Download - Ee Steel Fabrication

Transcript
Page 1: Ee Steel Fabrication

Owner :

PT RYHAN RESOURCE INDUSTRI

Up : MR AGUNG

Rukan Arthagading Niaga Blok I No.2 

Kelapa Gading Barat

Contractor :

PT DUTA MANDIRI PERKASA PRIMAKomplek Meditrania Blok D5 No 25 Samarinda

Phone/ Fax: (0541)-, E-Mail [email protected]

: Web:www.dutamandiriperkasa.com

PREPAIRATION

- Mob Demob Matrial and Peralatan

FABRICATION AND INSTALATION

1 SECTION CRANE LIFTING

- WF 1 = 600 x 200 x 11 x 17 MM

- WF 2 = 600 x 200 x 11 x 17 MM + Two side

- WF 3 = 500 x 200 x 10 x 16 MM

- WF 4 = 400 x 200 x 8 x 13

- WF 5 = 350 x 175 x 7 x 11

- Steel Pipe Ø 30 "

- Steel Plate 38 mm Thichnes ( 6M x 7 M)

2 SECTION CRANE & TRUCK TRAVELING 6M x 20M\

- WF 1 = 600 x 200 x 11 x 17 MM

- WF 2 = 600 x 200 x 11 x 17 MM + Two side

- WF 3 = 500 x 200 x 10 x 16 MM

- WF 4 = 400 x 200 x 8 x 13

- WF 5 = 350 x 175 x 7 x 11

- Steel Plate 38 mm Thichnes ( 6M x 20M)

3 SECTION RAILING Ø 2" Scedule 40 + ACECORIS

- Steel pipe ø 2" Scedhule 40

- Square Bare 20 x 20 x 6M

]

TOTAL IN WORD :

KETERANGAN PENAWARAN

- Harga adalah FOB Site

- Termasuk Cost Sosial

CARA PEMBAYARAN

- Untuk Pengadaan Barang 50% Saat PO Ditandatangani

- Payment II 30% Setelah Matrial siap dikirim

- Payment III 20% Setelah matrial sampai disite

Page : 1

Direktur Utama

" Dua milyar dua ratus delapan puluh enam juta rupiah"

B

275,000,000Rp

PT DUTA MANDIRI PERKASA PRIMA

Samarinda 13 February 2013

Yoga Nugroho Cp.ST

Kg

Kg

29,245,440Rp 19,218,432Rp 48,463,872Rp

232,288,000Rp

-Rp

152,646,400Rp 384,934,400Rp

-Rp -Rp

2,089

16,592

Kg

Kg

2,089

16,592

-Rp -Rp -Rp

KgTOTAL

13,689,600Rp 34,521,600Rp

329,323,200Rp 830,467,200Rp

7,920 Kg 7,920 Kg

2,688 Kg 2,688

35,796 Kg 35,796 Kg

1,488 Kg 1,488 Kg 20,832,000Rp

501,144,000Rp

110,880,000Rp

-Rp

-Rp

62,361,600Rp

72,864,000Rp 183,744,000Rp

-Rp

Kg 37,632,000Rp

595 Kg 595 Kg

1,512 Kg 1,512 Kg

8,332,800Rp

21,168,000Rp

1,590 Kg 1590 Kg

1,980 Kg 1980 Kg

22,260,000Rp

27,720,000Rp

14,628,000Rp

A

UPAH

1,908 Kg 1908 Kg 26,712,000Rp 17,553,600Rp

LOCATION :

NO QUATATION

Volume

PROJECT :

JOB DESCRIPTION:

Si DESCRIPTIONMATRIAL

SAT

QUATATIONSTEEL FABRICATION

BANGKANAI BLOK DEVELPOMENT ( CIVIL WORK)

STEEL FABRICATION

LUWE HULU - KALTENG

03/DMPP

UPAH TENAGA

VOLUME SATUAN MATRIAL

HARGA

12,529 Kg 12,529 Kg 175,400,400Rp 115,263,120Rp 290,663,520Rp

-Rp

797,518,192Rp ##############

TOTAL HARGA

36,888,000Rp

-Rp

18,216,000Rp 45,936,000Rp

5,475,840Rp 13,808,640Rp

13,910,400Rp 35,078,400Rp

44,265,600Rp

24,729,600Rp

2,286,132,832Rp 86,687