Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of...

32
Bridging Demand-Supply Gap Geoff Zeiss Editor – Building and Energy Geospatial Media and Communications Bridging Demand-Supply Gap Geospatial Media

Transcript of Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of...

Page 1: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Bridging Demand-Supply Gap

Geoff ZeissEditor – Building and EnergyGeospatial Media and Communications

Bridging Demand-Supply Gap

Geospatial Media

Geospatial Media and Communications

Page 2: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Major world trends driving change in construction

Geospatial Media

Page 3: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Global infrastructure + building spend

Buildings (and Buildings (and infrastructure) cost too much

Between The Poles

cost too much Patrick MacLeamy

Page 4: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Historical Productivity in Construction

Construction productivity has

stagnated

© 2009 Autodesk Between The PolesMcKinsey & Company

stagnated

Page 5: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Productivity gains reduce cost of infrastructure

Buildings and infrastructure cost

too much

© 2009 Autodesk Between The PolesGeospatial MediaMcKinsey & Company

too much

Page 6: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Environmental Impact of Buildings

Buildings are Buildings are responsible for a

third of the world’s

© 2009 Autodesk Between The PolesGeospatial MediaUS Green Building Council

third of the world’s emissions

Page 7: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Government mandates and incentives driving change

© 2009 Autodesk Between The PolesGeospatial Media

Page 8: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Global BIM Mandates/Incentives

� United States

� 2006 GSA mandated BIM for new Federal buildings

� Denmark

� State agencies require BIM for their projectsFederal buildings

� Singapore

� From 2015 BIM mandated for building permits for buildings greater that 5000 sq meters

� United kingdom

� BIM mandated for public projects from 2016

projects

� Finland

� 2007 State Property Services Agency requires BIM for its projects

� Hong Kong

� Housing Authority requires BIM for all new projects from 2014

Geospatial Media

2016

� Norway

� 2010 BIM adopted for government

projects

� South Korea

� Public Procurement Service made BIM compulsory for all projects over S$50 million and for all public sector projects by 2016

Page 9: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

UK motivation: Reduce costs, lower emissions, and export development

Page 10: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

UK BIM Level 2 by 2016

Page 11: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

UK BIM Level 2 Standards

• BIM Level 2 Standards, developed as a home-grown effort in the UK, have been submitted to ISO.

• BIM Level 3 Standards will be developed with international standards organizations including ISO, buildingSMART, and OGC.

Page 12: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

UK BIM Level 3– Integrated full lifecyle model

Nick Tune, BRE

Page 13: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Mandated standards: INSPIRE

Page 14: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Zero Energy Buildings

� EU “nearly zero energy” buildings -European Commission has mandated 2020/2021 when all new buildings have

� California "zero net energy" California to be designed to be “nearly zero energy”. For public buildings, the deadline is by 2018/2019.

� Japan “zero emissions buildings” - All new public buildings must be designed to be “zero emissions” by 2030.

� California "zero net energy" California Public Utilities Commission (CPUC) mandatd all new residential construction in California must be ZNE by 2020, all new commercial construction must be ZNE by 2030, and 50% of existing commercial buildings must be retrofit to ZNE by 2030.

Geospatial Media

� US “zero net energy” - The US Energy Independence and Security Act of 2007 (EISA 2007) requires that by 2030 all new Federal facilities must be “zero net energy” (ZNE) buildings.

� According to a report from Navigant Research, global zero energy buildings

� revenue is expected to grow from $629.3 million in 2014 to $1.4 trillion by 2035.

Page 15: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Industry response to demand

Geospatial Media

Page 16: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

BIM Adoption in Finland

Geospatial MediaTomi Henttinen, SAFA

Page 17: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Finland: BIM adoption by sector

Geospatial MediaTomi Henttinen, SAFA

Page 18: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

BIM Market In Finland

Geospatial MediaTomi Henttinen, SAFA

Page 19: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

BIM Adoption in U.S.

Geospatial MediaMcGraw-Hill Construction

Page 20: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Laser scanning is transforming construction

Geospatial MediaParsons-Brinckerhoff

Page 21: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Existing buildings

� “Scan to BIM” model is the starting point for energy performance modeling and redesignmodeling and redesign

� Private sector sees major business opportunity in energy performance modeling for existing buildings.

Mollenhauer (Los Angeles)

Page 22: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Energy performance analysis – BIM and geospatial

Between The PolesHistorical building

Page 23: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

BIM for Infrastructure

� In 2009 16% of owners, contractors, and A/E firms reported high/very high use of reported high/very high use of BIM for infrastructure on projects.

� In 2013 52% reported high/very high use of BIM for infrastructure .

Geospatial Media

infrastructure .

McGraw-Hill SmartMarket Report The Business Value of BIM for Infrastructure

Page 24: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

“Converged design”Imagery + geospatial + BIM + 3D

EnablesEnables- Planning- Right of way- Sustainable design

24

Between The Poles

- Sustainable design- Construction monitoring- Accurate as-builts

Page 25: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

5D for financial controlSF Presidio Parkway Project

Between The PolesCaltrans Caltrans -- Parsons BrinckerhoffParsons Brinckerhoff

Page 26: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

BIM and GPS enable machine control

� McAninch: Reduce fuel consumption by 43%, GHG emissions

� RCPS:

� Fine grading 214 passes down to 60 – 1 mile of road

� Providing our clients with a more accurate product – base course grade checking 45% accurate vs 98%

© 2009 Autodesk © Copyright 2010 Autodesk, Inc. All rights reserved

checking 45% accurate vs 98%

“Traditional processes of paper plans, stakeout sheets and grade stakes used to take up to a week to implement. Now with GPS machine control and 3D models from designers, that same size project can take hours “

- Tim Tometich, GPS division manager, McAninch Corporation

Page 27: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Autonomous vehicles

�Google 10+ vehicle fleet�Google 10+ vehicle fleet

�Driven a million miles without a driver

Geospatial MediaGeospatial MediaBetween The PolesRon Singh, Chief of Surveys, Oregon Department of Transportation

“Autonomous vehicles will be data hungry. Already cars are

using real-time sensing of their location and what is around

them. But I cannot imagine that they would not benefit from

knowing about the highway infrastructure.”

Page 28: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Current construction project lifecycle

Geospatial MediaBetween The PolesRon Singh, Chief of Surveys, Oregon Department of Transportation

Page 29: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Future construction project lifecycle

Disruptive !

Geospatial MediaBetween The PolesRon Singh, Chief of Surveys, Oregon Department of Transportation

Page 30: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

Parsons Brinckerhoff’s software quiver

Geospatial• ESRI• Global Mapper

Visualization• 3ds Max• Sketchup (Trimble)• Global Mapper

• Infraworks (Autodesk Infrastructure Modeler)

CADD• Microstation InRoads• AutoCAD/Civil 3D

• Sketchup (Trimble)• Realtime - UDK, Unity

Collaboration/4D• Navisworks

LiDAR, surveying, image

Geospatial MediaBetween The Poles

• AutoCAD/Civil 3D• Solidworks

LiDAR, surveying, image processing, structural engineering, etc

Page 31: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

�Urbanization and environmental challenges means massive investment in infrastructure

�more to do, fewer qualified people to do it

Convergence is the future

�more to do, fewer qualified people to do it

�less government money

�productivity -> investment in technology

� Increased private investment is changing how we design, build, and operate infrastructure

© 2009 Autodesk Geospatial MediaBetween The Poles

infrastructure

�driving BIM + geospatial + 3D

�intelligent models of urban infrastructure

�Transforming construction

Page 32: Geoff Zeiss Editor – Building and Energy Geospatial Media ...BIM for Infrastructure In 2009 16% of owners, contractors, and A/E firms reported high/very high use of BIM for infrastructure

[email protected]

Geoff Zeiss, Editor Energy and BuildingGeospatial Media and Communications

http://geospatial.blogs.com

Geospatial Media