Project 3State Highway 130
Austin, Texas area
![Page 2: Project 3 state highway 130 092210](https://reader033.fdocuments.in/reader033/viewer/2022060116/5581a875d8b42afd4c8b4e3d/html5/thumbnails/2.jpg)
2
Project
89 miles (Georgetown – Seguin)
Bypass congested I-35 section Austin-San Antonio
New toll highway
Almost all rural and semi-rural
Source: http://www.sh130.com/
![Page 3: Project 3 state highway 130 092210](https://reader033.fdocuments.in/reader033/viewer/2022060116/5581a875d8b42afd4c8b4e3d/html5/thumbnails/3.jpg)
3
CSS Design Collaborative design input from stakeholders
Cities Counties Property owners
Design charrettes Areas of stakeholder interest
Aesthetics Noise Future road, ped/bike networks Landscaping Historic property mitigation lighting
![Page 4: Project 3 state highway 130 092210](https://reader033.fdocuments.in/reader033/viewer/2022060116/5581a875d8b42afd4c8b4e3d/html5/thumbnails/4.jpg)
Features Regional icon (Texas star) Native wildflowers, trees Down facing luminaires Depressed toll plaza Provide for existing, future streets, paths on transportation
plan Grade separations
4Depressed toll plaza. Source: http://www.texastollways.com
![Page 5: Project 3 state highway 130 092210](https://reader033.fdocuments.in/reader033/viewer/2022060116/5581a875d8b42afd4c8b4e3d/html5/thumbnails/5.jpg)
Features
5
![Page 6: Project 3 state highway 130 092210](https://reader033.fdocuments.in/reader033/viewer/2022060116/5581a875d8b42afd4c8b4e3d/html5/thumbnails/6.jpg)
6
Status First 49 miles completed 2009 Last 40 miles under construction in 2009