Slide 1
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [Ultra Wideband Regulatory Update in Europe ]
Date Submitted: [14 July 2006]
Source: [Siew Yoon Tan] Company [Ofcom]Address [2a Southwark Bridge Road, SE1 9HA London, United Kingdom]Voice:[+44 2079813066], E-Mail:[[email protected]]
Abstract: [Description of UWB Regulatory update in Europe]
Purpose: [Information to 4a July 2006 meeting]
Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.
Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.
Slide 2
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Ultra Wideband Regulatory Updatein Europe
July 2006
Slide 3
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
CEPT Regulatory Package
Identification of long term spectrum access for generic UWB CompletedCompleted
Time limited opening of the 4.2 to 4.8GHz band for generic UWB OngoingOngoing
Identification of the 3.1 to 4.8GHz band for generic UWB on the basis of suitable mitigation technique – Completed for LDCCompleted for LDC
Complete regulatory solution expected to be finalized end 2006
BenefitMore time efficient to finalise issues separately due to different regulatory challenges at different bands…
Above 6GHz
Below 6GHz
Slide 4
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Above 6GHz
• Long term solution for Europe• CEPT Decision ECC/DEC/(06)04 for UWB operation above 6GHz
was adopted in May 06 http://www.ero.dk/documentation/docs/doc98/official/Word/ECCDEC0604.DOC
• Adoption of EC Decision for UWB above 6GHz expected in Oct 06
• EC issue additional mandate to CEPT to study extension at 8.5 to 9GHz band to allow use of UWB equipment at 6-9GHz
• Final report from CEPT to EC expected March 07
e.i.r.p of -41.3dBm/MHz @ 6 – 8.5GHz
Slide 5
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
UWB Mask for ECC Decision above 6GHz
-100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
0 2000 4000 6000 8000 10000 12000 14000
Frequency (MHz)
PS
D (
dB
m/M
Hz)
Level Agreed from 6 to 8.5GHz @ -41.3dBm/MHz
-85
Slide 6
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Below 6GHz
UWB Devices implementing efficient mitigation technique will be
permitted to operate at a level of -41.3dBm/MHz in the band 3.4 to
4.8GHz
• Low Duty Cycle (LDC)
• Detect and Avoid (DAA)
Time limited opening of the 4.2 to 4.8GHz band for generic UWB
operating at -41.3dBm/MHz without mitigation technique
Mitigation Technique
Phased Approach
Slide 7
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Mitigation Technique – LDC
• CEPT had completed work on technical requirement
• Draft ECC Decision on LDC in the frequency band 3.4 to 4.8GHz has been approved in ECC July 06 meeting for public consultation
UWB devices implementing LDC will be permitted to operate at a level of
-41.3dBm/MHz in the frequency band 3.4 to 4.8GHz with the following requirements
Ton max = 5 msToff mean ≥ 38 ms (averaged over 1 sec)Σ Toff > 950 ms per secondΣ Ton < 5% per second and 0.5% per hour
Slide 8
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Mitigation Technique – DAA
• CEPT expect to complete technical requirement in Oct 06• UWB implementing DAA will be permitted to operate at a level of -
41.3dBm/MHz in the frequency band 3.4 to 4.8GHz • The proposed DAA mechanisms composed of:
Introduction of “silent period” - For coexistence between UWB and victim services when avoid
mechanisms is not yet active - For measurements/detection operation
Victim service UL detection for “Avoid” operation activation. “Avoid” operation in order to protect the DL signal.
- further study on power level at the 3.4 – 3.8GHz band (currently –
85dBm/MHz)
Slide 9
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Mitigation Technique – Further work
• To study efficiency of mitigation technique to ensure protection of radars below 3.4GHz
Slide 10
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Phased Approach
• Time limited opening of the 4.2 to 4.8GHz band for generic UWB operating at -41.3dBm/MHz without mitigation technique
• Balanced view expressed in favour and against phased approach
• No consensus could be reached at July ECC meeting
• Further study on regulatory implications and enforcement aspect
• Report and decision expected in ECC Nov 06 meeting
Slide 11
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Proposed UWB Mask for ECC decision below 5GHz
-100
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
0 2000 4000 6000 8000 10000 12000 14000
Frequency (MHz)
PS
D (
dB
m/M
Hz)
Level Agreed for DAA Or LDC from 3.4 to 4.8GHz @ -41.3dBm/MHz
DAA Area -85dBm/MHz@ 3.4 to 3.8GHz after detection
-85
Proposed Phased approach without DAA until 2010/12 from 4.2 – 4.8GHz @ -41.3dBm/MHz
Slide 12
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Below 6GHz – Regulatory Milestones
Mitigation Technique
• LDC – draft ECC Decision for LDC for public Consultation July 06
• DAA – expected (earliest) draft ECC Decision for DAA for public Consultation Nov 06
Phased Approach
• Decision to allow or against phased approach Nov 06
• Expected adoption of EC Decision on UWB Above 6GHz Oct 06
CEPT
EC
Slide 13
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
Summary European Process and Timeline
• CEPT undertake UWB technical studies under EC Mandate and produced ECC Decision
• EC Radio Spectrum Committee (RSC) consider ECC Decision and then issue EC Decision which is MANDATORY to member states
• Timing of regulatory decision dependent on the EC RSC
EC RSC meetingEC RSC meeting
2006
Sept OctAugMar Apr May Jun Jul
CEPT ECC CEPT ECC MeetingMeeting
DecNov Jan2007
Expected adoption of EC Decision for UWB Above 6GHzFinalisation of EC Decision for UWB Above 6GHz Discussion of new EC Decision for UWB Below 6GHz
Adoption of ECC Decision ECC/DEC/(06)04
Approval of draft ECC Decision on LDC for Public Consultation
Expected Approval of draft ECC Decision on DAA for Public Consultation (earliest)
Expected ECC Decision on phased approach
Slide 14
doc.: IEEE 802.15-06-0309-00-004a
Submission for 4a
ECC Consultation
Public Consultation on Draft ECC Decision on the harmonised conditions for devices using Ultra-Wideband (UWB) with Low Duty Cycle
(LDC) in the 3.4 – 4.8GHz available at www.ero.dk