Ee Steel Fabrication

1
Owner : PT RYHAN RESOURCE INDUSTRI Up : MR AGUNG Rukan Arthagading Niaga Blok I No.2 Kelapa Gading Barat Contractor : PT DUTA MANDIRI PERKASA PRIMA Komplek Meditrania Blok D5 No 25 Samarinda Phone/ Fax: (0541)-, E-Mail [email protected] : Web:www.dutamandiriperkasa.com PREPAIRATION - Mob Demob Matrial and Peralatan FABRICATION AND INSTALATION 1 SECTION CRANE LIFTING - WF 1 = 600 x 200 x 11 x 17 MM - WF 2 = 600 x 200 x 11 x 17 MM + Two side - WF 3 = 500 x 200 x 10 x 16 MM - WF 4 = 400 x 200 x 8 x 13 - WF 5 = 350 x 175 x 7 x 11 - Steel Pipe Ø 30 " - Steel Plate 38 mm Thichnes ( 6M x 7 M) 2 SECTION CRANE & TRUCK TRAVELING 6M x 20M\ - WF 1 = 600 x 200 x 11 x 17 MM - WF 2 = 600 x 200 x 11 x 17 MM + Two side - WF 3 = 500 x 200 x 10 x 16 MM - WF 4 = 400 x 200 x 8 x 13 - WF 5 = 350 x 175 x 7 x 11 - Steel Plate 38 mm Thichnes ( 6M x 20M) 3 SECTION RAILING Ø 2" Scedule 40 + ACECORIS - Steel pipe ø 2" Scedhule 40 - Square Bare 20 x 20 x 6M ] TOTAL IN WORD : KETERANGAN PENAWARAN - Harga adalah FOB Site - Termasuk Cost Sosial CARA PEMBAYARAN - Untuk Pengadaan Barang 50% Saat PO Ditandatangani - Payment II 30% Setelah Matrial siap dikirim - Payment III 20% Setelah matrial sampai disite Page : 1 Direktur Utama " Dua milyar dua ratus delapan puluh enam juta rupiah" B 275,000,000 Rp PT DUTA MANDIRI PERKASA PRIMA Samarinda 13 February 2013 Yoga Nugroho Cp.ST Kg Kg 29,245,440 Rp 19,218,432 Rp 48,463,872 Rp 232,288,000 Rp - Rp 152,646,400 Rp 384,934,400 Rp - Rp - Rp 2,089 16,592 Kg Kg 2,089 16,592 - Rp - Rp - Rp Kg TOTAL 13,689,600 Rp 34,521,600 Rp 329,323,200 Rp 830,467,200 Rp 7,920 Kg 7,920 Kg 2,688 Kg 2,688 35,796 Kg 35,796 Kg 1,488 Kg 1,488 Kg 20,832,000 Rp 501,144,000 Rp 110,880,000 Rp - Rp - Rp 62,361,600 Rp 72,864,000 Rp 183,744,000 Rp - Rp Kg 37,632,000 Rp 595 Kg 595 Kg 1,512 Kg 1,512 Kg 8,332,800 Rp 21,168,000 Rp 1,590 Kg 1590 Kg 1,980 Kg 1980 Kg 22,260,000 Rp 27,720,000 Rp 14,628,000 Rp A UPAH 1,908 Kg 1908 Kg 26,712,000 Rp 17,553,600 Rp LOCATION : NO QUATATION Volume PROJECT : JOB DESCRIPTIO : Si DESCRIPTION MATRIAL SAT QUATATION STEEL FABRICATION BANGKANAI BLOK DEVELPOMENT ( CIVIL WORK STEEL FABRICATION LUWE HULU - KALTENG 03/DMPP UPAH TENAGA VOLUME SATUAN MATRIAL HARGA 12,529 Kg 12,529 Kg 175,400,400 Rp 115,263,120 Rp 290,663,520 Rp - Rp 797,518,192 Rp ############## TOTAL HARGA 36,888,000 Rp - Rp 18,216,000 Rp 45,936,000 Rp 5,475,840 Rp 13,808,640 Rp 13,910,400 Rp 35,078,400 Rp 44,265,600 Rp 24,729,600 Rp 2,286,132,832 Rp 86,687

description

Ee Steel Fabrication

Transcript of Ee Steel Fabrication

Page 1: Ee Steel Fabrication

Owner :

PT RYHAN RESOURCE INDUSTRI

Up : MR AGUNG

Rukan Arthagading Niaga Blok I No.2 

Kelapa Gading Barat

Contractor :

PT DUTA MANDIRI PERKASA PRIMAKomplek Meditrania Blok D5 No 25 Samarinda

Phone/ Fax: (0541)-, E-Mail [email protected]

: Web:www.dutamandiriperkasa.com

PREPAIRATION

- Mob Demob Matrial and Peralatan

FABRICATION AND INSTALATION

1 SECTION CRANE LIFTING

- WF 1 = 600 x 200 x 11 x 17 MM

- WF 2 = 600 x 200 x 11 x 17 MM + Two side

- WF 3 = 500 x 200 x 10 x 16 MM

- WF 4 = 400 x 200 x 8 x 13

- WF 5 = 350 x 175 x 7 x 11

- Steel Pipe Ø 30 "

- Steel Plate 38 mm Thichnes ( 6M x 7 M)

2 SECTION CRANE & TRUCK TRAVELING 6M x 20M\

- WF 1 = 600 x 200 x 11 x 17 MM

- WF 2 = 600 x 200 x 11 x 17 MM + Two side

- WF 3 = 500 x 200 x 10 x 16 MM

- WF 4 = 400 x 200 x 8 x 13

- WF 5 = 350 x 175 x 7 x 11

- Steel Plate 38 mm Thichnes ( 6M x 20M)

3 SECTION RAILING Ø 2" Scedule 40 + ACECORIS

- Steel pipe ø 2" Scedhule 40

- Square Bare 20 x 20 x 6M

]

TOTAL IN WORD :

KETERANGAN PENAWARAN

- Harga adalah FOB Site

- Termasuk Cost Sosial

CARA PEMBAYARAN

- Untuk Pengadaan Barang 50% Saat PO Ditandatangani

- Payment II 30% Setelah Matrial siap dikirim

- Payment III 20% Setelah matrial sampai disite

Page : 1

Direktur Utama

" Dua milyar dua ratus delapan puluh enam juta rupiah"

B

275,000,000Rp

PT DUTA MANDIRI PERKASA PRIMA

Samarinda 13 February 2013

Yoga Nugroho Cp.ST

Kg

Kg

29,245,440Rp 19,218,432Rp 48,463,872Rp

232,288,000Rp

-Rp

152,646,400Rp 384,934,400Rp

-Rp -Rp

2,089

16,592

Kg

Kg

2,089

16,592

-Rp -Rp -Rp

KgTOTAL

13,689,600Rp 34,521,600Rp

329,323,200Rp 830,467,200Rp

7,920 Kg 7,920 Kg

2,688 Kg 2,688

35,796 Kg 35,796 Kg

1,488 Kg 1,488 Kg 20,832,000Rp

501,144,000Rp

110,880,000Rp

-Rp

-Rp

62,361,600Rp

72,864,000Rp 183,744,000Rp

-Rp

Kg 37,632,000Rp

595 Kg 595 Kg

1,512 Kg 1,512 Kg

8,332,800Rp

21,168,000Rp

1,590 Kg 1590 Kg

1,980 Kg 1980 Kg

22,260,000Rp

27,720,000Rp

14,628,000Rp

A

UPAH

1,908 Kg 1908 Kg 26,712,000Rp 17,553,600Rp

LOCATION :

NO QUATATION

Volume

PROJECT :

JOB DESCRIPTION:

Si DESCRIPTIONMATRIAL

SAT

QUATATIONSTEEL FABRICATION

BANGKANAI BLOK DEVELPOMENT ( CIVIL WORK)

STEEL FABRICATION

LUWE HULU - KALTENG

03/DMPP

UPAH TENAGA

VOLUME SATUAN MATRIAL

HARGA

12,529 Kg 12,529 Kg 175,400,400Rp 115,263,120Rp 290,663,520Rp

-Rp

797,518,192Rp ##############

TOTAL HARGA

36,888,000Rp

-Rp

18,216,000Rp 45,936,000Rp

5,475,840Rp 13,808,640Rp

13,910,400Rp 35,078,400Rp

44,265,600Rp

24,729,600Rp

2,286,132,832Rp 86,687