY 25
2121
10. Green Supply Management
442
402380
365342 348 340
325
231263 252
275
0
50
100
150
200
250
300
350
400
450
500
FY 17 FY 18 FY 19 FY 20
Total supplier ISO9000 ISO14001
❖Significant Initiatives :
• Awareness Creation to Supply Chain Partners ( 63 Supplier Gemba’s Started at Organisation Level )
• Adoption of vendors for Gemba Concepts Implementation
• Procurement of Energy efficient ,Water efficient Equipment
• Incentivize the Vendors with Recyclable pallets
Green Purchase
•Adoption to No. of Parts/Suppliers
•Greening the Supply Chain
2222
11. Team work, Employee Involvement & Monitoring
Online Monitoring... Capturing in SAP
Daily•Aggregate-wise daily reports to GEMBA leaders
Weekly
•Power cost analysis with respective process owners
•Corrective actions planning
Monthly•Gap analysis review by Unit Head
Plant Head•Inter unit review by VP-Hosur units
9.5)Conducting various competitions like Poster making,Photography
contest ,ENCON Ideas & Awarding Best ENCON Projects through Kaizens
2323
14.Other relevant Information.
Madhakondapalli Lake rejuvenation : Volunteers from ALH2 participated in CSR’s initiative of lake rejuvenation. Aspiring to get 250 Dried Borewells recharged irrigation for 4,000 acres of 3 adjacent villages in FY22
2424
14.Other relevant Information.
Sapling donation to MYRADA (Mysore Resettlement and Development Agency)❖ MYRADA is an NGO that has had extensive experience in incubating, developing and
managing sustainable growth in south India
2525
14.Other relevant Information.
Awareness to public at Bodichipallivillage near Kelamangalam,TN
Spreading awareness to families, students and Visitors
❖ On TN Govt’s directive Ban on “use of one time use and throwaway plastics” following initiatives implemented progressively
❖ On 27/09/19 a knowledge sharing session on “Awareness on Harmful effects of plastic” was conducted by MR-H2 to the staffs of “Central Silk Board Authority of India”-Hosur
2626
14.Other relevant Information.
Awareness to public at Bodichipallivillage near Kelamangalam,TN
Spreading awareness to families, students and Visitors
❖ On TN Govt’s directive Ban on “use of one time use and throwaway plastics” following initiatives implemented progressively
❖ On 27/09/19 a knowledge sharing session on “Awareness on Harmful effects of plastic” was conducted by MR-H2 to the staffs of “Central Silk Board Authority of India”-Hosur
2727
14.Other relevant Information.
❖ MR-EMS – conducted a Tech-Talk session on “ Energy Trends in Efficiency Improvements of Blowers” to the members of ISHRAE,Hosur chapter
❖ MR-EMS – conducted knowledge sharing session on “ Energy Conservation Practices” to the final year students of Adhiyamaan Engineering College,Hosur on 14th December’2019
2828
➢ During Lockdown we have extended our arm for social welfare
➢ From 1st April 20, we were providing 3 time meals to various category of people – Team at GH, Primary Health Centres, Stranded people, Migrated community, Police and Municipal workers till June’20
➢ Donated 1000 nos of N 95 MASKS to GH.
➢ Organized basic provision items, vegetables to interior village communities – covered about 09 villages and 03 homes – provided worth of Rs.2 lakhs of materials
➢ Provided nutrition food to 20 HIV infected persons.
➢ Distributed the HIV Tablets from ART Centre, GH, Hosur and Krishnagiri to 100 HIV infected patients, who could not come to GH – Due to no transportation.
➢ Distributed 200 packets of buttermilk to the working staff of different departments, on various points for about 15 days.
14.Other relevant Information.
COVID Care beyond boundary…
2929
COVID – 19 Warriors: Screening Camp for Interstate Migrant Workmen
A free COVID 19 screening camp was arranged for the inter state migrantworkmen on 13th April 2020.
236 inter state migrant workmen were screened and none of them were foundwith any symptoms.
These migrants were working under different contracts in ALH2.
The screening comprises self evaluation of COVID 19 through a questionnaire,temperature monitoring, vitals assessment (oxygen saturation, pulse rate) andclinical examination
14.Other relevant Information.
3030
COVID 19 – Care beyond Work (during Country wide lockdown)
Due to the outbreak of Covid-19, the entire nation is under lockdown, resulting in suspension of inter- state transportation, closure of hotels / mess.
To support the Interstate migrant / Trainees, AL provides three times food for them till normalcy resorted, every day 300 breakfast/ lunch/ dinner are being distributed to Interstate migrant workmen
14.Other relevant Information.
3131
H2 AWARDS TIMELINE
1994 Regular Production Commenced
2004 1. CII Excellence in Water Management Award2. CII Leadership & Excellence in SHE Award
2017 Sustainability Award
QMS Certification: ISO 9001 - 1995
1997 Stallion Vehicle rolled out for the Indian Army
Euro-4 Compliant CNG Engines -2009
2002 1. EMS Certification ISO 14001:19962. CII Leadership & Excellence in SHE Award
2006 CII Leadership & Excellence in SHE Award
2013 1.Green Manufacturing Excellence Award 2. BEE Energy Conservation Merit Award
SKD to Ordinance Factory – Indian Army - 1998
1. Euro-3 Compliant Vehicles introduced - 20052. CII-Leadership & Excellence in SHE Award
Deming Prize- 2017
2008 1.CII Excellence in Water Management Award2.CII Leadership & Excellence in SHE Award
2015 Green Company of the Year Award
2019 CII Energy Efficient Unit Award
1. Euro 2 complaint vehicles rolled out - 20032. CII Excellence in Energy Management Award
1.Golden Peacock – Env. Mgmt Award - 20072. CII-Leadership & Excellence in SHE Award
BEE - National Energy Conservation Award -2014
Birla Institute of Management Award on CSR - 2018
EMS certification ISO14001:2015 - 2019