20181009 Fig 2 Habanero Long - wallbridgemining.com 2_Habanero... · trusives ts Planned U/G...
Transcript of 20181009 Fig 2 Habanero Long - wallbridgemining.com 2_Habanero... · trusives ts Planned U/G...
Gabbroic IntrusivesSediments
Planned U/G Development(off-sec�on)
L 5150
L 5165
-100 m
-50 m
Sec�
on 1
040
Sec�
on 1
030
Fenelon Gold Habanero Zone
Longitudinal (10 m corridor) Looking NortheastOctober 09, 2018
TSX: WM
0
Metres
5 10
> 10 g/t Au
3-5 g/t Au
5-10 g/t Au
Mineralized Drill Intersec�onsHabanero Zone
Hole-IDg/t Au uncut (g/t Au cut*)
True Width in metres
1-3 g/t Au
0.1-1 g/t Au
< 0.1 g/t Au
*Assays cut to 140 g/t Au
VG Visible Gold (where assays pending)
All drill intersections reported as true width in metres
Pre-2018 Drilling
2018 Drilling(assays pending where not coloured)
Sec�
on 0
990
Sec�
on 1
000
Sec�
on 0
980
-150 m
L 5180
L 5132
Underground DrillingSeptember 2018
FA-17-235.42 (5.42) g/t Au
3.10 m
FA-17-074.36 (4.36) g/t Au
2.76 m
FA-17-2780.38 (20.69) g/t Au
3.30 m
FA-97-14773.97 (73.97) g/t Au
0.34 m
FA-17-01914.32 (14.32) g/t Au
3.87 m
FA-17-1722.17 (22.17) g/t Au
3.15 m
FA-17-256.54 (6.54) g/t Au
3.77 m
FA-17-3211.30 (11.30) g/t Au
0.50 m
18-0990-01041.02 (41.02) g/t Au
4.99 m
18-0990-007122.35 (35.45) g/t Au
2.95 m
VG
VGVG
VG
VG
Surface DrillingFall 2018
Underground DrillingFall 2018
VG
VG
18-0990-01174.90 (57.09) g/t Au
5.21 m
18-0990-01324.30 (24.30) g/t Au
4.67 m
VG
18-0990-01798.90 (47.45) g/t Au
1.63 m