HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS...

18
ii HALAMAN PENGESAHAN UNIVERSITAS DIPONEGORO PERENCANAAN STRUKTUR HOTEL ALL SEASONS JOGJAKARTA Structural Design of All seasons Hotel Jogjakarta DWI PRASETYA ATMAJA L2A006041 FAJAR SULISTYO NUGROHO L2A006047 Semarang, Mei 2011 tentang persetujuan: Disetujui, Pembimbing Utama Pembimbing Pendamping IR. HARI WARSIANTO, MS. YULITA ARNI P, ST., MT. NIP. 194809161981031000 NIP. 197107231998022001 Mengetahui, Ketua Jurusan Teknik Sipil Fakultas Teknik Universitas Diponegoro, IR. SRI SANGKAWATI, MS. NIP. 195409301980032001

Transcript of HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS...

Page 1: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

ii

HALAMAN PENGESAHAN

UNIVERSITAS DIPONEGORO

PERENCANAAN STRUKTUR HOTEL ALL SEASONS JOGJAKARTAStructural Design of All seasons Hotel Jogjakarta

DWI PRASETYA ATMAJA L2A006041

FAJAR SULISTYO NUGROHO L2A006047

Semarang, Mei 2011tentang persetujuan:

Disetujui,Pembimbing Utama Pembimbing Pendamping

IR. HARI WARSIANTO, MS. YULITA ARNI P, ST., MT.NIP. 194809161981031000 NIP. 197107231998022001

Mengetahui,Ketua Jurusan Teknik Sipil

Fakultas Teknik Universitas Diponegoro,

IR. SRI SANGKAWATI, MS.NIP. 195409301980032001

Page 2: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

iii

HALAMAN PERNYATAAN ORISINALITAS

PERENCANAAN STRUKTUR HOTEL ALL SEASONS JOGJAKARTAStructural Design of All seasons Hotel Jogjakarta

Tugas Akhir ini adalah hasil karya kami sendiri,

dan semua sumber baik yang dikutip maupun yang dirujuk

telah kami nyatakan dengan benar.

NAMA : DWI PRASETYA ATMAJANIM : L2A006041

Tanda Tangan :

Tanggal : Mei 2011

NAMA : FAJAR SULISTYO NUGROHONIM : L2A006047

Tanda Tangan :

Tanggal : Mei 2011

Page 3: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

iv

HALAMAN PENGESAHAN

UJIAN TUGAS AKHIR

Tugas Akhir ini diajukan oleh :

Mahasiswa 1 : Dwi Prasetya Atmaja NIM : L2A006041

Mahasiswa 2 : Fajar Sulistyo Nugroho NIM : L2A006047

Jurusan : Teknik Sipil

Judul Tugas Akhir : PERENCANAAN STRUKTUR HOTEL ALL SEASONS

JOGJAKARTA

Structural Design of All Seasons Hotel Jogjakarta

Telah berhasil dipertahankan di hadapan Tim Penguji dan diterima sebagai bagian

persyaratan yang diperlukan untuk memperoleh gelar Sarjana Teknik pada Jurusan

Teknik Sipil, Fakultas Teknik, Universitas Diponegoro.

TIM PENGUJI

Penguji I : IR. HARI WARSIANTO, MS. ( ........................................................)

Penguji II : YULITA ARNI P, ST., MT. ( ........................................................)

Penguji III : ILHAM NURHUDA, ST., MT. ( ........................................................)

Semarang, Juni 2011

Jurusan Teknik Sipil

Ketua,

IR. SRI SANGKAWATI, MSNIP. 195409301980032001

Page 4: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

v

HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI

TUGAS AKHIR UNTUK KEPENTINGAN AKADEMIK

Sebagai sivitas akademika Universitas Diponegoro, kami yang bertanda tangan di bawah

ini :

Mahasiswa 1 : Dwi Prasetya Atmaja NIM : L2A006041

Mahasiswa 2 : Fajar Sulistyo Nugroho NIM : L2A006047

Jurusan : Teknik Sipil

Fakultas : Fakultas Teknik

Jenis Karya : Tugas Akhir

demi pengembangan ilmu pengetahuan, menyetujui untuk memberikan kepada Universitas

Diponegoro Hak Bebas Royalti Noneksklusif ( None – exclusive Royalty Free Right )

atas tugas akhir kami yang berjudul :

PERENCANAAN STRUKTUR HOTEL ALL SEASONS JOGJAKARTA

Structural Design of All seasons Hotel Jogjakarta

beserta perangkat yang ada (jika diperlukan). Dengan Hak Bebas Royalti/Noneksklusif ini

Universitas Diponegoro berhak menyimpan, mengalihmedia/formatkan, mengelola dalam

bentuk pangkalan data (database), merawat dan memublikasikan tugas akhir kami selama

tetap mencantumkan Nama kami sebagai penulis/pencipta dan sebagai pemilik Hak Cipta.

Demikian pernyataan ini kami buat dengan sebenarnya.

Dibuat di : Semarang

Pada Tanggal : Mei 2011

Yang menyatakan,

Dwi Prasetya Atmaja Fajar Sulistyo Nugroho

L2A006041 L2A006047

Page 5: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

viii

KATA PENGANTAR

Puji syukur kami panjatkan kepada Allah SWT atas segala karunia dan

kemurahan-Nya sehingga kami dapat menyelesaikan Tugas Akhir dengan judul

“Perencanaan Struktur Hotel All Seasons Jogjakarta”.

Tugas Akhir ini merupakan syarat dalam menyelesaikan kuliah Strata-1 (S-1)

pada jurusan Teknik Sipil Fakultas Teknik Universitas Diponegoro. Melalui Tugas Akhir

ini banyak pengalaman dan pengetahuan yang kami peroleh terutama mengenai

perencanaan struktur gedung bertingkat tahan gempa yang kemudian kami tuangkan dalam

bentuk laporan ini.

Di dalam pelaksanaan penyelesaian laporan ini, kami sebagai penulis banyak

dibantu oleh berbagai pihak. Pada kesempatan ini, dengan penuh rasa hormat kami ingin

mengucapkan terima kasih kepada :

1. Ibu Ir. Sri Sangkawati, MS. selaku Ketua Jurusan Teknik Sipil Fakultas Teknik

Universitas Diponegoro.

2. Bapak Ir. Agung Wibowo, MM., MSc., PhD. selaku Sekretaris Jurusan Teknik Sipil

Fakultas Teknik Universitas Diponegoro.

3. Bapak Ir. Arif Hidayat, CES., MT. selaku Koordinator Bidang Akademik Teknik Sipil

Fakultas Teknik Universitas Diponegoro.

4. Bapak Ir. Hariwarsianto, MS. selaku Dosen Pembimbing I.

5. Ibu Yulita Arni Priastiwi, ST., MT. selaku Dosen Pembimbing II.

6. Bapak Ir. Joko Siswanto, MSP. selaku Dosen Wali 2164.

7. Bapak Ir. Himawan Indarto, MS. yang telah memberikan ilmu tentang software

analisis struktur SAP2000.

8. Seluruh Dosen, Staf dan karyawan Jurusan Teknik Sipil Fakultas Teknik Universitas

Diponegoro Semarang atas jasa-jasanya selama kami menuntut ilmu.

Page 6: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

ix

9. Orang tua, kakak, adik, pacar, dan seluruh keluarga kami yang selalu mendoakan

kami, mencurahkan kasih sayang dan perhatian serta dukungan moral, spiritual dan

finansial selama ini.

10. Sahabat kami Ery, Lephi, Cino, Gentong, Aji, Ucil, Simbah, Bang Dik, Bayoth,

Cupang dan rekan mahasiswa Teknik Sipil angkatan 2006 yang lain yang telah banyak

memberi semangat.

11. Semua pihak yang tidak dapat disebutkan satu persatu yang telah membantu kami baik

secara langsung maupun tidak dalam menyelesaikan Tugas Akhir ini.

Penulis menyadari bahwa Tugas Akhir ini masih jauh dari sempurna. Oleh karena

itu kami sangat mengharapkan adanya saran dan kritik yang bersifat membangun untuk

penyempurnaan laporan Tugas Akhir ini dimasa mendatang.

Akhir kata, kami persembahkan Laporan Tugas Akhir ini untuk Almamater

tercinta dan rekan mahasiswa, semoga dapat bermanfaat bagi semua pihak.

Semarang, Mei 2011

Penyusun

1. Dwi Prasetya Atmaja

L2A006041

2. Fajar Sulistyo Nugroho

L2A006047

Page 7: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

x

DAFTAR ISI

HALAMAN JUDUL ......................................................................................................... i

HALAMAN PENGESAHAN .......................................................................................... ii

HALAMAN PERNYATAAN ORISINALITAS ............................................................ iii

HALAMAN PENGESAHAN UJIAN TUGAS AKHIR ................................................ iv

HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI TUGAS

AKHIR UNTUK KEPENTINGAN AKADEMIK.......................................................... v

ABSTRAK ...................................................................................................................... vi

ABSTRACT ...................................................................................................................vii

KATA PENGANTAR...................................................................................................viii

DAFTAR ISI .................................................................................................................... x

DAFTAR TABEL .......................................................................................................... xv

DAFTAR GAMBAR ................................................................................................... xvii

DAFTAR NOTASI ....................................................................................................... xix

BAB I PENDAHULUAN

1.1. TINJAUAN UMUM ............................................................................................ I-1

1.2. LATAR BELAKANG ......................................................................................... I-2

1.3. MAKSUD DAN TUJUAN................................................................................... I-2

1.4. DATA PROYEK ................................................................................................. I-3

1.5. BATASAN MASALAH ...................................................................................... I-4

1.6. SISTEMATIKA PENULISAN ............................................................................ I-4

BAB II TINJAUAN PUSTAKA

2.1. TINJAUAN UMUM ........................................................................................... II-1

Page 8: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xi

2.2. KONSEP PERENCANAAN STRUKTUR.......................................................... II-1

2.2.1. Desain Terhadap Beban Lateral .............................................................. II-2

2.2.2. Analisis Struktur Terhadap Gempa.......................................................... II-2

2.3. PERENCANAAN STRUKTUR BANGUNAN................................................... II-7

2.3.1. Pembebanan............................................................................................ II-7

2.3.2. Perencanaan Struktur Atas .................................................................... II-22

2.3.3. Perencanaan Struktur Bawah................................................................. II-40

2.3.4. Sistem Rangka Pemikul Momen Menengah (SRPMM) ......................... II-51

BAB III METODOLOGI

3.1. PERSIAPAN ..................................................................................................... III-1

3.2. ANALISA DAN PERHITUNGAN .................................................................... III-1

3.3. PENYUSUNAN RENCANA ANGGARAN BIAYA......................................... III-2

3.4. PENYAJIAN LAPORAN DAN FORMAT PENGGAMBARAN ...................... III-2

BAB IV PERHITUNGAN STRUKTUR

4.1. TINJAUAN UMUM ..........................................................................................IV-1

4.2. KRITERIA DESAIN .........................................................................................IV-1

4.3. ANALISIS STRUKTUR....................................................................................IV-2

4.3.1. Beban Mati (Dead Load) .......................................................................IV-2

4.3.2. Beban Hidup (Live Load).......................................................................IV-2

4.3.3. Perhitungan Beban Gempa (Quake Load) ..............................................IV-3

4.4. PERHITUNGAN STRUKTUR........................................................................IV-30

4.4.1. Perhitungan Tangga .............................................................................IV-30

4.4.2. Perhitungan Pelat Lantai ......................................................................IV-44

4.4.3. Perhitungan Balok................................................................................IV-60

4.4.4. Perhitungan Kolom ..............................................................................IV-74

4.4.5. Perhitungan Pondasi...........................................................................IV-101

BAB V RENCANA KERJA DAN SYARAT-SYARAT TEKNIS

5.1. SYARAT-SYARAT UMUM ..............................................................................V-1

Page 9: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xii

5.1.1. Lingkup Pekerjaan ..................................................................................V-1

5.1.2. Sarana Kerja ........................................................................................... V-1

5.1.3. Gambar – Gambar Dokumen...................................................................V-1

5.1.4. Gambar-Gambar Pelaksanaan dan Contoh - Contoh................................ V-2

5.1.5. Jaminan Kualitas.....................................................................................V-3

5.1.6. Material dan Tenaga Kerja ......................................................................V-3

5.1.7. Koordinasi Pekerjaan ..............................................................................V-4

5.1.8. Shop Drawing .........................................................................................V-4

5.2. PEKERJAAN PERSIAPAN................................................................................V-5

5.2.1. Pembersihan Tapak Proyek .....................................................................V-5

5.2.2. Pengukuran Tapak kembali .....................................................................V-5

5.2.3. Tugu Patokan Dasar (Bench Mark) .........................................................V-6

5.2.4. Papan Dasar Pelaksanaan (Bouwplank) ...................................................V-6

5.2.5. Pagar Pengaman Proyek..........................................................................V-6

5.2.6. Papan Nama Proyek................................................................................V-7

5.3. PEKERJAAN TANAH .......................................................................................V-7

5.3.1. Pekerjaan Persiapan ................................................................................V-7

5.3.2. Pekerjaan Galian.....................................................................................V-8

5.3.3. Pengawasan Penggalian ..........................................................................V-9

5.3.4. Pekerjaan Urugan....................................................................................V-9

5.3.5. Lantai Kerja dan Urugan Pasir .............................................................. V-10

5.3.6. Pembuangan Material Hasil Galian ....................................................... V-10

5.3.7. Pekerjaan Pengurukan Pasir Alas Pondasi ............................................. V-11

5.4. PEKERJAAN CETAKAN DAN PERANCAH ................................................. V-11

5.4.1. Umum...................................................................................................V-11

5.4.2. Bahan ...................................................................................................V-11

5.4.3. Pelaksanaan .......................................................................................... V-12

5.4.4. Pembongkaran ...................................................................................... V-13

5.4.5. Pemakaian Ulang .................................................................................. V-13

5.5. PEKERJAAN BETON...................................................................................... V-14

Page 10: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xiii

5.5.1. Umum...................................................................................................V-14

5.5.2. Semen...................................................................................................V-15

5.5.3. Agregat .................................................................................................V-16

5.5.4. Air ........................................................................................................ V-17

5.5.5. Besi Beton/ Tulangan............................................................................ V-17

5.5.6. Admixture/ Bahan Tambahan ................................................................ V-18

5.5.7. Mutu Beton........................................................................................... V-19

5.5.8. Tes Beton.............................................................................................. V-20

5.5.9. Pembuatan Beton .................................................................................. V-21

5.5.10. Pembesian............................................................................................. V-22

5.5.11. Pengecoran Beton ................................................................................. V-23

5.5.12. Pemadatan dan Penggetaran ..................................................................V-24

5.5.13. Sambungan Pelaksanaan ....................................................................... V-25

5.5.14. Perawatan Beton ................................................................................... V-25

5.5.15. Pembongkaran Cetakan......................................................................... V-26

5.5.16. Finishing Permukaan Beton ..................................................................V-27

5.5.17. Lapisan Kedap Air ................................................................................ V-28

5.6. PONDASI BORED PILE .................................................................................. V-28

5.6.1. Standar..................................................................................................V-28

5.6.2. Material ................................................................................................ V-28

5.6.3. Pelaksanaan .......................................................................................... V-29

BAB VI RENCANA ANGGARAN BIAYA

6.1. VOLUME PEKERJAAN ...................................................................................VI-1

6.1.1. Pekerjaan Persiapan ...............................................................................VI-1

6.1.2. Pekerjaan Tanah.....................................................................................VI-2

6.1.3. Pekerjaan Struktur Beton .......................................................................VI-4

6.2. ANALISA PEKERJAAN...................................................................................VI-5

6.3. RENCANA ANGGARAN BIAYA..................................................................VI-10

Page 11: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xiv

BAB VII PENUTUP

7.1. KESIMPULAN................................................................................................ VII-1

DAFTAR PUSTAKA

LAMPIRAN

Page 12: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xv

DAFTAR TABEL

Tabel 2.1 Berat sendiri material konstruksi II-8

Tabel 2.2 Berat sendiri komponen gedung II-8

Tabel 2.3 Beban hidup pada struktur II-9

Tabel 2.4 Kebutuhan Air per Hari II-10

Tabel 2.5 Faktor Keutamaan untuk Berbagai Gedung dan Bangunan II-14

Tabel 2.6 Parameter Daktilitas Struktur Gedung II-15

Tabel 2.7 Parameter Daktilitas Struktur Gedung II-19

Tabel 2.8 Jenis – Jenis Tanah II-20

Tabel 2.9 Momen Inersia Elemen Struktur II-29

Tabel 2.10 Lendutan Izin Maksimum II-50

Tabel 4.1 Perhitungan Kebutuhan Air per Hari IV-3

Tabel 4.2 Jenis Tanah Berdasarkan SNI 03-1726-2002 IV-5

Tabel 4.3 Hasil Nilai Test Penetrasi Standar Rata-Rata ( ) IV-6

Tabel 4.4 Berat Tiap Lantai IV-11

Tabel 4.5 Berat Lantai dan Lokasi Titik Berat Lantai IV-15

Tabel 4.6 Distribusi Beban Gempa Sepanjang Tinggi Bangunan IV-17

Tabel 4.7 Waktu Getar Alami Fundamental Struktur Arah – X IV-18

Tabel 4.8 Waktu Getar Alami Fundamental Struktur Arah – Y IV-18

Tabel 4.9 Distribusi Beban Gempa Arah – X (Tx = 2,63 detik) IV-19

Tabel 4.10 Waktu Getar Alami Fundamental Struktur Arah – X (Tx = 2,63

detik) IV-19

Tabel 4.11 Distribusi Beban Gempa Arah – Y (Ty = 2,36 detik) IV-20

Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah – Y (Ty = 2,36

detik) IV-20

Tabel 4.13 Hasil dari Modal Participating Mass Ratios IV-26

Page 13: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xvi

Tabel 4.14 Kontrol Kinerja Batas Layan dan Kinerja Batas Ultimit Akibat

Beban Gempa Statik Arah X IV-27

Tabel 4.15 Kontrol Kinerja Batas Layan dan Kinerja Batas Ultimit Akibat

Beban Gempa Statik Arah Y IV-27

Tabel 4.16 Kontrol Kinerja Batas Layan dan Kinerja Batas Ultimit Akibat

Beban Gempa Dinamik Arah X IV-27

Tabel 4.17 Kontrol Kinerja Batas Layan dan Kinerja Batas Ultimit Akibat

Beban Gempa Dinamik Arah Y IV-28

Tabel 4.18 Hasil Base Shear untuk masing-masing analisis IV-28

Tabel 4.19 Hasil Analisis Gaya dalam dengan Program SAP 2000 pada

kolom yang ditinjau lantai 1-2 IV-74

Tabel 4.20 Hasil Analisis Gaya dalam (aksial tekan) kolom-kolom dengan

Program SAP 2000 pada lantai yang ditinjau (lantai dasar) IV-75

Tabel 4.21 Diagram tekanan tanah pasif efektif : IV-106

Tabel 4.22 Perhitungan Momen Akibat Tekanan Tanah IV-106

Tabel 4.23 Perhitungan Momen Akibat Beban Lateral IV-107

Tabel 6.1 Daftar Volume Pekerjaan Beton VI-4

Tabel 6.2 Daftar Volume Pekerjaan Pembesian VI-5

Tabel 6.3 Daftar Volume Pekerjaan Bekisting VI-5

Page 14: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xvii

DAFTAR GAMBAR

Gambar 1.1 Denah dan Tampak Depan Gedung I-3

Gambar 2.1 Down Feed (Pasokan ke Bawah) II-10

Gambar 2.2 Peta Wilayah Gempa Indonesia II-12

Gambar 2.3 Spektrum Respons II-13

Gambar 2.4 Jenis Kolom Beton Bertulang II-24

Gambar 2.5 Panjang Efektif Kolom Tumpuan Jepit dan Sendi II-27

Gambar 2.6 Kurva Alinyemen untuk Portal Tak Bergoyang dan Portal

Bergoyang II-27

Gambar 2.7 Jenis Sengkang Pengikat II-33

Gambar 2.8 Diagram Regangan dan Gaya-Gaya Dalam II-37

Gambar 2.9 Lokasi Tulangan Pada Konstruksi Pelat Dua Arah II-53

Gambar 2.10 Pengaturan Tulangan Pada Pelat II-54

Gambar 2.11 Gaya lintang rencana untuk SPRMM II-55

Gambar 3.1 Diagram Alir Proses Perencanaan Hotel All Seasons Jogjakarta III-3

Gambar 4.1 Respon Spektrum Wilayah Gempa 3 IV-6

Gambar 4.2 Lokasi Pusat Massa dan Input Tiap Lantai IV-14

Gambar 4.3 Coakan 16% pada Lantai 1-5 dan 35% pada Lantai Atap IV-21

Gambar 4.4 Tangga Tipe A IV-31

Gambar 4.5 Pemodelan Struktur Tangga Tipe A IV-32

Gambar 4.6 Momen Arah 1-1 dan 2-2 pada Tangga Tipe A IV-32

Gambar 4.7 Tangga Tipe B IV-37

Gambar 4.8 Pemodelan Struktur Tangga Tipe B IV-38

Gambar 4.9 Momen Arah 1-1 dan 2-2 pada Tangga Tipe B IV-38

Gambar 4.10 Diagram Regangan dan Gaya-Gaya Dalam pada Balok IV-63

Gambar 4.11 Gaya geser pada Balok IV-66

Gambar 4.12 Momen Nominal Kanan dan Momen Nominal Kiri IV-66

Page 15: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xviii

Gambar 4.13 Penampang Balok Induk B1A IV-73

Gambar 4.12 Sketsa pertemuan antara balok dengan kolom pada kolom yang

di tinjau IV-75

Gambar 4.13 Sketsa pemodelan element kolom beserta gaya dalam Hasil

Analisis Program SAP2000 IV-75

Gambar 4.14 Grafik Penentu Panjang Efektif Kolom (k) Terhadap Sumbu Y

(k=2,14) IV-80

Gambar 4.15 Grafik Penentu Panjang Efektif Kolom (k) Terhadap Sumbu X

(k=2,18) IV-80

Gambar 4.16 Sketsa pemodelan element kolom beserta gaya dalam Hasil

Analisis Faktor Pembesaran Momen IV-84

Gambar 4.17 Hasil Analisis Design Kolom (40 x 60) dengan Penulangan 1%

x Ag IV-86

Gambar 4.18 Hasil Analisis Tulangan Vertikal arah X dengan SAP2000 IV-87

Gambar 4.19 Hasil Analisis Tulangan Vertikal arah Y dengan SAP2000 IV-87

Gambar 4.20 Hasil Analisis Tulangan Vertikal arah X dengan SAP2000 IV-91

Gambar 4.21 Hasil Analisis Tulangan Horizontal arah Y dengan SAP2000 IV-91

Gambar 4.22 Ketentuan SRPMM IV-92

Gambar 4.23 Checking Strong Column Weak Beam IV-92

Gambar 4.24 Hasil Analisis Design Kolom (40 x 60) IV-97

Gambar 4.25 Hasil Pengeplotan Mn IV-97

Gambar 4.26 Hasil Pengeplotan Mn2 IV-98

Gambar 4.27 Penampang Kolom K.40x60 IV-100

Gambar 4.28 Diagram Tekanan Tanah IV-105

Gambar 4.29 Diagram Interaksi Kolom Lingkaran IV-109

Gambar 4.30 Penulangan Pile Cap dan Bored Pile IV-115

Gambar 4.31 Potongan Memanjang Tie Beam IV-116

Page 16: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xix

DAFTAR NOTASI

As = Luas tulangan tarik

Ab = luas ujung bawah tiang

C = Faktor respon gempa

Cc = Gaya tekan beton

di = Simpangan horisontal lantai tingkat ke-i

Ec = Modulus elastisitas beton

Es = Modulus elastisitas baja tulangan

f’c = Tegangan tekan beton yang disyaratkan pada umur 28 hari

Fi = Beban gempa nominal statik ekuivalen tingkat ke-i

Fs = Tahanan gesek

fy = Tegangan tarik baja tulangan pada saat leleh

g = Percepatan gravitasi

I = Faktor keutamaan Struktur

I1 = Faktor keutamaan untuk menyesuaikan periode ulang gempa berkaitan dengan

penyesuaian probabilitas terjadinya gempa selama umur gedung

I2 = Faktor keutamaan untuk menyesuaikan umur gedung

JHP = Tahanan friksi

k = kelangsingan kolom

Le = Panjang efektif

Lc = Panjang efektif elemen kolom yang tertekan

Lu = Panjang bebas

Mu = Momen ultimate yang terjadi

Mn = Momen nominal

N = Standard Penetration Test ( SPT )

Ni = Nilai hasil SPT lapisan tanah ke-i

Pc = beban tekuk Euler untuk semua kolom penahan goyangan

Page 17: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xx

Pu = Gaya normal ultimate yang terjadi

Pn = Gaya normal nominal

qc = Tahanan penetrasi kerucut statis

r = Jari-jari girasi

R = Faktor reduksi gempa

Rx = Faktor reduksi gempa arah sumbu X

Ry = Faktor reduksi gempa arah sumbu Y

Su = Kekuatan geser tanah

ti = Tebal lapisan tanah ke-i

T = Waktu getar alami fundamental struktur

Ts = Gaya tarik baja tulangan

Tu = Gaya torsi ultimate yang terjadi

Tn = Gaya torsi nominal

Tc = Gaya torsi nominal yang disumbangkan oleh beton

V = Base Shear / beban geser dasar rencana

V1 = Gaya geser dasar nominal respons ragam pertama

Vx = Gaya geser dasar arah sumbu X

Vy = Gaya geser dasar arah sumbu Y

Vs = Kecepatan rambat gelombang geser

Vn = Gaya geser nominal

Vc = Kuat geser nominal yang disumbangkan oleh beton

Vs = Kuat geser nominal yang disumbangkan oleh tulangan geser

Vu = Gaya geser ultimate yang terjadi

Wt = Berat total lantai gedung

Wi = Berat lantai tingkat ke-i

Zi = Ketinggian lantai tingkat ke-i

Ф = Faktor reduksi kekuatan

µ = Faktor daktilitas struktur gedung

Page 18: HALAMAN PENGESAHAN UNIVERSITAS …eprints.undip.ac.id/34339/4/2172_PRELIMINARY.pdf · UJIAN TUGAS AKHIR ... Tabel 4.12 Waktu Getar Alami Fundamental Struktur Arah Y (T y = 2,36 ...

xxi

m = Simpangan maksimum struktur gedung akibat pengaruh gempa rencana pada

saat mencapai kondisi di ambang keruntuhan

y = simpangan struktur gedung pada saat terjadinya pelelehan pertama

ξ = koefisien pembatas

ρ = Rasio tulangan

ρb = Rasio tulangan pada keadaan balance

ρmin = Rasio tulangan minimum

ρmax = Rasio tulangan maksimum

Δo = Simpangan relatif antar tingkat orde pertama

εc’ = Regangan tekan beton

εs = Regangan tarik baja tulangan

εy = Regangan tarik baja tulangan pada saat leleh