EARTHWORK

EARTHWORK CROSS SECTIONSEARTHWORK VOLUMES

Page 2: Earthwork

EARTHWORK CROSS SECTIONS

Page 3: Earthwork

EARTHWORK CROSS SECTIONS

• Cut / Excavation wherever the existing ground is above the

constructed section

• Fill / Embankmentwherever the existing ground is below the

constructed section

Page 4: Earthwork

EARTHWORK CROSS SECTIONS

• Catch PointsThe points at which the cut or fill slopes

intersect the ground

• Hinge PointsThe points at which the cut or fill slopes

intersect the nearly horizontal roadway surface

Page 5: Earthwork

Example 1

The following are notes for an irregular cross section. Compute the cross-sectional area by dividing it into triangles and trapezoids. The roadway is 14 m wide and the side slopes are 1:2.

Page 6: Earthwork
Page 7: Earthwork

Solution

Page 8: Earthwork

EARTHWORK VOLUMES

• AVERAGE END AREA METHOD

Page 9: Earthwork

EARTHWORK VOLUMES

• Prismoidal formula

Page 10: Earthwork
Page 11: Earthwork

EARTHWORK VOLUMES

Page 12: Earthwork

Example 2Given the end area below. Calculate the

volumes of cut and fill between sta. 351+ 00 and 352+50. If the material shrinks 12%, how much excess cut or fill is there?

StationEnd Areas(m^3)

Cut Fill

351+00 57.93

351+50 52.28

351+75 23.58

352+00 8.4 3.73

352+14 13.8

352+50 33.34