DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000...

40
1 DOSTEL MAKINA 2015 - GEBZE

Transcript of DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000...

Page 1: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

1

DOSTEL MAKINA

2015 - GEBZE

Page 2: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Figures

Total 270 employees

Two production plant total 16.000 square meter

40.000 Ton Annual steel usage capacity ( Current %60)

TURNOVER 2014

2

DOSTEL 2014 FIGURES

Page 3: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

COŞKUNÖZ

• RENAULT PROJECTS DIE PRODUCTION

DOSTEL Figures

NEW PROJECTS

GEDIA – 2015

• OPEL ASTRA 5 DOOR VERSION

• FORD PROJECT

• VW PROJECT

• AUDI Q5/Q6 PROJECT

(TRANSFER & PROGRESSIVE

DIE PRODUCTION)

3

FORD OTOSAN - 2015

• V362/3 TRANSIT

• B460 TOURNEO COURIER

• CARGO TRUCK

HONDA - 2017

• CIVIC 2017

ISUZU - 2016

• DMAX

FIAT - 2015

• 356 HB PROJECT

Page 4: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Figures

PLANNED TURNOVER RATIO 2015

4

Page 5: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

Dostel 2

Dostel 1

DOSTEL Plants

Engineering, Tool &

Die Shop,

Management, Finance,

Purchasing & Sales,

Logistic

DOSTEL Plants

Engineering, Tool & Die

Management, Finance,

Purchasing & Sales, Logistic

5

Page 6: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Engineering & Tool Shop

ENGINEERING TEAM • 2 Process & Simulation Engineer • 4 Design Engineer

TOOL SHOP TEAM • 1 Chief Engineer • 2 CAM Engineer • 2 Project Engineer • 25 Die Maker & Machine operator

SOFTWARE INFORMATION

• CATIA V5 R20 • CIMATRON E10 • AUTOCAD 2010 • AUTOFORM PLUS R.4 • MS PROJECT • DINAMO

Engineering – Tool Shop

V5 R20

6

Page 7: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

CNC MACHINING PARK

NC/CNC 3D-2D Machining

CNC 3+2 Axis Machining

5000 x 2600 Bridge Type

4000 x 2100 Bridge Type

3250 x 1200 Bed Type

1700 x 700 Bed Type

3200 X 1600 High Speed

DOSTEL Engineering & Tool Shop

7

Page 8: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

Transfer Die Sets

Sample Dies

8

Page 9: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Sample Progressive Parts in Production

PROGRESSIVE DIE – 2 PART /

SHOT

PROGRESSIVE DIE – 1 PART /

SHOT

PROGRESSIVE DIE – 2 PART (L/R) / SHOT

9

PROGRESSIVE DIE – 1 PART /

SHOT

Page 10: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

TOFAŞ–FIAT TRIM AND PUNCHING DIE

TOFAŞ-FIAT CAM TRIM AND PUNCHING DIE

3000mm*2320mm*1000mm : 23,5 TON 2800mm*1700mm*900mm : 16 TON

10

Die Production Samples

Page 11: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

COŞKUNÖZ – MERCEDES NCR Project Die & CF Sets

Die Production Samples

11

Page 12: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

Die Production Samples

ISUZU Die Sets

PIERCING DIE SET FOR NPR 3D TRUCK CHASIS PART

800 mm x 3800 mm x 500 mm

12

FORM DIE SET FOR FTR-205 TRUCK CHASIS PART

800 mm x 8500 mm x 500 mm

Page 13: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

COŞKUNÖZ – GM OPEL Project Die & CF Sets

13

Die Production Samples

Page 14: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – DAIMLER A217 Project Die Sets

14

Die Production Samples

Page 15: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – DAIMLER A217 Project Die Sets Buy-Off in POLAND

15

Die Production Samples

Page 16: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – GM OPEL Project Die & Part Production -

POLAND

16

New Projects

Page 17: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – FORD Project Die Production - SPAIN

17

New Projects

Page 18: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA - GM Project Die & Part Production - POLAND

18

Prototype & serial, Part & die production

New Projects

Page 19: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – VW Project Die & Part Production -

POLAND

19

New Projects

Page 20: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – AUDI MEXICO Q5/Q6 DIE PRODUCTION

20

TOTAL : 16 PARTS

37 TOOL

New Projects

Page 21: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

GEDIA – AUDI MEXICO Q5/Q6 PROJECT MEETING & TRY OUT

STUDIES - 2015

21

New Projects

Page 22: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

22

Prototype & serial, Part & die production

Prototype production finished

Shock Absorber & Anti Roll Bar Bracket

New Projects

Page 23: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

Ford V362/3 Transit Urea Tank Straps

23

Prototype & serial, Part & die production

Prototype production finished

New Projects

Page 24: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

Radiator Guard – CARGO Truck (FORD)

24

Prototype & serial, Part & die production

New Projects

Page 25: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

New Projects

HONDA CIVIC 2016

25

TOTAL 7 PARTS

41 TOOL

13 CHECKING FIXTURES

3 WELDING FIXTURE

Page 26: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

COŞKUNÖZ

26

RENAULT PROJECTS DIE PRODUCTION

New Projects

Page 27: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

ISUZU D-MAX CHASIS PROJECT

27

TOTAL 158 PARTS

445 TOOL

145 CHECKING FIXTURES

25 WELDING FIXTURE

New Projects

Page 28: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Quality

• DEA Vento Measuring Machine

PCDMIS software

(3200 mm X 2000 mm)

• DEA Vento Measuring Machine

Capps NT software

(4000 mm X 2000 mm)

28

•ISO 9001 – ISO/TS 16949 CERTIFICATED FROM TÜV SÜD

•ISO 14001 CERTIFICATED FROM NQA

Page 29: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

TANDEM ROBOTIC LOAD

•D2-H10 : 1 x 750T (M) (3200x2100) (ABB)

3 x 400T (M) (2750x1800) (ABB)

PROGRESSIVE

•D1-PRG 10 : 1 x 315T (M) (2470x1250)

•D1-PRG 20 : 1 x 315T (M) (2470x1250)

TANDEM MANUAL

•D1-H10 : 1 x 500T (M)(2800x1500)

1 x 400T (M) (2740x1800)

2 x 315T (M) (2470x1250)

•D2-H20 : 1 x 1000T (H) (2800x1700)

3 x 500T (M) (3150x1700)

•D2-H30 : 1 x 400T (M) (2750x1500)

3 x 400T (M) (2750x1500)

DOSTEL Main Process Lines

Press Technologies

29

Page 30: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

D2 TRANSFER PRESS

1100T Transfer Press

5000 mm x 2500 mm

Full Automated Cut to Length Line

Press Technologies

DOSTEL Main Process Lines

30

Page 31: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

TRY-OUT PRESES

Press Technologies

DOSTEL Main Process Lines

31

1000T HIDROMODE 500T ERFURT 500T TOMRUK 400T COWISHAW

WALKER 2800x1700 2800x1500 2250x1540 2740x1800

Page 32: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

2 NEW INVESTMENT PLANNED TO 2015.

GOVERMENT INVESTMENT INCENTICE DOCUMENT HAS BEEN APPROVED

• 1600T TRANSFER PRESS - 5500 X 2500 TABLE SIZE

PLANNED DATE END OF 2015

• 400T PROGRESSIVE PRESS - 2500 X 1250 TABLE SIZE

PLANNED DATE END OF 2015

New Investments

DOSTEL Main Process Lines

32

Page 33: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Main Process Lines

WELDING

•MIG Welding Robot line (4 OTC Robot) •Spot Welding Robot line (14 Spot Welding Robot)

•Spot Welding Manuel line (18 Manuel gun)

33

Page 34: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

CRASH BOX FRONT

LEFT

CRASH BOX FRONT

RIGHT

FUEL TANK STRAP

HONDA

FUEL TANK STRAP

FORD

DOSTEL Safety Parts in Production

SWING ARM

34

FUEL TANK STRAP

FORD

Page 35: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Parts On Ford V362 Transit

BRKT HTR WTR CONTR VLV

MTNG

PNL HTR PLENUM CHMBER

FRT

MBR ASY FRT FLR

REINF FRT ST BEL ANC

MBR ASY RR FLR CS

CWL ASY

REINF DH LWR PNL

REINF DH LWR PNL STRP ASY

FU/TNK SUPT

CVR RR CNR INR FIN UPR

REINF BDY SD INR PNL

TRGH ASY L/C DR OPG DRN LWR

MBR RR FLR CS LWR

35

Page 36: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Sample Parts On Ford V363 Transit

CWL ASY

BRKT-RR SPG FRT

PNL W/SHLD HDR OTR

PNL HTR PLENUM CHMBER FRT LHD

REINF ASY BDY SD INR PNL LWR RH/LH

BRKT CPL/SHT BRG SUPT

STRP ASY FU/TNK SUPT

MBR ASY RR FLR CS CTR

CARR ASY LUGG MBR RR FLR CS LWR

MBR ASY CTR FLR CS REINF BDY SD LWR EDG RR MBR ASY BDY RR CS BRKT RR SPG RR

36

Page 37: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL Sample Parts On Ford B460 Transit

CWL ASY RH

37

CWL ASY LH

PNL HTR PLENUM CHMBER FRT LH PNL HTR PLENUM CHMBER FRT RH

DASH PANEL BRAKE CYLINDER REINF

DASH PANEL BRAKE CYLINDER REINF

FRNT BRACKET FUEL TANK STRAPS

Page 38: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

CROSS MEMBER HYUNDAI i20 PROJECT

38

DOSTEL Sample Parts On Hyundai / Isuzu Models

ISUZU P700 TRUCK CROSS CAR BEAM

Page 39: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

DOSTEL References

OEM

TIER 1

39

Page 40: DOSTEL MAKINA 2015 - GEBZEDOSTEL Figures Total 270 employees Two production plant total 16.000 square meter 40.000 Ton Annual steel usage capacity ( Current %60) TURNOVER 2014COŞKUNÖZ

THANK YOU

40