Layout DesignBasic GridCartesian Grid System
Basic StructuresBase PlatesVertical ColumnsHorizontal Platforms
Individual FoundationConcrete FoundationCross beams
EquipmentsMain – Vessels, Reactors, Heat Exchangers etc.Auxiliary – Moving Equipments, Conveyer etc.
Interfaces and Outer DimensionsConnecting dimensions for the connecting pipeworkConnecting dimensions for the measurement instrumentsConnecting dimensions for electrical or pneumatic drivesPosition and dimensions for the point of support and mountings
Other Building EngineeringWindows, Doors, Staircase, Control Room, Ventilation etc.
Platforms
Columns
z
Base Plates
y
x
Waste Incineration Plant for Lurgi Energie and Entsorgung GmbHc
Top View
Side View
Process engineering is the determination of the position and design of the foundations as well as the load specification required for construction analysis .
Typical Building Construction Drawings:
Steel construction plan Formwork plan HVAC ‐ plans Steel grating key plan
Building Design
i. Steel Construction DrawingsShow all details of the steel construction. Does not have to control each single transverse bracing etc. The interfaces are always important.
ii. Formwork PlansFrom which the details of the concrete components are derived. The foundations of the apparatuses, pump sumps, ramps, floor ducts etc. are in the focus.
iii. The HVAC Plans‐Contain data regarding radiators, wall ‐mounted fans, smoke extraction valves, ventilation links, blowers etc.
iv. Steel Grating Key PelanThe individual steel grating elements of which the areas are composed emanate from steel grating key plans. Each steel grating element has to be controlled.
Complex Planning Package
• Fittings concept
• Building design
• Component layout
• Materials concept
• E/MC – conceptShows the most time – consuming and how time ‐ critical the piping planning are.
Documents have to be available before planning
• Piping and instrumentation diagrams
1. Determination of piping classesPiping Classes
Materials qualityDiameter
Component standard
Material and dimensions of
gasketsDimensions of the pipe fittings
Bolt and nut types, dimensions for flange
connections
Wall thickness
Installation lengths and other dimensions
of related fittings
Installation lengths and other dimensions of related
I & C components
flange dimensions
3. Piping alignments
• Piping classes have to be stored in
structured form
• Respective dimension of pipe determined.
•Entails costs already possible
•Each plant platform one or more horizontal
alignments are planned.•Vertical routes able to realize vertical
connection the vertical and diagonal routes.
•The main pipeline distance through the plant
can be covered.
2. Carried out by 3D-CAD system
4. Individual pipe planning
•CAD‐engineers are required where an individual working range will be defined.
•Attention on:
•Blockage
• High temperature pipes
•Pipe stress
• Pipe supports
• Expansion joints
•3D CAD ‐ systems dispose of options which enable the generation of views from any
angle and also possible to zoom into the details.
5. Isometric drawings
2.5D drawing for each individual pipeline.
The individual lengths of the straight pipe section had to be added and each
pipe fitting had to be listed. 10
Thanks for Watching Please follow me / SAJJAD KHUDHUR ABBAS