Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview...

25
with Grouted Hot Tap Fittings An Alternative to Welded Fittings Presented by: Anna Rattray and Kevin Young

Transcript of Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview...

Page 1: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

withGrouted Hot Tap FittingsAn Alternative to Welded Fittings

Presented by: Anna Rattray and Kevin Young

Page 2: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

2

with

overview

IntroductionWagga Wagga City Council construction project.

technical considerationsRealign thin wall pipe with uninterruptable gas supply.

technical solutionGrouted tee eliminates need for live pipeline welding.

executionSimple field installation successfully complete.

Conclusion• First onshore application of grouted tees in Australia.

• Future ‘go to’ technology for operationally constrained applications?

Page 3: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

3

withIntroduction.

Page 4: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

4

with

introduction

Wagga WaggaLargest inland city in NSW.

Main Southern Railway line.

Bomen Business ParkRiverina Intermodal Freight and

Logistics (RiFL) Hub location.

Page 5: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

5

with

introduction

RiFL Hub road enabling works

Page 6: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

6

with

HP gas main impacted:• Operated & maintained by

APA Networks.

• Supply to three commercial

customers.

HP gas main modification

scope:• New alignment of 250m HP

main.

• Tie-in to existing HP main.

• Cut & cap existing HP main.

• Remove redundant section

HP main.

Existing HP main details

Diameter 88.9mm OD

Wall

Thickness

2.7mm

Material CS

(CE = 0.12)

Operating

Pressure

950kPag

MAOP 1050kPag

Year

Commissioned

Est. 1989

(By others)

introduction

APA Networks project

Page 7: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

7

with

technical considerations.

Page 8: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

8

withtechnical considerations

Gas free welding:

• APA Networks preferred practice.

• Pressure reduction unworkable for this HP gas main.

Live pipeline welding:

• Standard practices using low hydrogen electrodes.

• t > 6.4mm → low burn through risk.

• 4.8mm < t < 6.4mm → assess burn through risk.

• t < 4.8mm → high burn through risk.

Welded fittings alternative required:

• Thermal modelling confirmed high burn through risk.

• RiFL Hub project deadline.

Page 9: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

9

with

Key selection

criteria:• Safe.

• Reliable.

• Compliant with design

standards.

• Compatible with hot

tap equipment.

Domestic options:Bolt-on fittings.

International option:Grouted tee.

technical considerations

Welded fittings alternative

Bolt-on

Fitting

Grouted

tee

Page 10: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

10

with

APA New Materials Process:• Technical and quality

assessment.

Australian & International

standards review.

• Risk assessment.

• Lifecycle cost assessment.

• Fitness for purpose testing.

technical considerations

Grouted tee key benefits:• No live pipeline welding.

• No pressure reduction.

• Design life expectancy > 40

yrs.

• Pressure class 150 to 900.

• Compliant to relevant

standards.

• Compatible to hot tap

equipment.

• Extensive fitness for purpose

testing.

Welded fittings alternative.

Page 11: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

11

with

technical solutions.

Page 12: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

12

with

Steel shell:• Two half shells bolted together.

• One shell contains the branch.

Saddle seal:• Around neck of branch.

• Provides full pressure

containment.

Epoxy grout: Fills void between outside seal and

bore of shell.

technical solution

DNV GL grouted tee

Page 13: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

13

with

Grouted tee design

Compliant to standards:

• IGE/TD/1, IGE/TD/12,

BS80210, ASME B13.3,

ASME B31.8.

• Now AS 2885.

Complex loads:

• Installation.

• Operational.

• Cyclic Pressure.

• Grout.

• Thermal.

technical solution

Grouted tee qualification

Design validation:

• Series of comprehensive finite

element analyses.

• Full-scale test program at

arduous pressures and

environments.

• Analysis for life expectancy in

excess of 40 years.

Page 14: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

14

with

Order to delivery process:• Qualification review.

• Component selection.

• Fabrication.

• Assembly.

• Welding.

• NDT.

• Heat treatment.

• Inspection.

• Pressure testing.

• Qualify assurance report.

technical solution

Grouted tee manufacture

Page 15: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

15

with

execution.

Page 16: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

16

with

execution

Grouted tee installation

HP main realignment required 10 x grouted tees:• 2 x Branch (DN80mm); 4 x Flow stop (DN80mm); 4 x Vent (DN50mm).

Design/manufacture in UK & transported to Australia – 12 weeks.

Installation by DNV GL technicians from Singapore & UK – 3 days.

New HP main commissioned on time, within budget & w/o incident.

Page 17: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

17

with

execution

Pipeline surface preparation &

measurement.Grouted tee internal surface

preparation.

Grouted tee installation key steps

Page 18: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

18

with

execution

Half shells placed around

pipeline & rotabolts tightened.

Seal integrity (10%) test.

End seal putty applied & grout

pumped into annular space.

Grouted tee installation key steps

Page 19: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

19

with

execution

Pressure test (100%) once grout

cured & prior to hot tapping.Hot tapping and mechanical

contractor works followed.

Grouted tee installation key steps

Page 20: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

20

with

conclusion.

Page 21: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

21

with

conclusion

Hierarchy of controls:

Elimination

Physical controls

Procedural controls

Reduction

Mitigation

Procedural controls:• Qualified low hydrogen

weld procedures.

• Qualified welders.

• Welder supervision /

inspection.

• Thermal modelling.

• Workshop simulation.

Physical controls:Pipe wall thickness.

Elimination:Grouted tee.

Live welding controls

Page 22: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

22

with

conclusion

Thicker wallLive welding is low risk of burn

through

Controls adequate &

well practiced

Thinner wallLive welding is

high risk of burn through

Alternative to standard controls?

Best practice to eliminate risk

Live welding controls

Page 23: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

23

with

October 2000:First grouted tee installed in the UK.

Now > 830 installed: 55% are high pressure.

Sizes from DN15mm to DN1200mm.

May 2017:First grouted tee installed in Australia.

Grouted tees are:• Safe.

• Reliable.

• Compliant with design standards.

• Compatible with hot tap equipment.

Future: ‘go to’ technology in Australia where

operational constraints necessitate?

conclusion

Page 24: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

24

with

conclusion

Any questions

Page 25: Grouted Hot Tap Fittings An alternative to Welded Fittings · 2019-11-11 · 2 with overview Introduction Wagga Wagga City Council construction project. technical considerations Realign

25

with

Acknowledgements & further

information:

For further information contact:

Anna Rattray (APA) Kevin Young (DNV GL)

Senior Gas networks & Pipeline Engineer Group Leader, Safety & Asset Risk Management

+61 9463 8368 +65 98246087

[email protected] [email protected]

Or visit the website at:

www.apa.com.au or www.dnvgl.com

APA Networks Chris Gow Program Coordinator

Aland Cheney Field Supervisor

Michael Gallagher Acting Manager Engineering

Mark Landy Draftsperson

DNV GL Anthony Wood Principal Consultant

Steve Hodge Senior Consultant

Neil Pollock Operations Manager

Project success also due to: