Epdm Agile Webinar 3 2010 F
-
Upload
zero-wait-state -
Category
Technology
-
view
1.915 -
download
1
description
Transcript of Epdm Agile Webinar 3 2010 F
Enterprise PDM to Agile Integration
Powerful possibilities with DesignState
Zero Wait-State Company Confidential Do not distribute
Zero Wait-State Company Confidential Do not distribute
Agenda• Introductions• Company Information• Polls• Enterprise PDM Presentation• DesignState Presentation• Agile PLM Presentation• Question and Answer
Zero Wait-State Company Confidential Do not distribute
Introductions
Ramon BusboomEnterprise Group ManagerGoEngineer
Stephen PorterPartner, Vp of SalesZero Wait-State
David StewartPartner, CTOZero Wait-State
Rodney McCabeDirector of Product DevelopmentZero Wait-State
About Zero Wait-State
• Operating since 1999• Diverse customer base• Research Associate with SolidWorks• Gold Oracle Agile Partner• Extensive background in PLM
deployment and integration• Core competencies in Engineering
Collaboration, Data Migration and PDM and PLM Integration
About GoEngineer
Founded in 1984 North America’s Largest SolidWorks Reseller Oracle Gold Partner Extensive Expertise Supporting
CAD/CAM/PDM/PLM/3D Printing Technologies Over 7500 customers PDM/PLM Vertical Experience
Aerospace & Defense High tech Semi-conductor Medical Manufacturing
“It is our mission to help develop and support the most competitive product design teams in the world”
SolidWorks Enterprise PDM
organization
Other CADdata
SolidWorks Enterprise PDM
Granular Security
Scalable Solution
Unlimited Workflow
Replication
Fast Learning Curve
Data Connectivity
Search & Report
SolidWorksEnterprise PDM
SolidWorks Enterprise PDM
Granular Security
Scalable Solution
Unlimited Workflow
Replication
Fast Learning Curve
Data Connectivity
Search & Report
SolidWorksEnterprise PDM
SolidWorks Enterprise PDM
Fast Learning Curve
SolidWorksEnterprise PDM
SolidWorks Enterprise PDM
Fast Implementation
Low training requirement
Secure and Configurable
Built on Windows Explorer
Integrated within SolidWorks, Pro/E, ADSK
Fast Learning Curve
SolidWorksEnterprise PDM
SolidWorks Enterprise PDM
Powerful Search & Reporting
SolidWorksEnterprise PDM
SolidWorks Enterprise PDM
Where Used Information
Fast & Powerful Search/Reporting Capabilities
Promotes Design Reuse
Saved Searches
Powerful Search & Reporting
SolidWorksEnterprise PDM
Zero Wait-State Company Confidential Do not distribute
EPDM Integration Overview• DesignState Provides an interface from EPDM to Agile
PLM• The integration allows early visibility into design
information• The ability to leverage design data for
Bill of Materials reduces errors and streamlines process
• The interface is transparent to users eliminating learning curve and adoption issues
System Flexibility Through Customization
EPDMDesignState
DesignState features a powerful rules engine providing the ability to determine how objects get published and change orders created.
Through Agile process extensions, DesignState can be notified of events and perform actions on items in EPDM.
Application Process Flow
EPDM
1. State change issued against CAD objects
2. EPDM Workflow exports changed data
3. Data is sent to DesignState
1. Parts created in Agile if they do not exist with attachments
2. ECO created3. Parts added to ECO as
affected items4. BOM Structure created
DesignState
Zero Wait-State Company Confidential Do not distribute
EPDM Workflow Export
EPDMWorkflow
Change approved transition
BOM Exported
Zero Wait-State Company Confidential Do not distribute
DesignState Publish
Generate ECO Add Affected
Items
Zero Wait-State Company Confidential Do not distribute
Agile Change Order Result
PLM Provides Visibility & Expedites Processes
19
Greater Executive Process Visibility Portfolio Management
Tracking, Status Reporting & Analytics
DesignPartners
Suppliers& ExternalManufacturingPartners
Internal ManufacturingPlants
QMS-SOP/DHF/DMR/Regulatory/Quality(ECOs, Approvals, BOMs, Items, SOP’s, AML, Doc’s
Datasheets, Designs, Drawings, Artwork, Labeling, Packaging)
QA & R/A
Product Development
Operations
Sales &Marketing
International
Central Repository Single record of the truthIntegrated to Oracle ERP
Sourcing &Procurement
Internal Groups
Internal &External Partners
collaboration collaboration
DevelopConcept Plan Validate Launch Sustain EOL
Agile Product Governance & ComplianceProduct & program compliance against standards & regulatory requirements
Compliance Office
Agile Product Portfolio Management
Integrated product, program, resource & portfolio management
Executives & Program Office
Closed-loop product quality management across the extended enterprise
QualityProfessionals
Agile Product Cost Management
Product sourcing and lifecycle cost & risk management
Procurement Professionals
Agile Enterprise VisualizationNative document collaborative visualization across the global enterprise
Cross-Enterprise
Agile Engineering Collaboration
Engineering desktop integration & collaboration
Development& Engineering
Agile ProductCollaboration
Eng., Operations & Supply Chain
Enterprise product record visibility, management & collaboration
Agile Quality Management
Agile PLM Modules
© 2006 PTC 21
Specific OperationalImprovement Areas
17.5% reduction in product costs
75% reduction in ECO cycle times
25-35% reduction in design cycles
10-15% reduction in time-to-volume cycles
30-40% reduction in part duplicates and introduction of new parts
15-25% reduction in part search times (improving engineering efficiency)
Source: AberdeenGroup, Product Innovation Agenda Benchmark Report
Macro Financial Benefits Available To SMBs
PLM impacts small business
22
Example Customer ROI• Faster Time-To-Market — reduced by 25% • Increased Efficiency — improved by 30% • Reduced ECO Cycle Time — from 5 days down to 2
• 70% decrease in customer quote time• 87% reduction in document control costs • Lower costs due to 45% increase in supplier participation on bids
• Increased productivity, exceeding expectations by 25%. • Reduced change package cycle time by 30+ days. • Increased Visibility & Access to controlled docs by 30%+
• Managed to double gross margins • Went to a fully outsourced model in 18 months • Increased visibility & leverage of $1B in spend & 280 suppliers
• Reduced new product introductions process from 45 to 7 days • Reduced Costs: Lowered development costs • Increased Efficiency: Streamlined product development processes
Zero Wait-State Company Confidential Do not distribute
DEMO
[Questions & Comments]