El MerkThe El Merk mega project is expected to produce oil and natural gas for the next 30 to 40 years. The El Merk facility is located in Block 208 in the southern part of the Berkine Basin, the Block currently comprises four oil and gas fields, which were discovered by Anadarko between 1993 and 1998. The El Merk field is located approximately 300 km southeast of Hassi Messaoud in a remote area of the Algerian Sahara desert where the terrain consists of large interlocking sand dunes.
The development of these fields is the various responsibility of a joint association. A Memorandum of Understanding (MOU) to this effect was signed in July 2005 by a consortium led by Sonatrach and Anadarko.
Base de Vie - General Information
• Accommodations • Administration • Restaurant • Foyer • Sport areas
• Warehouse • Water treatment facilities • Electrical building • Sewage treatment plant • Maintenance workshop
The EMBC Buildings and Facilities include:
Heaviest Lift 342T Largest lift 49m x 5m
1,013km Electrical CablingSpools and Pipe Fittings
15,687T Structural Steel
CPF Construction
Heaviest Lift 342T Largest lift 49m x 5m
1,013km Electrical CablingSpools and Pipe Fittings
CPF Construction
15,687T Structural Steel
A N A D A R K O P E T R O L E U M C O R P O R A T I O N
w w w . a n a d a r k o . c o m • w w w . f a c e b o o k / a n a d a r k o p e t r o l e u m c o r p o r a t i o n • w w w . y o u t u b e . c o m / a n a d a r k o t v
300km of electricalservice lines
1600m Air-strip160km Road Network
390km Export Pipelines• 90,000 Bbl/day capacity oil pipeline• 30,000 Bbl/day capacity condensate pipeline• 35,000 Bbl/day capacity LPG pipeline
El Merk Substation
El Merk InfrastructureThe El Merk facilities comprise a Central Processing Facility (CPF) processing hydrocarbons, off-sites fluid gathering and gas/water injection systems, Oil – Condensate – LPG and a full infrastructure including 160km road network, 1600m air-strip, living accommodation for more than 500 people, administration, warehousing, maintenance workshops and storage facilities.
More than 10,000 people at peak construction61,166cu. m Concrete