1) Name of the project: Highway Project
2) State/District/Taluka: Karnataka/Bijapur/Bijapur
3) Location:
a) Distance of project site from the city: 7.00 KM
b) The nearest Railway station and its distance from the project site :10.00 KM
c) Distance of project site from college : 4.00 KM
![Page 3: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/3.jpg)
![Page 4: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/4.jpg)
![Page 5: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/5.jpg)
Longitudinal Section of Highway Line (Profile Leveling along the center line of Proposed Highway).
Cross-Sections for the center line of Highway.
Block Contouring for the Proposed Culvert.
![Page 6: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/6.jpg)
Dumpy level
Prismatic Compass
Chain, Tape, Arrows and Ranging Rods
![Page 7: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/7.jpg)
Components Designeda. Pavement thickness.
b. Horizontal Curvei. Radius of Horizontal Curveii. Super elevationiii. Extra Wideningiv. Stopping Sight Distance V. Overtaking Sight Distance vi. Setback Distances
vii. Transition Curvec. Vertical Curve.d. Box culverte. Earth work calculation
![Page 8: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/8.jpg)
![Page 9: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/9.jpg)
From IRC design plate No-1 for CBR 4% & traffic range 1-10 msa for 7.15 msa
Total thickness of pavement is 650mm.
Thickness of Bituminous surfacing is 30mm (SDBC)Thickness of Surface binder coarse is 70mm (DBM)Thickness of Granular base is 250mm (WBM)Thickness of Granular sub base is 300mm Granular material of CBR not less than 30%
![Page 10: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/10.jpg)
![Page 11: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/11.jpg)
![Page 12: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/12.jpg)
1. Radius of Horizontal Curve2. Length of curve3. Super elevation4. Check for Transverse Skid5. Design of extra widening6. Design of transition curve7. Total length of the curve8. Setting of curve a. first transition curve b.circular curve c.second transition curve9. Overtaking side distance and stopping side distance
![Page 13: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/13.jpg)
1.Radius of Horizontal Curve
2.length of curve
feVR
127
2
180..
RL
![Page 14: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/14.jpg)
3.Super elevation.
As the value is greater than the maximum super elevation of 0.07
limits the value of e to 0.07 the curve is safe for full speed of 80kmph as the ruling minimum radius is adopted, however check for transverse skid is made
4.Check for Transverse Skid.
f=0.15, hence safe
RVe225
2
eR
Vf
127
2
![Page 15: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/15.jpg)
5.Design of extra widening
We=0.71m Total width of the pavement
B=W+We =7.71m
We = (nl) 2/ (2×R) + V/ (9.5×√(R))
![Page 16: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/16.jpg)
VC
7580
30215.0CR
VLs
6. Design of transition curve
•Length of Transition Curve by rate of change of Centrifugal Acceleration
• Length of Transition Curve by rate of Introduction of Super elevation
Ls=E/2= Be NE
2
![Page 17: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/17.jpg)
7.Length of Transition Curve as per IRC
Adopt Higher among all values
RVLs27.2
![Page 18: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/18.jpg)
9.Overtaking sight distance and stopping sight distance
fVVtSSD254
278.02
AST 4.14
)28.0()2
28.0()28.0(
xVTS
xVbxTtbVOSD
![Page 19: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/19.jpg)
The length of the summit curve for stopping sight distance may be determined for the two conditions:
1) When the total length of summit curve Ls greater than the stopping sight distance SSD
2) When L is less than SSD.3) When L > SSD
4.4
2NSL
L> SSDLength of Vertical
curve for OSD
6.9
2NSL
![Page 20: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/20.jpg)
![Page 21: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/21.jpg)
![Page 22: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/22.jpg)
![Page 23: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/23.jpg)
ORIGINAL GROUND LEVEL = 559 m
QUANTITY OF CUTTING = 13494 m33
QUANTITY OF FILLING = 7371 m3
![Page 24: Highway Project](https://reader036.fdocuments.in/reader036/viewer/2022062412/587ec5161a28abf37b8b5e15/html5/thumbnails/24.jpg)