EARTHWORK
EARTHWORK CROSS SECTIONSEARTHWORK VOLUMES
EARTHWORK CROSS SECTIONS
EARTHWORK CROSS SECTIONS
• Cut / Excavation wherever the existing ground is above the
constructed section
• Fill / Embankmentwherever the existing ground is below the
constructed section
EARTHWORK CROSS SECTIONS
• Catch PointsThe points at which the cut or fill slopes
intersect the ground
• Hinge PointsThe points at which the cut or fill slopes
intersect the nearly horizontal roadway surface
Example 1
The following are notes for an irregular cross section. Compute the cross-sectional area by dividing it into triangles and trapezoids. The roadway is 14 m wide and the side slopes are 1:2.
Solution
EARTHWORK VOLUMES
• AVERAGE END AREA METHOD
EARTHWORK VOLUMES
• Prismoidal formula
EARTHWORK VOLUMES
Example 2Given the end area below. Calculate the
volumes of cut and fill between sta. 351+ 00 and 352+50. If the material shrinks 12%, how much excess cut or fill is there?
StationEnd Areas(m^3)
Cut Fill
351+00 57.93
351+50 52.28
351+75 23.58
352+00 8.4 3.73
352+14 13.8
352+50 33.34