MATERIAL SCHEDULEReporting date : Prepared by :
Project Name :
Periode :
Location :
NO DESCRIPTIONWEEK WEEK WEEK Volume PROGRESS REVIEW (%)
REMARKSsun mon tue wed thu fri sat sun mon tue wed thu fri sat sun mon tue wed thu fri satTOTAL SAT. PLAN ACTUAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 Pas.Bataco Begisting Sloof - 742m2
Semen 600 zak
Pasir 5 rit
Bataco 16000 bh
2 Pembesian Sloof - 824m
Besi D 13mm 800 btg
Besi d.8 mm 400 btg
Besi d.10 mm 150 btg
Kawat Bendrat 4 roll
3 Cor Sloof - 78m3
Split
4 Pas.Bata Dinding Retaining wall
5 Plester Pas.Bata
6 Pembesian Kolom
7 Begisting Kolom
3 WEEKLY SCHEDULE AND PROGRESS REPORT
Project Name :
Periode :
Location :
NO DESCRIPTIONWEEK WEEK
sun mon tue wed thu fri sat sun27 28 29 30 31 1 2 3
1 Pas.Bataco Begisting Sloof
2 Pembesian Sloof
3 Cor Sloof
4 Pas.Bata Dinding Retaining wall
5 Plester Pas.Bata
6 Pembesian Kolom
7 Begisting Kolom
3 WEEKLY SCHEDULE AND PROGRESS REPORTReporting date :
Project Name :
Periode :
Location :
WEEK WEEK Volume PROGRESS REVIEW (%)
mon tue wed thu fri sat sun mon tue wed thu fri satTOTAL SAT. PLAN
4 5 6 7 8 9 10 11 12 13 14 15 16
Reporting date : Prepared by :
PROGRESS REVIEW (%)REMARKS
ACTUAL