HARD GELATIN CAPSULE MACHINES SCADA Project Designed by: Ahmed Kamal Automation Engineer at Jedco International Pharmaceutical

Transcript of HGCM System2

Page 1: HGCM System2

HARD GELATIN CAPSULE MACHINES SCADA ProjectDesigned by: Ahmed KamalAutomation Engineer at Jedco International Pharmaceutical

Page 2: HGCM System2

What is Hard Gelatin Capsule ?

Page 3: HGCM System2

Hard Gelatin Capsule Machine

Page 4: HGCM System2

More about the machine Allen Bradley control system DeviceNet communication system 10 main heaters and HVAC system Hydraulic system Pneumatic system Mechanical system, and Pumps Electrical motors, Instruments, and

Sensors

Page 5: HGCM System2

Why SCADA project needed?

Production followed up by Management level

Parameters monitored and analyzed by Engineering level

Fault tracking Save manual data recording time HVAC calculations

Page 6: HGCM System2

Project Hardware AllenBradley -- SLC 5/04 & 5/05

controller StarTech Netrs232 ( Rs232 to Ethernet )

Adapter Ethernet Switches

Page 7: HGCM System2

Project Softwares RSLinx Gateway Microsoft Excel Visual Basic for applications StarTech IP-Extender

Manager

Page 8: HGCM System2

Project Objectives Remote monitoring and recording for

machines status and parameters. Print monthly report about break down

time Daily data presentation Archiving data

Page 9: HGCM System2

Reason behind using Excel Low cost instead of using that software:

FactoryTalk. Cristal Report. Sequel Database.

High programing capabilities. More popular. Unlimited Tags

Page 10: HGCM System2

Monitoring Screens • Three Machines• Sections

• General Informations• Machines Production• HVAC Parameters• Raw Material

Parameters• Process Heaters• HVAC Calculations• Notifications lamps

Page 11: HGCM System2

Monitoring Screens • Process Parameters

Page 12: HGCM System2

Charts

• Daily based• Show Set value• Show Present value• Adjustable Scale• Excellent visualize

Page 13: HGCM System2

Printable Charts• Save Ink• No need for colored

printer

Page 14: HGCM System2

Machine speed chart• Set and present value• Set value manipulation

Page 15: HGCM System2

HVAC Charts

• AHU Speed• AHU Humidity set value• AHU Humidity present

value

Page 16: HGCM System2

HVAC Charts

• Humidity Ratio• Calculated from

• AHU Temperature• AHU Humidity• Air Pressure

Page 17: HGCM System2

HVAC Charts

Page 18: HGCM System2

Production Chart• Production Counter• Reset once per shift

Page 19: HGCM System2

Alarm Report

• Alarm Time• Alarm Code• Alarm Message• For maintenance

schedule• To evaluate

maintenance crew

Page 20: HGCM System2

Breakdown Report• Breakdown duration per

working shift• Breakdown counter

Page 21: HGCM System2

Control Room

• Data Exporting• Start/Stop Recording• Data Archiving

Page 22: HGCM System2

Control Room

• Machine Time synchronization

• Record timer• Used passwords

Passwords

Page 23: HGCM System2

Data resorting

• Restore Operating parameters

• Restore by row number• Operators evaluation

Page 24: HGCM System2

Data resorting

• Restore Operating parameters

• Restore by row number• Operators evaluation

Page 25: HGCM System2

Recording

• Continuous Recording• Record every 30 minute• Classified by working

shifts• Record all monitored

parameters• No effect on opened

sheets

Page 26: HGCM System2

Thanks for reading