FMCG scheduling Martijn van Elzakker EWO meeting, March 2011 S P S Process Systems Engineering

Transcript of EWO 2011-03 Martijn.ppt - Carnegie Mellon Universityegon.cheme.cmu.edu/ewo/docs/UnileverEWO 2011-03...

FMCG scheduling g

Martijn van Elzakker

EWO meeting, March 2011

S P SProcess Systems Engineering

Outline

Problem Overview

Modeling Approach

Results Results

Future Work

S P S Process Systems Engineering 112-3-2011

Problem overview

Stage 1 Intermediate Stage Stage 2

Mi i f d t I t di t St P ki• Mixing of products

• Processing

• Intermediate Storage

• Maturing

• Packing

Product type 1

All products

Product type 2Product type 2

S P S Process Systems Engineering 212-3-2011

Main Challenge

Large computational times Intermediate inventoryIntermediate inventory

1. Limited storage capacity Many mixer switchesMany periods Large models

2 C2. Considerably more storage tanks than mixers and packers− Model size largely determined by storage stage

S P S Process Systems Engineering 312-3-2011

Dedicated time slots

1. Limited Storage Many Periods Large Models

Observation: Almost never two consecutive mixing runs of the same product class (same packer)

Dedicate product types to periods Smaller modelDedicate product types to periods Smaller model

Empty periods ensure flexibility

S P S Process Systems Engineering 412-3-2011

Related Period Model

2. Model size determined by # of tanks

Number of storage tanksTFpack1 TSmixn n

S P S Process Systems Engineering 512-3-2011

Results: Small Example Problems

Horizon: 48 hours

Demand

Case 1 Case 2 Case 3 Case 4Product 1 40,000 40,000 32,000 -Product 2 24,000 16,000 32,000 16,000Product 3 - - - 16,000

Product Type 1

Product 4 - - - 16,000Product 5 40,000 40,000 48,000 -Product 6 24,000 20,000 20,000 -

yp

ProductProduct 7 - - - 40,000Product 8 32,000

Product Type 2

S P S Process Systems Engineering 612-3-2011

Results

Required computational time Gurobi 3 0Gurobi 3.0

400

500

600

6000700080009000

200

300

400

RPMRTN

20003000400050006000

0

100

Case 1 Case 2 Case 3 Case 4

RTN*010002000

Case 1 Case 2 Case 3 Case 4

RTN b Sh ik d Fl d (2008)

Feasibility Makespan

S P S Process Systems Engineering

RTN by Shaik and Floudas (2008)

712-3-2011

Results

Required computational time Gurobi 3 0Gurobi 3.0

80

100

120

250030003500

40

60

80

RPMRTN* 1000

15002000

0

20

Case 1 Case 2 Case 3 Case 4

RTN

0500

Case 1 Case 2 Case 3 Case 4

RTN b Sh ik d Fl d (2008)

Feasibility Makespan

S P S Process Systems Engineering

RTN by Shaik and Floudas (2008)

812-3-2011

Full scale example case

Same set up: 1 mixer, 6 storage tanks, 2 packers

120 hour horizon

4 hour cleaning period every 72 hours

N l ti ithi 36 h

Product 1 2 3 4 5 6 7 8Demand [kg] 80,000 48,000 32,000 8,000 112,000 12,000 48,000 24,000

No solution within 36 hours

S P S Process Systems Engineering 912-3-2011

Heuristics

Bottleneck Minimum makespan 1st packer: 118 33 hrMinimum makespan 1 packer: 118.33 hr Minimum makespan 2nd packer: 109.44 hr

Products on the 1st packer in optimal order 4-3-2-1

Feasibility optimization: 28 hours

S P S Process Systems Engineering 1012-3-2011

Algorithm

Step 1: Order products on bottleneck stage Step 2: Relax horizon feasibility optimization Step 2: Relax horizon feasibility optimization 170s, 124.19hr makespan

St 3 Fi b ttl k ll ti MS i i i ti Step 3: Fix bottleneck allocation MS minimization 358s, 118.74hr makespan

S P S Process Systems Engineering 1112-3-2011

Algorithm

Step 4: Fix 2nd half allocation MS minimization 692s 118 33hr makespan692s, 118.33hr makespan

For example case with algorithm528 t fi t f ibl l ti 528s to first feasible solution

1220s to optimal solution

No guarantee of global optimality

S P S Process Systems Engineering 1212-3-2011

Conclusions

RPM model more efficient than RTN models Dedicated time periods improve efficiencyDedicated time periods improve efficiency Indirectly modeling inventory improves efficiency

Algorithm Required for larger cases

C t t l b l ti lit Cannot guarantee global optimality Gives good results within reasonable time

S P S Process Systems Engineering 1312-3-2011

Future work

Tactical Planning model 1-1 5 year horizon1 1.5 year horizon Fast moving consumer goods− Large number of products− Seasonality Weekly time periods− Large uncertainty in demand and supply

Capacity Estimation Capacity Estimation− How to determine maximum capacity utilization?

S P S Process Systems Engineering 1412-3-2011