Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report...

144
Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns Water Supply and Sanitation Sector Project Prepared by the Government of Nepal for the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Transcript of Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report...

Page 1: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Environmental Compliance Monitoring Report

Semi-Annual Report No. 1

Grant Number: G0157-NEP January-June, 2016

Nepal: Second Small Towns Water Supply and Sanitation Sector Project

Prepared by the Government of Nepal for the Asian Development Bank.

This environmental monitoring report is a document of the borrower. The views expressed herein do not

necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in

nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or

reference to a particular territory or geographic area in this document, the Asian Development Bank does

not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t  

  

 

ENVIRONMENTAL MONITORING REPORT  

P oje t Nu e : G a t   Se i ‐ A ual Repo t  Ja ua  – Ju e    

 

 

 

 

 

 

NEP: Se o d S all To s Wate  Suppl  a d Sa itatio  Se to  P oje ts 

. . . . 

Ka ahi a‐Mak aha  Da ak Bhasi Muku dapu  Kha d a i Baitadi 

. . . . 

I d apu  Baglu g Meghauli  V as Duha i 

. . . . 

La ahi Shi a aga  Kakad itta  Leta g Dha kuta 

. . . . 

Sa dhikha ka Phidi  Da akh‐Sukhad Na a a  Mu i ipalit  Ra pu  

 

 

 

 

 

 

 

 

P epa ed   the Depa t e t of Wate  Suppl  a d Se e age, Mi ist  of U a  De elop e t fo  the Asia  De elop e t Ba k. 

   

Page 3: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

ContentsA e iatio s ....................................................................................................................................... iii 

  I t odu tio  .....................................................................................................................................   

  Co plia e  ith E i o e tal Co e a ts ......................................................................................   

  App oa h a d Methodolog  fo  E i o e tal Mo ito i g ..............................................................   

.   Desk Re ie  .....................................................................................................................................   

.   Colle tio  a d  e ie  of se o da  sou es of i fo atio  f o   a ious sou es ........................   

.   Co pilatio  of e isti g i fo atio , i ple e tatio  status a d  o ito i g  ethods ................   

  Su a  of E i o e tal Mitigatio  a d Co pe satio  Measu es I ple e ted .........................   

.   Co plia e status  ith Natio al/State/Lo al statuto  e i o e tal  e ui e e ts ..................   

.   Su ‐p oje t P og ess a d Status ......................................................................................................   

  Co plia e Status  ith the E i o e tal Ma age e t a d Mo ito i g Pla s .............................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Ka ahi a Mak aha  ............................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   I d apu  .............................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   La ahi  ...............................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Sa dhikha ka  .....................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Da ak ................................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Baglu g  ..............................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Shi a aga  .........................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Phidi  ................................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Bhasi  ..................................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Meghauli  ..........................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Kakad itta  ........................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Da akh‐Sukhad  ................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Muku dapu  ....................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   V as  .................................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Leta g  ..............................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Na a a  Mu i ipalit  ......................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Kha d a i  ......................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Duha i  ...........................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Dha kuta  .......................................   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Ra pu  ..........................................   

Page 4: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

ii 

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Baitadi  ............................................   

Ta le  .  : O e all Co plia e  ith EMP ............................................................................................   

Ta le  . : I ple e tatio  of EMP ......................................................................................................   

  Mo ito i g of E i o e tal I pa ts o  P oje ts Su ou di gs ...................................................   

  G ie a e Re o di g a d Ha dli g ................................................................................................   

  Co lusio  ....................................................................................................................................   

 

 

 

Page 5: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

iii 

A e iatio s ADB    :  Asia  De elop e t Ba k 

SSTWSSSP  :  Se o d S all To s’ Wate  Suppl  a d Sa itatio  Se to  P oje t 

EMP    :  E i o e tal Ma age e t Pla  

DSC    :  Desig  a d Supe isio  Co sulta t 

DWSS    :  Depa t e t of Wate  Suppl  a d Se e age 

WUSC    :  Wate  Use ’s a d Sa itatio  Co ittee 

IEE    :  I itial E i o e tal E a i atio  

PMO    :  P oje t Ma age e t offi e 

MOUD   :  Mi ist  of U a  De elop e t 

TOR    :  Te  of Refe e e 

)OI    :  )o e of I flue e 

OSE    :  O upatio al Safet  E uip e t 

PPE    :  Pe so al P ote ti e E uip e t 

RE    :  Reside t E gi ee  

DDR    :  Due Dilige e Repo t 

GRC    :  G ie a e Red ess Co ittee 

BOQ    :  Bill of Qua tit  

Go t    :  Go e e t 

EA    :  E e uti g Age  

 

 

Page 6: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

I t odu tio  This  epo t su a izes the e i o e tal  o plia e a d  o ito i g fo  the pe iod Ja ua  to 

Ju e  . 

The  P oje t  has  th ee  o po e ts.  Co po e t    ill  de elop  a   effi ie t,  effe ti e,  a d 

a ou ta le  u a   ate   suppl   a d  sa itatio   se to     esta lishi g  a d  i ple e ti g 

poli ies,  esta lishi g  se i e  sta da ds,  a d e ha i g  se to   oo di atio .  Co po e t    ill 

e tail de elop e t of safe, a essi le, a d ade uate  ate  suppl  a d sa itatio  fa ilities i    

s all  to s.  Co po e t    ill  st e gthe   go e a e  a d  apa it   fo   p oje t  a age e t 

a d ope atio . 

P oje t  p og ess  a d  de elop e t  is  o u i g  i   a o da e  ith  the  o je ti es  set  fo th  i  

P oje t Do u e ts a d the e does  ot see  to  e a   ajo  de iatio s. Si ila l , the p oposed 

i ple e tatio   a a ge e ts  a e  o pletel   i   pla e  a d  fu tio i g,  as  desi ed  a d 

e isaged. The e does  ot see  to  e a   eed to  odif  the i ple e tatio  a a ge e t, as 

p oposed, at the  o e t. 

The P oje t has a  o je ti e to a  de elop a  effi ie t, effe ti e, a d a ou ta le u a   ate  

suppl   a d  sa itatio   se to     esta lishi g  a d  i ple e ti g  poli ies,  esta lishi g  se i e 

sta da ds, a d e ha i g se to   oo di atio ;   de elop safe, a essi le, a d ade uate  ate  

suppl  a d sa itatio  fa ilities i    s all to s; a d   st e gthe  go e a e a d  apa it  fo  

p oje t  a age e t a d ope atio . 

The  P oje t  is  st i i g  to a ds  a hie i g  these  o je ti es  a d  o  ajo   hi d a es  at  this 

ju tu e  a e  fo esee ,  hi h  ould  possi l   stall  a hie i g  these  ajo   p oje t  o je ti es. 

The efo e,  o side i g that the p oje t o je ti es a e o   ou se the e is  o  eed to  e isit these 

o je ti es at this ju tu e. 

The se u it  situatio  has i p o ed  o side a l  a d the  isk of dela  i  su p oje t desig  a d 

o st u tio  due to diffi ulties i  fieldi g the Go e e t staff,  o sulta ts, a d  o t a to s is 

g eatl   edu ed. The P oje t  i ple e tatio   s hedule has  take   i to a ou t  so e pote tial 

dela ,  ut  e pe ie es  i   the  p e ious  p oje t  sho   that,  due  to  the  atu e of  the  P oje t—

hi h is p o isio  of  ate  suppl  a d sa itatio  se i es to  o u ities‐ isks fo  distu a e 

a e e pe ted to  e  u h s alle  tha  p oje ts i  othe  se to s.  

Page 7: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

The  ajo   isks a d assu ptio s la gel  hold t ue e e   o ,  ut the e a e so e i p o e e ts 

ith  espe t  to  the  se u it   situatio   a d  the  politi al  pa ties  to a ds  fi alizi g  a  politi al 

solutio  to the p ese t i passe. These a e positi e aspe ts,  hi h  ill t a slate i to  o e fo us 

o   de elop e t  o ks.  I   spite  of  the  t a sitio al  phase  a d  fluid  politi al  s e a io,  the 

Go e e t has  ot  o ed a a   f o   its se to al  o it e ts espe iall   ith  efe e e to 

ate  a d  sa itatio .  Thus,  the  assu ptio s e isaged at  the  ti e of P oje t  i eptio  holds 

t ue e e   o  a d  e tio ed  isks a e still  ithi   a agea le li its. 

The  su ‐p oje ts  o sist  of  su fa e  ate  a d g ou d  ate   ased  ate   suppl   s ste s  a d 

sa itatio   i ludi g  o st u tio   of  toilets  a d  aste ate   t eat e t/septage  a age e t 

s ste s, su fa e  ate  d ai age a d solid  aste  a age e t i  so e sele ted to s . All the 

su ‐p oje ts ha e  ee   lassified as Catego  B a d o l  IEEs a e suffi ie t. 

The E i o e tal Spe ialists of the DSCs  Desig  a d Supe isio  Co sulta ts  a e  espo si le 

fo  e i o e tal  o ito i g. 

The IEE do u e ts  ith the EMPs  a e pa t of the  o t a tual do u e ts a d a e p o ided to 

the Co t a to s, DSCs a d the Wate  Suppl  a d Sa itatio  Di isio /Su ‐di isio  Offi es. 

The e  as  i i al p og ess i  the  o st u tio  a ti ities i  al ost all p oje ts due to sho tage 

of fuel a d st ikes o ga ized    a ious g oups i  Te ai i  the last  epo ti g pe iod. The situatio  

has i p o ed a d  ost of the p oje ts a e pe fo i g  ell e ept fe . 

Co plia e  ith E i o e tal Co e a ts PMO  ith  the  suppo t  of  DWSS  a d  MOUD  has  ee   st i i g  to  adhe e  a d  eet  all  the 

E i o e tal  Co e a ts  stipulated  i   the  P oje t Do u e ts.  The  su ‐p oje ts ha e  et  all 

the  o plia e  e ui e e ts  of  the  Go e e t  of  Nepal  as  the  TORs  a d  IEEs  ha e  to  e 

app o ed   MOUD. Ta le    su a izes  the  status of  the  ajo  p oje t  o e a ts a d  thei  

o plia es. Ta le   a d   sho  the status of E i o e tal  safegua ds du i g pla i g a d 

i ple e tatio  stages. 

   

Page 8: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  : G a t Co e a ts a d Status of Co plia e 

 S. No  Co e a t  ith  efe e e to G a t Ag ee e ts   Respo si ilit   Pe iod/ Deadli e 

Cu e t Status 

A.  E i o e tal       A.   GA, S hedule  , pa a  : 

The Re ipie t shall e su e, a d shall  ause DWSS a d WUSCs to e su e that:  The P oje t is u de take  a d all P oje t fa ilities a e desig ed,  o st u ted, i ple e ted, ope ated, a d  ai tai ed i  a o da e  ith the Bo o e 's appli a le la s a d  egulatio s, ADB's E viro e t Policy   a d all assess e ts a d e a i atio s shall  e u de take  a d p epa ed i  a o da e  ith the EARP. A   itigatio   easu es set out i  a  EIA, EMP o  a  IEE a e  a ied out; a d  All  o t a to s a e p o ided  ith the EIA, IEE a d EMP, a d that  i  the  o t a to s i ple e t the e ui ed  itigatio   easu es as des i ed i  the EMP i  a satisfa to   a e , a d  epo t the i ple e tatio  of the EMP i  a o da e  ith the EARP, alo g  ith a  de iatio  f o  the IEE; ii  the  iddi g do u e ts i lude the e ui e e t to  o pl   ith the EMP; a d  iii  losel   o ito  e i o e tal i pa t a d o plia e   the  o t a to s  ith the EMP a d e su e that  esults of su h  o ito i g a e i o po ated i  the QPR 

     Go t/EA 

     Befo e o t a t      Ite iii  du i g i ple etatio . 

        Co plied ith.  

A.   GA, S hedule  , pa a  : The Re ipie t shall e su e that p io  to issua e of  iddi g do u e ts fo  a Su p oje t, ADB shall ha e  e ie ed a d  lea ed all EIAs fo   atego  A Su p oje t a d IEEs fo  all  atego  B se siti e Su p oje ts [ as these  atego ies a e dete i ed u de  the EARP a d ADB's E viro e t Policy 

] i ludi g a d EMP o  a  updated o  e ised  e sio s the eof. All e i o e tal itigatio   easu es  e ui ed fo  a Su p oje t 

shall  e i o po ated i  the  ele a t  o t a t fo  i il  o ks. 

Go t/EA  Befo e iddi g  

Co plied ith.   

Page 9: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  : Status of E i o e tal Safegua ds du i g Pla i g Stage 

S. No.  Na e of P oje t o  Su p oje t 

E i o e tal s ee i g is a ied out? Yes o  No  

E i o e t atego  of 

the p oje t / su p oje t A/B/C/FI  

EARF is p epa ed  if appli a le  Yes/No  

EIA/IEE/DDR  ith EMP is p epa ed Yes/No  

ADB app o ed EIA/IEE  ith 

EMP Yes / U de  

Re ie  / Not Yet Due/O e  Due  

Go e e t app o ed EIA/IEE 

ith EMP Yes / U de  Re ie  / Not Yet Su itted  

Safegua d o ito i g a d oo di atio  e ha is  

esta lished Yes/No  

GRC is esta lished Yes/No  

Auto ated safegua d o ito i g s ste  usto ized Yes/No  

EMP  ost i  app o ed do u e t is i luded 

i  BOQ as a  i di idual ite  

Yes/No  

  Ka ahi a‐Mak aha   Y  B  Y  Y  Y  Y  Y  Y  N  Y   I d apu   Y  B  Y  Y  Y  Y  Y  Y  N  Y   La ahi  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Sa dhikha ka  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Da ak  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Baglu g  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Shi a aga   Y  B  Y  Y  Y  Y  Y  Y  N  Y   Phidi   Y  B  Y  Y  Y  Y  Y  Y  N  Y   Bhasi  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Meghauli  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Kakad itta  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Da akh‐Sukhad  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Muku dapu   Y  B  Y  Y  Y  Y  Y  Y  N  Y   V as  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Leta g  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Na a a  Mu i ipalit   Y  B  Y  Y  Y  Y  Y  Y  N  Y   Kha d a i  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Duha i  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Dha kuta  Y  B  Y  Y  Y  Y  Y  Y  N  Y   Ra pu   Y  B  Y  Y  Y  Y  Y  Y  N  Y   Baitadi  Y  B  Y  Y  Y  Y  Y  Y  N  Y 

Note: EIA‐ E i o e tal I pa t Assess e t; IEE‐ I itial E i o e tal E a i atio ; DDR‐ Due Dilige e Repo t; EMP‐ E i o e tal Ma age e t Pla ; GRC‐ G ie a e Red ess Co ittee; BOQ‐ Bill of Qua tit   

Page 10: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  : Status of E i o e tal Safegua ds du i g I ple e tatio  Stage 

Na e of P oje t: Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

S.N  Na e of Su ‐P oje t  Co plia e to E i o e tal Ma age e t Pla *  G ie a es 

Coeti

e A

tio Pla

s ae 

pep

aed

 ad i

ple

eted   

Y/N

 

E o

plia

e ep

oti

g is 

aitaied

 Y/N

 

Ph si al  Biologi al  So io‐e o o i  Sp

oil M

aage

et 

Coplia

e i % ** 

Ladslid

e potetio

 ith

 Bio‐e

gg 

Dai

age Ma

age

et 

oplia

e i %

** 

Othes a

s pe EMP 

speif

 

Co pe sato  Pla tatio  

Fi e ood is used fo  ookig a d heati g 

Othe s as pe  EMP spe if  

O upatio al Health a d Safet   Co u it  st u tu es a e o pe sated/ e o st u ted p og ess i  % of total 

Othe s as pe  EMP spe if  

No. o

f gie

aes 

dou

eted 

No. o

f gie

aes 

esol

ed 

No. o

f gie

aes 

ude

 poessi

Taget No

Re‐Pla

ted 

No. 

Safet  Gea s a e suffi ie t a d used Y/N  

La o s a e i su ed Y/N  

La o  a d o k  a ps 

a e health  a d ha e sa ita  fa ilities  Y/N  

St u tu e   

St u tu e   

  Ka ahi a‐Mak aha   Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  I d apu   Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  La ahi  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Sa dhikha ka  Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Da ak  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Baglu g  Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Shi a aga   Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Phidi   Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Bhasi  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Meghauli  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Kakad itta  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Da akh‐Sukhad  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Muku dapu   Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  V as  Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Leta g  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Na a a  Mu i ipalit   Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Kha d a i  Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Duha i  Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Dha kuta  Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Ra pu   Y  NA  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

  Baitadi  Y  Y  Y    NA  NA  N    Y  Y  Y  NA  NA    NA  NA  NA  Y  Y 

Page 11: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

App oa h a d Methodolog  fo  E i o e tal Mo ito i g The p ese t e i o e tal  o ito i g  epo t has  ee  p epa ed  ased o  the e i o e tal 

a age e t pla   EMP  des i ed i  the IEE  epo t of the p oje t  hi h has  ee  app o ed   

the  Mi ist   of  U a   De elop e t,  Go e e t  of  Nepal.  The  ajo   a ti ities  u de take  

du i g the p epa atio  of the e i o e tal  o ito i g  epo t a e outli ed  elo . 

. Desk Re ie  The  p oje t  e gi ee i g  epo t,  IEE  epo t  a d  othe   ele a t  do u e ts  e e  tho oughl  

e ie ed. Poli ies, legislatio s a d guideli es  ele a t to the p oje t  e e also  efe ed to. A  

e i o e tal  o ito i g  fo at  as  p epa ed  to  fill  the  i ple e tatio   status  of  the 

E i o e tal Ma age e t Pla  a d  o ito i g  ethods adopted i  the p oje t. 

.   Colle tio   a d  e ie   of  se o da   sou es  of  i fo atio   f o   a ious sou es 

Se o da  i fo atio   as  olle ted th ough the  o thl  p og ess  epo ts that a e su itted 

 DSCs. I fo atio   as also  olle ted f o  the  o t a to   e o ds, DSCs te h i al do u e ts, 

et . Othe  i fo atio   as  olle ted f o  WUSC, DSC, Co t a to , DWSS a d PMO. 

.   Co pilatio   of  e isti g  i fo atio ,  i ple e tatio   status  a d o ito i g  ethods 

All  the  i fo atio   a d  data  ega di g  o ito i g  o ks  a d  i ple e tatio   status  of  EMP 

as  do e  ith  efe e e  to  the  IEE  epo t,  desig   epo ts,  o t a to   e o ds,  a d  o thl  

p og ess  epo ts. Qualitati e as  ell as  ua titati e a al sis of  o ito i g pa a ete s,  epo ts 

f o   site  i spe to s  a d  su je ti e  judg e ts.  Thus  the  i fo atio   olle ted  f o   diffe e t 

sou es  as p o essed a d  a al zed  a o di g  to  the ph si al,  iologi al,  so ioe o o i   a d 

ultu al e i o e ts  ithi  the zo e of i flue e. 

 

Page 12: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Su a  of E i o e tal Mitigatio  a d Co pe satio  Measu es I ple e ted . Co plia e status  ith Natio al/State/Lo al statuto  e i o e tal  e ui e e ts 

S.No.  Cit / To   Wo k  pa kage  o.  Appli a le 

legislatio /t pe of lea a e 

Clea a e gi e    a d 

date 

Su je t/ issue 

Re a ks/a tio  eeded 

  Ka ahi a a d Mak aha    Bat h I, Pa kage II SSTWSSSP/ICB‐ /Ka ahi a‐Mak aha  

NA  NA  NA  ‐ 

  I d apu    Bat h I, Pa kage III SSTWSSSP/ICB‐ /I d apu  Mo a g 

NA  NA  NA  ‐ 

  La ahi  Chailahi VDC   Bat h I, Pa kage II SSTWSSSP/ICB‐ /La ahi_Da g 

N/A  N/A  N/A  ‐ 

 Sa dhikha ka   Bat h I, Pa kage II 

SSTWSSSP/ICB‐ / Sa dhikha ka_A ghakha hi 

La d o e ship at u de g ou d  ese oi  a d su p  ell site 

VDC  Ha do e  of la do e ship to WUSC 

 

  Da ak   SSTWSSSP/ICB‐ / Da ak_Jhapa  N.A  N.A  N.A   

  Baglu g   Bat h I, Pa kage II SSTWSSSP/ICB‐ /Baglu g_Baglu g  N/A  N/A  N/A  ‐ 

 Shi a aga    Bat h I  Pa kage I  

Co t a t No‐ SSTWSSSP/ICB‐  /Shi a aga _Kailali 

NA  NA  NA  ‐ 

  Phidi   SSTWSSSP/ICB‐ / Phidi _Pa htha   NA  NA  NA   

 Bhasi  Bhi dutta Mu i ipalit  a d Suda VDC  

Bat h    Pa kage I  Co t a t No‐ SSTWSSSP/ICB‐

/Bhasi_Ka ha pu  

N/A  N/A  N/A   

  Meghauli   Bat h II, Pa kage III SSTWSSSP/ICB‐ /Meghauli_Chit a  

N/A  N/A  N/A  ‐ 

 

Kaka itta  Me hi aga  u i ipalit  

Bat h II,Pa kage IV SSTWSSSP/ICB‐ /Kaka itta_Jhapa  

La d o e ship at o e head ta k ge e ato  house, gua d houses at Su e d a aga , Be eli, Sha ti a ailo, Baza  A ea, deep tu e  ell 

Me hi aga  Mu i ipalit   

Ha do e  of la d o e ship to Kaka itta D i ki g  ate  use s’ a d sa itatio  

 

Page 13: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S.No.  Cit / To   Wo k  pa kage  o.  Appli a le 

legislatio /t pe of lea a e 

Clea a e gi e    a d 

date 

Su je t/ issue 

Re a ks/a tio  eeded 

site  o ga izatio  

  Da akh Sukhad  Sukhad & Sadepa i  

Bat h I, Pa kage II SSTWSSSP/ICB‐ /Da akh‐Sukhad_Kailali 

N.A  N.A  N.A   

 Muku dapu   Bat h II, Pa kage II 

SSTWSSSP/ICB‐ /Muku dapu ‐Na alpa asi 

N/A  N/A  N/A  ‐ 

  V as  Bat h II, Pa kage II SSTWSSSP/ICB‐ /V as_Ta ahu 

N/A  N/A  N/A  ‐ 

 Leta g  Bat h II, Pa kage IV  

SSTWSSSP/ICB‐ /Leta g_Mo a g  

N.A  N.A  N.A   

 Na a a  Mu i ipalit   Bat h I, Pa kage I, 

Co t a t No : SSTWSSSP/ICB‐ /Na a a  Mu i ipalit _ Dailekh 

N/A  N/A  N/A   

 Kha d a i  Bat h II, Pa kage III  

SSTWSSSP/ICB‐/Kha a i_Sa ku asa ha 

N.A  N.A  N.A  ‐ 

  Duha i  Co t a t No : SSTWSSSP/ICB‐  /Duha i_Su sa i 

N/A  N/A  N/A   

  Dha kuta  Bat h II, Pa kage IV  SSTWSSSP/ICB‐ /Dha kuta_Dha kuta 

N.A  N.A  N.A  ‐ 

 

Ra pu   Bat h II, Pa kage II SSTWSSSP/ICB‐ /Ra pu ‐Palpa 

Bushes a d Sh u s Clea a e 

Mi ist  of Fo est, th ough dist i t le el offi e  DFO  

NA  Fo estatio  a d g ee e  of the a ea afte  o pletio  of o po e t like ese oi . Sta ilizatio   o k of slope  utti g a ea 

  Baitadi  Dash ath ha d Mu i ipalit  

Bat h I, Pa kage I SSTWSSSP/ICB‐ /Baitadi_Baitadi 

N.A  N.A  N.A   

Page 14: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

. Su ‐p oje t P og ess a d Status 

S.No.  To s  Na e of the o t a to  

Listi g of  o ks u de  the pa kage 

Sta ti g date  la d lea a e  a d 

s hedule date of o pletio  

What t pe of o ks 

o ti ue at p ese t 

P og ess % as of Ju e, 

 

E pe ted ha ges f o  

app o ed s ope 

Fulfill e t of 

o je ti es‐  T pe of e edial easu es eeded 

Ke  assu ptio s a d  isks that affe t attai e t 

of the o je ti es 

  Ka ahi a‐ Mak aha  

M/S Si hu a ‐Cha d a & Basa ta JV 

Deep tu e  ell ‐  Nos.  Pu p house  u  ge e ato  house –   No.  I stitutio al/s hool toilets –   Nos.  WUSC offi e  uildi g:   No.  Pipeli e: Dist i utio  –  , .   

T a s issio  –  .   

Sta ti g date:  De e e  

,   Co pletio  date: Ja ua   , 

 

Defe t Lia ilit  Pe iod E di g o   O t   

 %  Safe a d Ade uate Wate  Suppl  

‐  ‐ 

  I d apu   Ta dia Tu di  OHT  : o. CWR‐ os. Deep tu e ell‐ os. Me ha i al T eat e t Pla t ‐ os. Pipeli e : k  Offi e Buildi g, Ele t o e ha i al  o k: os 

Sta ti g date  Ja   ,   Co pletio  date  Ma   , 

 

Defe t Lia ilit  Pe iod E di g o   Ma  

 

%  Safe a d Ade uate Wate  Suppl  

‐  ‐ 

  La ahi  Si hu a ‐Cha d a & Basa t‐Naga ju   JV  

Ci il  o k Pipeli e  o ks a d fitti gs i  T a s issio  ai , dist i utio   ai , 

Sta ti g date: Ja ua   , 

 

Defe t Lia ilit  Pe iod E di g o  

 %    Safe a d Ade uate Wate  Suppl  

‐  ‐ 

Page 15: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

household  o e tio  Ele t i al  o ks a d ele t o e ha i al o ks at deep tu e  ell 

a d  ese oi  site E i o e tal itigatio   o ks 

Pu li  toilet, i stitutio al toilet  o ks Ope atio  a d ai te a e  o ks 

 Date of o pletio : Ja ua   , 

 

 Ja ua   

  

Sa dhikha ka  Ta tia‐ Tu di JV  G ou d  ese oi  ta k  ,   u. , 

Su p  ell   Nos.  Slo  sa d filte s   Nos. Sedi e tatio  ta k  Nos. Pipeli e  o ks   k  

Sta ti g date: Ja ua   , 

  Date of o pletio : Ja ua   , 

Stage II‐O&M  

. %  T a sfo atio  of WUSC uildi g 

due to o gested site o ditio  

‐  No  isk easu ed 

  Da ak  Ta tia‐ Tu di JV  O e head Wate  Ta k Cu  –   Nos 

Deep Tu e  ell –   Nos Me ha i al T eat e t U its –  Nos Gua d Houses –   Nos. Pipeli e –   k  Co pou d Wall –   Ele t o‐Me ha i al Wo ks –   Nos 

Sta ti g date: Ja ua   , 

  Date of o pletio : Ja ua   , 

 

Stage II‐O&M E di g o   Sept. 

  

. %  Safe Wate  Suppl  

‐  ‐ 

  Baglu g  Ta tia Tu di JV   

Ci il  o k Pipeli e  o ks a d fitti gs i  T a s issio   ai , dist i utio   ai , household  o e tio  Sa ita  a d ele t i al 

Sta ti g date: De e e  

,    Date of o pletio : 

Likel  to e te  Stage II – O&M   e d of Jul    

.  %    ‐  No  isk easu ed 

Page 16: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

o ks i  la o ato  uildi g  

E i o e tal  itigatio  o ks 

Ope atio  a d ai te a e  o ks 

Ja ua   ,  

  Shi a aga   Si hu a ‐Cha d a & Basa t‐ Naga ju  JV 

O e head ta k     No 

U de g ou d  ate  ta k      No 

Su p ell –   setsI stitutio al lat i e –   No  P essu e filte  –   sets Val e  ha e  ‐   os. Dist i utio  pipeli e et o k –   k  

 

Sta ti g Date‐De e e  

,    Date of Co pletio  – Ja ua   , 

 

Stage II – O&M 

. %  ‐  ‐  ‐ 

  Phidi   M/S Sha a‐Mahade  Khi ti 

Sto age ta k:  Nos‐    ;  Nos –    ; 

   Nos –     Total Le gth of pipe: Dist i utio  ‐  .  K  T a s issio  ‐  . K  T eat e t U it: Co e tio al T eat e t Pla t  ith g it  ha e , Sedi e tatio  Ta k, Slo  sa d filt atio  a d hlo i atio . 

Sta ti g date  De    

 Co pletio  date             

 De    

Stage II –O&M Sta ted f o   Ma    

. %  ‐  ‐  ‐ 

  Bhasi  Su e ‐Cha d a & Basa t –AM JV 

O e head ta k    ‐   No. Val e  ha e  ‐  No. Deep tu e  ell ‐  No. Pu li  toilets –  No. 

Sta ti g Date ‐Septe e  

,    Date of 

Stage II‐O&M  .  %  ‐  ‐  ‐ 

Page 17: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

P essu e filte    sets Soft e  filte    sets Dist i utio  pipeli e et o k‐   k  

Co pletio ‐ O to e   , 

 

  Meghauli  Sha a‐ Cha d a & Basa ta –AM JV 

Ci il  o k Pipeli e, pipe fitti g a d Othe  Pipe li e  elated o ks  

Ele t i al a d  e ha i al o ks 

E i o e tal  itigatio  o ks 

Bo ehole d illi g a d i stallatio  of  /    dia. deep tu e  ell Sa itatio   o po e t o k 

Ope atio  a d ai te a e  o ks 

Sta ti g date : Ja ua   , 

  Date of o pletio : Jul ,    

Stage II‐O&M  .  %  ‐  ‐  No  isk easu ed 

  Kaka itta  Ha gzhou –Ka kai JV 

O e head  ese oi  ta k ‐, 

Deep tu e  ell‐ , T a s issio /dist i utio  ate  suppl  pipe li e‐.  k , 

Gua d  ua te ‐ , Bou da   all, T a sfo e ‐ , Sta ilize  ‐ , T eat e t pla t‐ , Su e si le pu p, Ge e ato  ‐  sets 

Sta ti g Date Ja ua  

,   Co pletio  date  Jul   ,  

Defe t Lia ilit  Pe iod  E di g o    O t. 

 

%  Additio  of ele t i it  sta ilize  due to lo  oltage ualit  

‐  No  isks  

  Da akh Sukhad 

Su e ‐ Cha d a & Basa t 

A ess  oad i p o e e t ith G a elli g 

Sta ti g date  Jul   ,    Date of 

Stage I Co st u tio  

. %  I p o e et of  i  oad su fa es to 

Side d ai s a d Retai i g all  eeded 

To p ote t RCC ul e t o e  d ai  li e f o  ollapsi g due 

Page 18: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Co pletio : Jul .  ,   

easil  d ai  off  ai  ate  

to fu the  la d slide a ou d the  ul e t. Possi ilit  of ate  loggi g 

du i g hea  ai s 

  Muku dapu   CTCE‐Kalika‐Ra a   JV  

Su fa e sou es a d i takes, Deep  o i g a d pu pi g s ste , Ge e ato  a d Ge e ato  shed, T a s issio   ai s, t eat e t fa ilities, ese oi s, Dist i utio  ai s, house  o e tio , ate   ualit  testi g 

fa ilit , offi e  uildi g, gua d/ope ato  house, ou da   all o st u tio  

Sta ti g date: De e e  

,    Date of o pletio : Jul   ,   

Stage II – O&M 

. %       

  V as  Multipo e ‐A a ‐M itsa ji a i JV  

Ci il  o k Pipeli e, pipe fitti g a d othe  pipe li e  elated o ks  

Ele t i al a d  e ha i al o ks 

E i o e tal  itigatio  o ks 

Bo ehole d illi g a d i stallatio  of  /    dia. deep tu e  ell Sa itatio   o po e t o k 

Ope atio  a d ai te a e  o ks 

Sta ti g date : Jul   , 

  Date of o pletio : Ja   ,   

La d de elop e t o k at 

t eat e t pla t site, Soil soli g  ith sa d a d PCC of PST, HRF a d slo  sa d filte  t eat e t pla t, RCC o k i  

p og ess 

. %  Soil e osio , ha ge i  la d use patte  

The lo atio  of t eat e t site has  ee  sele ted so as to a oid fo ests. CFUs  ill  e suppo ted i  affo estatio   

 

  Leta g  Ra a ‐ OHT‐ , deep tu e  ell‐ ,  Sta ti g Date  Defe t Lia ilit   %  ‐  Not  eeded  No  isk 

Page 19: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ni gshi g‐Di a JV 

t a s issio  / dist i utio  ate  suppl  pipe li e‐  

K , RVT‐ , ge e ato ‐ , ou da   all, 

t a sfo e ‐ , t eat e t pla t‐ , su e si le pu p, I filt atio   ells, offi e  uildi g, ge e ato  ope ato  house et   

Aug. ,   Co pletio  Date Ja .  ,   

Pe iod  E di g o    Ju e 

 

    easu ed 

  Na a a  u i ipilit  

Su e ‐Cha d a & Basa ta JV 

I take st u tu es –   p oposed a d   eha ilitatio  U de g ou d  ate  ta k   Nos. T eat e t pla t a d sedi e tatio  ta k T a s issio   ai  pipeli e 

. k  Dist i utio  pipeli e – 

.  k  

Sta ti g Date –Jul   , 

 Date of Co pletio  – Ja ua    , 

  

Pipeli e, Ci il Wok, Fitti g o ks 

.  %  ‐  ‐  ‐ 

  Kha d a i  M/S Si ote ‐Ashish JV 

I take st u tu e‐  Nos Colle tio   ha e ‐  Nos Roughe i g Filte   Set  ‐   u it  

Roughe i g Filte  ‐    u it  Slo  Sa d Filte   Set ‐     u it  Rese oi  Ta k   Cu ‐ Nos 

Rese oi  Ta k   Cu  – Nos 

Rese oi  Ta k   Cu  – Nos 

La o ato  Buildi g –  Nos 

Sta ti g date stAugust, 

  Co pletio  date 

st Ja ua ,  

Realig e t of T a s issio  Pipeli e, House Co e tio s, SSF et . 

 %  ‐  ‐  ‐ 

Page 20: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Gua d house –  Nos Pu li  Toilet‐  Nos Pipeli e: T a s issio   ai  ‐

,  B a h t a s issio   ai ‐

,  Dist i utio   ai   e  ‐ 

,   

  Duha i  Ha gzhou Ka kai JV 

Deep Tu e Wells:  os. Ne  

Deep Tu e Wells:   os. Test Bo ehole  Offi e Buildi g :   o Me ha i al T eat e t Pla t U it:   Gua d /Ope ato  House:  Dist i utio  pipe li e: . k  T a s issio  pipeli e :  OHT i let DI fla ge pipe: 

 Val e Cha e :    os. Ele t o e ha i al  o ks:   os. 

House Co e tio s:   os. 

Su fa e D ai  : .  k  Pu li  toilet  ith septi  ta k:    os.  

Sta ti g date August 

,   Co pletio  date Ja  ,  

Pu li  toilet o st u tio  o ks 

i ludi g additio al HDPE pipe li e joi ti g ,la i g a d filli g i  dist i utio  li e o  goi g 

. %  ‐  ‐  ‐ 

  Dha kuta  M/S Ha gzhou‐Ka kai JV 

Pu pi g statio  ‐  Nos     

G ou d  ese oi      

Sta ti g date st Sep,  

 

Stage II – O&M  E di g o    Sept. 

. %  ‐  ‐  ‐ 

Page 21: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

‐  Nos;    ‐  Nos  ;   ‐  

Nos  

St ea  i take‐  Nos Ele t i al : Ge e ato ‐ , T a sfo e ‐,   K  T a s issio   .  

K  Pipeli e: E isti g:   k  Pu pi g  ai s GI    dia  =  .  K  Ta khu a to Ni u a HDPE  kg  lass  :  .  k  Dist i utio  :  .  K  T eat e t U it: G it  ha e s, Sedi e tatio , Roughe i g filte s a e p oposed usi g e isti g SSF at S hoolda da fo  pu pi g s he e. 

Co pletio  date 

 Ju e ,  EOT Stage    

 

  Ra pu   Di esh Cha d a‐Naga ju   JV  

Ci il  o k Pipes a d fitti gs Ele t i al a d  e ha i al o ks 

E i o e tal  itigatio  o ks 

Bo ehole d illi g a d i stallatio  of  /    dia. deep tu e  ell Wate  la o ato  Multi g ade p essu e filte  Sa itatio   o po e t o k 

Ope atio  a d 

Sta ti g date : August  , 

  Date of o pletio : Fe ua   , 

 

Pipeli e  o k. C ossi g & Val e  ha e  o ks, 

fi ishi g o ks, 

ele t i al & Me ha i al o ks et . 

. %  Soil E osio , Cha ge i  La d use patte , Cha ge i  ua tit  of 

pipeli e 

The Lo atio  of  ese oi  a d t eat e t site has  ee  situated at a d ea  fo est 

a ea. CFUs  ill e suppo ted 

i  affo estatio  

No Majo  la dslide o u s du i g e a atio . Mi i u  dest u tio  of fo est a ea due to o st u tio  a ti ities. 

Page 22: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

ai te a e  o ks   Baitadi  Sha a‐

Cha d a & Basa t‐Ku a  JV 

I take st u tu e ‐  No.  Colle tio   ha e  –   No.  Sedi e tatio  ta k –   No.  Roughe i g filte  –   No.  Slo  sa d filte  –   No.  U de g ou d  ate  ta k 

  u.   –   Nos  ,    u.   –   No  Pu li  toilet –   Nos.  WUSC offi e  uildi g:   No.  Pipeli e: Dist i utio  ‐ .  k  T a s issio  –  .  k  

Sta ti g date:   Jul   ,   Co pletio  date Ma   ,   

Co st u tio  of RVT ta k, sedi e tatio  ta k a d I take st u tu es 

.  %       

 

 

Page 23: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Co plia e Status  ith the E i o e tal Ma age e t a d Mo ito i g Pla s 

The E i o e tal Ma age e t a d Mo ito i g Pla s a e  ei g i ple e ted  ith  espe t 

to  the  guideli es  defi ed  i   the  I itial  E i o e tal  E a i atio   IEE   Repo t  of Se o d 

S all  To   Wate   Suppl   a d  Sa itatio   Se to   P oje t  ADB  Loa   G a t‐ ‐  NEP: 

Se o d S all To s Wate  Suppl  a d Sa itatio  Se to  P oje t . 

As  the  o k  p og esses,  e i o e tal  ualit   o ito i g  i   te s  of  ai   ualit ,  ate  

ualit ,  oise  le el,  a d  othe   pa a ete s  ith  e ologi al  aspe ts  is  i   p og ess  at  a 

ualitati el   a epta le  s ale  ith  a  fe   e eptio s.  The  o t a to ’s  pe so el  a d  site 

staff  f o   the  Co sulta t,  e e  o ie ted/t ai ed  a d  ade  a a e  of  thei   espo si ilit  

to a ds E i o e tal Safegua d issues, du i g  o st u tio   o ks, su h as: 

Adhe i g  to  the  ele a t  ad e se  e i o e tal  i pa ts  itigatio   easu es 

that a e set out i  the EMP  hile  a i g out  o st u tio  a ti ities of the su ‐

p oje t; a d 

Assessi g  the  o ditio s  of  su ou di g  e i o e tal  o ditio s,  status  of 

adja e t  lea ed  a ea  a d  othe   i f ast u tu e,  p io   to  o st u tio  

o e e e t a d upo   o pletio  of  o st u tio  a d the e  full   ei state 

the e i o e t to at least thei  p e‐p oje t  o ditio s. 

Detailed Co plia e Status  ith EMP a d Mo ito i g Pla s of the p oje t a e p ese ted i  

Ta les  elo . 

Page 24: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Ka ahi a Mak aha  SN  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  P e‐Co st u tio  Phase 

Re ie  of Desig /Esti ate 

Co pleted           

Re ie  of spe ifi atio  of  o k 

Co pleted           

Ph si al E i o e t 

Co st u tio  Phase 

  Soil e osio  a d soil sta ilit  

E a ated soil pla ed safel  agai st e osio  

Co pleted    Sta ki g of soil Qua tit  of soil e ai i g T i e a  eek 

Co t a to /WSSDO/DSC 

Not Appli a le   

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe li e 

t e h a d  ell o pa ted 

Co pleted    Co t a to /WSSDO/DSC 

Not Appli a le   

  Ai  Qualit  Dust  E i o e t  

F e ue t sp i kli g of ate  

O goi g  Dust du i g o st u tio   as ithi  the 

tole a e li it 

Dust i  Ai    E e  da  

Co t a to /WSSDO/DSC 

Not Appli a le   

Visual   o ito i g of ai  ualit  

O goi g  Not Appli a le   

 Use of  asks  O goi g  Not Appli a le   

  Noise a d Vi atio  

Rest i tio  o  u e essa  ho ki g of ho  f o  the  ehi les used fo   o st u tio  pu pose 

O goi g  D i e s a e i st u ted  ot to use p essu e ho s as fa  as possi le 

Co t ol o  use of lo i g ho s 

 Dail  du i g o st u tio  

Co t a to /WSSDO/DSC 

Satisfa to   No Co plai ts f o   o u it  o  high  oise le el du i g  ight ti e. 

Regula  ai te a e of 

e uip e t 

O goi g  

E uip e t a e egula l  ai tai ed so as 

to p odu e less oise a d i atio  

Pe iodi  ai te a e  e o d 

 

Co t a to /WSSDO/DSC 

Satisfa to    

Page 25: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Muffle s fitti gs o  ois  e uip e t 

O goi g  High  oise p odu i g e uip e t  as ot used so uffle s fitti gs e e  ot  e ui ed 

O se atio   Co t a to /WSSDO/DSC 

 Satisfa to     

Speed  est i tio   O goi g  No  ajo  a ide t e o ds fou d due to  ehi le speed 

Speed Co t ol  Co t a to /WSSDO/DSC 

Satisfa to    

Biologi al E i o e t 

Co st u tio  Phase 

  I pa t o  atu al egetatio  a d e olog  Distu a e a d loss of atu al egetatio  a d e olog  

Rest i ti g use of fuel ood i  la o   a p. 

O goi g  Haphaza d  utti g do  of t ees  as ot fou d 

S oke o se atio  at la o   a p Bia uall  

WSSDO/WUSC  Satisfa to    

P o isio  of i i izatio  of egetatio   lea a e 

Co pleted  Pipeli e has  ee  lo ated so as to i i ize egetatio  lea a e 

Clea ed a ea Affo ested a ea  Bia uall  

WSSDO/WUSC  Not Appli a le   

  Loss of flo a & fau a due to p oje t sitti g &  elated a ti ities 

P o isio  of i i izatio  of egetatio   lea a e 

O goi g  No  ajo  loss of ha itat  as o se ed due to p oje t  elated  a ti ities 

Appea a e of fau a   Bia uall  

WSSDO/WUSC  Satisfa to    

E i o e tal a a e ess p og a  

O goi g  Lo al  o u it  fo est  o ittee o ito  a d o du t p og a s fo  p ote tio  of fo est ha itat 

Satisfa to    

Page 26: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Rest i ti g use of fuel ood i  la o   a p. 

 

O goi g  Wood gi e    the  o u it  fo est  t igs a d a hes  used as 

the  ajo  sou e of fuel i  the la o  a p 

Satisfa to    

So io‐E o o i  a d Cultu al E i o e t 

Co st u tio  Phase 

   I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to  e take  at the ti e of o st u tio  

Co pleted  Ne essa  p e autio  take  to  i i ize i pai e t of e isti g o u it  i f ast u tu e like oad, foot t ail, et . 

U i te upted hu a   o e e t   Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

A  da ages to the e isti g i f ast u tu e has to  e  epai ed 

Co pleted  No  ajo  e isti g i f ast u tu e has ee  da aged   

p oje t a ti ities 

Satisfa to    

  La  a d O de  issue a d distu a e o  so ial st u tu e &  ultu e 

I st u tio  to all o ke s to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed a e  

Beha io  of lo al People  Weekl  

Co t a to / WSSDO/DSC 

Satisfa to    P o ide a a e ess p og a  

P ohi itio  of use of al ohol a d ga li g 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

Cultu al a a e ess of lo al  o u ities to 

O goi g  No a a e ess p og a  p o ided 

Satisfa to    

Page 27: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

outside  o k fo e  to  o ke s ho e e   o iole e due to  ultu al diffe e es e o ded 

O ie tatio  to outside o ke s 

O goi g  Sepa ate o ie tatio  fo  outside  o k fo e  ot p o ided 

Belo  Satisfa tio   P o ide O ie tatio  a d i st u tio  p og a   

  E plo e t of lo al people E o o i  o ditio  of lo al people i eases  

Positi e i pa t o  the p oje t a d  o u it  

O goi g  E o o i  o ditio  of lo al people uplifted  

Appea a e of lo al people i   o k fo e  Weekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

  O upatio al Health a d safet  

I st u tio  to adopt safet   easu es 

O goi g  No fo al a a e ess a d i st u tio  p og a  held ho e e   o e o ds of  ajo  a ide t fou d 

Use of safet  easu es e.g. 

hel ets, safet  shoes, et .  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to   Co ti ue p o idi g fo al a a e ess p og a s 

Fi st aid to  e easil  a essi le 

O goi g  Neithe  Health o  a ide t  ase e o ded du i g this pe iod 

Satisfa to    

Page 28: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  Pollutio  f o  outside  o k fo e 

P ope  sa ita  o ditio  to  e ai tai ed i  the la o  a p  sa ita  toilet, safe d i ki g  ate  

O goi g   Sa ita   o ditio  i  toilet ai tai ed a d 

safe d i ki g ate  p o ided to o ke s 

Si k la o   Waste a d lea li ess of a ea  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Colle tio  of solid  aste i  fi ed pla e 

O goi g  Pla e fo  solid aste  olle tio  ot allo ated 

Pa tiall  Satisfa to    

Pe iodi   lea i g  O goi g  No ad e se e i o e tal o ditio  fou d at p oje t site 

Satisfa to    

 

   

Page 29: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   I d apu  SN  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  P e‐Co st u tio  Phase 

Re ie  of Desig /Esti ate 

Co pleted           

Re ie  of spe ifi atio  of  o k 

Co pleted           

Ph si al E i o e t 

Co st u tio  Phase 

  Soil e osio  a d soil sta ilit  

E a ated soil pla ed safel  agai st e osio  

Co pleted    Sta ki g of soil Qua tit  of soil e ai i g T i e a  eek 

Co t a to /WSSDO/DSC 

Not Appli a le   

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe li e 

t e h a d  ell o pa ted 

Co pleted    Co t a to /WSSDO/DSC 

Not Appli a le   

  Ai  Qualit  Dust  E i o e t  

F e ue t sp i kli g of ate  

O goi g  Dust du i g o st u tio   as ithi  the 

tole a e li it 

Weekl   Co t a to /WSSDO/DSC 

Satisfa to    

Visual   o ito i g of ai  ualit  

O goi g  Satisfa to    

 Use of  asks  O goi g  Satisfa to    

  Noise a d Vi atio  

Rest i tio  o  u e essa  ho ki g of ho  f o  the  ehi les used fo   o st u tio  pu pose 

O goi g  D i e s a e i st u ted  ot to use p essu e ho s as fa  as possi le 

Co t ol o  use of lo i g ho s 

 Weekl  

Co t a to /WSSDO/DSC 

Satisfa to   No Co plai ts f o  o u it  o  high oise le el du i g ight ti e. 

Regula   ai te a e of e uip e t 

O goi g  E uip e t a e egula l  ai tai ed so as 

to p odu e less oise a d i atio  

Pe iodi  ai te a e  e o d 

Co t a to /WSSDO/DSC 

Satisfa to    

Page 30: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Muffle s fitti gs o  ois  e uip e t 

O goi g  High  oise p odu i g e uip e t  as ot used so uffle s fitti gs e e  ot  e ui ed 

O se atio   Co t a to /WSSDO/DSC 

 Satisfa to     

Speed  est i tio   O goi g  No  ajo  a ide t e o ds fou d due to  ehi le speed 

Speed Co t ol  Co t a to /WSSDO/DSC 

Satisfa to    

Biologi al E i o e t 

Co st u tio  Phase 

  I pa t o  atu al egetatio  a d e olog  Distu a e a d loss of atu al egetatio  a d e olog  

Rest i ti g use of fuel ood i  la o   a p. 

O goi g  Haphaza d  utti g do  of t ees  as ot fou d 

S oke o se atio  at la o   a p  Bia uall  

WSSDO/WUSC  Satisfa to    

P o isio  of i i izatio  of egetatio   lea a e 

Co pleted  Pipeli e has  ee  lo ated so as to i i ize egetatio  lea a e 

Clea ed a ea Affo ested a ea  Bia uall  

WSSDO/WUSC  Not Appli a le   

  Loss of flo a & fau a due to p oje t sitti g &  elated a ti ities 

P o isio  of i i izatio  of egetatio   lea a e 

O goi g  No  ajo  loss of ha itat  as o se ed due to p oje t  elated  a ti ities 

Appea a e of fau a  Bia uall  

WSSDO/WUSC  Satisfa to    

E i o e tal a a e ess p og a  

O goi g  Lo al  o u it  fo est  o ittee o ito  a d o du t p og a s fo  p ote tio  of fo est ha itat 

Satisfa to    

Page 31: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Rest i ti g use of fuel ood i  la o   a p. 

 

O goi g  Wood gi e    the  o u it  fo est  t igs a d a hes  used as 

the  ajo  sou e of fuel i  the la o  a p 

Satisfa to   Use of LPG a d Ke ose e  

So io‐E o o i  a d Cultu al E i o e t 

Co st u tio  Phase 

  I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to  e take  at the ti e of o st u tio  

Co pleted  Ne essa  p e autio  take  to  i i ize i pai e t of e isti g o u it  i f ast u tu e like oad, foot t ail, et . 

U i te upted hu a   o e e t   Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

A  da ages to the e isti g i f ast u tu e has to  e  epai ed 

Co pleted  No  ajo  e isti g i f ast u tu e has ee  da aged   

p oje t a ti ities 

Satisfa to    

  La  a d O de  issue a d distu a e o  so ial st u tu e &  ultu e 

I st u tio  to all o ke s to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed a e  

Beha io  of lo al People  Weekl  

Co t a to / WSSDO/DSC 

Satisfa to    P o ide a a e ess p og a  

P ohi itio  of use of al ohol a d ga li g 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

Cultu al a a e ess of lo al  o u ities to 

O goi g  No a a e ess p og a  p o ided 

Satisfa to    

Page 32: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

outside  o k fo e  to  o ke s ho e e   o iole e due to  ultu al diffe e es e o ded 

O ie tatio  to outside o ke s 

O goi g  Sepa ate o ie tatio  fo  outside  o k fo e  ot p o ided 

Belo  Satisfa tio   P o ide O ie tatio  a d i st u tio  p og a   

  E plo e t of lo al people  

Positi e i pa t o  the p oje t a d  o u it  

O goi g  E o o i  o ditio  of lo al people uplifted  

Appea a e of lo al people i   o k fo e  Weekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

  O upatio al Health a d safet  

I st u tio  to adopt safet   easu es 

O goi g  No fo al a a e ess a d i st u tio  p og a  held ho e e   o e o ds of  ajo  a ide t fou d 

Use of safet  easu es e.g. 

hel ets, safet  shoes, et .  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to   Co ti ue p o idi g fo al a a e ess p og a s 

Fi st aid to  e easil  a essi le 

O goi g  Neithe  Health o  a ide t  ase e o ded du i g this pe iod 

Satisfa to    

  Pollutio  f o  outside  o k fo e 

P ope  sa ita  o ditio  to  e ai tai ed i  the la o  a p  sa ita  toilet, safe d i ki g  ate  

O goi g   Sa ita   o ditio  i  toilet ai tai ed a d 

safe d i ki g ate  p o ided to o ke s 

Si k la o   Waste a d lea li ess of a ea  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Page 33: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

SN  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Colle tio  of solid  aste i  fi ed pla e 

O goi g  Pla e fo  solid aste  olle tio  ot allo ated 

Pa tiall  Satisfa to    

Pe iodi   lea i g  O goi g  No ad e se e i o e tal o ditio  fou d at p oje t site 

Satisfa to    

 

   

Page 34: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   La ahi  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  P e‐Co st u tio  Phase 

Re ie  of Desig /Esti ate 

Co pleted  Desig /esti atio  has  ee   e ie ed  

Te h i al Desig  Afte  su issio  ofdesig   epo t 

DWSS/SSTWSSSP/ PMC 

Satisfa to    

Re ie  of spe ifi atio  of  o k 

Co pleted  Wo k spe ifi atio  e ie ed 

Te h i al spe ifi atio  ega di g  ate ials a d  o k a ship  Afte  su issio  of desig   epo t 

DWSS/SSTWSSSP/ PMC 

Satisfa to    

Ph si al E i o e t 

Co st u tio  Phase 

  Soil e osio  a d soil sta ilit  

E a ated soil pla ed safel  agai st e osio  

Co pleted  E a ated soil  ot asted due to flood 

a d e osio  

Sta ki g of soil Qua tit  of soil e ai i g T i e a  eek 

Co t a to /WSSDO/ DSC 

Satisfa to    

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe li e 

t e h  ith  ell o pa ted 

Co pleted  E a ated soil  as used to fill t e hes i  the RVT site a ea 

Co t a to /WSSDO/ DSC 

Satisfa to    

  Ai  Qualit   Dust  E i o e t  

F e ue t sp i kli g of ate  

Co pleted  Dust ge e atio  f o   o st u tio  ate ials a d  

t e h diggi g  e e a oided   sp i kli g of  ate  

Dust i  Ai    E e  da  

Co t a to /WSSDO/ DSC 

Satisfa to    

Page 35: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

 Visual  o ito i g of ai  ualit  

Co pleted  Ai   ualit  o ito i g  ot 

p a ti ed 

Satisfa to    

 Use of  asks  Co pleted  Not st i tl  i ple e ted 

Satisfa to     

  Noise a d Vi atio  

Rest i tio  o  u e essa  ho ki g of ho s f o  the  ehi les used fo   o st u tio  pu pose 

Co pleted  D i e s a e i st u ted  ot to use p essu e ho s  as fa  as possi le 

Co t ol o  use of lo i g ho s 

  Dail  du i g o st u tio  

Co t a to /WSSDO/ DSC 

Satisfa to    

Regula   ai te a e of e uip e t 

O goi g  E uip e t a e egula l   ai tai ed so as to p odu e less oise a d  i atio  

Pe iodi  ai te a e  e o d 

 

Co t a to /WSSDO/ DSC 

Satisfa to    

Muffle s fitti gs o   ois  e uip e t 

Co pleted  High  oise p odu i g e uip e t  as  ot used so  uffle s fitti gs  e e  ot e ui ed 

O se atio   Co t a to /WSSDO/ DSC 

 Satisfa to     

Speed  est i tio   O goi g  No  ajo  a ide t e o ds fou d due to ehi le speed 

Co t olli g speed  Co t a to /WSSDO/ DSC 

Satisfa to    

Page 36: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Biologi al E i o e t 

Co st u tio  Phase 

   I pa t o   atu al egetatio  a d e olog  Distu a e a d loss of  atu al egetatio  a d e olog  

Rest i ti g use of fuel ood i  la o   a p. 

O goi g  Wood used as the ajo  sou e of fuel 

i  the la o   a p, ho e e  haphaza d utti g do  of t ees  as  ot fou d 

S oke,  oal o se atio  at la o  a p   Bia uall  

WSSDO/WUSC  Satisfa to    

P o isio  of i i izatio  of egetatio   lea a e 

Co pleted  Pipeli e has  ee  lo ated so as to i i ize  egetatio  lea a e 

Clea ed a ea Affo ested a ea  Bia uall  

WSSDO/WUSC  Satisfa to    

   Loss of flo a & fau a due to p oje t sitti g & elated a ti ities 

P o isio  of i i izatio  of egetatio   lea a e 

Co pleted  No  ajo  loss of ha itat  as o se ed due to p oje t  elated  a ti ities 

Appea a e of fau a   Bia uall  

WSSDO/WUSC  Satisfa to    

E i o e tal a a e ess p og a  

Co pleted  Lo al  o u it  fo est  o ittee o ito  a d  o du t 

p og a s fo  p ote tio  of fo est ha itat 

Satisfa to    

Rest i ti g use of fuel ood i  la o   a p. 

 

O goi g  Wood gi e    the o u it  fo est t igs a d  a hes  used as the  ajo  sou e of fuel i  the la o   a p 

Satisfa to    

Page 37: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

So io‐E o o i  a d Cultu al E i o e t 

Co st u tio  Phase 

   I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to  e take  at the ti e of o st u tio  

Co pleted  Ne essa  p e autio  take  to i i ize 

i pai e t of e isti g  o u it  i f ast u tu e like oad, foot t ail, et . 

U i te upted hu a   o e e t   Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

A  da ages to the e isti g i f ast u tu e has to  e  epai ed 

Co pleted  No  ajo  e isti g i f ast u tu e has ee  da aged   

p oje t a ti ities 

Satisfa to    

  La  a d O de  issue a d distu a e o  so ial st u tu e & ultu e 

I st u tio  to all o ke s to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a  espo si le a d dis ipli ed  a e  

Beha io  of lo al People  Weekl  

Co t a to / WSSDO/DSC 

Satisfa to     

P ohi itio  of use of al ohol a d ga li g 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

Cultu al a a e ess of lo al  o u ities to outside  o k fo e 

O goi g  No a a e ess p og a  p o ided to o ke s ho e e   o iole e due to  ultu al diffe e es e o ded 

Satisfa to    

O ie tatio  to outside o ke s 

Co pleted  Sepa ate o ie tatio  fo  outside  o k fo e  ot p o ided 

Satisfa to     

Page 38: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  E plo e t of lo al people E o o i  o ditio  of lo al people i eases  

Positi e i pa t o  the p oje t a d  o u it  

Co pleted  E o o i   o ditio  of lo al people uplifted  

Appea a e of lo al people i   o k fo e  Weekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

  O upatio al Health a d safet  

I st u tio  to adopt safet   easu es 

O goi g  No fo al a a e ess a d i st u tio  p og a  held ho e e   o e o ds of  ajo  a ide t fou d 

Use of safet  easu es e.g. 

Hel et, safet   elt et .  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Fi st aid to  e easil  a essi le 

O goi g  Not i ple e ted st i tl  

Satisfa to     

  Pollutio  f o  outside  o k fo e 

P ope  sa ita  o ditio  to  e ai tai ed i  the la o  a p  sa ita  toilet, safe d i ki g  ate  

O goi g  Sa ita   o ditio  i  toilet  ai tai ed a d safe d i ki g ate  p o ided to o ke s 

Si k la o   Waste a d lea li ess of a ea  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Colle tio  of solid  aste i  fi ed pla e 

O goi g  Pla e fo  solid  aste olle tio   ot allo ated 

Satisfa to     

Pe iodi   lea i g  O goi g  No ad e se e i o e tal o ditio  fou d at p oje t site 

Satisfa to    

  T affi  a age e t 

 .  T affi  

o gestio s a d distu a e to 

P io   otifi atio  of o st u tio  a ti ities 

Co pleted  P e‐i fo atio  ega di g o st u tio   o ks like du i g pipe la i g  o ks p o ided 

Noti e  oa ds  Use of di e sio  sig  oa ds 

 As  eeded 

Co t a to / WUSC 

Satisfa to    

Page 39: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

pedest ia s  

.  Dis uptio  of the lo al a ess 

Di e sio  sig oa ds to e p o ided 

Co pleted  Not st i tl  i ple e ted 

Co t a to / WUSC 

Satisfa to    Sig oa d  eed to  e pla ed st i tl   

Co st u tio  of D ai age Wo k 

  Soil e osio , silt u off a d u settled st eet su fa es 

E a ated soil pla ed safel  agai st e osio  

Co pleted  Majo  a ou t of the e a ated soil used fo   a kfilli g a d e ai i g soil used to p ote t agai st e osio  

Sta ki g of soil  Mo ito i g of soil disposal site.  Dail  

Co t a to /DSC  Satisfa to   E osio  p o e sites should  e p ote ted   filli g soil 

Reuse of e a ated soil p ope l  du i g a kfilli g  ith  ell o pa ted 

Co pleted  E a ated soil  as ei g used to  a kfill 

of  t e hes 

Satisfa to    

Su plus soil to  e disposed i  p ope  pla es  A ju  Khola a d E isti g du pi g site  

Co pleted  Su plus ea th  ot ield i   o side a le a ou t 

Satisfa to    

  Ai , dust a d oise pollutio  

F e ue t sp i kli g of ate  

Co pleted  Dust ge e atio  f o   o st u tio  ate ials a d  

t e h diggi g  e e a oided   sp i kli g of  ate  

Dust i  Ai   

Co t a to / WSSDO/DSC 

Satisfa to    Sp i kli g of ate   eed to  e 

do e  outi el  to i i ize the 

health haza ds to  o ke s due to 

dust ge e atio  Mo ito i g of ai  ua tit  

Co pleted  Ai   ualit  o ito i g  ot 

p a ti ed 

Satisfa to    Mo ito i g  eed to  e do e if e ui ed 

Page 40: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Use of ta pauli  to  o e  loose  o st u tio  ate ials  sa d a d 

Agg egate  at the ti e of t a spo tatio  

Co pleted  Co st u tio  ate ials  o e ed 

du i g t a spo tatio  usi g ta pauli  to a oid dust ge e atio  

Satisfa to    

T a spo tatio  of o st u tio   ate ials as a d  he   e ui ed 

Co pleted  T a spo tatio  of o st u tio  ate ials do e o l  

i  the  e essa  a eas to a oid a  u e essa  dust ge e atio  

Satisfa to     

  Distu a e a d isk of a ide ts o  site to  o ke s a d pu li  

I fo  the pu li  i  ad a e 

Co pleted  P io  i fo atio  to the pu li  gi e  efo e soil 

e a atio  

Use of sig   oa d, di e sio   oa d Use of safet  gea s Fi st aid  o   Dail  

Co t a to /DSC  Satisfa to     

Follo  the safet   ules fo  all  o st u tio  a ti ities 

Co pleted  Not i ple e ted st i tl  

Satisfa to     

E lude the pu li  f o  the  o st u tio  site a d use of  oti e  oa d & di e sio  sig s 

Co pleted  Pu li  a e  ot st i tl  e luded f o  o st u tio  site 

Satisfa to     

   

Page 41: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Sa dhikha ka  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

P e‐ o st u tio  Phase 

.  Detailed Desig   Re ie  of Desig  / Esti ate Co pleted 

Co pleted           

.  P e‐Co st u tio   Re ie  of Spe ifi atio  of Wo k 

Co pleted           

Co st u tio  Phase 

Ph si al E i o e t 

.  Soil e osio  , soil sta ilit  a d Geolog  

E a ated soil pla ed safel  agai st e osio  

O goi g  No e osio  o se ed 

Visual O se atio  T i e a  eek 

Co t a to / WSSDO/DSC 

Satisfa to    

Reuse of e a ated soil p ope l  du i g  a kfilli g the pipe li e t e h a d  ell o pa ted 

O goi g  Co pa ted   a i g 

Visual O se atio   T i e a  eek 

Co t a to /  WSSDO/DSC 

Satisfa to    

  Ai   ualit   Dust  E i o e t  

F e ue t sp i kli g of  ate   O goi g  As a d  he  e ui ed 

Visual O se atio  E e  da  

Co t a to /WSSDO/DSC 

Satisfa to     

Visual  o ito i g of ai  ualit  

O goi g    Visual O se atio  E e  da  

Co t a to / WSSDO/DSC 

Satisfa to    

Use of  asks  O goi g    Visual O se atio  E e  da  

Co t a to / WSSDO/DSC 

Pa tial Satisfa to    

  Noise a d Vi atio  

P o isio  of  est i tio  o  lo i g of p essu e ho  

haphaza dl  fo  the  ehi le i ol e i   o st u tio  o ks 

O goi g  D i e s a e i st u ted  ot to use  p essu e ho s as fa  as possi le  

O se atio s/ E e  da  

Co t a to /WSSDO/DSC 

Satisfa to    

Regula   ai te a e of e uip e t 

O goi g  Regula   lea i g  ope ato s a d 

Pe iodi  Mai te a e 

Co t a to /WSSDO/DSC  

Satisfa to    

Page 42: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

ai te a e i  o kshop i   ase 

of  eakdo  

e o d E e  da  

Muffle s fitti gs o   ois  e uip e t 

O goi g  Muffle s a e fitted  ut  ill  e i p o ed fu the  

E uip e t o se atio  E e  da  

Co t a to /WSSDO/DSC 

Pa tiall  Satisfa to    

Speed Rest i tio   O goi g  D i e s a e i st u ted  ot to speed 

O se atio  E e  da  

Co t a to /WSSDO/DSC 

Pa tiall  Satisfa to    

Biologi al E i o e t 

  I pa t o   atu al egetatio  a d e olog  due to: Co st u tio  of diffe e t o po e ts of s ste  like pipe la i g,  ate  ta k, t eat e t pla t, uildi g,et .   

Rest i ti g use of fuel  ood i  la o   a p, 

O goi g  Li ited use of fi e ood du i g gas sho tages. 

O se atio  of S oke, Coal Bia uall   

Co t a to / WSSDO/ DSC 

Satisfa to    

P o isio  of  i i izatio  of egetatio   lea a e a d fo estatio   he e e e  eeded 

O goi g  La o s ha e  ee  i st u ted o  i i izatio  of egetatio  lea a e 

Visual O se atio   Bia uall   

Co t a to /WSSDO/DSC 

Satisfa to    

  I pa t o  flo a, fau a a d ha itat due to p oje t sitti g a d elated a ti ities 

E i o e tal a a e ess p og a  

O goi g  Regula  p og a s a e ei g  o du ted  NGOs 

Visual O se atio   Bi‐a uall  

WSSDO/ WUSC  Satisfa to    

So io‐e o o i  E i o e t 

Page 43: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to  e take  at the ti e of o st u tio  

O goi g  Re o d of da ages to footpath i  so e pla es. 

Visual O se atio   Dail  

Co t a to /WSSDO/DSC 

Satisfa to    

A  da age to the e isti g i f ast u tu e has to  e epai ed 

O goi g  Esti ate has ee  p epa ed 

fo  the da ages a d fo a ded fo  app o al 

Visual O se atio   Dail  

Co t a to /WSSDO/DSC 

Satisfa to    

  La  a d o de  issues due   i pa t o  so ial st u tu e a d ultu al aspe t  I flu  of outside o kfo e, o e  a d 

u a ted a ti ities  Cultu al diffe e e 

I st u tio  to all  o ke s to a t i  a  espo si le  a e  

O goi g  No  ase of is eha io  e o ded 

O se atio  of the o ke s 

Weekl  

Co t a to /  WSSDO/WUSC 

Satisfa to     

P ohi itio  of use of al ohol a d ga li g 

O goi g  No  e o ds of use of al ohol e o ded 

O se atio  Weekl  

Co t a to /  WSSDO/WUSC 

Satisfa to    

Cultu al a a e ess p og a  ill  e  o du ted to the 

outside  o kfo e 

O goi g    Re o ds of a a e ess p og a s o du ted  Weekl  

Co t a to /  WSSDO/WUSC 

Satisfa to    

  O upatio al Health a d Safet  I pa t o  health depe di g upo  

I st u tio  to adopt safet  easu es 

O goi g  Hel ets, Safet  Shoes, Glo es et . a e p o ided to la o s 

O se atio s  Bi Weekl  

Co t a to /WSSDO/WUSC 

Satisfa to    

Page 44: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

o ki g o ditio  O upatio al health a d safet  OHS  Pu li  health 

Fi st aid at ha d i  the o ki g a ea 

O goi g  Fi st aid  o  kept i  the site offi e 

Fi st aid  o   Weekl  

Co t a to /WSS DO//WUSC 

Satisfa to    

  Co u it  Health a d Safet  

P ope  sa itatio  a d h gie e to  e  ai tai ed 

O goi g  Sepa ate toilets fo   ale a d fe ale  o ke s o st u ted at site  

Sa itatio   Weekl  

WSSDO,WUSC, Co t a to  

Satisfa to    

Qualit  of d i ki g  ate  to e  o ito ed 

O goi g  Sa e d i ki g ate  p o ided 

at la ou   a p as that of lo al o su e s  

D i ki g  ate  ualit  tests 

 Weekl  

WSSDO,WUSC, Co t a to  

Satisfa to    

Colle tio  of Solid  aste i  fi ed pla e 

O goi g  Site has  ee  ide tified a d o k  ei g do e 

a o di gl  

O se atio  Bi‐Weekl  

WSSDO/Co t a to /DSC 

Pa tiall  Satisfa to    

Pe iodi  Clea i g  O goi g  Pe iodi  Clea i g Do e Regula l  

O se atio  / Bi‐Weekl  

Co t a to / WSSDO/DSC 

Satisfa to    

P ope   ei state e t of the pa e e t  o ks i ludi g the  oad a d footpath to o igi al state. 

O goi g  I luded i  the Bill of Qua tities a d  ill  e do e a o di gl  

O se atio  / Bi‐Weekl  

Co t a to / WSSDO/DSC 

Satisfa to    

 

   

Page 45: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Da ak  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethod sa d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

P e‐ o st u tio  Phase 

.  Detailed Desig   Re ie  of Desig  / Esti ate Co pleted 

Co pleted           

.  P e‐Co st u tio   Re ie  of Spe ifi atio  of Wo k 

Co pleted           

Co st u tio  Phase 

Ph si al E i o e t 

.  Soil e osio  , soil sta ilit  a d Geolog  

E a ated soil pla ed safel  agai st e osio  

O goi g  No e osio  o se ed 

Visual O se atio  T i e a  eek 

Co t a to / WSSDO/DSC 

Satisfa to    

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe 

li e t e h a d  ell o pa ted 

O goi g  Co pa ted   a i g 

Visual O se atio    T i e a  eek 

Co t a to /  WSSDO/DSC 

Satisfa to    

  Ai   ualit   Dust  E i o e t  

F e ue t sp i kli g of ate  

O goi g  As a d  he  e ui ed 

Visual O se atio  E e  da  

Co t a to / WSSDO/DSC 

Satisfa to     

Visual  o ito i g of ai   ualit  

O goi g    Visual O se atio  E e  da  

Co t a to / WSSDO/DSC 

Satisfa to    

Use of  asks  O goi g    Visual O se atio  E e  da  

Co t a to / WSSDO/DSC 

Satisfa to    

Page 46: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethod sa d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  Noise a d Vi atio  

P o isio  of est i tio  o   lo i g of p essu e ho  haphaza dl  fo  the ehi le i ol e i  o st u tio   o ks 

O goi g  D i e s a e i st u ted  ot to use  p essu e ho s as fa  as possi le  

O se atio s/ E e  da  

Co t a to /WSSDO/DSC 

Satisfa to    

Regula   ai te a e of e uip e t 

O goi g  Regula   lea i g   ope ato s a d ai te a e i  o kshop i   ase 

of  eakdo  

Pe iodi  Mai te a e e o d E e  da  

Co t a to /WSSDO/DSC  

Satisfa to    

Muffle s fitti gs o  ois  e uip e t 

O goi g  Muffle s a e fitted ut  ill  e 

i p o ed fu the  

E uip e t o se atio  E e  da  

Co t a to /WSSDO/DSC 

Satisfa to    

Speed Rest i tio   O goi g  D i e s a e i st u ted  ot to speed 

O se atio  E e  da  

Co t a to /WSSDO/DSC 

Satisfa to    

Biologi al E i o e t 

  I pa t o   atu al egetatio  a d e olog  due to: Co st u tio  of diffe e t o po e ts of s ste  like pipe la i g,  ate  ta k, t eat e t pla t,  uildi g. Et .   

Rest i ti g use of fuel ood i  la o   a p, 

O goi g    O se atio  of S oke, Coal  Bia uall   

Co t a to / WSSDO/ DSC 

Satisfa to    

P o isio  of i i izatio  of egetatio   lea a e a d fo estatio  he e e e   eeded 

O goi g  La o s ha e  ee  i st u ted o  i i izatio  of egetatio  lea a e 

Visual O se atio   Bia uall    

Co t a to /WSSDO/DSC 

Satisfa to    

Page 47: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethod sa d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  I pa t o  flo a, fau a a d ha itat due to p oje t sitti g a d elated a ti ities 

E i o e tal a a e ess p og a  

O goi g    Visual O se atio   Bi‐a uall   

WSSDO/ WUSC  Satisfa to    

So io‐e o o i  E i o e t 

  I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to e take  at the ti e 

of  o st u tio  

O goi g    Visual O se atio   Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

A  da age to the e isti g i f ast u tu e has to  e  epai ed 

O goi g    Visual O se atio   Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

  La  a d o de  issues due i pa t o  so ial st u tu e a d ultu al aspe t  I flu  of outside o kfo e, o e  a d 

u a ted a ti ities  Cultu al diffe e e 

I st u tio  to all o ke s to a t i  a espo si le  a e  

O goi g  No  ase of is eha io  e o ded 

O se atio  of the o ke s 

Weekl  

Co t a to /  WSSDO/WUSC 

Satisfa to     

P ohi itio  of use of al ohol a d ga li g 

O goi g  No  e o ds of use of al ohol  e o ded 

O se atio  Weekl  

Co t a to /  WSSDO/WUSC 

Satisfa to    

Cultu al a a e ess p og a   ill  e o du ted to the outside  o kfo e 

O goi g    Re o ds of a a e ess p og a s o du ted  Weekl  

Co t a to /  WSSDO/WUSC 

Satisfa to    

Page 48: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethod sa d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  O upatio al Health a d Safet  I pa t o  health depe di g upo  o ki g o ditio  O upatio al health a d safet  OHS  Pu li  health 

I st u tio  to adopt safet   easu es 

O goi g  Hel ets, Safet  Shoes, Glo es et . a e p o ided to la o s 

O se atio s  Bi Weekl  

Co t a to / WSSDO/WUSC 

Satisfa to    

Fi st aid at ha d i  the  o ki g a ea 

O goi g  Fi st aid  o  kept i  the site offi e 

Fi st aid  o   Weekl  

Co t a to /WSS DO//WUSC 

Satisfa to    

  Co u it  Health a d Safet  

P ope  sa itatio  a d h gie e to  e ai tai ed 

O goi g    Sa itatio   Weekl  

WSSDO, WUSC, Co t a to  

Satisfa to    

Qualit  of d i ki g ate  to  e o ito ed 

O goi g    D i ki g  ate  ualit  tests 

 Weekl  

WSSDO, WUSC, Co t a to  

Satisfa to    

Colle tio  of Solid aste i  fi ed pla e 

O goi g    O se atio  Bi‐Weekl  

WSSDO/Co t a to /DSC 

Pa tiall  Satisfa to    

 

   

Page 49: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Baglu g  S/N 

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple etatio  

status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase 

Ph si al E i o e t 

  Risk of pollutio  of  i e   ate  due to the o st u tio  of I take  Ea th o k a d othe  aso   o k  

Regula   ate   ualit  o ito i g of  ate  i  

the dist i utio  s ste  

O goi g  Dist i utio  pipe la i g  o k is i  p og ess 

Wate   ualit  o ito i g 

T i e a  eek 

Co t a to /WSSDO/DSC 

Satisfa to    

Reuse of e a ated soil p ope l  

O goi g  U used soil a e  ei g take   lo al people fo  pe so al 

use 

Co ditio  of the pipe li es T i e a  eek 

Co t a to /WSSDO/DSC 

Pa tiall  Satisfa to    

.  Soil e osio  a d soil sta ilit  

E a ated soil pla ed safel  agai st e osio  

O goi g  No  isk of soil e osio  fou d  Sta ki g of soil  T i e a  eek 

Co t a to /WSSDO/DSC 

Satisfa to    

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe li e 

t e h  ith  ell o pa ted 

O goi g   Ba kfilli g of soil  ei g do e i ediatel  afte  o pletio  of pipe la i g o ks 

Co ditio  of the pipe li es  T i e a  eek 

Co t a to /WSSDO/DSC 

Satisfa to    

  Ai   ualit   Dust  E i o e t   Ai  pollutio  due to  o e e t of p oje t  ehi le  Ai  pollutio  due to dust pa ti le  Ai  pollutio  due to ope atio  of 

F e ue t sp i kli g of ate  

O goi g  Dust ge e atio  f o  o st u tio   ate ials a d  t e h diggi g  e e a oided  sp i kli g of  ate  

Dust i  Ai   E e  da  

Co t a to /WSSDO/DSC 

Pa tiall  Satisfa to     

T a spo tatio  of o st u tio   ate ials as a d  he e  e ui ed 

O goi g  T a spo tatio  of o st u tio   ate ials do e o l  i  the  e essa  a eas to a oid a  u e essa  dust ge e atio  

Satisfa to    

Use of ta pauli  to o e  loose o st u tio   ate ials 

O goi g  Co st u tio   ate ials o e ed du i g t a spo tatio  usi g 

Satisfa to    

Page 50: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N 

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple etatio  

status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

pu ps a d diesel ge e ato  

at the ti e of t a spo tatio . 

ta pauli  to a oid dust ge e atio  

Visual  o ito i g of ai  ualit  

O goi g  Ai   ualit   o ito i g  ot p a ti ed  

Belo  Satisfa to    

  Noise a d Vi atio  due to:  The p oje t ehi ula  Mo e e t  Noise pollutio  due to ope atio  of diesel ge e ato  

P o isio  of  est i tio  o   lo i g of p essu e ho  haphaza dl  fo  the  ehi le i ol e i  o st u tio   o ks 

O goi g  D i e s a e i st u ted  ot to use p essu e ho  as fa  as possi le 

Co t ol use of lo i g p essu e 

ho   E e  da  

Co t a to /WSSDO/DSC 

Satisfa to    

Regula l   ai te a e of e uip e t 

O goi g  E uip e t a e  egula l  ai tai ed so as to p odu e 

less  oise a d  i atio  

Pe iodi  Mai te a e e o d E e  da  

Pa tiall  Satisfa to    

Muffle  fitti gs o  ois  e uip e t 

O goi g  High  oise p odu i g e uip e t  as  ot used so uffle  fitti gs  as  ot e ui ed 

O se atio   E e  da  

Pa tiall  Satisfa to    

Speed Rest i tio   

O goi g  No  ajo  a ide t  e o ds fou d due to  ehi le speed 

Co t olli g speed E e  da  

Pa tiall  Satisfa to    

Biologi al E i o e t 

  Distu a e a d loss of fo est app o i atel    t ees to  e  ut  a d  egetatio  

Co pe sato  pla tatio  at the  ate of   sapli gs fo  ea h felled  

O goi g  Affo estatio  pla   ot o du ted  et 

Nu e  of t ees Pla ted  Fou  ti es a  ea  

WSSDO/ WUSC/CFU 

Pa tiall  Satisfa to    

O l   a ked t ees to e  lea ed 

O goi g  O l   a ked a d pe itted t ees  e e  lea ed 

Affo ested a ea  Fou  ti es a  ea  

Satisfa to  

Vegetatio   lea a e to  e  i i ized as fa  as possi le 

O goi g  T a s issio  pipeli e alig e t has  ee  lo ated so as to  i i ize  egetatio  

Clea ed a ea  Weekl  

Satisfa to  

Page 51: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N 

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple etatio  

status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

lea a e  

Rest i ti g use of fuel ood i  the la o  a p 

O goi g  Wood used as the  ajo  sou e of fuel i  the la o  a p, ho e e  haphaza d utti g do  of t ees  as ot fou d 

S oke,  oal o se atio   Weekl  

Pa tiall  Satisfa to  

  I pa t o  flo a, fau a a d ha itat due to p oje t sitti g a d  elated a ti ities 

E i o e tal a a e ess p og a  

O goi g  Lo al Co u it  Fo est U it o ito  a d  o du t 

p og a s fo  p ote tio  of fo est ha itat 

Flo a a d fau a Dist i utio   Bi‐a uall   

WSSDO/ WUSC 

Pa tiall  Satisfa to    

Night ti e ope atio  of  a hi e  to  e a oided 

O goi g  Night ti e ope atio  of the a hi e   ot p a ti ed 

Use of a hi e ies 

 As  eeded 

E elle t   

Hu ti g/poa hi g a ti ities of la o s to e p ohi ited 

O goi g  No  e o ds of a  hu ti g /poa hi g a ti ities fou d 

A ti ities of la o   As  eeded 

E elle t   

  I pa t to a uati  life 

Co st u tio   o k to e a oided i   ai  

seaso  

O goi g  Majo   o st u tio   o ks a d pipe la i g  o ks   e e a oided i  the  ai  seaso  

Ri e   ate  ualit  tests 

 Mo thl  

WUSC/ DWSS  Satisfa to    

Qualit  of  i e   ate  to  e  egula l  o ito ed 

O goi g  Wate   ualit   o ito i g is do e at  egula  i te als 

Satisfa to    

Ba  o  fishi g a ti ities  O goi g  Fishi g a ti ities is  ot  ei g p a ti ed  

Fishi g a ti ities Mo thl  

Satisfa to    

So io‐e o o i  E i o e t 

Page 52: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N 

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple etatio  

status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to e take  at the ti e of o st u tio  

O goi g  Ne essa  p e autio  is ei g take  to  i i ize 

i pai e t of e isti g o u it  i f ast u tu e like  oad, foot t ail, et . 

Co ditio  of the i f ast u tu es  Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

A  da aged to the e isti g i f ast u tu e has to  e  epai ed 

O goi g  No  ajo  e isti g i f ast u tu es has  ee  da aged   p oje t a ti ities 

Satisfa to    

  la  a d o de  issues a d distu a es o  so ial st u tu e a d  ultu al p a ti e  I pa t o  e plo e t Mig atio  Lo al e o o  Cultu al  alue Pollutio  f o  outside  o kfo e  

I st u tio  to all o ke s to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed a e  

Beha io  of the Wo ke s  Weekl  

Co t a to /WSSDO/ WUSC 

Satisfa to     

P ohi itio  of use of al ohol a d ga li g 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Use of al ohol, Ga li g Weekl  

Satisfa to    

P io it  to  e gi e  fo  e plo e t of lo al la o s 

O goi g  Due to la k of lo al o kfo e, la ou s f o  ea  dist i ts a e  ajo l  

e plo ed 

Pe e tage of lo als e plo ed Weekl  

Satisfa to     

Wo ke s to  e st i tl  supe ised 

O goi g  The e a e  o  iole e a d distu a e  e o ds  eated 

  o ke s 

Beha io  of the Wo ke s Weekl  

Satisfa to    

P ope  sa itatio  fa ilit   ill  e p o ided i  the la o   a p sa itatio  toilet a d safe d i ki g  ate  Colle tio  of solid aste i  fi ed pla e 

O goi g  No epide i  disease o  e to  sp ead fou d at la ou   a p ho e e  solid aste  a age e t  as  ot 

fou d 

La o   a p o se atio   Weekl  

Pa tiall  Satisfa to    

Page 53: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N 

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple etatio  

status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Cultu al a a e ess p og a   ill  e o du ted to the outside  o kfo e 

O goi g  No a a e ess p og a  p o ided to  o ke s ho e e   o  iole e due to  ultu al diffe e es  e o ded 

Beha io  of outside  o kfo e  Weekl  

Satisfa to    

  O upatio al Health a d Safet  I pa t o  health depe di g upo  o ki g o ditio  O upatio al health a d safet  OHS  So io E o o i  alues Aestheti   alues  

I st u tio  to adopt safet   easu es 

O goi g  I st u tio  has  ee  gi e  to adopt safet   easu es 

Use of safet  gea s  Weekl  

Co t a to /WSSDO/WUSC 

Pa tiall  Satisfa to    

Ade uate safet  e uip e t like ha d glo es, ha d  o e  hel ets a d  oots  ill e p o ided 

O goi g  Safet  e uip e t p o ided   o t a to s  ut la o s 

ha dl  use the  

Pa tiall  Satisfa to    

Fi st aid at ha d i  the o ki g a ea 

O goi g  Fi st aid  o  ge e all  kept at the  o st u tio   a p site 

Satisfa to    

  Co u it  Health a d Safet  Sp ead of  ate  o e diseases 

 Dete io atio  i  sa ita   o ditio  

P ope  sa itatio  a d h gie e to  e ai tai ed 

O goi g  Wo ke s  ot affe ted   epide i s due to poo  sa itatio  a d h gie e  

Sa itatio   

WSSDO, WUSC, Co t a to  

Satisfa to    

Qualit  of d i ki g ate  to  e  o ito ed 

O goi g  Sa e d i ki g  ate  p o ided at la o   a p as that of lo al  o su e s  

D i ki g  ate  ualit  tests 

 

Satisfa to    

T eat e t of o u i a le diseases a d  egula  health  he kups to  e do e 

O goi g  Regula  health  he k‐ups   of o ke s  ot p a ti ed  

T eat e ts  Satisfa to  

Pe iodi   lea i g  O goi g  Pe iodi   lea i g do e  ut ot at  egula  i te als 

A ea of ga age disposal 

Satisfa to  

Page 54: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N 

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple etatio  

status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  T affi  a age e t 

T affi  o gestio s a d distu a e to pedest ia s Dis uptio  of the lo al a ess 

P io   otifi atio  of o st u tio  a ti ities 

O goi g  P e i fo atio   ega di g o st u tio   o ks like du i g pipe la i g  o ks gi e  

Noti e  oa ds  As  eeded 

Co t a to / WUSC 

Satisfa to  

Di e sio  sig oa ds to e p o ided 

O goi g  Not st i tl  i ple e ted  Use of di e sio  sig   oa ds As  eeded 

Satisfa to  

 

   

Page 55: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Shi a aga  S/N  Des iptio  of I pa t  Mitigatio   easu es p oposed  I ple e ta

tio  status Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

 Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to / Belo  Satisfa tio  / Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to I p o e i ple e tatio  

Co st u tio  Phase I pa t   

  Ge e atio  of  aste ate  

Su fa e  u off a d t a spo tatio  of e a ated  ate ials to ea   odies 

Distu a e of the la d s ste  Co ta i atio  of g ou d ate  

Reuse of  ate    the o su e s i  the  ea  settle e ts to i igate thei  fa la d a d  egeta le ga de s 

Co pleted           

While d illi g  o eholes  i i al i atio  a d distu a es  ill e e su ed 

Co pleted           

P ope  p ote tio  du i g a d afte  d illi g a d disi fe ti g afte  d illi g  ill  e do e 

Co pleted           

  Distu a e of la d s ste , e osio  a d la dslide  Cha ges i   o pholog  of ate  s ste  

U sta le a d e osio  p o e sites  ill  e a oided a d o l  app o ed  ua i g sites  ill  e used 

Co pleted           

Qua i g a ti ities f o  i e s/st ea s  ill  ot  e do e so as to  ha ge the  i e   oss se tio s a d lo gitudi al p ofiles 

Co pleted           

La d   ill  e le eled to suit the lo al la ds ape afte  e t a tio  is  o plete 

Co pleted           

  Noise pollutio   Ai  pollutio  due to elease of e issio s 

Use of old a d  o  out e uip e t a d  ehi les, lo  ualit  fuel  ill  e p ohi ited to edu e the  oise a d ai  pollutio . 

Co pleted           

Page 56: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t  Mitigatio   easu es p oposed  I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

 Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to / Belo  Satisfa tio  / Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to I p o e i ple e tatio  

The e uip e t  ill  e  he ked  te h i ia s  efo e the 

o e e e t of  o k a d o ki g i   ight shift  ith 

e uip e t p odu i g high  oise ill  e p ohi ited. 

Co pleted           

The  o st u tio   ate ial  ill e  o e ed du i g 

t a spo tatio  to a oid dust ge e atio . 

Co pleted           

  U o ga ized disposal of e a ated ea th  Soil e osio , silt  u off  Possi le pollutio  of su fa e  ate   Dete io atio  of ai  ualit  due to dust 

 Distu a e to the pedest ia s  

P e autio a   easu es  ill  e take  du i g  o st u tio  to a oid  a i g 

Co pleted           

E a ated soil  ill  e pla ed safel  agai st e osio

Co pleted 

Reuse of e a ated soil a d a k filli g of t e hes  ill  e 

do e 

Completed

As fa  as possi le  o st u tio  a ti ities  ill  e a oided i  the ai  seaso . 

Completed

Sp i kli g of  ate  to a oid dust  Completed

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

Completed

  Ge e atio  of e ess g ease, solid  aste a d othe   o st u tio   aste   

Me ha is  of solid  aste a age e t  ill  e de eloped 

i  the p oje t site  efo e the a tual  o e e e t of  o k 

Completed

Page 57: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t  Mitigatio   easu es p oposed  I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

 Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to / Belo  Satisfa tio  / Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to I p o e i ple e tatio  

Pollutio  of  ea  i igatio   a als a d ate   odies 

P ohi itio  of u a ted litte i g a d dis ha ge of  aste 

Completed

  O st u tio  i  pedest ia  a d t affi   o e e t   Re o al of e a ated ate ial  a  affe t the 

lo al la d s ste   e osio  a d soil i sta ilit  

While e a ati g a d la i g pipes  i i al  i atio  a d slope distu a es  ill  e e su ed 

Co pleted 

E a ated soil  ill  e du ped i  oute  side of t e h opposite to oadside a d  a kfilli g  ill  e do e p ope l  

Co pleted 

E a ated soil  ill  e pla ed safel  agai st e osio  

Co pleted 

  Loss of  egetatio  a d ha itat 

P o isio  of  i i izatio  of egetatio   lea i g a d  a eful utti g of g ou d  egetatio  

Co pleted 

Pla tatio  of t ee a d sh u  he e e e  possi le 

Co pleted 

  .  Lo al  eside ts  ould e distu ed    oise, 

dust a d i peded a ess 

Wo k to  e  o du ted as ui kl  as possi le to  i i ize 

distu a e 

Co pleted 

Reside ts  ill  e  o sulted a d i fo ed a out the distu a es i  ad a e 

Co pleted 

  P o le s due to i espo si le  eha io  of o k fo e  e.g. ga li g, 

dis espe t to the lo al a ea a d people  

All the  o ke s  ill  e i st u ted to a t i  a espo si le  a e  

Co pleted 

P ohi itio  of al ohol, ga li g  Co pleted 

Page 58: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t  Mitigatio   easu es p oposed  I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

 Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to / Belo  Satisfa tio  / Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to I p o e i ple e tatio  

Local people will be employed as far as possible

Co pleted 

  Risk of a ide ts to the o ke s a d pu li  

As it's  health a d safet  pla  i ludi g safet   easu es su h as p o isio  of  ask, hel et, ha d glo es a d  u e   oots to o ke s  ill  e p epa ed a d 

i ple e ted 

Co pleted           

Fi st aid  ill  e kept at ha d i  o ki g a ea 

Co pleted 

Ge e al pu li   ill  e e luded f o  all the  o st u tio  sites 

Co pleted 

I su a e  ill  e p o ided to the  o ke  

Co pleted 

  Pu li  health haza d Reje tio  of the lo atio   people 

Pu li  toilet  ill  e lo ated afte  o sulti g all the stakeholde s 

Co pleted           

  U o ga ized disposal of e a ated ea th Su fa e  u off, pollutio  of  ate   a s Nuisa e to pedest ia s Dete io atio  of ai  ualit  due to dust 

Disposal agai st e osio  a d euse of e a ated soil 

Co pleted           

Sp i kli g of  ate  to a oid dust  Co pleted           

Te po a  di e sio s a d sig oa ds  ill  e p o ided to the pedest ia s 

Co pleted           

  Loss of  egetatio  a d ha itat 

P o isio  of  i i izatio  of egetatio   lea i g a d  a eful utti g of g ou d  egetatio  ill  e do e 

Co pleted           

T ees a d sh u s  ill  e pla ted he e e  possi le 

Co pleted           

Page 59: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t  Mitigatio   easu es p oposed  I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

 Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to / Belo  Satisfa tio  / Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to I p o e i ple e tatio  

  Risk of a ide ts to the o ke s a d pu li  

A site health a d safet  pla   ill e p epa ed a d i ple e ted 

Co pleted           

 

   

Page 60: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Phidi   Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  phase 

Haphaza d o kfo e  a ps esulti g i  st ess a d deg adatio  of lo al e i o e t 

Esta lish  o kfo e a ps  ith sa ita  a e ities at desig ated sites o l  

O goi g   Health a d sa itatio  o ditio s a ou d the a ps  o al  La o   a ps a e o  hi ed  uildi gs/pla es a d a e  ell   ith satisfa to  fa ilities 

Visual o se atio  Befo e the o st u tio  sta ts a d at th ee o thl  

i te als 

Co t a to , DSC 

Satisfa to     

Lo al people dep i ed of  o k oppo tu ities, i o s  a   e 

e plo ed 

Gi e p efe e e to the lo al people  a o e the age of   espe iall  SPAF, PAF a d  o e  i  jo s. Settle  age  ate ased o  DWEC a d 

p o ide a list to the DSC 

O goi g   Lo al people a e e gaged f o   ithi  the lo alit    No  hild la o  e plo ed  

Co t a to  e o ds   E e   o th 

Co t a to / DSC 

Satisfa to     

Loss of  egetatio  due to  egetatio  lea a e fo  o st u tio  of p oposed st u tu es; fuel  ood, a d  NTFP  olle tio    the  o kfo e 

Co t ol i   utti g of t ees  O goi g   Pipeli e alig e t is al a s kept a dista e f o  t ees  No pote tial loss  of t ees i  the p oje t  a eas 

Visual;  e o ds of the Co t a to    O e a  o th 

Co t a to / DSC 

Pa tiall  satisfa to     

P ohi it the use of fuel ood 

O goi g   Rest i tio  o  use of fuel  ood  

Visual;  e o ds of the Co t a to    O e a  o th 

Co t a to / DSC 

Pa tiall  satisfa to     

Cha ges i  the o pholog  of the 

Mi i g of  o st u tio  ate ials o l  f o  

O  goi g  Co st u tio   ate ial t a spo ted f o  

 Visual o se atio , 

Co t a to / DSC 

Satisfa to     

Page 61: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

st ea s due to i i g of sa d a d 

g a el 

ua ies app o ed   VDC.  

app o ed  ua  sites   Qua i g a ti ities do e  a efull   

e o ds  O e a  o th  Bo o  pits to  e le eled 

to suit the aestheti s of the a ea to its o igi al state.  Su h a ti ities should  ot ha ge the  i e   oss se tio s a d lo gitudi al p ofiles. 

Haza ds to health a d h gie e a d safet  of  o ke s 

P epa e a d i ple e t site safel  pla  that i ludes  easu es to: E lude the pu li  f o  all  o st u tio  sites E su e that the  o ke s use p ote ti e e uip e t P o ide health a d safet  t ai i g to the pe so el Follo  do u e ted p o edu es fo  site a ti ities Keep a ide t  epo ts a d  e o ds As fa  as possi le the lo al people  ho k o  the lo al  o ditio s should  e hi ed 

O goi g    Sig oa ds  e e used i   o st u tio  sites    P ote ti e e uip e t i ludi g hel ets, asks,  oots, glo es, e e p o ided fo  o ke ’s safet   ut  ot 

p ope l  used   o ke s 

 No  ajo  a ide ts o u ed du i g o st u tio   o k     

I te ie   ith o ke s 

  Weekl   

Co t a to   Pa tiall  satisfa to    

Ai   ualit  dete io atio , Noise pollutio  a d pu li  health haza d due to 

T a spo t o l   e ui ed a ou t of  o st u tio  ate ial, a oid 

te po a  sto age. 

O goi g   Co st u tio   ate ials fo  o goi g  o k a e o l  t a spo ted a d the  ate ials  e e 

Site o se atio    Mo thl  

DSC / o t a to  

Satisfa to     

Page 62: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

dust ge e atio  ehi ula  e issio s 

Use ta pauli s, plasti  sheets, jute  ags to  o e  ate ials du i g 

t a spo t. 

o e ed  ith ta pauli s du i g t a spo t    Sp i kli g of  ate  do e as pe   eeded   I st u ted  ehi le staff 

Dust supp essio  at the site   f e ue t sp i kli g ith  ate . 

Li it  ehi le speed so that  ehi les  o pl   ith the  atio al  ehi le  ass e issio  sta da ds,  . Regula   ai te a e of ehi les 

T e h e a atio  ould  ause soil e osio , silt  u  off, settli g of st eet su fa es, su fa e a d g ou d  ate   ould get polluted ; La d alue deg aded a d e a  uisa e to 

pedest ia s, 

P e autio a   easu es should  e take  du i g o st u tio , to a oid soil e osio  silt  u  off. 

O goi g   E a ated soil is eused fo   a kfilli g of t e hes  Ba kfilli g of e a ated t e hes is do e p ope l  a d esto ed to o igi al o ditio   No e a atio   o k a ied out du i g ai  seaso s 

Site o se atio     Mo thl  / eekl  

DSC/ Co ta to   

Satisfa to     

P ope   a k filli g of e a ated t e hes should  e do e o st u tio  a ti ities should  e, as fa  as possi le ,a oided du i g the  ai  seaso  Te po a  di e sio s a d sig   oa ds fo  pedest ia s should  e p o ided 

Lo al  eside ts a d sites  a  of so ial a d  ultu al i po ta e  a   e distu ed    oise, 

Ca  out the o st u tio   o k as ui kl  as possi le to i i ize the 

distu a es. 

O goi g   Co st u tio  a ti ities goi g s oothl  i   o‐o di atio   ith WUSC.  O goi g  o ks 

O se atio   Weekl  /Mo thl   

 DSC/Co t a to  

Satisfa to     

Page 63: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

dust a d i peded a ess 

Co sult  eside ts a d i fo  the  of the  o k s hedule i  ad a e 

dis ussed  i  ad a e du i g  eeti g   ith WUSC 

People  a   e i o e ie ed a d thei  health  a   e at  isk if  ate  suppl  s ste  is shut do  

Pla   o k  a efull  to keep the shut do  to the  i i u  

O goi g   Wo k  a ied out p ope l  to  i i ize shut do   

O se atio s   Co t a to  Re o ds;   I te ie s  ith eside ts 

Weekl / Mo thl   

Satisfa to     

P o ide alte ati e  ate  suppl  to the affe ted eside ts 

 

   

Page 64: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Bhasi  S/N  Des iptio  of 

I pa t Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase I pa ts   

.  U o ga ized disposal of e a ated ea th  Soil e osio , silt u off  Pollutio  of su fa e ate  

 Dete io atio  of ai  ualit  due to dust 

Distu a e to the pedest ia s 

P e autio a  easu es  ill  e 

take  du i g o st u tio  to a oid  a e i  

Co pleted  E a atio  o ks  e e  

do e  a efull  to a oid  a e i  

Co t a to  e o ds  Dail  

DSC  Satisfa to    

Reuse of e a ated soil a d  a kfilli g of t e hes  ill  e do e 

Co pleted  E a ated soil as used to fill 

t e hes i  the RVT site a ea 

Qua tit  of soil e ai ed  Dail  

Co t a to    Satisfa to    

Safe disposal of e a ated soil 

Co pleted  Soil used fo  a kfilli g of 

t e hes 

Disposal site  Dail  

Co t a to , WSSDO 

Satisfa to    

Sp i kli g of  ate  to a oid dust 

O goi g  Dust pa ti les a oided   sp i kli g of ate . 

Dust i  the ai   Dail  

Co t a to   Satisfa to    

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

O goi g  Te po a  di e sio   ot usuall  e ui ed. 

Sig oa ds  Dail  

Co t a to  , WSSDO 

Satisfa to    

.   Noise pollutio        

Use of ea  plugs a d p ohi itio  o  usi g high  oise p odu i g e uip e t du i g ight shift  o k. 

O goi g  No  o plai ts f o  lo al ega di g high oise du i g ight ti e 

Co t a to  e o ds  As  eeded 

Co t a to   Satisfa to   

 

Page 65: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

 Ai  pollutio  due to elease of e issio s 

Co e i g of o st u tio  ate ials du i g 

t a spo t a d use of ehi les  o fo i g to  atio al sta da ds. 

O goi g  A ou t of dust i  ai   a d e issio s f o  the t a spo tatio  ehi les  e e fou d  egligi le 

Co t a to  e o ds   As  eeded 

Co t a to   Satisfa to    

.   Ge e atio  of e ess g ease, solid aste a d othe  o st u tio   aste    Pollutio  of  ea  i igatio   a als a d  ate   odies 

Me ha is  of safe disposal of  aste ill  e de eloped i  

the p oje t site efo e the a tual o e e e t of o k. 

O goi g  Safe disposal of the  o st u tio  aste  as 

p a ti ed  

Co t a to  e o ds    Dail  

DSC,WSSDO  Satisfa to    

P o isio  of dust i  fo  solid  aste olle tio . 

O goi g  Dust i s ha e ee  p o ided ut  e e  ot 

used ofte . 

Co t a to  e o ds  Dail  

Mu i ipalit , WUSC 

Satisfa to    

P ohi itio  of u a ted litte i g a d dis ha ge of aste 

O goi g  Toilet  ith p ope  soak pit i  the p oje t a p a ea a d aste dis ha ge 

A ou t a d disposal of solid aste 

 Mo thl  

Mu i ipalit , WUSC, Co t a to  

Satisfa to    

.  O st u tio  i  pedest ia  a d t affi   o e e t 

Ca e  ill  e take  hile e a ati g 

a d la i g of pipes so that the e is i i al  i atio  

a d slope distu a es 

O goi g  Ma ual e a atio   as  do e to a oid slope distu a es  

Co t a to  Re o ds  U e e  su fa es  Dail  

Co t a to  , DSC 

Satisfa to    

Page 66: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Re o al of e a ated  ate ial a  affe t the lo al la d s ste  e osio  a d soil i sta ilit  

E a ated soil  ill e du ped i  oute  

side of t e h opposite to  oadside a d  a kfilli g  ill e do e p ope l  

O goi g  Ba kfilli g do e ith p ope  o pa tio  

Pa e e t de olitio     Dail  

Co t a to   Pa tiall  satisfa to    

Risk of pollutio  of othe  st ea s i  the a ea  ausi g i ease i  tu idit  

Spoil  a age e t u it to  o k effi ie tl  to a oid the e a ated soil f o  fi di g its  a  do st ea  to othe  su fa e sou es a d i igatio   a als. 

O goi g  Othe  su fa e sou es a d i igatio   a als e e  ot 

distu ed   e a ated soil 

Co t a to  e o ds   Weekl  

Co t a to   Satisfa to    

Loss of  egetatio  a d ha itat 

P o isio  of i i izatio  of egetatio   lea i g a d  a eful  utti g of g ou d egetatio  

O goi g  Vegetatio  lea i g a d utti g of g ou d egetatio  is i i ized 

 Clea ed a ea  Weekl  

Co t a to   Satisfa to    

Pla tatio  of t ee a d sh u   he e e e  possi le 

O goi g  Cutti g of t ees as  ot  eeded 

i  the o st u tio  site a d alua le pla ts e e p ote ted 

as fa  as possi le  

Affo ested a ea,  u e s of t ees pla ted  Yea l  

WUSC  Satisfa to    

.  Lo al  eside ts  Wo k  ill  e  O goi g  Wo k i  de se  Co t a to   DSC, WSSDO  Satisfa to    

Page 67: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

ould  e distu ed   oise, dust a d 

i peded a ess 

o du ted as ui kl  as possi le 

to  i i ize distu a e 

settle e t a eas  as do e ui kl  to i i ize 

distu a e 

e o ds    Mo thl  

The  eside ts  ill  e o sulted a d i fo  a out the distu a es i  ad a e 

O goi g  P io   oti e a d i fo atio  ega di g o k e e 

gi e  to the lo al people 

Co u i atio  ith lo al 

people   As  eeded 

Co t a to , DSC, WSSDO 

Satisfa to    

.   P o le s due to i espo si le eha io  of  o k 

fo e  e.g. ga li g, dis espe t to the lo al a ea a d people  

All the  o ke s  ill e i st u ted to a t 

i  a  espo si le a e  

O goi g  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed a e  

Beha io  of o ke s 

  Weekl  

Co t a to , WSSDO 

Satisfa to    

Possi le so ial gathe i g shall  e allo ed 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Uses of al ohol, e o ds of fights Weekl  

WUSC, Co t a to  

Satisfa to    

Lo al people  ill  e e plo ed as fa  as possi le 

O goi g  Lo al people e e  ai l  

i ol ed i  o st u tio  a ti ities 

Lo al su e   As  eeded 

WUSC, Co t a to  

Satisfa to    

.  Risk of a ide ts to the  o ke s a d pu li  

A site health a d safet  pla  i ludi g safet   easu es su h as p o isio  of pe so al p ote ti e e uip e t  ill  e i luded 

O goi g   Ne essa  safet  e uip e t  as p o ided to o ke s 

Use of hel et, ask, glo es, 

Boots et .   As  eeded 

WUSC, Co t a to  

Pa tiall  Satisfa to    

Fi st aid  ill  e kept  O goi g  Fi st Aid  o   Fi st aid  o   Co t a to ,  Satisfa to     

Page 68: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

at ha d i   o ki g a ea 

kept i  the site offi e 

 Mo thl  

DSC, WSSDO 

Ge e al pu li   ill e e luded f o  all o st u tio  sites 

O goi g  Ge e al pu li  e e  ot st i tl  

p ohi ited i  o st u tio  sites 

Sig oa ds    Mo thl  

Co t a to , DSC, WSSDO 

Pa tiall  Satisfa to    

I su a e  ill  e p o ided to the o ke s 

O goi g  I su a e p o ided to ea h  o ke s ith the su  of 

Rs.  ,  pe  la o . 

Health a d safet  i su a e   O e ti e 

Co t a to , DSC, WSSDO 

Satisfa to    

SANITATION COMPONENT 

.  U o ga ized disposal of e a ated ea th  Su fa e  u off, pollutio  of  ate  a s 

 Nuisa e to pedest ia s  Dete io atio  of ai  ualit  due to dust 

Safe disposal a d  e‐use of e a ated soil 

O goi g   Soil used fo  a kfilli g of 

t e hes 

Sta ki g of soil, ua tit  of soil e ai ed Dail  

Co t a to    Satisfa to    

Sp i kli g of  ate  to a oid dust 

O goi g   Dust  as a oided   sp i kli g of ate  

Dust i  the Ai    Dail  

Co t a to   E elle t   

Te po a  di e sio s a d sig oa ds  ill  e p o ided to the pedest ia s 

O goi g   Sig oa ds e e p o ided  

Sig oa ds   Dail  

Co t a to  , WSSDO 

Satisfa to    

Page 69: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

.  Loss of  egetatio  a d ha itat 

P o isio  of i i izatio  of egetatio   lea i g a d  a eful  utti g of g ou d egetatio   ill  e do e 

O goi g   Vegetatio  lea i g a d utti g of g ou d egetatio  is i i ized 

Clea ed a ea   Weekl  

Co t a to   Satisfa to    

T ees a d sh u s ill  e pla ted he e e  possi le 

O goi g   Cutti g of t ee as  ot  eeded 

i  the o st u tio  site a d alua le pla ts e e p ote ted 

as fa  as possi le  

Affo ested a ea,  u e s of t ees pla ted    Yea l  

WUSC  Satisfa to    

.  Risk of a ide ts to the  o ke s a d pu li  

A site health a d safet  pla   ill  e p epa ed a d i ple e ted 

O goi g   Ne essa  safet  e uip e t   as p o ided to o ke s 

Use of safet  gea s  Dail  

WUSC, Co t a to , WSSDO 

Pa tiall  Satisfa to    

 

   

Page 70: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Meghauli  S/N  Des iptio  of 

I pa t Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  P e‐Co st u tio  Phase 

Re ie  of Desig /Esti ate 

Co pleted  Desig /esti atio  has ee   e ie ed  

Te h i al Desig  Afte  su issio  of desig   epo t

DWSS/SSTWSSSP/PMC 

Satisfa to    

Re ie  of spe ifi atio  of  o k 

Co pleted  Wo k spe ifi atio  e ie ed 

Te h i al spe ifi atio  ega di g ate ials a d o k a ship 

Afte  su issio  of desig   epo t 

DWSS/SSTWSSSP/PMC 

Satisfa to    

Ph si al E i o e t 

Co st u tio  Phase 

  Soil e osio  a d soil sta ilit  

E a ated soil pla ed safel  agai st e osio  

Co pleted  E a ated soil  ot asted due to flood 

a d e osio  

Sta ki g of soil Qua tit  of soil e ai i g T i e a  eek 

Co t a to /WSSDO/DSC 

Satisfa to    

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe 

li e t e h a d  ell o pa ted 

Co pleted  E a ated soil  as used to fill t e hes i  the RVT site a ea 

Co t a to /WSSDO/DSC 

Satisfa to    

  Ai  Qualit   Dust  E i o e t  

F e ue t sp i kli g of  ate  

O goi g  Dust ge e atio  f o  o st u tio   ate ials a d  t e h diggi g e e a oided   

sp i kli g of  ate  

Visual O se atio    E e  da  

Co t a to /WSSDO/DSC 

Satisfa to    

Visual  o ito i g of ai   ualit  

O goi g  Ai   ualit   o ito i g ot p a ti ed 

Satisfa to    

Use of  asks  O goi g  Not st i tl  i ple e ted 

Satisfa to     

Page 71: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Deli e   ehi le  ill e  o e ed 

O goi g  Loose  o st u tio  ate ials  o e ed  ith 

ta pauli  du i g t a spo tatio   

Satisfa to    

  Noise a d Vi atio  

Rest i tio  o  u e essa  ho ki g of ho s f o  the ehi les used fo  o st u tio  pu pose 

O goi g  D i e s a e i st u ted ot to use p essu e 

ho s as fa  as possi le 

Co t ol o  use of lo i g ho s 

 Dail  du i g o st u tio  

Co t a to /WSSDO/DSC 

Satisfa to    

Regula l  ai te a e of 

e uip e t 

O goi g  E uip e t a e egula l   ai tai ed so as to p odu e less oise a d  i atio  

Pe iodi  ai te a e e o d Dail  du i g o st u tio  

Co t a to /WSSDO/ DSC 

Satisfa to    

Muffle s fitti gs o  ois  e uip e t 

O goi g  High  oise p odu i g e uip e t  as  ot used so  uffle s fitti gs  e e  ot e ui ed 

O se atio   Dail  du i g o st u tio  

Co t a to /WSSDO/ DSC 

 Satisfa to     

Speed  est i tio   O goi g  No  ajo  a ide t e o ds fou d due to ehi le speed 

Co t olli g speed  Dail  du i g o st u tio  

Co t a to /WSSDO/ DSC 

Satisfa to    

P o isio s of  oise a ie  pla ed i  

se siti e a eas 

O goi g  Hea   oise p odu i g e uip e t  ot used at o st u tio  site 

Site o se atio  Dail  du i g o st u tio  

Co t a to /WSSDO/ DSC 

Satisfa to    

Wo ks to  e est i ted to da  hou  o l  

O goi g  Wo ki g i  the  ight ti e  ot p a ti ed  

Wo ki g s hedule e o ds Dail  du i g o st u tio  

Co t a to /WSSDO/ DSC 

E elle t    

Page 72: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Biologi al E i o e t 

Co st u tio  Phase 

  I pa t o   atu al egetatio  a d e olog  Distu a e a d loss of  atu al egetatio  a d e olog  

Rest i ti g use of fuel  ood i  la o  a p. 

O goi g  Wood used as the ajo  sou e of fuel i  

the la o   a p, ho e e  haphaza d utti g do  of t ees as  ot fou d 

S oke o se atio  at la o   a p   Bia uall  

WSSDO/WUSC  Satisfa to    

P o isio  of i i izatio  of egetatio   lea a e 

O goi g  Pipeli e has  ee  lo ated so as to i i ize  egetatio  lea a e 

Clea ed a ea Affo ested a ea  Bia uall  

WSSDO/WUSC  Satisfa to    

  Loss of flo a & fau a due to p oje t sitti g & elated a ti ities 

P o isio  of i i izatio  of egetatio   lea a e 

O goi g  No  ajo  loss of ha itat  as o se ed due to p oje t  elated  a ti ities 

Appea a e of fau a   Bia uall  

WSSDO/WUSC  Satisfa to    

E i o e tal a a e ess p og a  

O goi g  Lo al  o u it  fo est  o ittee o ito  a d  o du t 

p og a s fo  p ote tio  of fo est ha itat 

Satisfa to    

Rest i ti g use of fuel  ood i  la o  a p.  

O goi g  Wood gi e    the o u it  fo est t igs a d  a hes  used as the  ajo  sou e of fuel i  the la o   a p 

Satisfa to    

So io‐E o o i  a d Cultu al E i o e t 

Co st u tio  Phase 

Page 73: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

   I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to e take  at the ti e 

of  o st u tio  

O goi g  Ne essa  p e autio  take  to  i i ize i pai e t of e isti g o u it  i f ast u tu e like oad, foot t ail, et . 

U i te upted hu a   o e e t a d  ehi le o e e t 

  Dail  

Co t a to / WSSDO/DSC 

Satisfa to    

A  da aged to the e isti g i f ast u tu e has to e  epai ed 

O goi g  No  ajo  e isti g i f ast u tu e has ee  da aged   

p oje t a ti ities 

Satisfa to    

  La  a d O de  issue a d distu a e o  so ial st u tu e & ultu e 

I st u tio  to all o ke s to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a  espo si le a d dis ipli ed  a e  

Beha io  of lo al People  Weekl  

Co t a to / WSSDO/DSC 

Satisfa to     

P ohi itio  of use of al ohol a d ga li g 

Co pleted  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

Cultu al a a e ess of lo al  o u ities to outside  o k fo e 

Co pleted  No a a e ess p og a  p o ided to  o ke s ho e e   o  iole e due to  ultu al diffe e es  e o ded 

Satisfa to    

O ie tatio  to outside  o k 

Co pleted  Sepa ate o ie tatio  fo  outside  o k fo e ot p o ided 

Belo  Satisfa tio      

  E plo e t of lo al people E o o i  o ditio  of lo al people i eases  

Positi e i pa t o  the p oje t a d o u it  

O goi g  E o o i   o ditio  of lo al people uplifted  

Appea a e of lo al people i  o k fo e 

 Weekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Page 74: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  O upatio al Health a d safet  

I st u tio  to adopt safet   easu es 

O goi g  No fo al a a e ess a d i st u tio  p og a  held ho e e  o  e o ds of  ajo  

a ide t fou d 

Use of safet  easu es e.g. 

hel et, safet   elt et .  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Fi st aid to  e easil  a essi le 

O goi g  Not i ple e ted st i tl  

Pa tiall  Satisfa to    

  Pollutio  f o  outside  o k fo e 

P ope  sa ita  o ditio  to  e ai tai ed i  the 

la o   a p  sa ita  toilet, safe d i ki g ate  

O goi g   Sa ita   o ditio  i  toilet  ai tai ed a d safe d i ki g  ate  p o ided to  o ke s 

Si k la o   Waste a d lea li ess of a ea  Bi eekl  

Co t a to /WSSDO/DSC/WUSC 

Satisfa to    

Colle tio  of solid aste i  fi ed pla e 

O goi g  Pla e fo  solid  aste olle tio   ot allo ated 

Pa tiall  Satisfa to    

Pe iodi   lea i g  O goi g  No ad e se e i o e tal o ditio  fou d at p oje t site 

Satisfa to    

  T affi  a age e t 

 .  T affi  

P io   otifi atio  of o st u tio  a ti ities 

O goi g  P e‐i fo atio  ega di g  o st u tio  o ks like du i g pipe 

la i g  o ks p o ided 

Noti e  oa ds  Use of di e sio  sig   oa ds 

Co t a to / WUSC 

Satisfa to    

Page 75: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

o gestio s a d distu a e to pedest ia s  

.  Dis uptio  of the lo al a ess 

Di e sio  sig oa ds to  e p o ided 

O goi g  Not st i tl  i ple e ted 

 As  eeded 

Co t a to / WUSC 

Pa tiall  Satisfa to    

Co st u tio  of D ai age Wo k   Soil e osio , silt 

u off a d u settled st eet su fa es 

E a ated soil pla ed safel  agai st e osio  

O goi g  Majo  a ou t of the e a ated soil used fo  a kfilli g a d e ai i g soil used to p ote t agai st e osio  

 Sta ki g of soil  Mo ito i g of soil disposal site.  Dail  

Co t a to /DSC  Satisfa to    

Reuse of e a ated soil p ope l  du i g a kfilli g  ith  ell o pa ted 

O goi g   E a ated soil  as ei g used to  a kfill 

of  t e hes 

Satisfa to    

Su plus soil to  e disposed i  p ope  pla es  A ju  Khola a d E isti g du pi g site  

O goi g  Su plus ea th  ot  ield i   o side a le a ou t 

Satisfa to    

  Ai , dust a d oise pollutio  

F e ue t sp i kli g of  ate  

O goi g  Dust ge e atio  f o  o st u tio   ate ials a d  t e h diggi g e e a oided   

sp i kli g of  ate  

Dust i  Ai   Co t a to / WSSDO/DSC 

Pa tiall  satisfa to    

Mo ito i g of ai  ua tit  

O goi g  Ai   ualit   o ito i g ot p a ti ed 

Pa tiall  satisfa to    

Page 76: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g e a ks E elle t/Satisfa to/Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Use of ta pauli  to o e  loose o st u tio  ate ials  sa d a d 

Agg egate  at the ti e of t a spo tatio  

O goi g  Co st u tio   ate ials o e ed du i g t a spo tatio  usi g ta pauli  to a oid dust ge e atio  

Satisfa to    

T a spo tatio  of o st u tio  ate ials as a d he   e ui ed 

O goi g  T a spo tatio  of o st u tio   ate ials do e o l  i  the e essa  a eas to 

a oid a  u e essa  dust ge e atio  

satisfa to    

  Distu a e a d isk of a ide ts o  site to  o ke s a d pu li  

I fo  the pu li  i  ad a e 

O goi g  P io  i fo atio  to the pu li  gi e   efo e soil e a atio  

Use of sig   oa d, di e sio   oa d Use of safet  gea s Fi st aid  o  A ide t  e o ds Dail  

Co t a to /DSC  Satisfa to     

Follo  the safet  ules fo  all o st u tio  a ti ities 

O goi g  Not i ple e ted st i tl  

Pa tiall  Satisfa to     

E lude the pu li  f o  the o st u tio  site a d use of  oti e  oa d & di e sio  sig s 

O goi g  Pu li  a e  ot st i tl  e luded f o  o st u tio  site 

Pa tiall  Satisfa to     

Use of p ote ti e e uip e t like glo es,  oots, fa e ask et .  

O goi g  P ote ti e e uip e t p o ided   o t a to s  ut o ke s do ’t use 

the   o pulso il   

Co t a to /DSC  Pa tiall  Satisfa to    

 

Page 77: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

   

Page 78: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Kakad itta   Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  phase   

Distu a e to the la d s ste  a d soil e osio  

E a atio  te h i ue Ba kfilli g the pipeli e t e h ith p ope  o pa tio  

Co st u tio  site 

Co pleted  E a atio   o k do e a efull   ith  i i u  i atio  a d slope distu a e  Co pa ted    a i g  

Di e t o se atio  a d  e o d i spe tio  Dail   

Co t a to / DSC 

Satisfa to     

Soil disposal a ea 

Co pleted  E a ated soil is  o pletel  used fo   a kfilli g  

Di e t o se atio  a d  e o d i spe tio   Dail  du i g o st u tio  o k 

Co t a to  DSC 

E elle t    

Sta ki g of soil  Co pleted  Sta ki g of soil do e a efull  to a oid e osio   

O se atio   Dail   

Co t a to  DSC 

Satisfa to     

Su fa e a d g ou d ate   ualit  

Wate   ualit  Dissol ed o ge , BOD, Tu idit , et . 

La o ato   Co pleted   Wate   ualit  testi g  epo t sho s that  esults a e ithi  the  a ge of NDWQS 

 Esta lished la o ato  fo  pe iodi  test of  ate  ualit  

Re o d i spe tio    Mo thl  

DSC  Satisfa to     

Qua i g   Qua i g a ti it  Lo al aestheti s 

Qua  site  Co pleted  Qua  sites allo ated   u i ipalit   e e i  use fo  ua i g  

Di e t o se atio  a d  o t a to  e o ds O e  

DSC WUSC 

Satisfa to     

Page 79: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Ai  a d Noise pollutio  

Use of e uip e t a d ehi les 

Co st u tio  a d Ope atio  site 

Co pleted  I st u ted to  ehi le staff to i i ize  lo i g of ho s 

f o   ehi les used fo  o st u tio  pu pose  Regula   lea i g   ope ato s a d  ai te a e i   o kshop i   ase of eakdo  

Re o d i spe tio    Weekl   

DSC/WUSC  Satisfa to     

Qualit  of fuel  Co pleted  Fuel supplied   NOC used   Re o ds Weekl  

DSC/ Co t a to   

Satisfa to     

Sp i kli g of ate  

 

Co pleted  Sp i kli g of  ate  do e as pe   e ui e e t 

O se atio    Weekl   

DSC/ Co t a to  

Satisfa to     

Use of  uffle s  Co pleted  Wo k do e  ith  i i al oise 

I st u ted to i stall if e ui ed  

 Site o se atio   Weekl  

DSC/ Co t a to   

Satisfa to     

Loss of egetatio  

Clea ed a ea  Co st u tio  site 

Co pleted  I st u tio  gi e  to  o ke s fo   i i izatio  of egetatio   lea a e   No pote tial loss of t ees/ egetatio /aestheti s i  the s he e a ea  NGO has  ee   o du ti g e i o e tal a a e ess p og a s 

O se atio  a d  e o d i spe tio   Weekl   

Co t a to / WUSC 

Satisfa to     

No of t ees/sh u s pla ted 

Page 80: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

I pa t o  a uati  a i als 

Qualit  of efflue t 

Co st u tio  site a d outlet of t eat e t pla t 

Co pleted  D ai age  e e  o st u ted sepa atel   Efflue t f o   o st u tio  site   olle ted i  pits a d t eat e t pla t  e e dis ha ge to  ea  e pt  d ai   ith  o settle e ts a ou d 

Re o d i spe tio    Mo thl  

WUSC/DSC  Satisfa to     

P o le s f o  outside o k fo e 

Beha io  of the o ke s 

P oje t a ea  Co pleted  I st u ted all  o ke s to a t i  a  espo si le  a e   No  o plai ts a d a  othe   ase o se ed 

Re o d i ui  Co u i atio  ith people 

Mo thl  a d as eeded 

WUSC/ Co t a to   

Satisfa to     

Uses of al ohol Re o ds of fights 

Co pleted  No  ase o se ed  i.e. fights,  o plai ts et .  

Lo al su e   Weekl   

WUSC Co t a to  

 Satisfa to     

Distu a e to the lo al people 

Use of sig oa ds, oti e  oa d 

P oje t a ea  Co pleted   Sig oa ds  e e used i   ajo  pu li  a eas 

Lo al su e   Weekl  

WUSC Co t a to  

 Satisfa to     

Disposal a ea  Co pleted  Wastes  e e disposed at autho ized a eas f o  Mu i ipalit  

Site o se atio  Re o ds  Mo thl  a d as eeded 

WUSC/ Co t a to  

Satisfa to     

O upatio al Health a d Safet  

T pe a d u e  of 

a ide ts A site health a d safet  pla  i ludi g safet  

Co st u tio  site 

Co pleted  No  ase of a ide ts o se ed  Safet  e uip e t  e e p o ided to  o ke s Toilet  o st u ted a d 

Visual o se atio    Dail   

Co t a to  DSC 

Satisfa to     

Page 81: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

easu es su h as p o isio  of ask, hel et, 

ha d glo es a d  u e  oots to o ke s  ill  e 

p epa ed a d i ple e ted P ope  sa ita  o ditio  to  e ai tai ed i  

the la o   a p 

os uito  ets supplied i  a p   Solid  aste  olle ted a d disposes  i  pit 

Fi st aid a d e e ge  se i es 

Co pleted   Fi st aid kit pla ed  i   site offi e 

Sit o se atio   Weekl   

DSC   

 Satisfa to  

 

 

   

Page 82: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Da akh‐Sukhad  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e  i ple e tatio  

P e‐ o st u tio  Phase 

.  Detailed Desig   Re ie  of Desig  / Esti ate Co pleted 

Co pleted           

.  P e‐Co st u tio   

Re ie  of Spe ifi atio  of Wo k 

Co pleted           

Co st u tio  Phase 

Ph si al E i o e t 

.  Soil e osio  , soil sta ilit  a d Geolog  

E a ated soil pla ed safel  agai st e osio  

Co pleted           

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe 

li e t e h a d  ell o pa ted 

Co pleted           

  Ai   ualit   Dust  E i o e t  

F e ue t sp i kli g of ate  

Co pleted           

Visual  o ito i g of ai   ualit  

Co pleted           

Use of  asks  Co pleted           

Page 83: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e  i ple e tatio  

  Noise a d Vi atio  

P o isio  of est i tio  o   lo i g of p essu e ho  haphaza dl  fo  the ehi le i ol e i  o st u tio  o ks 

Co pleted           

Regula   ai te a e of e uip e t 

O goi g  Use of old a d o  out 

e uip e t  as p ohi ited to edu e the  oise a d pollutio  

Pe iodi  Mai te a e e o d E e  da  

Co t a to /WSSDO/DSC  

Satisfa to    

Biologi al E i o e t 

  I pa t o   atu al egetatio  a d e olog  due to o st u tio  of diffe e t o po e ts of s ste  like pipe la i g,  ate  ta k, t eat e t pla t,  uildi g. et .   

Rest i ti g use of fuel ood i  la o   a p, 

Co pleted           

P o isio  of i i izatio  of egetatio   lea a e a d fo estatio  he e e e   eeded 

Co pleted           

  I pa t o  flo a, fau a a d ha itat due to p oje t sitti g a d elated a ti ities 

E i o e tal a a e ess p og a  

Co pleted           

So io‐e o o i  E i o e t 

Page 84: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e  i ple e tatio  

  I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to e take  at the ti e 

of  o st u tio  

Co pleted           

A  da age to the e isti g i f ast u tu e has to  e  epai ed 

Co pleted           

  La  a d o de  issues due i pa t o  so ial st u tu e a d ultu al aspe t  I flu  of outside o kfo e, o e  a d 

u a ted a ti ities  Cultu al diffe e e 

I st u tio  to all o ke s to a t i  a espo si le  a e  

Co pleted           

P ohi itio  of use of al ohol a d ga li g 

Co pleted           

Cultu al a a e ess p og a   ill  e o du ted to the outside  o kfo e 

Co pleted           

  O upatio al Health a d Safet  I pa t o  health depe di g upo  o ki g o ditio  

I st u tio  to adopt safet   easu es 

Co pleted           

Page 85: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e  i ple e tatio  

O upatio al health a d safet  OHS  Pu li  health 

Fi st aid at ha d i  the  o ki g a ea 

Co pleted           

  Co u it  Health a d Safet  

P ope  sa itatio  a d h gie e to  e ai tai ed 

Co pleted           

Qualit  of d i ki g ate  to  e o ito ed 

Co pleted  P o le  of A se i  o te t i  the household suppl  s ste  at Sadepa i 

D i ki g  ate  ualit  tests 

 Weekl  

WSSDO, WUSC, Co t a to  

Satisfa to    

Colle tio  of Solid aste i  fi ed pla e 

Co pleted           

 

   

Page 86: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Muku dapu  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase 

Ph si al E i o e t 

  Da age to utilit  li es,  o u it  se i es a d i f ast u tu e 

Lo atio  of p oje t st u tu es a oid ele t i  poles, po e  suppl  st u tu es a d i f ast u tu es 

Co pleted  No  ajo  da age to pu li  a d pe so al i f ast u tu e  e o ded 

O se atio , o sultatio  ith lo al 

people   Weekl  du i g o st u tio  

DWSS/ SSTWSSSP 

Satisfa to    

People  ill  e  otified a d se i es  esto ed as soo  as possi le to o e o e pu li  i o e ie e 

Co pleted  P e‐i fo atio  gi e  to pu li  a out the distu a e a d i o e ie e espe iall  du i g pipe la i g  oks 

Satisfa to     

Lette  of app o al a d ag ee e ts  ill  e o tai ed 

Co pleted  Pe issio  o tai ed f o   o e ed autho ities 

E elle t   

  Ai ,  ate  a d oise pollutio  

Dust supp essio  at the site   sp i kli g  ate  at egula  i te als. 

o goi g  Dust ge e atio  f o  o st u tio   ate ials a d  t e h diggi g  e e a oided   sp i kli g of ate  

O se atio , sp i kli g of ate ; 

Do oil a d g ease, A ou t of oise le els 

i  dB Mo thl  

PIU/DSC  Pa tiall  Satisfa to    

No e uip e t,  hi h  ill p odu e hea   oise  ill e used 

o goi g  High  oise p odu i g e uip e t  e e  ot used 

Satisfa to    

Page 87: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Haphaza d disposal of aste    o ke s  ill  e o ito ed. Leakage a d 

disposal of oil a d g ease ill  e  he ked  egula l  

a d  epai ed i ediatel  if  oti ed. 

o goi g  Disposal of  o st u tio  astes do e at 

sa tio ed a ea ho e e  solid  aste  a age e t at  a psite  as  ot fou d; No leakage of g ease a d oil fou d 

Satisfa to    

  I pa ts o  Qua  a d Spoil disposal site 

A oidi g u sta le a d e osio  p o e sites Qua i g a ti ities f o  i e s/st ea s  ill  ot  e allo ed so as to  ha ge the  i e   oss se tio s a d lo gitudi al p ofiles 

Co pleted  Co st u tio   ate ials ought f o   egiste ed ushe  i dust   hose ua i g sites a e at 

Dhu ki as a d Ma oha i i e  a d e t a tio   ei g do e  ithout ha pe i g the  i e  p ofile 

O se atio    Mo thl  

DSC/WUSC  Satisfa to    

Qua  site  ill  e le eled  to suit the lo al la ds ape afte  e t a tio  is  o plete 

Co pleted  P a ti ed   a  egiste ed C ushe  I dust   

Satisfa to    

Du pi g of e a ated soil i  oute  side of t e h opposite to oadside a d  a kfilli g 

Co pleted  E a ated soil  as du ped opposite to oadside  so as to i i ize the  lo kage of 

the  oad 

Satisfa to    

   

E osio  a d la d su fa e  distu a e 

E a ated soil  ill  e pla ed agai st e osio  

Co pleted  No  isk of e osio  of soil fou d 

O se atio  a d  e o ds o  a ou t of la d e a ated a d e a ated soil  eused 

DSC/WUSC  Satisfa to    

Reuse of e a ated soil a d  a kfilli g of t e hes  ill  e do e 

Co pleted  Ba kfilli g of soil  ei g do e i ediatel  afte  o pletio  of pipe la i g o ks a d  e ai i g soil 

a e used fo  filli g of the t e hes at OHT site 

Satisfa to     

Page 88: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

As fa  as possi le o st u tio  a ti ities ill  e a oided i  the ai  seaso  

Co pleted  No  ajo   o st u tio  o ks a d pipe la i g o ks do e du i g  ai  

seaso    

 Weekl  

Satisfa to    

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

Co pleted  Di e sio  sig oa d pla ed du i g e a atio  o k i  the  oad 

Satisfa to    

Biologi al E i o e t 

   Loss of  egetatio   The lo atio  of  ese oi s a d  oute of the t a s issio  li e f o  the i take at the st ea  to the sto age ta k has ee  pla ed to a oid ai  fo est. 

Co pleted  T a s issio  pipeli e alig e t has  ee  desig ed so as to i i ize  egetatio  lea a e a d a oid  ai  fo est 

O se atio , Co sultatio  ith CFUGs 

 Dail   hile o ki g 

i side fo est a ea 

DFO/DSC  Satisfa to    

CFUs  ill  e suppo ted i  affo estatio  

Co pleted  Affo estatio  pla  has ot  ee   o du ted  et  CFU 

Satisfa to    

  Possi le Fi e ood e t a tio  a d NTFP/Ti e  E ploitatio , Hu ti g a d Poa hi g of Wild life 

Use of fuel  ood a d ti e   olle tio   ill  e p ohi ited 

Co pleted  Fuel  ood used  ut  ith st i t  o ito i g of CFU thus e ess  ood  ot used 

O se atio ,  Re o ds a d o sultatio  ith lo al 

people a d CFUGs    Mo thl  

DFO/DSC  Satisfa to    

Illegal  olle tio  of NTFPs a d t ade  ill  e p ohi ited. 

Co pleted  No illegal  olle tio  a d t adi g of  t ees fou d 

E elle t 

LPG/ke ose e  ill  e p o ided to the o kfo e.  

Co pleted  Wo ke s  asi all  use ood as the sou e of 

fuel ho e e  haphaza d utti g of t ees  ot fou d 

Satisfa to  

Page 89: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

E ou age a d suppo t the lo al  o u it  to o t ol illegal hu ti g a d poa hi g of  ildlife a d s uggli g of fo est esou es. 

Co pleted  No  e o ds of illegal hu ti g a d poa hi g of ildlife fou d 

E elle t 

A a e ess  aisi g p og a s  ill  e o ga ized to edu ate lo al people i  fo est o se atio  

Co pleted  A a e ess p og a  a e ei g  o du ted ega di g fo est o se atio    lo al NGOs 

Satisfa to  

So io‐E o o i  a d Cultu al E i o e t 

  Sou e dispute a d ate  use  o fli ts 

Co sultatio  a d ag ee e t  ith  ate  use s g oups 

Co pleted  WUSC pla s  ital  ole fo  oo di atio  a o g people so  o  ajo  o fli t fou d 

Co sultatio  ith 

diffe e t ate  use s 

g oups  O e du i g Desig  Phase 

DWSS/SSTWSSSP 

Satisfa to    

  E plo e t ge e atio  a d i ease i  i o e 

P io it  to lo al people O  jo  t ai i g 

Co pleted  No fo al t ai i g p o ided to  o kfo e a d due to the la k of lo al  a po e  e plo e s a e hi ed f o  ea  dist i ts 

Co sultatio  ith lo al 

people,  E plo e t e o ds Mo thl  

PIU/DSC  Satisfa to    

  Distu a e to o u it  a ti ities 

T affi  Ma age e t Pla  ill  e de eloped a d o k  ill  e  o du ted 

as  ui kl  as possi le to i i ize distu a e 

Co pleted  Wo ki g at the u a  a eas  e e do e  ui kl  to a oid t affi  o gestio  a d distu a e to pu li s 

O se atio  a d   Co sultatio  

DSC/WUSC  Satisfa to    

Page 90: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Reside ts  ill  e o sulted a d i fo ed a out the distu a es i  ad a e 

Co pleted  P e‐i fo atio  ega di g  o st u tio  o ks like du i g pipe 

la i g  o ks gi e  

ith lo al people  Weekl  

Satisfa to    

  So ial dispute a d dissatisfa tio  

Lo al people  ill  e gi e  p io it  fo  the e plo e t 

Co pleted  P io it  gi e  to lo al  ut due to la k of lo al a po e   o kfo e 

hi ed f o   ea  dist i ts 

O se atio  a d  Co sultatio  ith lo al 

people  Weekl  

DSC/WUSC  Satisfa to    

All the  o ke s  ill  e i st u ted to a t i  a espo si le  a e  

Co pleted  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed  a e  

Satisfa to    

P ohi itio  of al ohol, ga li g 

Co pleted  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

  O upatio al Health a d safet  

P o ide t ai i g to o ke s o  the pote tial 

o upatio al health a d safet  i pa ts/haza ds a d  itigatio   easu es to  e used du i g o st u tio  

Co pleted  No fo al t ai i g p og a s  ega di g safet   easu es a d o upatio al health p o ided to  o ke s 

O se atio  a d Co sultatio  ith la o s 

a d lo al people    Weekl  

PIU/DSC  Satisfa to    

Fi st aid  ill  e kept at ha d i   o ki g  a ea 

Co pleted  Fi st aid  o  ge e all  kept at the  o st u tio  a p site 

Satisfa to    

Ge e al pu li   ill  e e luded f o  all o st u tio  sites 

Co pleted  Not effe ti el  i ple e ted due to the eas  a essi ilit  of the o st u tio  site 

Satisfa to    

I su a e  ill  e p o ided to the  o ke s 

Co pleted  I su a e p o ided to ea h  o ke s  ith the su  of Rs.  ,  pe  la o . 

Satisfa to     

Page 91: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  Co u it  Health a d Safet  

Re ui ed h gie i  o ditio s  ill  e ai tai ed i  the la o  a ps. 

Co pleted  No epide i  disease o  e to  sp ead fou d at la o   a p ho e e  solid aste  a age e t  as ot fou d 

O se atio    Weekl  

DSC/WUSC  Satisfa to    

D i ki g  ate  fa ilit  a d te po a  pit lat i e ill  e esta lished at o st u tio  sites to o t ol ope  defe atio  a d pollutio  of  ate  odies   the  o ke s. 

Co pleted  Ope  defe atio   ot fou d a d la o  use te po a  pit lat i e; Pollutio  of  ate   odies 

 la o   ot fou d 

Satisfa to    

A a e ess  elated to o u it  health a d safet  to the lo al people 

Co pleted  A a e ess p og a  o du ted   lo al NGOs ega di g health a d safet  to lo al people 

Satisfa to    

 

   

Page 92: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   V as  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase 

Ph si al E i o e t 

  Da age to utilit  li es,  o u it  se i es a d i f ast u tu e 

Lo atio  of p oje t st u tu es to a oid ele t i  poles, po e  suppl  st u tu es a d i f ast u tu es 

Co pleted  No  ajo  da age to pu li  a d  i f ast u tu e e o ded 

O se atio , Co sultatio  ith lo al people 

  Weekl  du i g o st u tio  

DWSS/ SSTWSSSP 

Satisfa to    

People  ill  e  otified a d se i es  esto ed as soo  as possi le to o e o e pu li  i o e ie e 

Co pleted  P e i fo atio  gi e  to pu li  a out the distu a e a d i o e ie e, espe iall  du i g pipe la i g  oks 

Satisfa to     

Lette  of app o al a d ag ee e ts  ill  e o tai ed 

Co pleted  Pe issio  o tai ed f o   o e ed autho ities 

E elle t   

  Ai ,  ate  a d oise pollutio  

Dust supp essio  at the site  sp i kli g  ate  at 

egula  i te als. 

O goi g  Dust ge e atio  f o  o st u tio   ate ials a d  t e h diggi g e e a oided   

sp i kli g of  ate  

O se atio , sp i kli g of ate ; Oil a d 

g ease e uip e t, A ou t of  oise le els i  dB  Mo thl  

PIU/DSC  Pa tiall  Satisfa to    

No e uip e t,  hi h  ill p odu e hea   oise  ill  e used 

O goi g  Hea   oise p odu i g e uip e t  e e  ot used 

Satisfa to    

Page 93: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Haphaza d disposal of aste    o ke s  ill  e o ito ed. Leakage a d 

disposal of oil a d g ease ill  e  he ked  egula l  

a d  o e ted i ediatel  if  oti ed. 

O goi g  Disposal of o st u tio   astes do e at sa tio ed a eas. Ho e e  solid aste  a age e t at a psite  as  ot fou d; No leakage of g ease a d oil fou d 

Pa tiall  Satisfa to    

  I pa ts o  Qua  a d Spoil disposal site 

A oidi g u sta le a d e osio  p o e sites Qua i g a ti ities f o  i e s/st ea s  ill  ot  e allo ed so as to  ha ge the i e   oss se tio s a d lo gitudi al p ofiles 

O goi g   Co st u tio   ate ials ought f o  

egiste ed  ushe  i dust   hose ua i g sites a e at 

Seti  i e  at Kot e a d e t a tio   ei g do e ithout ha pe i g the i e  p ofile 

O se atio    Mo thl  

DSC/WUSC  Satisfa to    

Qua  site  ill  e le elled to suit the lo al la ds ape afte  e t a tio  is  o plete 

O goi g  P a ti ed   the egiste ed  ushe  i dust   

Satisfa to    

Du pi g of e a ated soil o  oute  side of t e h opposite the  oadside a d a kfilli g 

O goi g  E a ated soil  as du ped opposite to the  oadside  so as to i i ize  lo kages oad 

Satisfa to    

  

E osio  a d la d su fa e  distu a e 

E a ated soil  ill  e pla ed agai st e osio  

O goi g  Sta ki g of soil a e do e i  plai  a eas so as to a oid e osio  of soil 

O se atio  a d e o ds o  a ou t of la d e a ated a d 

DSC/WUSC  Satisfa to    

Page 94: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Reuse of e a ated soil a d a kfilli g of t e hes  ill e do e 

O goi g  Ba kfilli g of soil  ei g do e i ediatel  afte   o pletio  of pipe la i g  o ks a d e ai i g soil a e used fo  filli g of the t e hes at RVT sites 

e a ated soil eused  Weekl  

Satisfa to   

As fa  as possi le o st u tio  a ti ities  ill e a oided i  the  ai  

seaso  

O goi g  No  ajo   o st u tio  a d pipe la i g  o ks do e du i g  ai  seaso    

Satisfa to  

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

O goi g  Di e sio  sig oa d pla ed du i g e a atio   o ks 

Satisfa to  

Biologi al E i o e t 

  Loss of  egetatio   The lo atio  of  ese oi s a d  oute of the t a s issio  li e f o  the i take at the st ea  to the sto age ta k has  ee  pla ed to a oid the  ai  fo est. 

O goi g  T a s issio  pipeli e alig e t has  ee  desig ed so as to i i ize  egetatio  lea a e a d a oid the  ai  fo est 

O se atio , Co sultatio  ith CFUGs 

 Dail   hile o ki g i  fo est 

a eas 

DFO/DSC  Satisfa to    

CFUs  ill  e suppo ted i  affo estatio  

O goi g  Affo estatio  pla  has ot  ee  i ple e ted et   Bag ha j a g CFU 

Belo  satisfa tio    

  Possi le Fi e ood e t a tio  a d NTFP/Ti e  

Use of fuel  ood a d ti e   olle tio   ill  e p ohi ited 

O goi g  Wood gi e    the o u it  fo est t igs a d  a hes  

O se atio ,  Re o ds a d 

DFO/DSC  Satisfa to    

Page 95: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

E ploitatio , Hu ti g a d Poa hi g of Wild life 

Illegal  olle tio  of NTFPs a d t ade  ill  e p ohi ited. 

O goi g  No illegal  olle tio  fou d 

o sultatio  ith lo al people 

a d CFUGs    Mo thl  

Excellent

LPG/ke ose e  ill  e p o ided to the  o kfo e.  

O goi g   Wo ke s  asi all  use ood as the sou e of 

fuel gi e    the o u it  fo est t igs a d  a hes  

Partially satisfactory

E ou age a d suppo t the lo al  o u it  to  o t ol illegal hu ti g a d poa hi g of  ildlife a d s uggli g of fo est esou es. 

O goi g  No  e o ds of illegal hu ti g a d poa hi g of  ildlife fou d 

Excellent

A a e ess  aisi g p og a s  ill  e o ga ized to edu ate lo al people i  fo est o se atio  

O goi g  A a e ess p og a s a e  ei g  o du ted ega di g fo est o se atio    lo al NGOs 

Satisfactory

So io‐E o o i  a d Cultu al E i o e t 

  Sou e dispute a d ate  use  o fli ts 

Co sultatio  a d ag ee e t  ith  ate  use s g oups 

O goi g  WUSC pla s a  ital  ole fo   oo di atio  a o g people so  o ajo   o fli t fou d 

Co sultatio  ith diffe e t ate  use ’s 

g oups O e du i g Desig  Phase 

DWSS/SSTWSSSP 

Satisfa to    

Page 96: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  E plo e t ge e atio  a d i ease i  i o e 

P io it  to lo al people O  jo  t ai i g 

O goi g  No fo al t ai i g p o ided to  o kfo e a d due to the la k of lo al  a po e ; e plo e s a e hi ed f o   ea  dist i ts 

Co sultatio  ith lo al 

people,  E plo e t e o ds Mo thl  

PIU/DSC  Pa tiall  Satisfa to    

  Distu a e to o u it  a ti ities 

T affi  Ma age e t Pla  ill  e de eloped a d  o k ill  e  o du ted as ui kl  as possi le to i i ize 

distu a e 

O goi g  Wo ks i  the u a  a eas  e e do e ui kl  to a oid t affi  o gestio  a d distu a e to pu li s 

O se atio    Co sultatio  ith lo al people 

  Weekl  

DSC/WUSC  Satisfa to    

Reside ts  ill  e  o sulted a d i fo ed a out the distu a es i  ad a e 

O goi g  P e‐i fo atio  ega di g  o st u tio  o ks  p o ided 

Satisfa to    

  So ial dispute a d dissatisfa tio  

Lo al people  ill  e gi e  p io it  fo  the e plo e t 

O goi g  P io it  gi e  to lo al ut due to la k of lo al a po e   o kfo e 

hi ed f o   ea  dist i ts 

O se atio   Co sultatio  ith lo al people 

 Weekl  

DSC/WUSC  Satisfa to    

All the  o ke s  ill  e i st u ted to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a  espo si le a d dis ipli ed  a e  

Satisfa to    

P ohi itio  of al ohol, ga li g 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

  O upatio al Health a d safet  

P o ide t ai i g to  o ke s o  the pote tial o upatio al health a d safet  i pa ts/haza ds a d itigatio   easu es to  e 

used du i g  o st u tio  

O goi g  No fo al t ai i g p og a s  ega di g safet   easu es a d o upatio al health p o ided to  o ke s 

O se atio    Co sultatio  ith la o s a d 

lo al people 

PIU/DSC  Belo  Satisfa tio    

Page 97: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Fi st aid  ill  e kept at ha d i   o ki g a ea 

O goi g  Fi st aid  o  ge e all  kept at the o st u tio   a p site 

   Weekl  

Pa tiall  Satisfa to    

Ge e al pu li   ill  e e luded f o  all o st u tio  sites 

O goi g  Not effe ti el  i ple e ted due to the eas  a essi ilit  of the  o st u tio  site 

Pa tiall  Satisfa to    

I su a e  ill  e p o ided to the  o ke s 

O goi g  I su a e of Rs. ,   p o ided to 

ea h  o ke   

Satisfa to     

  Co u it  Health a d Safet  

Re ui ed h gie i  o ditio s  ill  e Mai tai ed i  the la o  a ps. 

O goi g  No epide i  disease o  e to  sp ead fou d at la o   a p ho e e  solid  aste a age e t  as  ot 

fou d 

O se atio    Weekl  

DSC/WUSC     

D i ki g  ate  fa ilit  a d te po a  pit lat i e  ill e esta lished at o st u tio  sites to o t ol ope  defe atio  a d pollutio  of  ate  odies   the  o ke s. 

O goi g  Ope  defe atio   ot fou d a d la o  use te po a  pit lat i es; Pollutio  of  ate  odies   la o   ot 

fou d Sa e  ate   o su ed at la o   a p as that  lo al  o u it  

Satisfa to    

A a e ess  elated to o u it  health a d safet  to the lo al people 

O goi g  A a e ess p og a  o du ted   lo al NGOs  ega di g health a d safet  to lo al people 

Satisfa to    

 

Page 98: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

   

Page 99: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Leta g  Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple etatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio 

Co st u tio  phase   

Distu a e to the la d s ste  a d soil e osio  

E a atio  te h i ue 

Co st u tio  site 

O goi g   E a atio   o k do e a efull   ith  i i al i atio  a d slope distu a e 

Di e t o se atio  a d  e o d i spe tio   Dail  du i g o st u tio  

Co t a to  DSC 

Satisfa to     

Soil disposal a ea  O goi g   E a ated soil  o pletel  used fo   a kfilli g  

Sta ki g of soil  O goi g   E a ated soil sta ked o   oute  side of  t e h opposite to  oadside du i g pipe la i g  o ks a d a kfilli g i ediatel  

do e  afte   o pletio  of o k  

Su fa e a d g ou d ate  ualit  

Wate   ualit  Dissol ed o ge , BOD, Tu idit   

La o ato   Co pleted  

Wate   ualit  test do e fo  oth g ou d  ate  a d 

su fa e  ate , test  epo ts sho  that esults a e  ithi  the  a ge of NDWQS 

Re o d i spe tio    Mo thl   

Co t a to  DSC 

Satisfa to     

Qua i g   Qua i g a ti it    Lo al aestheti s 

Qua  site  O goi g   Chisa g Khola lo ated i  the Leta g VDC  used fo  ua i g a ti ities 

Di e t o se atio  a d o t a to  e o ds  O e  

DSC  Satisfa to     

Ai  a d Noise pollutio  

Use of e uip e t a d  ehi les 

Co st u tio  a d Ope atio  

O goi g   Regula   lea i g   ope ato s a d  ai te a e i   o kshop i   ase of 

Re o d i spe tio   

DSC WUSC 

Satisfa to     

Page 100: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple etatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio 

site  eakdo   No use of old  ehi les   P ope  i st u tio  to ehi le staff  

 Weekl  

Qualit  of fuel  O goi g   Fuel supplied   NOC used 

Sp i kli g of ate  

 

O goi g   As   e ui ed  Re o d i spe tio   Weekl  

DSC WUSC 

Satisfa to     

Use of  uffle s  O goi g   I st u ted   ut  ot  p a ti ed   

Site o se atio  Weekl   

DSC WUSC Co t a to   

Not satisfa to     

Loss of egetatio  

Clea ed a ea   Co st u tio  site 

  I st u tio  gi e  to  o ke s   Rest i tio  o  use of fuel ood i  la o   a p 

O se atio  a d e o d i spe tio   eekl   

Co t a to  WUSC 

Not Satisfa to     

No of t ees/sh u s pla ted 

O goi g   No t ees  e e  ut du i g o st u tio  a ti ities Pipe li e alig e t is al a s kept at a dista e f o  t ees 

 

I pa t o  a uati  a i als 

Qualit  of efflue t  Co st u tio  site a d outlet of  t eat e t pla t 

O goi g   P ope  sa ita  fa ilit  a d toilet   ith soak pit o st u ted   

Visual o se atio    Mo thl  

WUSC DSC 

Satisfa to     

P o le s f o  outside o kfo e

Beha io  of the o ke s 

P oje t a ea  O goi g  I st u ted all  o ke s to a t i  a  espo si le  a e   No  o plai ts a d  o  ases 

Re o d I ui   Co u i ati

WUSC,   Co t a to   

Satisfa to     

Page 101: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

Lo atio   I ple etatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Patiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio 

o se ed  o   ith people  Mo thl  a d as  eeded  

Uses of al ohol Re o ds of fights

O goi g   No  ase o se ed  i.e. fights,  o plai ts et  

Lo al su e  Weekl   

WUSC Co t a to  

 Satisfa to     

Distu a e to the lo al people

Use of sig oa ds,  oti e oa d 

P oje t a ea  O goi g   Te po a  di e sio s a d sig oa ds  e e p o ided fo  pedest ia s 

Lo al su e   Weekl  

WUSC Co t a to  

 E elle t    

Disposal a ea O goi g   Re ai i g  soil afte  a kfilli g is used fo  

le eli g the u e e  su fa e  

Site o se atio   Re o ds Mo thl  a d as  eeded 

WUSC Co t a to  

 Satisfa to     

O upatio al Health a d Safet  

T pe a d  u e  of a ide ts  

Co st u tio  site 

O goi g   No  ase of a ide ts o se ed  Safet  e uip e t  e e p o ided to  o ke s  Te po a  a a ge e t of sa itatio  fa ilit  a aila le at  o ki g site  

       

Fi st aid a d e e ge  se i es 

O goi g    Fi st aid kit pla ed  at  site offi e 

Visual o se atio  Weekl   

DSC Co t a to   

Satisfa to    

 

   

Page 102: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Na a a  Mu i ipalit  S/N  Des iptio  of 

I pa t Mitigatio  easu es 

p oposed 

I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted   

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase I pa ts   

.  

U o ga ized disposal of e a ated ea th    Soil e osio , silt u off   Pollutio  of su fa e  ate   Dete io atio  of ai   ualit  due to dust Distu a e to the pedest ia s      

P e autio a  easu es  ill  e 

take  du i g o st u tio  to a oid  a e i  

O goi g  E a atio   o ks e e  do e a efull  to a oid a e i  

Co t a to  e o ds  Dail  

DSC  Satisfa to    

Reuse of e a ated soil a d a kfilli g of 

t e hes  ill  e do e 

O goi g  E a ated soil as used to fill 

t e hes i  the RVT site a ea 

Qua tit  of soil e ai ed  Dail  

Co t a to    Satisfa to    

Safe disposal of e a ated soil 

O goi g  Soil used fo  a kfilli g of 

t e hes 

Disposal site  Dail  

Co t a to , WSSDO 

Satisfa to    

Sp i kli g of  ate  to a oid dust 

O goi g  Dust pa ti les a oided   sp i kli g of ate . 

Dust i  the ai   Dail  

Co t a to   Satisfa to    

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

O goi g  Te po a  di e sio   ot usuall   e ui ed. 

 Sig oa ds  Dail  

Co t a to  , WSSDO 

Satisfa to    

.   Noise pollutio        

Use of ea  plugs a d p ohi itio  o  usi g high  oise p odu i g e uip e t du i g ight shift  o k. 

O goi g  No  o plai ts f o  lo al ega di g high oise du i g ight ti e 

Co t a to  e o ds  As  eeded 

Co t a to   Satisfa to   

 

Page 103: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted   

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

 Ai  pollutio  due to  elease of e issio s 

Co e i g of o st u tio  ate ials du i g 

t a spo t a d use of  ehi les o fo i g to atio al 

sta da ds. 

O goi g  A ou t of dust i  ai   a d e issio s f o  the t a spo tatio  ehi les  e e fou d  egligi le 

Co t a to  e o ds   As  eeded 

Co t a to   Satisfa to    

.   Ge e atio  of e ess g ease, solid  aste a d othe  o st u tio  aste 

   Pollutio  of ea  

i igatio   a als a d  ate   odies 

Me ha is  of safe disposal of aste  ill  e 

de eloped i  the p oje t site  efo e the a tual o e e e t of  o k. 

O goi g  Safe disposal of the  o st u tio  aste  as 

p a ti ed  

Co t a to  e o ds    Dail  

DSC,WSSDO  Satisfa to    

P o isio  of dust i  fo  solid aste  olle tio . 

O goi g  Dust i s ha e ee  p o ided ut  e e  ot 

used ofte . 

Co t a to  e o ds  Dail  

Mu i ipalit , WUSC 

Satisfa to    

P ohi itio  of u a ted litte i g a d dis ha ge of aste 

O goi g  Toilet  ith p ope  soak pit i  the p oje t  a p a ea a d  aste dis ha ge 

A ou t a d disposal of solid aste 

Mo thl  

Mu i ipalit , WUSC, Co t a to  

Satisfa to    

.  O st u tio  i  pedest ia  a d t affi   o e e t 

Ca e  ill  e take  hile e a ati g 

a d la i g of pipes so that the e is i i al  i atio  

a d slope distu a es 

O goi g  Ma ual e a atio   as  do e to a oid slope distu a es  

Co t a to  Re o ds  U e e  su fa es  Dail  

Co t a to  , DSC 

Satisfa to    

Page 104: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted   

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Re o al of e a ated ate ial  a  

affe t the lo al la d s ste  e osio  a d soil i sta ilit  

E a ated soil  ill e du ped i  

oute  side of t e h opposite to oadside a d a kfilli g  ill  e 

do e p ope l  

O goi g  Ba kfilli g do e ith p ope  o pa tio  

Pa e e t de olitio     Dail  

Co t a to   Pa tiall  satisfa to    

Risk of pollutio  of othe  st ea s i  the a ea ausi g i ease i  tu idit  

Spoil  a age e t u it to  o k effi ie tl  to a oid the e a ated soil f o  fi di g its a  do st ea  

to othe  su fa e sou es a d i igatio   a als. 

O goi g  Othe  su fa e sou es a d i igatio   a als e e  ot 

distu ed   e a ated soil 

Co t a to  e o ds   Weekl  

Co t a to   Satisfa to    

Loss of  egetatio  a d ha itat 

P o isio  of i i izatio  of egetatio  lea i g a d a eful  utti g of g ou d  egetatio  

O goi g  Vegetatio  lea i g a d utti g of g ou d egetatio  is i i ized 

 Clea ed a ea  Weekl  

Co t a to   Satisfa to    

Pla tatio  of t ee a d sh u   he e e e  possi le 

O goi g  Cutti g of t ees as  ot  eeded 

i  the o st u tio  site a d  alua le pla ts  e e p ote ted as fa  as possi le  

Affo ested a ea, u e s of t ees 

pla ted  Yea l  

WUSC  Satisfa to    

.  Lo al  eside ts ould  e 

Wo k  ill  e o du ted as 

O goi g  Wo k i  de se settle e t a eas 

Co t a to  e o ds 

DSC, WSSDO  Satisfa to    

Page 105: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted   

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

distu ed   oise, dust a d 

i peded a ess 

ui kl  as possi le to  i i ize distu a e 

as do e  ui kl  to  i i ize distu a e 

   Mo thl  

The  eside ts  ill e  o sulted a d 

i fo  a out the distu a es i  ad a e 

O goi g  P io   oti e a d i fo atio  ega di g o k e e gi e  

to the lo al people 

Co u i atio  ith lo al people 

  As  eeded 

Co t a to , DSC, WSSDO 

Satisfa to    

.   P o le s due to i espo si le eha io  of  o k 

fo e  e.g. ga li g, dis espe t to the lo al a ea a d people  

All the  o ke s ill  e i st u ted 

to a t i  a espo si le a e  

O goi g  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed a e  

Beha io  of o ke s 

  Weekl  

Co t a to , WSSDO 

Satisfa to    

Possi le so ial gathe i g shall  e allo ed 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Uses of al ohol, e o ds of fights Weekl  

WUSC, Co t a to  

Satisfa to    

Lo al people  ill e e plo ed as 

fa  as possi le 

O goi g  Lo al people e e  ai l  

i ol ed i  o st u tio  a ti ities 

 Lo al su e   As  eeded 

WUSC, Co t a to  

Satisfa to    

.  Risk of a ide ts to the  o ke s a d pu li  

A site health a d safet  pla  i ludi g safet  easu es su h as 

p o isio  of pe so al p ote ti e e uip e t  ill  e i luded 

O goi g   Ne essa  safet  e uip e t  as p o ided to o ke s 

Use of hel et, ask, glo es, 

Boots et .  As  eeded 

WUSC, Co t a to  

Pa tiall  Satisfa to    

Fi st aid  ill  e  O goi g  Fi st Aid  o  kept  Fi st aid  o   Co t a to ,  Satisfa to     

Page 106: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted   

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

kept at ha d i  o ki g a ea 

i  the site offi e   Mo thl  

DSC, WSSDO 

Ge e al pu li   ill e e luded f o  

all  o st u tio  sites 

O goi g  Ge e al pu li  e e  ot st i tl  

p ohi ited i  o st u tio  sites 

Sig oa ds    Mo thl  

Co t a to , DSC, WSSDO 

Pa tiall  Satisfa to    

I su a e  ill  e p o ided to the o ke s 

O goi g  I su a e p o ided to ea h o ke s  ith the 

su  of Rs. ,  pe  

la o . 

Health a d safet  i su a e   O e ti e 

Co t a to , DSC, WSSDO 

Satisfa to    

SANITATION COMPONENT 

.  U o ga ized disposal of e a ated ea th  Su fa e  u off, pollutio  of  ate  a s 

 Nuisa e to pedest ia s  Dete io atio  of ai   ualit  due to dust 

Safe disposal a d e‐use of e a ated soil 

O goi g   Soil used fo  a kfilli g of 

t e hes 

Sta ki g of soil, ua tit  of soil e ai ed Dail  

Co t a to    Satisfa to    

Sp i kli g of  ate  to a oid dust 

O goi g   Dust  as a oided  sp i kli g of ate  

Dust i  the Ai    Dail  

Co t a to   E elle t   

Te po a  di e sio s a d sig oa ds  ill  e p o ided to the pedest ia s 

O goi g   Sig oa ds  e e p o ided  

Sig oa ds   Dail  

Co t a to  , WSSDO 

Satisfa to    

Page 107: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio  easu es 

p oposed 

I ple e tatio  status 

Details/  e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted   

  Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

.  Loss of  egetatio  a d ha itat 

P o isio  of i i izatio  of egetatio  lea i g a d a eful  utti g of g ou d  egetatio  ill  e do e 

O goi g   Vegetatio  lea i g a d utti g of g ou d egetatio  is i i ized 

Clea ed a ea   Weekl  

Co t a to   Satisfa to    

T ees a d sh u s ill  e pla ted he e e  possi le 

O goi g   Cutti g of t ee as  ot  eeded 

i  the o st u tio  site a d  alua le pla ts  e e p ote ted as fa  as possi le  

Affo ested a ea, u e s of t ees 

pla ted    Yea l  

WUSC  Satisfa to    

.   Risk of a ide ts to the  o ke s a d pu li  

A site health a d safet  pla   ill  e p epa ed a d i ple e ted 

O goi g   Ne essa  safet  e uip e t   as p o ided to o ke s 

Use of safet  gea s    Dail  

WUSC, Co t a to , WSSDO 

Pa tiall  Satisfa to   Use of Pe so al P ote ti e E uip e t should e  ade o pulso  fo  o ke s i  the o st u tio  site  

 

   

Page 108: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Kha d a i  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods 

a d f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Ph si al E i o e t  

Co fli t due to p oje t Lo atio  

Co sultatio  a d i ol e e t of lo al o u ities a d WUSC 

             

Co st u tio  phase   

Risk of pollutio  of i e   ate  due to the  o st u tio  of i take Ea th o k a d othe   aso  o k  

Regula   ate   ualit  o ito i g i  the ate  sou e a d 

dist i utio  s ste  

Wate   ualit  Mo ito i g,  Disposal of soil P ope l ,  Co ditio  of the pipe li e t e h 

O goi g   Ea th a d othe  aso   o k do e a efull  to p e e t i e   ate  f o  ei g polluted 

Co t a to  e o ds   T i e a eek 

Co t a to/DSC 

Satisfa to     

Reused of e a ated soil p ope l  

O goi g   E a ated soil is eused p ope l  fo  a kfill of t e hes  

Soil e osio  a d soil sta ilit  

E a ated soil pla ed safel  agai st e osio  

Sta k of soil,  Qua tit  of soil e ai  

O goi g   At Piple RVT, Gai ipa g a T eat e t pla t a d Ku apa i t eat e t pla t e osio   e e o se ed a d  io‐e gi ee i g  o k as do e to  o t ol 

a d p e e t f o  fu the  e osio   

Visual o se atio  

 T i e a eek 

Co t a to/DSC 

Satisfa to     

Page 109: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods 

a d f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Reuse of e a ated soil p ope l  du i g a kfilli g the pipe 

li e t e h  ith  ell o pa ted 

  E a ated soil is o pletel  used fo  a kfilli g  ith 

p ope   a i g 

 Ai  Qualit   Dust  E i o e t   Ai  pollutio  due to o e e t of 

p oje t  ehi les Ai  pollutio  due to dust pa ti les 

F e ue t sp i kli g of  ate  

Dust i  Ai , Depositio  o  ops a d egetatio , No  o plai ts f o  lo al eside e, Mo ito i g of e ide e issued   o e ed 

age ,  TSPM, PM , NO , SO , Co  NAAQS of Nepal 

O goi g   Spa kli g of  ate  do e as pe   eed 

Co t a to  e o ds  E e da   

Co t a to/DSC  

Satisfa to     

Mo ito i g of ai  ua tit  

Dust i  ai  a d e issio s f o  the t a spo tatio  ehi les  e e fou d egligi le 

 No  o plai  f o  lo als a d  o ke s i  the site 

Use of  asks 

Deli e   ehi le  ill e  o e ed 

Vehi le e issio  test 

Noise a d Vi atio  due to: o e e t of 

p oje t   ehi les 

Rest i tio  o  u e essa  ho ki g of ho  f o  the ehi le used fo  o st u tio  pu pose 

Co t ol o  use of lo i g ho s, 

Pe iodi  ai te a e e o d, No o plai ts f o  lo al  eside e,   he Le  

dB A WHO Sta da ds 

O goi g  P ope  i st u tio  gi e  to  ehi le staff,  o e uip e t p odu i g e essi e oise i  use 

 Regula   o ito i g of  o ki g e uip e t do e   No  o plai  of oise f o  lo als 

Co t a to  e o ds  Dust le el a d isi ilit  E e da  

Co t a to/DSC 

Satisfa to     

Regula l  ai te a e of 

e uip e t 

Muffle s fitti gs to ois  e uip e t 

Page 110: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods 

a d f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Speed  est i tio   a d  o kfo e   Wo ks  a ied out du i g da  hou  o l  

P o isio s of  oise a ie  pla ed i  

se siti e a eas Wo ks to  e est i ted to da  hou  o l  

Biologi al E i o e t  

I pa t o   atu al egetatio  a d e olog  Distu a e a d loss of  atu al egetatio  a d e olog  

Rest i ti g use of fuel ood i  la o   a p. 

S oke,  oal  O goi g   I st u tio  gi e  to o ke s a d o t a to s  

Re o ds, o u i atio   ith lo al people  Bia uall  

WUSC/DSC  Satisfa to     

P o isio  of i i izatio  of egetatio   lea a e 

Clea ed a ea,  O goi g   Vegetatio   lea i g a d  utti g of g ou d  egetatio  is  i i ized 

Fo estatio   he e e e eeded 

Affo ested a ea,  O goi g   Cutti g of the t ees e e  ot  eeded 

a d pla ts  e e p ote ted as fa  as possi le  

I pa t o  a uati  life 

Co st u tio   o k to e a oided i   ai  

seaso  

Ri e   ate  ualit  test  EC, 

PH, Do,TSS, Oil a d g ease. 

O goi g   No  o st u tio  o k  as  a out 

du i g  ai  seaso  

Co t a tos  e o ds  Bia uall  

WUSC  Satisfa to     

Qualit  of  i e   ate  to  e  egula l  o ito ed 

Ba  o  fishi g a ti ities. 

Fishi g a ti ities  O goi g   P ope  i st u tio  to  o kfo e  

Page 111: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods 

a d f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Loss of ha itat Clea a e of ushes/ egetatio

, Loss of flo a & fau a due to p oje t sitti g a d elated a ti ities 

P o isio  of i i izatio  of egetatio   lea a e 

Flo a a d fau a Dist i utio   A ti ities of la o  

O goi g   No  ase of loss of ha itat  as o se ed due to p oje t  a ti it  a d elated a ti ities 

Visual o se atio  

Bi‐a uall  a d as eeded 

Co t a to/ DSC 

Satisfa to     

E i o e tal a a e ess p og a  

So io‐E o o i  a d Cultu al E i o e t 

I pai e t to i f ast u tu e Co st u tio  a ti ities  a  i pai  so e of the e isti g o u it  i f ast u tu e su h as  oad, foot t ail et .  

P ope  p e autio  to e take  at the ti e 

of  o st u tio   A  da aged to the e isti g i f ast u tu e has to e  epai ed 

Co ditio  of the i f ast u tu es 

O goi g   E a atio   o k a d pipe la i g o k   a ied out a efull   

Co t a to  Re o ds  Dail   

Co t a to/ DSC 

Satisfa to     

    Da aged i f ast u tu e  i.e. oad  e e est ai ed to o igi al  o ditio s 

La  a d o de  issues a d distu a es o  so ial st u tu e a d  ultu al p a ti e I pa t o  so ial st u tu e & ultu al aspe ts I pa t o  e plo e t Mig atio  

I st u tio  to all o ke s to a t i  a espo si le  a e   

Beha io s of lo al people a d o ke s 

 Al ohol  ottle, Qua els, Nu e  of lo al e plo ed 

O goi g   P ope  guida e to o ke s to a t i  espo si le  a e  a d a ti g i  dis ipli e  a e   No  e o ds of fights a d use of al ohol fou d   Lo al people  e e ostl  i ol ed i  

Co t a tos  e o ds   Weekl  

Co t a to/DSC 

Satisfa to     

P ohi itio  of use of al ohol a d ga li g Cultu al a a e ess of lo al  o u ities to outside  o kfo e P io it  to  e gi e  to the lo al fo  e plo e t. 

Page 112: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods 

a d f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Lo al e o o  Cultu al  alue Pollutio  f o  outside  o k fo es   

Wo kfo e to  e st i tl  supe ised  

o st u tio  a ti ities   Wo k fo e  e e supe ised   DSC e gi ee s a d  o t a to s  

P ope  sa itatio  fa ilit   ill  e p o ided i  the la o  a p  sa itatio  toilet a d safe d i ki g  ate  

    La o   a ps a e o  hi ed uildi gs/pla es 

a d a e  ell sa itized  ith satisfa to  fa ilities  Te po a  toilet a d d i ki g  ate  fa ilities  as a aila le at la o  a p  Solid  aste  e e olle ted  i  pits 

Co t a tos  e o ds  Weekl   

Co t a to/DSC 

Satisfa to     

Colle tio  of solid aste i  fi ed pla es 

O upatio al Health a d safet  i pa t o  health of  o ke s  O upatio al Health a d Safet  OHS  So io‐e o o i  alues Pu li  health Aestheti  alues 

I st u tio  to adopt safet   easu es 

Use of safet  easu es  iz. 

Hel et, safet  elt 

et . 

O goi g   I st u ted a d e essa  safet  

e uip e t p o ided to  o ke s   Wo ke   eglige e i  usi g  Pe so al P ote ti e e uip e t 

O se atio, o t a to  e o ds  Weekl   

Co t a to/ DSC/WUSC 

Satisfa to    

Ade uate safet  e uip e t like ha d glo es, ha d  o e  hel ets a d  oots ill  e p o ide 

Fi st aid to  e easil  a essi le 

Fi st aid p o ided to the  o ke s i   ase 

Satisfa to    

Page 113: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t 

Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods 

a d f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

of a ide ts  ut e e kept i  the 

site offi e Wo ke s a e to  e i su ed   the o t a to . 

All the  o ke s e e i su ed   the o t a to  

T affi  a age e t 

T affi   o gestio s a d distu a e to pedest ia s Dis uptio  of the lo al a ess 

P io   otifi atio  of o st u tio  a ti ities 

Noti e  oa d  Use of di e sio  sig   oa d  S ooth o e e t 

of  ehi le 

O goi g   P io   oti e a d i fo atio  ega di g  o k, espe iall  fo  distu a es f o  pipe la i g a ti ities as  ei g gi e  to 

lo al people a d WUSC Di e sio  sig oa ds  e e ot i  use i  so e 

of the sites 

Visual o se atio  

 As  eeded  

Co t a to/DSC/WUSC 

Pa tiall  satisfa to      

 

   

Page 114: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Duha i  Des iptio  of I pa t  Mitigatio   easu es 

p oposed I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  phase   

Ge e atio  of  aste  ate . Su fa e  u off a d t a spo tatio  of e a ated  ate ials to ea   odies 

Distu a e of the la d s ste   Co ta i atio  of g ou d ate  

Reuse of  ate    the o su e s i  the  ea  settle e ts to i igate thei  fa  la d a d  egeta le ga de s 

O goi g   No e essi e ge e atio  of aste  ate   

Wate   olle tio  i  pits fo  euse 

Reuse of ate  

 as pe   eed 

DSC  Satisfa to    

Ca e  ill  e take   hile d illi g  o eholes so that the e is  i i al  i atio  a d distu a es 

O goi g   D illi g do e  ith  a e fo  i i al distu a e i  the 

a ea 

Co t a to  e o ds As pe   eed 

DSC  Satisfa to    

P ope  p ote tio  du i g a d afte  d illi g  ill  e do e 

O goi g   The  e ai i g d illed  o k at the e d of da  is te po a  sealed to p ote t f o   o ta i atio   

Co t a to  e o ds Dail   

DSC  Satisfa to    

Distu a e of la d s ste , e osio  a d la dslide  Cha ges i   o pholog  of ate  s ste  

 

U sta le a d e osio  p o e sites  ill  e a oided a d o l  app o ed  ua i g sites  ill  e used 

O goi g  No e osio  o se ed   Lo atio  a d  o ditio  of ua ies a d  o o  pits 

Sa d a d g a els  e e t a spo ted f o  the ua  sites app o ed   

Mu i ipalit , DDC o  VDC as app op iate 

Co t a to  e o ds     O e 

DSC  Satisfa to    

Qua i g a ti ities f o  i e s/st ea s  ill  ot  e do e so as to  ha ge the i e   oss se tio s a d lo gitudi al p ofiles Qua  site  ill  e le eled to suit the lo al la ds ape afte  the e t a tio  is o plete 

Noise pollutio   Ai  pollutio  due to  elease 

No use of old a d  o  out e uip e t a d  ehi les, lo   ualit  fuel  ill  e 

O goi g  No old  ehi les i  use p odu i g e essi e  oise a d pollutio  

Co t a to  e o ds Dust le el a d 

DSC  Satisfa to    

Page 115: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t  Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

of e issio s  

p ohi ited to  edu e  oise a d ai  pollutio . 

Fuel used as supplied   NOC 

isi ilit  As  eeded 

Regula  i spe tio  of e uip e t a d p ohi itio  of usi g high  oise ge e ati g e uip e t i  ight ti e. 

O goi g  No  o k is do e du i g ight ti e 

Co t a to  e o ds Dail   

DSC  Satisfa to    

The  o st u tio   ate ials ill  e  o e ed du i g 

t a spo tatio  to a oid dust ge e atio  

O goi g  As pe   itigatio   easu e p oposed 

Co t a to  e o ds As pe   ee du i g t a spo tatio 

DSC  E elle t   

U o ga ized disposal of e a ated ea th   Soil e osio , silt  u  off Possi le pollutio  of su fa e  ate   Dete io atio  of ai   ualit  due to dust  Distu a e to the pedest ia s 

P e autio a   easu es  ill e 

Take  du i g  o st u tio  to a oid  a i g 

O goi g  E a atio   o k do e a efull  to a oid  a i g 

Co t a to  e o ds Dail    

DSC  Satisfa to    

E a ated soil  ill  e pla ed safel  agai st e osio  

O goi g  No e osio  o se ed  E a ated soils  o pletel  used fo   a kfill of t e hes  

Sta ki g of soil Qua tit  of soil e ai ed Disposal site  Dail   

DSC  Satisfa to    

Reuse of e a ated soil Ba kfilli g of t e hes  ill e do e 

Safe disposal of e a ated soil 

As fa  as possi le o st u tio  a ti ities  ill e a oided i  the  ai  

seaso . 

O goi g  A oided  o st u tio   o k su h as diggi g t e hes du i g  ai  seaso  

Co t a to  e o ds  As  eeded 

DSC/ Co t a to s 

Satisfa to    

Page 116: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t  Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Sp i kli g of  ate  to a oid dust 

O goi g  Sp i kli g of  ate  do e i  eed  a ea  

Dust i  the Ai  Dail   

 DSC/ Co t a to  

Satisfa to    

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

O goi g  Cautio  at  us   oad a d de se a ea  e e used  hile pipe la i g a d othe  o st u tio  a ti ities 

Sig oa ds Dail   

Co t a to   Satisfa to    

Ge e atio  of e ess g ease, solid  aste a d othe   o st u tio   aste 

Pollutio  of  ea  i igatio   a al sa d  ate  odies 

O goi g  Most of the  o ke s a e lo al people a d the o ke s f o  outside  e e 

p o ided p ope  sa itatio  fa ilit  a d p ope  guida e p o ided 

Co t a to  e o ds Mo thl  

DSC,WUSC,VDC 

Satisfa to    

Me ha is  of safe disposal Su h as g ease i te epto  of  aste  ill  e de eloped i  the p oje t site  efo e the a tual  o e e e t of  o k 

O goi g  Waste ge e ated  e e disposed to allo ated a ea 

Co t a to  e o ds  Dail   

DSC  Satisfa to    

P ohi itio  of u a ted Litte i g a d dis ha ge of aste 

O goi g  Waste  ate  a d hu a  aste  e e disposed i to a 

soak pit 

A ou t a d disposal of solid Waste/Mo thl   

DSC  

Satisfa to    

O st u tio  i  pedest ia  a d t affi   o e e t  Re o al of e a ated ate ial  a  affe t the 

lo al la d s ste e osio  a d oil i sta ilit  

Ca e  ill  e take   hile e a ati g a d la i g pipes so that the  i i al i atio  a d slope distu a es 

O goi g  E a atio   o k is do e a efull   

Co t a to  e o ds U e e  su fa es Dail  

DSC, Co t a to  

Satisfa to    

E a ated soil  ill  e du ped i  oute  side of t e h opposite to  oadside a d  a kfilli g should  e 

O goi g  E a ated soil pla e safel  to p ote t pa e e t  Ba kfilli g is do e 

Visual i spe tio     

Co t a to   Satisfa to    

Page 117: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t  Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

do e p ope l   i ediatel  afte  o e tio  is  o pleted 

 Dail  

E a ated soil  ill  e pla ed safel  agai st e osio  

O goi g  E a ated soil is  o pletel  used fo   a kfilli g 

Sta ki g of soil Dail  

Co t a to , DSC 

Satisfa to    

Loss of  egetatio  a d ha itat 

P o isio  of  i i izatio  of egetatio   lea i g a d a eful  utti g of g ou d egetatio  

O goi g  No  eed to  ut t ees a d pla ts I  so e of the pla es du i g pipe la i g  o k  lea i g of g ou d  egetatio   e ui ed 

Clea ed a ea Weekl  

Co t a to    Satisfa to    

Pla tatio  of t ee a d sh u  he e e e  possi le 

O goi g   Pla tatio   ot do e the atio  :  

Affo ested a ea, u e s of 

t ees pla ted Yea l   

WUSC  Satisfa to    

Lo al  eside t  ould  e distu ed  oise, dust a d i peded a ess 

Wo k to  e  o du ted as ui kl  as possi le to i i ize distu a e 

O goi g  I su a e of  o ke s do e Dis ussio  a d  eeti g ith lo al people a d WUSC 

a out a ti ities 

Co t a to  e o ds Mo thl  

DSC  Satisfa to    

Reside ts  ill  e  o sulted a d i fo ed a out the distu a es i  ad a e 

O goi g  Dis ussio  a out the  o k du i g  eeti gs  ith WUSC i  pa ti ipatio  of lo al people 

Co u i atio   ith lo al people As  eeded 

Co t a to   Satisfa to    

P o le s due to i espo si le  eha io  of o k fo e  e.g..ga li g, 

dis espe t to the lo al a ea a d people  

All the  o ke s  ill  e i st u ted to a t i  a espo si le  a e  

O goi g  P ope  guida e to  o ke s to a t i   espo si le a e  

Beha io  of o ke s 

Weekl  

Co t a to , WUSC 

Satisfa to    

P ohi itio  of al ohol, ga li g 

O goi g  No  e o ds of fights  Uses of al ohol, e o ds of fights Weekl  

Co t a to , WUSC 

Satisfa to    

Page 118: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t  Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted  

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Lo al people  ill  e e plo ed as fa  as possi le 

O goi g  Lo al  o ke s  e e gi e  p io it  

Lo al su e  As  eeded 

Co t a to    Satisfa to    

Risk of a ide ts to the o ke s a d pu li  

As its health a d safet  pla  i ludi g safet   easu es su h As p o isio  of  ask, hel et, ha d glo es a d u e   oots to  o ke s  ill e p epa ed a d 

i ple e ted 

O goi g  Safet   easu es p o ided ut  otused    o kfo e 

p ope l  

Use of hel et,  ask, glo es,  oots et . Dail   

Co t a to   Pa tiall  satisfa to    

Fi st aid  ill  e kept at ha d i  Wo ki g a ea 

O goi g  Fi st Aid kit a aila le i  site offi e  

Fi st aid  o  Mo thl  

Co t a to , DSC 

Satisfa to    

Ge e al pu li   ill  e e luded Fo al  o st u tio  sites 

O goi g  Lo al people see  at o st u tio  sites 

Sig oa ds   Mo thl   

Co t a to   Pa tiall  satisfa to    

I su a e  ill  e p o ided to the  o ke s 

O goi g  I su a e of  o ke s do e a d WUSC  e e s a a e 

Health a d safet  i su a e O e  

Co t a to , DSC 

Satisfa to    

 

   

Page 119: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Dha kuta  Des iptio  of I pa t  Mitigatio   easu es 

p oposed Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito ig o du ted  

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  

Satisfa to /Belo  Satisfa tio /Poo /Ve Poo , Not 

appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio   Phase   

Distu a e to the la d s ste  a d soil e osio  

E a atio  te h i ue  Qua tit  of soil  e ai ed 

O goi g   E a atio   o k is do e  a efull  to a oid  a i g  

Di e t o se atio  a d e o d i spe tio   Dail  du i g o st u tio  

Co t a to/ DSC 

Satisfa to     

Soil disposal a ea  E a ated soil used o pletel  fo  a kfilli g of 

t e hes Sta ki g of soil  No e osio  

o se ed Qua i g  Qua i g A ti it  

Lo al aestheti s o t a to  e o ds 

O goi g   Sa d a d g a els t a spo ted f o  the  ua  sites app o ed   Mu i ipalit , DDC o  VDC as app op iate 

Di e t o se atio  a d o t a to  e o ds  O e  

DSC  Satisfa to     

Ai  a d Noise pollutio   Use of e uip e t a d  ehi les Qualit  of fuel Use of  uffle s 

Re o d i spe tio  

O goi g   Regula  ai te a e of o ki g e uip e t 

a d  ehi les  as do e  No e essi e ge e atio  of  oise a d s oke  as o se ed  Fuel used as 

Re o d i spe tio     Weekl   

DSC/WUSC  Satisfa to     

Page 120: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t  Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito ig o du ted  

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  

Satisfa to /Belo  Satisfa tio /Poo /Ve Poo , Not 

appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

supplied   NOC Sp i kli g of  ate   O goi g   Sp i kli g of  ate  

do e as pe   eed Loss of vegetation Clea ed a ea  Re o d 

i spe tio  O goi g   No t ees  e e  ut 

du i g  o st u tio  a ti ities   Vegetatio   lea i g a d  utti g of g ou d  egetatio  as   i i ized 

 Visual O se atio  a d e o d i spe tio   Weekl  

Co t a to/ WUSC 

Satisfa to     

No of t ees/sh u s pla ted 

Impact on aquatic animals

I ease i  tu idit  i   ate   due to e osio  of loosel  deposited e a ated soils  

Re o d i spe tio  

O goi g   E a ated soil  as safel  disposed a d o pa tio  do e to p e e t f o  e osio  i  i take sites   No  o st u tio  o k  as  a out 

du i g  ai  seaso  

Mo thl   WUSC  Satisfa to     

P o le s f o  outside o kfo e 

Beha io  of the o ke s 

Re o d i ui   Lo al su e  Co u i atio  ith people 

O goi g   Wo ke s  e e a ti g i  a espo si le a d dis ipli ed  a e   

Co u i atio  ith lo al 

people Mo thl  a d as eeded 

Co t a to/ WUSC 

Satisfa to     

Uses of al ohol Re o ds of fights 

No  e o ds of fights a d poli e  ases 

Distu a e to the lo al people 

Use of sig oa ds, oti e  oa d 

Re o d i ui   Co u i atio 

O goi g   Sig oa ds  as used  fo  di e sio  a d i fo atio  to lo al people 

Visual o se atio    Weekl  

Co t a to/WUSC 

 Satisfa to     

Page 121: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Des iptio  of I pa t  Mitigatio   easu es p oposed 

Pa a ete s to e Mo ito ed 

I ple e tatio status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito ig o du ted  

Mo ito i g  e a ks E elle t/Satisfa to/Pa tiall  

Satisfa to /Belo  Satisfa tio /Poo /Ve Poo , Not 

appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Disposal a ea  ith people  E a ated soil used o pletel  fo  a kfilli g a d e ai i g soil is disposed to sa tio ed a ea 

       

O upatio al Health a d Safet  

T pe a d  u e  of a ide ts 

File  e o d  O goi g   No  ase of a ide ts  Ne essa  PPE p o ided  ut  ot i  use    o ke s 

Visual o se atio    Dail   

Co t a to/DSC 

Satisfa to    Co pulsio  use of PPE i  the o st u tio  site is e ui ed  ith st i t  supe isio  f o   supe iso   

  Fi st aid a d e e ge  se i es 

Fi st aid kit  as  ot a aila le at the o st u tio   site fo  e e ge  se i e, usuall  kept i  site offi e  

Pa tiall  satisfa to    Keepi g of fi st aid o  at ha d i  the o ki g a ea  

 

   

Page 122: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Ra pu  S/N  Des iptio  of 

I pa t Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase 

Ph si al E i o e t 

  Da age to utilit  li es, o u it  se i es a d i f ast u tu e  

Lo atio  of p oje t st u tu es to a oid ele t i  poles, po e  suppl  st u tu es   a d i f ast u tu e 

O goi g  No  ajo  da age to pu li  a d i f ast u tu e  e o ded 

O se atio , Co sultatio  ith lo al 

people   Weekl  du i g o st u tio   

DWSS/ SSTWSSSP 

Satisfa to    

People  ill  e  otified a d se i es  esto ed as soo  as possi le to o e o e pu li  i o e ie e 

O goi g  P e‐i fo atio  gi e  to pu li  a out the distu a e a d i o e ie e, espe iall  du i g pipe la i g  oks 

Satisfa to   

Lette  of app o al a d ag ee e ts  ill  e o tai ed 

Co pleted  Pe issio  o tai ed f o   o e ed autho ities 

E elle t 

  Ai ,  ate  a d oise pollutio  

Dust supp essio  at the site   sp i kli g ate  at  egula  

i te als. 

O goi g  Dust ge e atio  f o  o st u tio   ate ials a d  t e h diggi g e e a oided   

sp i kli g of  ate  

O se atio , sp i kli g of ate ; 

Oil a d g ease e uip e t A ou t of oise le els i  

dB 

PIU/DSC  Satisfa to    

No equipment, which will produce heavy noise will be used

Ongoing Heavy noise producing equipment were not used

Satisfactory

Page 123: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Haphaza d disposal of aste    o ke s  ill e  o ito ed. 

Leakage a d disposal of oil a d g ease  ill e  he ked  egula l  

a d  o e ted i ediatel  if oti ed. 

O goi g  Disposal of o st u tio   astes do e at sa tio ed a eas. Ho e e  solid aste  a age e t at a psite  as  ot fou d; No leakage of g ease a d oil fou d 

 Mo thl  

Pa tiall  Satisfa to    

  I pa ts o  Qua  a d Spoil disposal site 

A oidi g u sta le a d e osio  p o e sites Qua i g a ti ities f o   i e s/st ea s ill  ot  e allo ed so 

as to  ha ge the  i e  oss se tio s a d 

lo gitudi al p ofiles 

O goi g   Co st u tio   ate ials ought f o  

egiste ed  ushe  i dust   hose ua i g sites a e at 

Kali Ga daki a d e t a tio  is  ei g do e  ithout ha pe i g the  i e  p ofile 

O se atio    Mo thl  

DSC/WUSC  Satisfa to    

Qua  site  ill  e le eled to suit the lo al la ds ape afte  e t a tio  is  o plete 

O goi g  P a ti ed   the egiste ed C ushe  I dust   

Satisfa to    

Du pi g of e a ated soil o  oute  side of t e h opposite the oadside a d a kfilli g 

O goi g  E a ated soil  as du ped opposite to the  oadside  so as to i i ize  lo kages 

Satisfa to    

  E osio  a d la d su fa e  distu a e 

E a ated soil  ill  e pla ed agai st e osio  

O goi g  Sta ki g of soil a e usuall  do e i  plai  a eas  ut  ea  slopp  a ea  as also  oti ed 

O se atio  a d  e o ds o  a ou t of la d e a ated 

DSC/WUSC  Satisfa to    

Page 124: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Reuse of e a ated soil a d  a kfilli g of t e hes  ill  e do e 

O goi g  Ba kfilli g of soil  ei g do e i ediatel  afte   o pletio  of pipe la i g  o ks a d e ai i g soil a e used fo  filli g of the t e hes at RVT sites 

a d e a ated soil  eused  Weekl  

Satisfa to     

As far as possible construction activities will be avoided in the rainy season

Ongoing No major construction and pipe laying works done during rainy season

Satisfactory

Temporary diversions and signboards will be provided for the pedestrians

Ongoing Diversion signboard placed during excavation works

Satisfactory

Biologi al E i o e t 

   Loss of egetatio  

The lo atio  of ese oi s a d  oute of the t a s issio  li e f o  the i take at the st ea  to the sto age ta k has  ee  pla ed to a oid the ai  fo est. 

O goi g  T a s issio  pipeli e alig e t has  ee  desig ed so as to i i ize  egetatio  lea a e a d a oid the  ai  fo est 

O se atio , Co sultatio  ith CFUGs 

 Dail   hile o ki g i  

fo est a eas 

DFO/DSC  Satisfa to    

CFUs  ill  e suppo ted i  affo estatio  

O goi g  Affo estatio  pla  has ot  ee  i ple e ted et   Ra he CFU a d Kisa a i CFU 

Satisfa to    

  Possi le Fi e ood e t a tio  a d 

Use of fuel  ood a d ti e   olle tio   ill e p ohi ited 

O goi g  Wood gi e    the o u it  fo est t igs a d  a hes  

O se atio ,  Re o ds a d 

DFO/DSC  Satisfa to    

Page 125: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

NTFP/Ti e  E ploitatio , Hu ti g a d Poa hi g of Wild life 

Illegal  olle tio  of NTFPs a d t ade  ill e p ohi ited. 

O goi g  No illegal  olle tio  fou d 

o sultatio  ith lo al 

people a d CFUGs    Mo thl  

E elle t   

LPG/ke ose e  ill  e p o ided to the o kfo e.  

O goi g   Wo ke s  asi all  use ood as the sou e of 

fuel gi e    the o u it  fo est t igs a d  a hes  

Satisfa to    

E ou age a d suppo t the lo al o u it  to  o t ol illegal hu ti g a d poa hi g of  ildlife a d s uggli g of fo est  esou es. 

O goi g  No  e o ds of illegal hu ti g a d poa hi g of  ildlife fou d 

E elle t   

A a e ess  aisi g p og a s  ill  e o ga ized to edu ate lo al people i  fo est o se atio  

O goi g  A a e ess p og a s a e  ei g  o du ted ega di g fo est o se atio    lo al NGO  alled Sk  So iet  Nepal  

Satisfa to    

So io‐E o o i  a d Cultu al E i o e t 

  Sou e dispute a d  ate  use o fli ts 

Co sultatio  a d ag ee e t  ith  ate  use s g oups 

O goi g  WUSC pla s a  ital  ole fo   oo di atio  a o g people so  o ajo   o fli t fou d 

Co sultatio  ith diffe e t ate  use s 

g oups  O e du i g Desig  Phase 

DWSS/SSTWSSSP 

Satisfa to    

Page 126: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  E plo e t ge e atio  a d i ease i  i o e 

P io it  to lo al people O  jo  t ai i g 

O goi g  No fo al t ai i g p o ided to  o kfo e a d due to the la k of lo al  a po e ; e plo e s a e hi ed f o   ea  dist i ts 

Co sultatio  ith lo al 

people,  E plo e t e o ds  Mo thl  

PIU/DSC  Pa tiall  Satisfa to    

  Distu a e to o u it  a ti ities 

T affi  Ma age e t Pla   ill  e de eloped a d  o k  ill  e o du ted as  ui kl  as possi le to i i ize 

distu a e 

O goi g  Wo ki g at the u a  a eas  e e do e ui kl  to a oid t affi  o gestio  a d distu a e to pu li s 

O se atio  a d Co sultatio  ith lo al 

people   Weekl  

DSC/WUSC  Satisfa to    

Reside ts  ill  e o sulted a d i fo ed a out the distu a es i  ad a e 

O goi g  P e i fo atio  ega di g  o st u tio  o ks like du i g pipe 

la i g  o ks gi e  

Satisfa to    

  So ial dispute a d dissatisfa tio  

Lo al people  ill  e gi e  p io it  fo  the e plo e t 

O goi g  P io it  gi e  to lo al ut due to la k of lo al a po e   o kfo e 

hi ed f o   ea  dist i ts like Da g, Kapil astu 

O se atio  a d Co sultatio  ith lo al 

people  Weekl  

DSC/WUSC  Satisfa to    

All the  o ke s  ill  e i st u ted to a t i  a espo si le  a e  

O goi g  Wo ke s  e e a ti g i  a  espo si le a d dis ipli ed  a e  

Satisfa to    

P ohi itio  of al ohol, ga li g  

O goi g  No  e o ds of fight a d use of al ohol fou d 

Satisfa to    

Page 127: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  O upatio al Health a d safet  

P o ide t ai i g to o ke s o  the 

pote tial o upatio al health a d safet  i pa ts/haza ds a d itigatio   easu es 

to  e used du i g o st u tio  

O goi g  No fo al t ai i g p og a s  ega di g safet   easu es a d o upatio al health p o ided to  o ke s 

O se atio  a d   Co sultatio  ith la o s 

a d lo al people    Weekl  

PIU/DSC  Satisfa to    

Fi st aid  ill  e kept at ha d i   o ki g a ea 

O goi g  Fi st aid  o  ge e all  kept at the o st u tio   a p site 

Pa tiall  Satisfa to    

Ge e al pu li   ill  e e luded f o  all o st u tio  sites 

O goi g  Not effe ti el  i ple e ted due to the eas  a essi ilit  of the  o st u tio  site 

Pa tiall  Satisfa to    

I su a e  ill  e p o ided to the o ke s 

O goi g  I su a e p o ided to ea h  o ke s  ith the su  of Rs.  ,  pe  la o . 

Satisfa to     

  Co u it  Health a d Safet  

Re ui ed h gie i  o ditio s  ill  e ai tai ed i  the 

la o   a ps. 

O goi g  No epide i  disease o  e to  sp ead fou d at la o   a p ho e e  solid  aste a age e t  as  ot 

fou d 

O se atio    Weekl  

DSC/WUSC  Satisfa to    

Page 128: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/N  Des iptio  of I pa t 

Mitigatio   easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

Mo ito i g o du ted   

Mo ito i g  e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

D i ki g  ate  fa ilit  a d te po a  pit lat i e  ill  e esta lished at o st u tio  sites to o t ol ope  defe atio  a d pollutio  of  ate  odies   the o ke s. 

O goi g  Ope  defe atio   ot fou d a d la o  use te po a  pit lat i e; Pollutio  of  ate  odies   la o   ot 

fou d 

Satisfa to    

A a e ess  elated to o u it  health a d safet  to the lo al people 

O goi g  A a e ess p og a  o du ted   lo al NGOs  ega di g health a d safet  to lo al people 

Satisfa to    

 

   

Page 129: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  . : Co plia e  ith E i o e tal Ma age e t Pla   Baitadi  S/No.  Des iptio  of I pa t  Mitigatio  

easu es p oposed I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

Co st u tio  Phase I pa ts   

.  

U o ga ized disposal of e a ated ea th  Soil e osio , silt  u off   Pollutio  of su fa e ate  

 Dete io atio  of ai  ualit  due to dust 

Distu a e to the pedest ia s             

P e autio a  easu es  ill  e 

take  du i g o st u tio  to a oid  a e i  

O goi g  E a atio  o ks  e e  

do e  a efull  to a oid  a e i   

Co t a to  e o ds  Dail  

DSC  Satisfa to    

Reuse of e a ated soil a d  a kfilli g of t e hes  ill  e do e 

O goi g  E a ated soil as used to fill 

t e hes i  the RVT site a ea 

Qua tit  of soil e ai ed  Dail  

Co t a to    Satisfa to    

Safe disposal of e a ated soil 

O goi g  Soil used fo  a kfilli g of 

t e hes 

Disposal site  Dail  

Co t a to  , WSSDO 

Satisfa to    

Sp i kli g of  ate  to a oid dust 

O goi g  Dust ge e ated espe iall  f o  e e t a d othe  o st u tio  ate ials  e e 

a oided   sp i kli g of ate  

Dust i  the ai      Dail  

Co t a to   Satisfa to    

Te po a  di e sio s a d sig oa ds  ill  e p o ided fo  the pedest ia s 

O goi g  Sig oa ds a d te po a  di e sio s a e ei g pla ed i  

the  o k a eas fo  pedest ia s 

Sig oa ds   Dail  

Co t a to  , WSSDO 

Satisfa to    

Page 130: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/No.  Des iptio  of I pa t  Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

.  Noise pollutio          Ai  pollutio  due to elease of e issio s 

P ohi itio  of high oise p odu i g 

e uip e t a d p o idi g ea  plugs fo  the  o ke s 

O goi g  Nois  e uip e t  ot used. No o plai ts f o  lo al  ega di g high  oise le el du i g  ight. 

Co t a to  e o ds   As  eeded 

Co t a to   Satisfa to   

 

Co e i g of loose ate ials du i g 

t a spo tatio  a d p ohi itio  o  usi g lo   ualit  fuel a d ehi le  ot o fo i g to atio al sta da ds. 

O goi g  A ou t of dust i  ai   a d e issio s f o  the t a spo tatio  ehi les  e e fou d  egligi le 

Co t a to  e o ds  As  eeded 

Co t a to   Satisfa to    

Ge e atio  of e ess g ease, solid  aste a d othe   o st u tio  aste 

          Pollutio  of  ea  i igatio   a als a d ate   odies 

Me ha is  of safe disposal of  aste ill  e de eloped i  

the p oje t site efo e the a tual o e e e t of o k. 

  

O goi g  Safe disposal of the  o st u tio  aste  as 

p a ti ed  

Co t a to  e o ds  Dail  

DSC,WSSDO  Satisfa to    

P o isio  of dust i  fo  solid  aste olle tio . 

O goi g  Dust i s ha e ee  p o ided ut  e e  ot 

used ofte . 

Co t a to  e o ds  Dail   

Mu i ipalit , WUSC 

Pa tial Satisfa to    

P ohi itio  of u a ted litte i g a d dis ha ge of 

O goi g  Toilet  ith p ope  soak pit as fou d i  

A ou t a d disposal of solid 

Mu i ipalit , WUSC 

Satisfa to    

Page 131: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/No.  Des iptio  of I pa t  Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

aste  the p oje t a p a ea so  o ope  defe atio  a d  aste dis ha ge 

aste   Mo thl  

.  O st u tio  i  pedest ia  a d t affi  o e e t 

Ca e  ill  e take  hile e a ati g 

a d la i g of pipes so that the e is i i al  i atio  

a d slope distu a es 

O goi g  Ma ual e a atio   as ostl  do e to 

a oid a  ha es of slope distu a es a ise f o  usi g e a ato s 

Co t a to  Re o ds   U e e  su fa es   Dail  

Co t a to  , DSC 

Satisfa to    

.  Re o al of e a ated ate ial  a  affe t the 

lo al la d s ste  e osio  a d soil i sta ilit  

E a ated soil  ill e du ped i  oute  

side of t e h opposite to oadside a d a kfilli g  ill  e 

do e p ope l  

O goi g  Ba kfilli g do e ut i  so e 

a eas due to i ade uate o pa tio , i egula   oad su fa es fou d. 

Pa e e t de olitio    Dail  

Co t a to   Pa tial satisfa to    

.  Risk of pollutio  of othe  st ea s i  the a ea  ausi g i ease i  tu idit  

Spoil  a age e t u it to  o k effi ie tl  to a oid the e a ated soil f o  fi di g its  a  do st ea  to othe  su fa e sou es a d i igatio   a als. 

O goi g  Othe  su fa e sou es a d i igatio   a als e e  ot 

distu ed   e a ated soil 

Co t a to  e o ds   Weekl  

Co t a to   Satisfa to    

Page 132: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/No.  Des iptio  of I pa t  Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

.  Loss of  egetatio  a d ha itat 

P o isio  of i i izatio  of egetatio   lea i g a d  a eful  utti g of g ou d egetatio  

O goi g  Vegetatio  lea i g a d utti g of g ou d egetatio  is i i ized 

 Clea ed a ea  Weekl  

Co t a to   Satisfa to    

Pla tatio  of t ee a d sh u   he e e e  possi le 

O goi g  Cutti g of t ees as  ot  eeded 

i  the o st u tio  site a d alua le pla ts e e p ote ted 

as fa  as possi le  

 Affo ested a ea,  u e s of t ees pla ted   Yea l  

WUSC  Satisfa to    

.  Lo al  eside ts  ould e distu ed    oise, 

dust a d i peded a ess 

Wo k  ill  e o du ted as ui kl  as possi le 

to  i i ize distu a e 

O goi g  Wo k i  the de se settle e t a eas  as do e ui kl  to i i ize 

distu a e 

 Co t a to  e o ds   Mo thl  

DSC, WSSDO  Satisfa to    

The  eside ts  ill e  o sulted a d 

i fo ed a out the distu a es i  ad a e 

O goi g  P io   oti e a d i fo atio  ega di g  o k e e gi e  to 

the lo al people 

Co u i atio  ith lo al 

people   As  eeded 

Co t a to , DSC, WSSDO 

Satisfa to    

.  P o le s due to i espo si le  eha io  of  o k fo e  e.g. ga li g, dis espe t to 

All the  o ke s  ill e i st u ted to a t 

i  a  espo si le a e  

O goi g  Wo ke s  e e a ti g i  a espo si le a d dis ipli ed 

Beha io  of o ke s 

  

Co t a to , WSSDO 

Satisfa to    

Page 133: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/No.  Des iptio  of I pa t  Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

the lo al a ea a d people   

a e   

Weekl  

Possi le so ial gathe i g shall  e allo ed 

O goi g  No  e o ds of fight a d use of al ohol fou d 

Uses of al ohol, e o ds of fights Weekl  

WUSC, Co t a to  

Satisfa to    

Lo al people  ill  e e plo ed as fa  as possi le 

O goi g  Lo al people e e  ai l  

i ol ed i  o st u tio  a ti ities 

Lo al su e    As  eeded 

WUSC, Co t a to  

Satisfa to    

.  Risk of a ide ts to the o ke s a d pu li  

A site health a d safet  pla  i ludi g safet  easu es su h as 

p o isio  of pe so al p ote ti e e uip e t  ill  e i luded 

O goi g   Ne essa  safet  e uip e t   as p o ided to o ke s 

Use of hel et, ask, glo es, 

Boots et .   As  eeded 

WUSC, Co t a to  

Pa tiall  Satisfa to    

Fi st aid  ill  e kept at ha d i   o ki g a ea 

O goi g  Fi st Aid p o ided to the o ke s i   ase 

of a ide t  ut as usuall  kept 

i  the site offi e. 

Fi st aid  o      Mo thl  

Co t a to , DSC, WSSDO 

Satisfa to     

Ge e al pu li   ill e e luded f o  all o st u tio  sites 

O goi g  Ge e al pu li  e e  ot st i tl  

p ohi ited i  o st u tio  sites 

 Sig oa ds   Mo thl  

Co t a to , DSC, WSSDO 

Pa tiall  Satisfa to    

Page 134: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/No.  Des iptio  of I pa t  Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

    I su a e  ill  e p o ided to the o ke s 

  

O goi g  I su a e p o ided to ea h  o ke s ith the su  of 

Rs.   ,  pe  la o  

O e ti e  Health a d safet  i su a e  Co t a to , DSC, WSSDO  

Satisfa to    

SANITATION COMPONENT Co st u tio  Phase I pa t 

  U o ga ized disposal of e a ated ea th  Su fa e  u off, pollutio  of  ate  a s 

 Nuisa e to pedest ia s  Dete io atio  of ai  ualit  due to dust 

Safe disposal a d e‐use of e a ated soil 

O goi g   Soil used fo  a kfilli g of 

t e hes 

Sta ki g of soil, ua tit  of soil e ai ed  Dail  

Co t a to    Satisfa to    

Sp i kli g of  ate  to a oid dust 

O goi g   Dust ge e ated espe iall  f o  e e t a d othe  o st u tio  ate ials  e e 

a oided   sp i kli g of ate  

 Dust i  the Ai      Dail  

Co t a to   E elle t   

Te po a  di e sio s a d sig oa ds  ill  e p o ided to the pedest ia s 

O goi g   Sig oa ds e e p o ided 

at   o st u tio  site of pu li  toilets 

 Sig oa ds  Dail  

Co t a to  , WSSDO 

Satisfa to    

Page 135: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

S/No.  Des iptio  of I pa t  Mitigatio  easu es p oposed 

I ple e tatio  status 

Details/ e a ks o  i ple e tatio  

Mo ito i g ethods a d 

f e ue  

  Mo ito i g o du ted  

  Mo ito i g e a ks E elle t/Satisfa to /Pa tiall  Satisfa to /Belo  Satisfa tio /Poo /Ve  Poo , Not appli a le  

Re a ks a d a tio s take  to i p o e i ple e tatio  

  Loss of  egetatio  a d ha itat 

P o isio  of i i izatio  of egetatio   lea i g a d  a eful  utti g of g ou d egetatio   ill  e do e 

O goi g   Vegetatio  lea i g a d utti g of g ou d egetatio  is i i ized 

Clea ed a ea   Weekl  

Co t a to   Satisfa to    

T ees a d sh u s ill  e pla ted he e e  possi le 

O goi g   Cutti g of the t ee  as  ot eeded i  the o st u tio  site a d alua le pla ts e e p ote ted 

as fa  as possi le  

Affo ested a ea,  u e s of t ees pla ted   Yea l  

WUSC  Satisfa to    

  Risk of a ide ts to the o ke s a d pu li  

A site health a d safet  pla   ill  e p epa ed a d i ple e ted 

O goi g   Ne essa  safet  e uip e t   as p o ided to o ke s 

Use of safet  gea s   Dail  

WUSC, Co t a to , WSSDO 

Pa tiall  Satisfa to    

    

Page 136: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

Ta le  .  : O e all Co plia e  ith EMP No.  Su ‐P oje t Na e  EMP Pa t of Co t a t 

Do u e ts Y/N  EMP Bei g I ple e ted Y/N  

Status of I ple e tatio E elle t/Satisfato /Pa tiall  satisfa to  /Belo   Satisfa to  

A tio  P oposed a d Additio al Measu es Re ui ed 

  Bat h I, Pa kage II SSTWSSSP/ICB‐ /Ka ahi a‐Mak aha  

Y  Y  Satisfa to    

  Bat h I, Pa kage III SSTWSSSP/ICB‐ /I d apu  Mo a g 

Y  Y  Satisfa to   Co ti uatio  of p ope   a age e t of health a d sa itatio   o ditio s a ou d the  a ps; p ohi it use of fi e ood. 

  Bat h I, Pa kage II SSTWSSSP/ICB‐

/La ahi_Da g 

Y  Y  Satisfa to    

  Bat h I, Pa kage II SSTWSSSP/ICB‐ / Sa dhikha ka_A ghakha hi 

Y  Y  Satisfa to    

  SSTWSSSP/ICB‐ / Da ak_Jhapa 

Y  Y  Satisfa to    

  Bat h I, Pa kage II SSTWSSSP/ICB‐

/Baglu g_Baglu g 

Y  Y  Satisfa to    

  Bat h I  Pa kage I  Co t a t No‐ SSTWSSSP/ICB‐  /Shi a aga _Kailali 

Y  Y  Satisfa to   P oje t Co pleted 

  SSTWSSSP/ICB‐ / Phidi _Pa htha  

Y  Y  Satisfa to    

  Bat h    Pa kage I  Co t a t No‐ SSTWSSSP/ICB‐

/Bhasi_Ka ha pu  

Y  Y  Satisfa to    

  Bat h II, Pa kage III SSTWSSSP/ICB‐

/Meghauli_Chit a  

Y  Y  Satisfa to    

Page 137: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

  Bat h II,Pa kage IV SSTWSSSP/ICB‐

/Kaka itta_Jhapa  

Y  Y  Satisfa to   ‐ 

  Bat h I, Pa kage II SSTWSSSP/ICB‐ /Da akh‐Sukhad_Kailali 

Y  Y  Satisfa to    

  Bat h II, Pa kage II SSTWSSSP/ICB‐

/Muku dapu ‐Na alpa asi 

Y  Y  Satisfa to    

  Bat h II, Pa kage II SSTWSSSP/ICB‐

/V as_Ta ahu 

Y  Y  Satisfa to   Gi e  o e e phasis o  p o idi g pe so al p ote ti e e uip e t a d  o pel  o ke s to use it o   egula   asis du i g the  o k; e e t safet  sig s, a i g sig als, safet   a ie s alo g the site; est i tio  of ge e al pu li  i  the e ti e o st u tio  site. 

  Bat h II, Pa kage IV  SSTWSSSP/ICB‐

/Leta g_Mo a g  

Y  Y  Satisfa to   Gi e  o e e phasis o  p o idi g all  ea s of pe so al p ote ti e e uip e t a d  o pel the  to use the  o  a  egula   asis du i g  o k; e e t safet  sig s,  a i g sig als, a d safet   a ie s alo g the site; assig  flag e  to  o t ol t affi  i  se siti e a eas. 

  Bat h I, Pa kage I, Co t a t No : SSTWSSSP/ICB‐

/Na a a  Mu i ipalit _ Dailekh 

Y  Y  Satisfa to    

  Bat h II, Pa kage III  SSTWSSSP/ICB‐

/Kha a i_Sa ku asa ha 

Y  Y  Satisfa to   Co pulsio  use of PPE’s du i g  o st u tio   o k; e e t safet  sig s,  a i g sig als, safet   a ie s alo g the site; Rest i tio  of ge e al pu li  i  the e ti e  o st u tio  site. 

  Co t a t No : SSTWSSSP/ICB‐  /Duha i_Su sa i 

Y  Y  Satisfa to    

  Bat h II, Pa kage IV  SSTWSSSP/ICB‐

/Dha kuta_Dha kuta 

Y  Y  Satisfa to   Co pulsio  use of PPE du i g  o st u tio   o k. Fi st aid  o  a d e e ge  se i es i  the  o ki g a ea is  e ui ed a d e i o e tal  itigatio  easu es  e ui ed i  so e of the sites. 

Page 138: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

  Bat h II, Pa kage II SSTWSSSP/ICB‐ /Ra pu ‐Palpa 

Y  Y  Satisfa to   Gi e  o e e phasis o  p o idi g pe so al p ote ti e e uip e t a d  o pel  o ke s to use it o   egula   asis du i g the  o k; e e t safet  sig s, a i g sig als, safet   a ie s alo g the site; est i tio  of ge e al pu li  i  the e ti e o st u tio  site. 

  Bat h I, Pa kage I SSTWSSSP/ICB‐

/Baitadi_Baitadi  

Y  Y  Satisfa to   Gi e  o e e phasis o  p o idi g pe so al p ote ti e e uip e t a d  o pel  o ke s to use it o   egula   asis du i g the  o k; e e t safet  sig s, a i g sig als, safet   a ie s alo g the site; est i tio  of ge e al pu li  i  the e ti e o st u tio  site. 

 

Ta le  . : I ple e tatio  of EMP Status of E i o e t, Fo est, a d Othe  Clea a e 

Cit /To   Wo k  pa kage  o.   Appli a le legislatio / 

t pe of  lea a e 

Clea a e gi e    a d date  Su je t 

/issues 

Re a ks/a tio   eeded 

Ra pu   SSTWSSSP/ICB‐/Ra pu ‐Palpa  

 

Bushes a d sh u s lea a e 

Mi ist  of Fo est th ough dist i t le el offi e  DFO  

NA  Fo estatio  a d g ee e  of the a ea afte   o pletio  of  o po e t like ese oi  ta k. Sta ilizatio   o k of slope  utti g a ea 

Page 139: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t  

 

Mo ito i g of E i o e tal I pa ts o  P oje ts Su ou di gs 

S. NO. 

Su ‐P oje t Na e 

Co p ehe si e e i o e tal  o ito i g pa a ete s A ie t Ai  Qualit  

 Wate  Qualit  

 Noise Qualit  

 Solid Waste Ma age e t 

 Health a d Safet  

 

  Ka ahi a‐Mak aha  

‐ Dust pa ti les a e  ithi  the tole a e li it. ‐Co plai ts f o  the lo als  ega di g the ai  pollutio   e e also  ot e o ded. ‐Wo ke s  ea i g  asks du i g  o ki g hou s i  dust  e i o e t is satisfa to . 

‐D i ki g  ate  has ee  supplied to the o ke s f o  the taps. 

‐ No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit. ‐ Wo ke s a e  egula l  ade a a e o  health, 

sa itatio  a d h gie e.   ‐No  ajo   oise 

ge e ati g e uip e t a e used, thus  o o plai ts f o  the lo al o u it . ‐ Noise le el is  ithi  the tole a le li it. 

‐Household  astes ge e ated f o  the la o   a p a e  ei g olle ted a d p ope l  disposed. ‐ Regula  i st u tio  a d t ai i g is gi e  to the o kfo e a d  o t a to s ega di g  a s of  a agi g solid  astes. ‐ The e is  o e ide e of o plai ts f o   o u it . 

‐ All staffs a d  o ke s e e p o ided  ith  asi  

health k o ledge a d a a e ess a out the HIV/AIDS  as also o du ted  ithi  this pe iod. ‐ Clea   ate  is p o ided a d a a e ess  ega di g sa itatio  a d h gie e as  o du ted  egula l . 

‐ Wo ke s  e a e a a e a out the safet  e uip e t a d a ide t ase  as  ot  e o ded. ‐ Safet  sig als  e e also posted at  a ious  o ki g a eas a d  a p. 

  I d apu  

‐D i ki g  ate  has ee  supplied to the o ke s f o  the taps. 

‐ No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit. ‐ Wo ke s a e  egula l  ade a a e o  health, 

sa itatio  a d h gie e. ‐ The e is a p ohi itio  of litte i g a d dis ha ge of to i  a d  o ‐to i  astes to the  ate  

st ea s. 

‐ No  epo ti g has  ee  do e ega di g solid  aste a age e t du i g this 

pe iod.  

  La ahi  ‐ Mo ito ed usi g  isual i spe tio   ethod. 

‐D i ki g  ate  has ee  supplied to the 

‐ Ca p sites had  ee  esta lished a a  f o  

‐Household  astes ge e ated f o  the la o   a p a e  ei g 

   Sa dhikha ka 

Page 140: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

  Da ak 

‐ Sp i kli g of  ate   as do e  egula l  as a d he   eeded. 

‐ Co pulsio  of  ea i g asks  hile  o ki g i  the 

dust  e i o e t has ee   a ied out  egula l  ut is  ot satisfa to . 

‐ No  o plai ts f o  lo al people  ega di g ai  pollutio .  

o ke s f o  the taps. ‐ No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit. ‐ Wo ke s a e  egula l  ade a a e o  health, 

sa itatio  a d h gie e. ‐ Waste ate  ge e ated f o  the  a p  as  ot dis ha ged i  the st ea .   

eside tial a eas. ‐ The  o t a to  has  ee  st i tl  i st u ted to keep thei   ehi les, ge e ato s a d othe   a hi e  i  good  o ditio . ‐ Wo kfo e has  ee  i st u ted to use ea  plugs at  oise ge e ati g sites. ‐ No  o plai ts f o  lo al people  ega di g oise pollutio . 

olle ted a d p ope l  disposed. ‐ Regula  i st u tio  a d t ai i g is gi e  to the o kfo e a d  o t a to s ega di g  a s of  a agi g solid  astes. ‐Ma age e t of the o st u tio   astes see s to e satisfa to . 

‐ I fo atio  gi e   ega di g e i o e tal haza ds due to solid  astes, o upatio al health a d sa itatio   as also p o ided to the  o ke s. 

  Baglu g 

‐ Ai   ualit  of the sites see s to  e  o al   isual i spe tio . ‐ Ai  pollutio  due to the e issio s f o   ehi les is ot sig ifi a t. 

‐ Sp i kli g of  ate   as do e  egula l  as a d he   eeded. 

‐ Use of lo   ualit  fuel a d  ehi les  ot o fo i g to  atio al sta da d  as p ohi ited. ‐No  o plai ts f o  lo al people  ega di g ai  pollutio . 

 

  Shi a aga  

‐ Due to the  o pletio  of p oje t the e a e  o ph si al a ti ities  hi h ill i ease the dust 

pa ti les a d ai  pollutio . ‐ Vehi les t a spo ti g o st u tio   ate ials a e ot ope atio al a d the e 

‐ Noise pollutio  f o  the  ehi les  as egligi le. 

‐ Sou ds f o  othe  e uip e t like pu ps a d ge e ato s  e e ithi  the tole a e 

li it. 

‐ Solid  aste ge e ated  ithi  the  a p a ea  as  ell a aged. 

‐ Dust i s  e e kept to  olle t the  aste a d litte i g of aste  as p ohi ited. 

‐ All  olle ted solid  aste  as p ope l  disposed at lo atio  

 

Page 141: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

is less  ua tit  of  ehi ula  e hausts. 

ide tified  ithi  the  a p. 

  Phidi  

‐ Ai   ualit  of the sites see s to  e  o al   isual i spe tio . ‐ Ai  pollutio  due to the e issio s f o   ehi les is ot sig ifi a t. 

‐ Sp i kli g of  ate   as do e  egula l  as a d he   eeded. 

‐ Use of lo   ualit  fuel a d  ehi les  ot o fo i g to  atio al sta da d  as p ohi ited. ‐No  o plai ts f o  lo al people  ega di g ai  pollutio . 

‐D i ki g  ate  has ee  supplied to the o ke s f o  the taps. 

‐ No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit. ‐ Wo ke s a e  egula l  ade a a e o  health, 

sa itatio  a d h gie e. ‐ Waste ate  ge e ated f o  the  a p  as  ot dis ha ged i  the st ea .  

‐ Ca p sites had  ee  esta lished a a  f o  eside tial a eas. ‐ The  o t a to  has  ee  st i tl  i st u ted to keep thei   ehi les, ge e ato s a d othe   a hi e  i  good  o ditio . ‐ Wo kfo e has  ee  i st u ted to use ea  plugs at  oise ge e ati g sites. ‐ No  o plai ts f o  lo al people  ega di g oise pollutio . 

‐Household  astes ge e ated f o  the la o   a p a e  ei g olle ted a d p ope l  disposed. ‐ Regula  i st u tio  a d t ai i g is gi e  to the o kfo e a d  o t a to s ega di g  a s of  a agi g solid  astes. ‐Ma age e t of the o st u tio   astes see s to e satisfa to . 

‐ I fo atio  gi e   ega di g e i o e tal haza ds due to solid  astes, o upatio al health a d sa itatio   as also p o ided to the  o ke s. 

 

  Bhasi 

‐ Dust le el i  the a ea  as ithi  the tole a le li it. 

‐ F e ue t sp i kli g  as ate   as do e as a d he   e ui ed to  i i ize 

the suspe ded pa ti les to float i  to the ai . ‐ Vehi ula  e haust  as also u de  the  o t ol due to p ohi itio  of use of lo  ualit  fuel a d use of ehi les  o fo i g to atio al sta da ds. 

‐ No e ide e of ate o e disease ithi  the p oje t  a p 

a ea. ‐ Wate   ualit   as ai tai ed as pe  the 

EMP.  ‐Waste ate  f o  the toilet  as  olle ted i  the soak pit a d  as  ot dis ha ged i  to the st ea s.  ‐Regula  I st u tio s ha e  ee  gi e  i   a p ega di g health a d sa itatio . 

‐ Noise pollutio   e ai s i sig ifi a t, he e  o e o d of pu li  o plai ts  ega di g high le el of  oise.  ‐High  oise p odu i g a d olde  e uip e t e e  ot used du i g the 

pe iod of  o ito i g. 

‐Solid  aste ge e ated  ithi  the  a p a ea  as  ell a aged. 

‐ Dust i s  e e kept to  olle t the  aste a d litte i g of aste  as p ohi ited.  

‐All  olle ted solid  aste  as p ope l  disposed at lo atio  ide tified  ithi  the  a p. 

 

  Meghauli  ‐ Ai   ualit  of the sites  ‐D i ki g  ate  has  ‐ Ca p sites had  ee   ‐Household  astes ge e ated   

Page 142: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

  Kaka itta  

see s to  e  o al   isual i spe tio . ‐ Ai  pollutio  due to the e issio s f o   ehi les is ot sig ifi a t. 

‐ Sp i kli g of  ate   as do e  egula l  as a d he   eeded. 

‐ Use of lo   ualit  fuel a d  ehi les  ot o fo i g to  atio al sta da d  as p ohi ited. ‐No  o plai ts f o  lo al people  ega di g ai  pollutio . 

ee  supplied to the o ke s f o  the taps. 

‐ No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit,  ot dis ha ged i  the st ea . ‐ Wo ke s a e  egula l  ade a a e o  health, 

sa itatio  a d h gie e.  

esta lished a a  f o  eside tial a eas. ‐ The  o t a to  has  ee  st i tl  i st u ted to keep thei   ehi les, ge e ato s a d othe   a hi e  i  good  o ditio . ‐ Wo kfo e has  ee  i st u ted to use ea  plugs at  oise ge e ati g sites. ‐ No  o plai ts f o  lo al people  ega di g oise pollutio . 

f o  the la o   a p a e  ei g olle ted a d p ope l  disposed. ‐ Regula  i st u tio  a d t ai i g is gi e  to the o kfo e a d  o t a to s ega di g  a s of  a agi g solid  astes. ‐Ma age e t of the o st u tio   astes see s to e satisfa to . 

‐ I fo atio  gi e   ega di g e i o e tal haza ds due to solid  astes, o upatio al health a d sa itatio   as also p o ided to the  o ke s. 

 

  Da akh‐Sukhad 

‐ Ai  pollutio  due to the e issio s f o   ehi les is ot sig ifi a t. 

‐ Sp i kli g of  ate   as do e  egula l  as a d he   eeded. 

‐ Although the i pa t is lo  so e  itigatio  easu es like  o pulsio  

of  ea i g  asks  hile o ki g i  the dust  

e i o e t has  ee  a ied out  egula l   ut is ot satisfa to . 

‐ No  o plai ts f o  lo al people  ega di g ai  pollutio . 

 

  Muku dapu   ‐ Ai   ualit  of the sites see s to  e  o al   isual i spe tio . ‐ Ai  pollutio  due to the 

 

  V as  

Page 143: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

e issio s f o   ehi les is ot sig ifi a t. 

‐ Sp i kli g of  ate   as do e  egula l  as a d he   eeded. 

‐ Use of lo   ualit  fuel a d  ehi les  ot o fo i g to  atio al sta da d  as p ohi ited.  

  Leta g 

‐ Ai   ualit  of the sites see s to  e  o al   isual i spe tio . ‐ Use of lo   ualit  fuel a d  ehi les  ot o fo i g to  atio al sta da d  as p ohi ited. ‐ Regula   ai te a e of o st u tio  e uip e t. ‐Rest i tio  of usi g  ood as fuel  ithi  the  a p as  ot satisfa to  du i g 

the pe iod. 

‐D i ki g  ate  has ee  supplied to the o ke s f o  the taps. 

‐ No  e o ds of  ate  o e diseases. 

  

‐ Ca p sites had  ee  esta lished a a  f o  eside tial a eas. ‐ The  o t a to  has  ee  st i tl  i st u ted to keep thei   ehi les, ge e ato s a d othe   a hi e  i  good  o ditio .  

‐ All  aste is  a aged p ope l  i  the sa tio ed a ea. ‐I fo atio  gi e   ega di g e i o e tal haza ds due to solid  astes, o upatio al health a d sa itatio   as also p o ided to the  o ke s.  

 

  Na a a  Mu i ipalit  

‐Although the dust le el is ith the li it, sp i kli g of ate   as do e as a d he   e ui ed. 

‐ Vehi ula  e haust  as u de  the  o t ol due to p ohi itio  of use of lo  ualit  fuel a d use of ehi les  o fo i g to atio al sta da ds. 

‐No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit a d as  ot dis ha ged i  to 

the st ea s ‐ Regula  I st u tio s ha e  ee  gi e  i   a p ega di g health a d sa itatio .  

‐Noise pollutio   e ai s i sig ifi a t, he e  o e o d of pu li  o plai s. ‐ High  oise p odu i g a d olde  e uip e t e e  ot used du i g the 

pe iod of  o ito i g. 

‐ Solid  aste ge e ated  ithi  the  a p a ea  as  ell a aged. 

‐ Dust i s  e e kept a d olle ted solid  aste  as p ope l  disposed at lo atio  ide tified  ithi  the  a p. 

 

  Kha a i  ‐  Ai   ualit  of the sites  ‐D i ki g  ate  has  ‐ Ca p sites had  ee   ‐Solid  aste ge e ated i  the   

Page 144: Environmental Compliance Monitoring Report · Environmental Compliance Monitoring Report Semi-Annual Report No. 1 Grant Number: G0157-NEP January-June, 2016 Nepal: Second Small Towns

Se o d S all To  Wate  Suppl  a d Sa itatio  Se to  P oje t 

Page |   

 

G ie a e Re o di g a d Ha dli g Most of the g ie a es  e e  e al  i   atu e a d  as sol ed. As  e go th ough the  o thl  p og ess  epo t the e a e  o  epo ti g   DSC 

ega di g  e o di g a d sol i g g ie a es i  all   to  p oje ts. Ho e e , ea h to  ha e esta lished a  egiste  to  e o d g ie a es. Till 

o   o g ie a es has  ee   e o ded. 

 Co lusio  No se ious o issio s o   iolatio s of e i o e tal sta da ds a d  o s ha e  ee   e o ded du i g this pe iod i  all   to  p oje t. 

 

 

 

  Duha i  see s to  e  o al. ‐I sig ifi a t ai  pollutio  due  o e e t of  ehi le.     ‐Sp i kli g of  ate  as a d he   eeded. 

‐ No  o plai ts f o  lo al people  ega di g ai  pollutio .  

ee  supplied to the o ke s f o  the taps. 

‐ No  e o ds of  ate  o e diseases. 

‐ Waste ate  ge e ated f o  the  a p is  ei g olle ted i  soak pit,  ot dis ha ged i  the st ea . ‐ I st u tio s ha e  ee  gi e  i  ea h  a p ega di g the health a d sa itatio .  

esta lished a a  f o  eside tial a eas. ‐ The  o t a to  has  ee  st i tl  i st u ted to keep thei   ehi les, ge e ato s a d othe   a hi e  i  good  o ditio . ‐ Wo kfo e has  ee  i st u ted to use ea  plugs at  oise ge e ati g sites. ‐ No  o plai ts f o  lo al people  ega di g oise pollutio . 

a p site  as  olle ted i  pits.  ‐I st u tio   as gi e  to the o kfo e a d  o t a to s ega di g the  a s of a agi g solid  astes.  

‐Ma age e t of  o st u tio  aste see s to  e 

satisfa to . 

   Dha kuta     Ra pu    

  Baitadi