Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D...

8
NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX: WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary Stope Design New 2018 U/G Development Planned U/G Development CH-01 CH-02 Stope Mined 2018 Bulk Sample

Transcript of Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D...

Page 1: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

NV-01

NV-02

NV-03

NV-04

NV-05

NV-06

TSX: WM

Fenelon Gold 3D view

Looking NortheastSeptember 20, 2018

Open Pit

2004 U/GDevelopment

Preliminary Stope Design

New 2018 U/GDevelopment

Planned U/G Development

CH-01

CH-02

Stope Mined2018 Bulk Sample

Page 2: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

Naga Viper zone

Chipotle zone

Habanero zone

Paprika zone

Previously released

Mineralized Drill Intersec�ons (> 3 g/t Au)

TSX: WM

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

*Assays cut to 140 g/t Au

Gabbroic Intrusives

Intermediate Intrusives

Argillite/Graphi�c Argillite

Geology (U/G Mapping)

Silicified Shear Zones

Quartz veins

Gabbroic IntrusivesSediments

0

Metres

5 10

N

2004 U/GDevelopment

New 2018 U/GDevelopment

Fig. 3. Inclined Longitudinal

Fig. 4. Inclined Longitudinal

-800

-680

Previously released

Mineralized Drill Intersec�ons (> 3 g/t Au)

2018 Drill setup

1030-00116.65 (16.65) g/t Au

3.22 m

1040-00149.23 (36.48) g/t Au

5.59 m

1130-00118.32 (18.32) g/t Au

4.74 m1110-00116.67 (16.67) g/t Au

2.75 m

1080-00143.47 (37.13) g/t Au

2.15 m

990-00110.55 (10.55) g/t Au

3.22 m

1030-00121.47 (21.47) g/t Au

2.57 m

1045-00126.17 (26.17) g/t Au

2.27 m

Ramp to L 5228

L 5213 Explora�on Dri�

Fenelon Gold 5213 Level

Plan view (10 m corridor)

September 20, 2018

Ramp to L 5195

All drill intersections reported as true width in metres

Sec�

on 1

040

Sec�

on 1

030

Sec�

on 1

050

0990-Drill SetupAll drill holes star�ng 18-0990-

1000-Drill SetupAll drill holes star�ng 18-1000-

1010-Drill SetupAll drill holes star�ng 18-1010-

1035-Drill SetupAll drill holes star�ng 18-1035-

1030-Drill SetupAll drill holes star�ng 18-1030-

1075-Drill SetupAll drill holes star�ng 18-1075-

1080-Drill SetupAll drill holes star�ng 18-1080-

Sec�

on 0

990

1020-Drill SetupAll drill holes star�ng 18-1020-

Page 3: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

New 2018 U/GDevelopment

Underground DrillingOctober-November 2018

Underground DrillingSeptember 2018

1040-005116.2 (41.79) g/t Au

7.74 m

1030-00260.03 (19.88) g/t Au

3.65 m

1040-00232.44 (22.58) g/t Au

3.82 m

1030-00510.09 (10.09) g/t Au

5.09 m

FA-95-0139.77 (9.77) g/t Au

5.74 m

FA-97-13596.22 (36.57) g/t Au

3.80 m

1040-00412.57 (12.57) g/t Au

9.94 m

FAB-11-106.11 (6.11) g/t Au

6.64 m

> 10 g/t Au

3-5 g/t Au

5-10 g/t Au

Mineralized Drill Intersec�ons(2.5m Min Width) Chipotle Zone

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

1-3 g/t Au

0.1-1 g/t Au

< 0.1 g/t Au

Fenelon Gold Chipotle Zone

Inclined Longitudinal Looking Northeast

September 20, 2018

TSX: WM

Pre-2018 Drilling

2018 Drilling(assays pending where not coloured)

*Assays cut to 140 g/t Au

Sec�

on 1

040

Sec�

on 1

030

Sec�

on 0

990

L 5195

L 5180

L 5213

L 5228

-50 m

-100 m 0

Metres

5 10

2004 U/GDevelopment

Planned U/G Development

Open Pit

VGVisible Gold (where assays pending)

All drill intersections reported as true width in metres

CH-01

CH-02Se

c�on

100

0 VG

VG

VG

VG

18-1030-00615.91 (15.91) g/t Au

2.20 m18-1030-007

16.72 (16.72) g/t Au1.08 m

18-1030-0089.27 (9.27) g/t Au

2.76 m

18-1030-01210.09 (10.09) g/t Au

1.33 m

18-1035-00229.23 (28.35) g/t Au

3.26 m

18-1035-01228.30 (28.30) g/t Au

0.44 m

18-1035-01030.47 (30.47) g/t Au

2.72 m

18-1035-013144.96 (78.10) g/t Au

1.77 m

18-1035-01750.31 (25.18) g/t Au

5.51 m

18-1035-01812.68 (12.68) g/t Au

2.38 m

18-1035-01165.76 (42.89) g/t Au

1.78 m

18-1035-01927.10 (24.69) g/t Au

5.56 m

18-0990-007204.0 (140.0) g/t Au

0.40 m

Page 4: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

Gabbroic IntrusivesSediments

Underground DrillingOctober-November 2018

Underground DrillingSeptember-October 2018

FA-17-07264.5 (42.1) g/t Au

2.89 m

1130-00118.32 (18.32) g/t Au

4.74 m

FA-17-17311.1 (71.9) g/t Au

2.16 m

FA-17-26260.2 (73.3) g/t Au

5.27 m

FA-97-13410.01 (10.01) g/t Au

3.57 m

FA-97-12361.01 (40.25) g/t Au

2.69 m

FAB-11-1051.09 (41.74) g/t Au

10.54 m 1040-00572.01 (41.65) g/t Au

7.40 m

1050-00722.31 (22.31) g/t Au

2.15 m

1030-00564.31 (50.11) g/t Au

3.72 m

1040-00219.40 (19.40) g/t Au

5.63 m1040-003

19.84 (19.84) g/t Au 3.52 m

1050-005127.5 (26.33) g/t Au

7.31m

1040-00413.33 (13.33) g/t Au

3.44 m

2004 U/GDevelopment

Planned U/G Development

L 5132

L 5150

L 5165

L 5195

L 5213

L 5228

L 5180

-100 m

-50 m

Sec�

on 1

040

Sec�

on 1

030

Sec�

on 1

130

Fenelon Gold Naga Viper Zone

Inclined Longitudinal Looking Northeast

September 20, 2018

TSX: WM 0

Metres

5 10

> 10 g/t Au

3-5 g/t Au

5-10 g/t Au

Mineralized Drill Intersec�onsNaga Viper Zone

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

1-3 g/t Au

0.1-1 g/t Au

< 0.1 g/t Au

*Assays cut to 140 g/t Au

VG Visible Gold (where assays pending)

All drill intersections reported as true width in metres

NV-01

NV-02

NV-03

NV-04

Pre-2018 Drilling

2018 Drilling(assays pending where not coloured)

New 2018 U/GDevelopment

Sec�

on 0

990

Sec�

on 1

000

Sec�

on 0

980

NV-05

NV-06

18-1035-01261.1 (61.1) g/t Au

0.29 m

VG

18-1035-00548.81 (24.35) g/t Au

5.86 m

VG

VG

VG

VG

18-1035-01340.69 (40.09) g/t Au

3.58 m

VG

VG

VG

18-1035-0049.37 (9.37) g/t Au

3.27 m

18-0990-00639.47 (23.32) g/t Au

2.33 m

18-0990-00735.21 (31.36) g/t Au

2.70 m

18-1080-001611.0 (140.0) g/t Au

0.40 m

18-1080-00612.80 (12.80) g/t Au

1.59 m

18-1080-00319.24 (19.24) g/t Au

1.00 m

18-1035-019137.63 (88.38) g/t Au

4.10 m

Page 5: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

Gabbroic IntrusivesSediments

L 5150

L 5165

-100 m

-50 m

Sec�

on 1

040

Sec�

on 1

030

Fenelon Gold Habanero Zone

Longitudinal Looking Northeast

September 20, 2018

TSX: WM

0

Metres

5 10

> 10 g/t Au

3-5 g/t Au

5-10 g/t Au

Mineralized Drill Intersec�onsHabanero Zone

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

1-3 g/t Au

0.1-1 g/t Au

< 0.1 g/t Au

*Assays cut to 140 g/t Au

VG Visible Gold (where assays pending)

All drill intersections reported as true width in metres

Pre-2018 Drilling

2018 Drilling(assays pending where not coloured)

Sec�

on 0

990

Sec�

on 1

000

Sec�

on 0

980

-150 m

L 5180

L 5132

Underground DrillingSeptember 2018

FA-17-235.42 (5.42) g/t Au

3.10 m

FA-17-074.36 (4.36) g/t Au

2.76 m

FA-17-2780.38 (20.69) g/t Au

3.30 m

FA-97-14773.97 (73.97) g/t Au

0.34 mFA-17-019

14.32 (14.32) g/t Au 3.87 m

FA-17-1722.17 (22.17) g/t Au

3.15 m

FA-17-256.54 (6.54) g/t Au

3.77 m

FA-17-3211.30 (11.30) g/t Au

0.50 m

VG 18-0990-01041.02 (41.02) g/t Au

4.99 m

VG

VG

18-0990-007122.35 (35.45) g/t Au

2.95 m

VG

VGVG

VG

VG

Surface DrillingFall 2018

Underground DrillingFall 2018

VG

VG

Page 6: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

Chip

otle

zone

Nag

a Vi

per z

one

L 5228

CH-01

CH-02

NV-03

NV-04

NV-01

NV-02

Papr

ika

zone

Haba

nero

zone

New 2018 U/GDevelopment

18-1035-012 18-1035-013

18-1035-010

18-1035-005

18-1035-004 18-1035-002

18-1035-019

18-1035-017

1040-00319.84 (19.84) g/t Au

3.52 m

FAB-11-1051.09 (41.74) g/t Au

10.54 m

1040-00572.01 (41.65) g/t Au

7.40 m

18-1035-00229.23 (28.35) g/t Au

3.26 m

18-1035-01228.30 (28.30) g/t Au

0.44 m18-1035-01261.1 (61.1) g/t Au

0.29 m

18-1035-01030.47 (30.47) g/t Au

2.72 m

VG

18-1035-01750.31 (25.18) g/t Au

5.51 m

18-1035-013144.96 (78.10) g/t Au

1.77 m

1040-00149.23 (36.48) g/t Au

5.59 m

1040-00232.44 (22.58) g/t Au

3.82 m

1040-00219.40 (19.40) g/t Au

5.63 m

1040-00412.57 (12.57) g/t Au

9.94 m

1040-005116.2 (41.79) g/t Au

7.74 m

FA-95-0139.77 (9.77) g/t Au

5.74 m

FAB-11-106.11 (6.11) g/t Au

6.64 m

Mineralized Drill Intersec�ons (> 3 g/t Au)

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

*Assays cut to 140 g/t Au

TSX: WM

Fenelon Gold Cross Sec�on 1040

(10 m corridor)Looking NorthwestSeptember 20, 2018

2004 U/GDevelopment

VGVisible Gold (where assays pending)

L 5213

L 5150

L 5165

L 5195

L 5180

Gabbroic Intrusives

Intermediate Intrusives

Argillite/Graphi�c Argillite

Pyroxenite

Mineralized Shear Zones

0

Metres

5 10

Planned Stopes & Development Planned Stopes & Development (slightly off-sec�on)

Open Pit

-50 m

-100 m

All drill intersections reported as true width in metres

Pre-2018 Drilling (white label)

2018 Drilling (orange label)

Anah

eim

zone

18-1035-01927.10 (24.69) g/t Au

5.56 m

Page 7: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

Papr

ika

zoneHa

bane

ro zo

ne

Nag

a Vi

per z

one

Chip

otle

zone

18-1035-013

18-1035-011

18-1035-007

18-1035-006

18-1035-005

18-1035-002

18-1035-003

18-1035-019

18-1035-018

18-1035-014

18-1035-00229.23 (28.35) g/t Au

3.26 m

18-1035-00548.81 (24.35) g/t Au

5.86 m

18-1035-016

18-1035-01340.69 (40.09) g/t Au

3.58

18-1035-01812.68 (12.68) g/t Au

2.38 m18-1035-018

9.04 (9.04) g/t Au3.60 m

18-1035-01165.76 (42.89) g/t Au

1.78 m

18-1035-019137.63 (88.38) g/t Au

4.10 m

1050-005127.5 (26.33) g/t Au

7.31 m1050-005

19.70 (19.70) g/t Au 1.60 m

1050-0085.64 (5.64) g/t Au

2.84 m

FAB-11-015.07 (5.07) g/t Au

5.11 m

1050-0055.14 (5.14) g/t Au

3.15 m

BZ-04-0128.32 (8.32) g/t Au

3.47 m

FAB-11-036.12 (6.12) g/t Au

2.48 m

1050-00722.31 (22.31) g/t Au

2.15 m

Pre-2018 Drilling (white label)

Mineralized Drill Intersec�ons (> 3 g/t Au)

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

2018 Drilling (orange label)

*Assays cut to 140 g/t Au

TSX: WM

Fenelon Gold Cross Sec�on 1050

(10 m corridor)Looking NorthwestSeptember 20, 2018

2004 U/GDevelopment

VGVisible Gold (where assays pending)

L 5213

L 5150

L 5165

L 5195

L 5180

Gabbroic Intrusives

Intermediate Intrusives

Argillite/Graphi�c Argillite

Pyroxenite

Mineralized Shear Zones

0

Metres

5 10

Planned Stopes & Development Planned Stopes & Development (slightly off-sec�on)

L 5228

Open Pit

-50 m

-100 m

All drill intersections reported as true width in metres

New 2018 U/GDevelopment

NV-03

NV-04

NV-01

NV-02

CH-01

Page 8: Fenelon Gold 3D view · 2018. 9. 20. · NV-01 NV-02 NV-03 NV-04 NV-05 NV-06 TSX:WM Fenelon Gold 3D view Looking Northeast September 20, 2018 Open Pit 2004 U/G Development Preliminary

18-0990-006

18-0990-007

18-0990-008

18-0990-009

18-0990-010

18-0990-01318-0990-014

18-0990-011

18-0990-012

18-0990-015

18-0990-017

VG

VG

VG

VG

18-0990-01041.02 (41.02) g/t Au

4.99 m

18-0990-01012.42 (12.42) g/t Au

3.50 m

FA-95-06037.61 (37.61) g/t Au

0.70 m

0990-00110.55 (10.55) g/t Au

3.22 m

FA-17-01914.32 (14.32) g/t Au

3.87 m FA-17-07264.5 (42.1) g/t Au

2.89 mFA-17-17

7.90 (7.90) g/t Au 2.85 m

FA-17-1722.17 (22.17) g/t Au

3.15 m

TSX: WM

Fenelon Gold Cross Sec�on 0990

(10 m corridor)Looking NorthwestSeptember 20, 2018

All drill intersections reported as true width in metres

0.00

X

20.0

0 X

Mineralized Drill Intersec�ons (> 3 g/t Au)

Hole-IDg/t Au uncut (g/t Au cut*)

True Width in metres

*Assays cut to 140 g/t Au

VGVisible Gold (where assays pending)

Gabbroic Intrusives

Intermediate Intrusives

Argillite/Graphi�c Argillite

Pyroxenite

Mineralized Shear Zones

Planned Stopes & Development Planned Stopes & Development (slightly off-sec�on)

Pre-2018 Drilling (white label)

2018 Drilling (orange label)

0

Metres

5 10

L 5213

L 5150

L 5165

L 5195

L 5180

L 5228

-50 m

-100 m

18-0990-007204.0 (140.0) g/t Au

0.40 m

18-0990-00639.47 (23.32) g/t Au

2.33 m

Papr

ika

zone

Haba

nero

zone

Naga

Vip

er zo

ne

Chip

otle

zone