Group 4 project students

14
GROUP 4 PROJECT Teamwork assessment

description

The power point that I present to students.

Transcript of Group 4 project students

Page 1: Group 4 project students

GROUP 4 PROJECTTeamwork assessment

Page 2: Group 4 project students

WHY WORK IN A TEAM? When there is more than one thing to do at a

timeExample:

Page 3: Group 4 project students

WHY WORK IN A TEAM? When there is more than one thing to do at a

timeExample:

Page 4: Group 4 project students

WHY WORK IN A TEAM? When there is more than one thing to do at a

timeExample:

Page 5: Group 4 project students

TEAM MEMBERS

Have different roles Have a common goal Don’t choose each other

Page 6: Group 4 project students

TEAM SKILLS

Communication Co-operation Motivation Perseverance Adaptability

Page 7: Group 4 project students

IS SCIENCE A TEAM ACTIVITY?

Nuclear Physics

Page 8: Group 4 project students

IS SCIENCE A TEAM ACTIVITY?

Particle Physics

Page 9: Group 4 project students

IS SCIENCE A TEAM ACTIVITY?

Exceptions

Page 10: Group 4 project students

GROUP 4 PROJECT

The group 4 project is a collaborative activity where students from different group 4 subjects work together on a scientific or technological topic, allowing for concepts and perceptions from across the disciplines to be shared in line with aim 10.

To encourage an understanding of the relationships between scientific disciplines and the overarching nature of the scientific method.

Page 11: Group 4 project students

ASSESSING PERSONAL SKILLS

Personal Hygiene?

TEAMWORK

Page 12: Group 4 project students

IB CRITERIA

Page 13: Group 4 project students

SELF ASSESSMENT & PEER ASSESSMENT

Chris

2

2

2

Alistair

0

0

0

Page 14: Group 4 project students

THINGS TO THINK ABOUT

Make sure the task fits into the time Make sure you have a role Meet regularly Do you need to appoint a leader? If you haven’t got anything to do its not a

good team Have fun