![Page 1: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/1.jpg)
EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS
MANAGEMENT ENVIRONMENT 11th Annual Systems Engineering
Conference
Presenter: Mike KorzenowskiOct 20th, 2008
Authors: GLSN Team – Kurt Hansen, Jim Garrity
![Page 2: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/2.jpg)
22Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Introduction
A System Engineering approach wrapped with a Design For Six Sigma (DFSS) blanket of methodology to provide a means of designing and delivering an Integrated Logistics Management Environment for the collaboration and delivery of logistics information over a military support network.
![Page 3: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/3.jpg)
33Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Large Scale, Sprawling Systems
Stove pipes for product source and deliverySecurity, Limited accessFunding ProblemsHeavy Payloads, Quick Access DemandsHeavy, Traditional Process Driven methodsOld, New Mil StandardsLarge Complex Legacy SystemsNew Technologies waiting to be exploited
![Page 4: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/4.jpg)
44Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Transitions to Deal With
Old Technology, Legacy ProcessesLogistics maintainability modelsToday's technology without changing the development processesStreamlined delivery over Global Support NetworksContainment to Military Networks with limited accessLow time, costHigh Demand, The Right Data at the Right Time
![Page 5: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/5.jpg)
55Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
The Typical Full Product Life Cycle
Concept Feasibility Project Definition Development Production In Service Disposal
Systems Logistics
Operations
Logistics Product Data Management (LPDM)
![Page 6: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/6.jpg)
66Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
(ILS) Has not changed1388-2B MIL-Standard (circ 1973)
![Page 7: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/7.jpg)
77Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
ILS – Integrated Logistics Support
The ILS management process which facilitates development and integration of the 10 individual logistic support elements to specify, design, develop, acquire, test, field, and support systems. There are 10 ILS elements:
Maintenance planning Supply support Support and Test Equipment/Equipment support Manpower and personnel Training and training support Technical data Computer Resources support Facilities Packaging, Handling, Storage, and Transportation (PHS&T) Design interface
![Page 8: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/8.jpg)
88Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Source Data Model and Outputs For Supportability (ILS Program)
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 9: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/9.jpg)
99Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Products Delivered
Technical manuals. Technical and supply bulletins. Transportability guidance technical manuals. Maintenance expenditure limits and calibration procedures. Repair parts and tools lists. Maintenance allocation charts. Preventive maintenance instructions. Drawings/specifications/technical data packages. Software documentation. Provisioning documentation. Depot maintenance work requirements. Identification lists. Component lists. Product support data. Safety critical parts list. Lifting and tie down pamphlet/references. Hazardous Material documentation.
![Page 10: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/10.jpg)
Typical Tools – Program to support ILSCONTENT
CREATION & CAPTURE•ArbortextEpic Editor•MsWord
•Content@XML/SGML
Management &Multi-Channel
Publishing•SLIC/SLICwave•IBM Mainframe
(LS3Q)•TIPS-PC
(MsWord/VBA/VB/Access)
•AutotrolTechnicalIllustration
•ProductView•PRO-E
•Adobe Illustrator•Adobe Photoshop
•Authorware•QuickSilver(Packaging)
STORAGEAND
MANAGEMENT
•Content@•Documentum
•Access•IBM Mainframe
(LS3Q)•SLIC/SLICwave
ASSEMBLY/DATA
TRANSFORM
•Omnimark•Perl
•VB/VBA•Sed/Awk/Nawk
•Unix Shell•Xychange
•EMS2 RPSTLEditing Tool
(ERET)
PRODUCTION
•Content@•XPP (XML Publishing)
•Epic •EMS2 Reformatter
/Linker/Compiler•InfoLinker
•Adobe Acrobat•IBM Mainframe(LS3Q) –LSA36
Delivery•MRP (Pricing)
•WebFLIS (Prov NSN)
DEPLOYMENT
•Adobe PDF•EMS2 Runtime
•InstallShield•Internet Explorer•Powerarchiver/
Winzip
ANALYSIS
•SLIC/SLICwave•PRO-E/UG
•ProductView•COMPASS/Lite
•IDE•ECARDS•ESCHER
•CMWebstat•eXpress (Testability
Modeling Tool)
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 11: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/11.jpg)
1111Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
The Enterprise, High-Level Military
ProgramGovt.
OEM
LTN
Contractor
WeaponSystem
![Page 12: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/12.jpg)
1212Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Extend
The Enterprise, High-Level Military
ProgramGovt.
OEM
LTN
Contractor
WeaponSystem
E
E
E
![Page 13: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/13.jpg)
1313Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Why? Products Delivered over Network
Data is now capable of streaming and is considered developed in native format for delivery over a network. (serialization)Near-time access is required, updates as well.Publish-Subscribe methods is desired, only when I need it mentalityAuthentification, Security maintained easilyInformation Assurance can be appliedFeedback to OEM
![Page 14: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/14.jpg)
1414Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Attempts to Solve
Replacing legacy systems with integrated COTS packages (like Baan, PeopleSoft, and SAP)
Developing data and information warehouses
Establishing central operational data stores or data clearinghouses
Implementing Enterprise Portals
Using Middleware
Using XML
Reengineering all applications to a single architecture
All of these approaches have value and some will even provide at least temporary benefit. However, unless they are business-driven and model-based they are more likely to further compound the problems than provide a solution.
![Page 15: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/15.jpg)
1515Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Design for Six Sigma (DFSS)
The goal of DFSS is to create designs that are development efficient, capable of exceptionally high yields and are robust to process variations.
![Page 16: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/16.jpg)
1616Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Design for Six Sigma (DFSS)
Capture Voice of Customer & Define Eng. RequirementsWants & needs toolsCustomer use observationsKano AnalysisQuality Function Deployment (QFD)
Develop Concepts and SelectPugh MatrixAxiomatic DesignTRIZFailure Mode & Effects Analysis (FMEA)
Develop Detailed DesignSystems EngineeringFunction Models & FMEAsTransfer Functions
Statistical DesignMonte Carlo Analysis
Design for Robust PerformanceDesign of ExperimentsRobust DesignDesign for Reliability
Design for ManufacturabilityProcess Capability DatabasesStatistical Tolerancing
Predict QualityDFSS Scorecards
![Page 17: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/17.jpg)
1717Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Axiomatic Design
Axiomatic design is systems design methodology using matrix methods to systematically analyze the transformation of customer needs into functional requirements, design parameters, and process variables.
![Page 18: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/18.jpg)
1818Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
2 Principles of Axiomatic Design
Axiom 1:The Independence AxiomMaintain the independence of the functional requirements (FRs)
Axiom 2:The Information AxiomMinimize the information content of the design
![Page 19: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/19.jpg)
1919Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Key Axiomatic Design DefinitionsCustomer Needs (CN)
Collection of statements expressed in the “voice of the customer” that express the customers’ perceptions of the design task
Functional Requirement (FR) Minimum set of independent requirements that completely characterize the functional needs of the product (or software, organizations, systems, etc.) in the functional domain
Constraint (C)Bounds on acceptable solutionsThere are two kinds of constraints:
Input constraintsImposed as part of the design specifications
System constraintsImposed by the system in which the design solution must function
Design parameter (DP)Key physical (or other equivalent terms in the case of software design, etc.) variables in the physical domain that characterize the design that satisfies the specified FRs.
![Page 20: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/20.jpg)
2020Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Four Axiomatic Domains
![Page 21: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/21.jpg)
Overall Axiomatic Process
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 22: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/22.jpg)
2222Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Three States of Functional Coupling
UncoupledEach DP uniquely satisfies a single FR
Order of Development and Function not important
DecoupledSome DP’s impact more than one FR.
A Progressive Solution is possible
Order of Development and Function are important
CoupledSome DP’s impact more than one FR.
A Simultaneous Solution is required
Order of Development and Function are important and will require iterations
![Page 23: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/23.jpg)
Axiomatic design:Evaluate options using the independence axiom
The Independence Axiom: Maintain independence between functional requirements
Decoupled - Acceptable
FR.1 X O OFR.2 X X OFR.3 X X X
Uncoupled - Desired
DP.1 DP.2 DP.3FR.1 X O OFR.2 O X OFR.3 O O X
Coupled - Unacceptable
DP.1 DP.2 DP.3FR.1 X X XFR.2 X X XFR.3 X X X
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 24: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/24.jpg)
2424Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
AnalysisAnalysis from DFSS axiomatic design methods indicate the need for a point-point solution, (eliminate design coupling) specifically to meet the critical component requirements, however a technology which will expand (Design Parameter).
A methodology of delivering just the interface to and from the components, streamed line for global access, performance in near-time and system delivered in less than a year time (Critical Key Parameters).
A unique approach is required, which resulted in a new way for successful Application Integration and Deployment of Data with the demands specified.
It is being called Point Service Enterprise Architecture (PSEA).Where a Point Service Enterprise Architecture links an enterprise’s business architecture with its existing enterprise systems and applications utilizing existing software component frameworks that can be applied specifically to meet a business practice. Point-to-Point Application Services.
.NET, J2EE, SOA Architectures, ect all are enabling technologies, it’s the arrangement of the frameworks interfaced to existing systems with interlacing services over a business process.
![Page 25: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/25.jpg)
2525Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
PSEA
A well-documented process architecture is critical, with a precise logical organization of information pertaining to the following elements:
Strategic goals, objectives, and strategies
Business rules and measures
Information requirements
Processes, systems and applications
Relationships between architecture elements
Technology infrastructure
![Page 26: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/26.jpg)
2626Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
DataStore
Framework
DataMart
Existing Infrastructure
Framework
Extendable
PSEA Services
PSEA PSEAPSEA Adapters
PSEA High-Level
![Page 27: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/27.jpg)
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 28: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/28.jpg)
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 29: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/29.jpg)
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 30: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/30.jpg)
Logistic Consumers
PM-Field Service
Personnel
GLSN NETWORKINTERFACES
ARMY TACTICALLOGISTICSNETWORKS
Data
I/O,Events
REMOTEUNITS
Maintenance
Supply Chain Management
VHMSCLOE
LOG DATA SYNCHRONIZATION
PUBLIC SWITCHED NETWORKS
SECURE
DIRECT COMMUNICATION NETWORKS
GOVERNMENTLOG
SYSTEMS
LOG SUPPORT SYSTEMSAND
PRODUCTS
LSARTM
SUPPLIER
Enterprise Information Systems
ContractorsSupportSystems
Other
SECURE
Busi
ness
Entit
es
R&D
PM
MFGService
DATA I/O
Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
![Page 31: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/31.jpg)
As Fielded, Actual MTBF, MTTR, ect.
![Page 32: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/32.jpg)
3232Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Conclusion
(PSEA) Point services allow enterprises to develop applications on globally distributed computing platform effectively.
Modernization Efforts, bridging Contractor to Government:GLSN (Global Logistics Support Network)CLOE (Common Logistics Operating Environment)VHMS (Vehicle Health Management Systems
![Page 33: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/33.jpg)
3333Approved for Public Release, Distribution Unlimited, GDLS approved, log 2008-98, dated 10/13/08
Questions, Other Information
Whitepaper on PSEA is availableProven – GD Enterprise and Army
![Page 34: EXTENDING ENTERPRISE SYSTEMS FOR AN INTEGRATED LOGITICS MANAGEMENT ENVIRONMENT 11th ... · 2017. 5. 19. · Design for Six Sigma (DFSS) z Capture Voice of Customer & Define Eng. Requirements](https://reader036.fdocuments.in/reader036/viewer/2022070207/60f83d285871247c3a087c04/html5/thumbnails/34.jpg)