ESPACIO NEWSLETTER 3
description
Transcript of ESPACIO NEWSLETTER 3
1
Basement SpeedingSpeeding in the basement is still occurring. We request that all drivers, both two wheelers and four, be told to be doubly cautious in the basement. Drivers caught speeding in the basement will be barred from the Espacio Premises.
Villa SalesPlease note sales of villas must include an Association NOC letter as well as transfer fee to the Association as stated in the Bye-laws.
SecuritySecurity has been found asleep in the night. Residents are requested to write and report such incidents to the Facilities Manager and the committee.
Basement Debris
Debris has substantially increased in the basement. Please have your basement debris and leftover material removed at the earliest. If you are in the process of remodeling or planning to remodel please do seal the area of work in the name of health and decorum.
Espacio VolunteersAs owners and residents please feel free to step forward to contribute in any way towards theimprovement of the community space.
Waste SegregationWaste segregation continues to be refined on the property. We ask that residents be vigilant in segregation as BBMP will refuse to take incorrect segregation, creating issues for the whole community. We thank the
volunteers who have taken on this task.
Basement safety equipmentWe are now researching procurement of the same. We thank those who have come forward to help with this process.
GymThe gym is now open for usage.
Pool, Lounge & Party AreasAll the above areas are undergoing the final treatments, including electrical light fittings, and sanitary equipment. They will be available for usage shortly.
ESPACIONEWSLETTERN
OVE
MBE
R 2
012
2
Deepavalli 2012The annual Espacio Deepavalli party will be held on the 13th. Please do join us.
Fireworks tips• Always use fireworks outside and have a bucket of
water and a hose nearby in case of accidents.• Steer clear of others — fireworks have been
known to backfire or shoot off in the wrong direction
• Never throw or point fireworks at someone, even in jest.
• Avoid carrying fireworks in your pocket• Point fireworks away from homes• Light one firework at a time• never relight a dud• Soak all fireworks in a bucket of water before
throwing them in the trash can• Keep pets indoors to reduce the risk that they'll
run loose or get injured.• If a child is injured by fireworks, immediately go
to a doctor or hospital. • If an eye injury occurs, don't allow your child to
touch or rub it, as this may cause even more damage. Also, don't flush the eye out with water or attempt to put any ointment on it. Instead, cut out the bottom of a paper cup, place it around the eye, and immediately seek medical attention.
• If it's a burn, remove clothing from the burned area and run cool, not cold, water over the burn (do not use ice)
Payee ListThe community thanks those who have paid their dues. The list of dues is attached along with this newsletter. If incorrect please inform the facilities manager Mr. Manohar (91-9845475869).
AccountsSome rough accounts have been included at the end of this newsletter for the readers perusal.
ESPA
CIONE
WSL
ETTE
R N
ovem
ber 2
012
3
PAYEELISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
A2 27000
A5 13500
B2 13500
B3 27000
C1 13500
C3 27000
C4 27000
C5 27000
E1 40500
E2 40500
F2 13500
F3 13500
4
ACCOUNTSLISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
Cement/Sand R 90,193.00
Bricks Purchases R 1,650.00
Cement bags R 43,440.00
Red mud R 3,600.00
Rock Cement R 200.00
Sand Purchase R 34,000.00
White Cement R 7,303.00
Electrical Fittings R 187,990.00
CCTV Adopter R 600.00
CFL Bulbs R 3,373.00
Earthing cable at gym R 22,000.00
Electrical fitting R 55,039.00
Electrical Item R 180.00
Emergency Lights R 780.00
Light & Style R 44,483.00
Prism Lights R 61,535.00
Hardware R 305,069.00
Hardware Items R 120,335.00
Poonam traders-laminates R 7,328.00
R C Ventures-Dust Bins R 19,500.00
Raghavendra glass R 47,042.00
Subadhra Hardware R 4,316.00
Television for Clubhouse R 45,990.00
Toilet plumbing items R 60,558.00
5
ACCOUNTSLISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
Marble/Granite/Tiles R 560,401.00
Advance-tiles R 1,000.00
Chemicals for marble R 8,445.00
Dhara Marbles R 32,050.00
Granite R 3,710.00
H.V.Stone R 99,125.00
Liquidwash R 850.00
Maheshwari Impex R 17,930.00
Marble laying R 50,000.00
Marble Purchases R 195,000.00
P.C.Mallappa R 5,565.00
Tiles R 21,440.00
Tiles(P C Mallappa) R 125,286.00
Paints R 62,448.00
Paints R 1,442.00
Paints(Cauvery Traders) R 7,763.00
Paints(Floors & Walls) R 53,243.00
Plants R 52,900.00
Plants purchase R 52,900.00
Plumbing R 73,817.00
Hardware Items R 17,982.00
Plumbing Items R 55,835.00
Water Proofing R 42,000.00
Karnataka Engg R 30,000.00
Water Proofing R 12,000.00
Wood R 59,230.00
Purchase of Wood R 59,230.00
6
ACCOUNTSLISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
Labour Charges R 405,910.00
Borewell repair-Imtiaz R 2,000.00
Labour Charges R 5,600.00
Labour charges-Debris R 3,000.00
Labour charges-Satish-Servant Toilet
R 6,000.00
Labour Charges-Satpal(POP Work)
R 10,000.00
Labour charges-Servant Toilet
R 4,000.00
Labour Charges-Tea R 500.00
Labour Charges-weekly payment
R 14,800.00
Labour Charges-Welding-Servant Toilet
R 1,000.00
Labour Charges(Arasu-Grill work)
R 6,500.00
Labour Charges(Basha) R 1,000.00
Labour Charges(Bhima-Painting)
R 12,000.00
Labour Charges(Bhima) R 31,000.00
Labour Charges(Breakage Lounge Area)
R 10,000.00
Labour Charges(Breakage of ladies toilet)
R 1,000.00
Labour Charges(Carpentry work advance)
R 6,000.00
Labour Charges(Carpentry work)
R 15,500.00
Labour Charges(Chipping/plastering)
R 15,000.00
Labour Charges(Debris clearing)
R 19,500.00
Labour Charges(Debris) R 10,000.00
Labour Charges(Glass cutting)
R 750.00
7
ACCOUNTSLISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
Labour Charges(Glass Removal)
R 2,000.00
Labour Charges(grillwork) R 6,000.00
Labour charges(Gym room breakage)
R 4,000.00
Labour Charges(Gym Wall plastering)
R 1,500.00
Labour Charges(Imtiaz) R 10,000.00
Labour Charges(JCB Work) R 5,000.00
Labour Charges(Johny-Club House)
R 1,600.00
Labour Charges(Mason work,chipping)
R 6,500.00
Labour Charges(Mason Work)
R 1,600.00
Labour charges(Night work) R 800.00
Labour Charges(Party Hall MS Roof)
R 2,000.00
Labour charges(Party Hall-Bhima)
R 5,000.00
Labour Charges(Plumbing work)
R 3,600.00
Labour Charges(Polishing work)
R 5,000.00
Labour Charges(POP Work) R 2,500.00
Labour Charges(Ramlal-POP Work)
R 4,000.00
Labour Charges(Saravanakumar-painting)
R 19,500.00
Labour Charges(Satpal-POP work)
R 10,210.00
Labour Charges(Skylight) R 5,000.00
Labour charges(Sudarshan) R 6,000.00
8
ACCOUNTSLISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
ACCOUNTSLISTES
PACIONE
WSL
ETTE
R N
ovem
ber 2
012
Labour Charges(Suraj-carpenter)
R 45,000.00
Labour Charges(Tiles Laying)
R 15,000.00
Labour Charges(Venkatesh-Plumbing)
R 5,000.00
Labour Charges(Wall at STP area)
R 7,000.00
Labour Charges(Wall Painting)
R 3,000.00
Labour Charges(Wall work at STP)
R 6,000.00
Labour charges(Weekly Payment)
R 40,450.00
Labour Charges(Welding at New toilet)
R 7,500.00
Grand Total R 1,839,958.00