What is FWUC?

• organizations of farmers established in order to own, operate and maintain the irrigation system and related infrastructure that serve the land that they cultivate.

Page 3: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

FWUC committee

• FWUC committee normally consists of – 4 persons as FWUC executive committee– 3 persons per group as FWUG committee– 2 persons per sub-group

• Number of group and sub-group divided depending on branch canal and area irrigated

Page 4: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

FWUC structure

FWUC

FWUG

Sub-group

Sub-group

FWUG

Sub-group

Page 5: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

• FWUC– Manage whole irrigation area– Functioning by statutes approved by MOWRAM– Hold a general meeting– Decision of water distribution plan– Decision and collecting irrigation service fee

Role and responsibility of FWUC committee

Page 6: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

• FWUG– Implementing the work program of the

Community;– Coordinating between members of FWUG and

community; and– Collecting irrigation service fee from the members

according to the terms set by the community

Page 7: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

• Sub-group– Collecting fee– Manage side canal– Join FWUC committee meeting

Page 8: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Stakeholders/partners involved• Local authorities ( village, commune, district

and provincial level)• Line department/ministry• Private Water Seller (PWS)

Page 9: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Irrigation Service Fee setting up (ISF)

• FWUC executive committee draft the ISF (statute)• Consultation meeting at village basis• Finalize the ISF• Normally, it is 150kg/ha/yr• The fee can be in the form of rice or money

Page 10: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Fee payment

• Without PWS, Farmers pay ISF directly to FWUC ( Farmers pump water from the canal by themselves)

• With PWS, Farmers pay water fee to PWS according to number of cropping ( water fee can be ranged from 300,000- 450,000 riel/ha) and PWS pay ISF to FWUC

Page 11: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

What Officially FWUC need to have

• Statute/by-law• Bank account• Committee ( organizational chart)• 5-year maintenance plan

Page 12: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Steps in FWUC establishment and Capacity building ( by PDOWRAM)

• FWUC establishment– Meeting with local authorities– Village meeting to introduce PIMD ( Participatory

Irrigation Management and Development) and Objective of forming FWUC

– Sub-group leader election– FWUG leader election– FWUC committee election

Page 13: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

• Draft and finalize statute/by-law• Consultation meeting at village basis• Draft and finalize 5-year maintenance plan

Page 14: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

FWUC capacity building

• Operation ( 6 lessons)• Maintenance (7 lessons)• Additional course (10 lessons)

Page 15: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

What CAVAC do for irrigation?

• Construction and O&M– Consultation with PDOWRAM to identify potential

canal to be rehabilitated– Site visit– Feasibility study– Canal alignment identification and pegging– Land-loss check– Topography ( PDOWRAM)

Page 16: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

– Detail design (CAVAC)– Bidding- Temporary monitor committee setting up

(community)– Construction– FWUC establishment and capacity building

Page 17: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Main canal

Page 18: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Secondary canal

Page 19: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Delivery canal

Page 20: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Canal alignment identification activities

Page 21: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Concrete canal

Page 22: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Canal construction

Page 23: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Canal alignment pegging

Page 24: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Irrigated rice field

Page 25: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Successful farmer

Page 26: Farmer Water User Community (FWUC) 3 rd CDN meeting, 19 May 2013.

Thank you!!!!