DB analaysis.xlsx

4
Analysis for Dry Brick Kharwanza as per Actual S.no. CSR Name of Item Quantity Rate Premium no L B H Qty unit 1 24.16 Laying of brick on end edging 2 3280 6560 rft or 2000.00 cum 52.4 0 1 1 3280 10 0.75 24600.00 cft or 696.69 cum 5.18 14 2 Supply of Bricks 1 3280 8 26240.00 Sft or 2438.66 sqm 296.1 0 2 1 3280 8 26240.00 Sft or 2438.66 sqm 32.01 0 Compaction of Earthwork laid by villagers Laying First Class Dry Brick on edge flooring or paving in ordinary bonded courses or in herring bond or other special courses / bond along with preparation of sub grade with rough dressing of soil, final dressing of earth to give level surface and comber including watering, rolling with road roller. All joints shall be thoroughly filled / grouted with dry sand, applied to a thickness of not less than 20 mm

Transcript of DB analaysis.xlsx

Analysis for Dry Brick Kharwanza as per ActualS.no. CSR Name of Item Quantity RatenoB ! Qty unit" #$."% ayin& of 'rick on en( e(&in )#*+ %,%+ rftor #+++.++ cum ,#.$" Compaction of -arthwork lai( 'y .illa&ers" )#*+ "+ +./, #$%++.++ cftor %0%.%0 cum ,."*# Supply of Bricks" )#*+ * #%#$+.++ Sftor #$)*.%% s1m #0%."#" )#*+ * #%#$+.++ Sftor #$)*.%% s1m )#.+"Laying First Class Dry Brick on edge flooring or paving in ordinarybondedcoursesorinherringbondorother specialcourses/bondalongwithpreparationofsub gradewithrough dressingofsoil,finaldressing ofearth togivelevelsurfaceandcomberincludingwatering, rolling with road roller. ll !oints shall be thoroughly filled / grouted with dry sand, applied to a thickness of not less than "# mm over the surface of flooring and brushed into the!oints,rollingthesurfacewithlightroadrollerafter sprinkling with water complete in all respects.Analysis for Dry Brick Kharwanza as per Actual2remium Amount+ "+$*++"$ $""$+ /##+**+ /*+%#0+0+%)Analysis for Dry Brick KharwanzaS.no. CSR Name of Item Quantity RatenoB ! Qty unit" #$."% ayin& of 'rick on en( e(&in )#*+ %,%+ rftor #+++.++ cum )*.+"" #$.$ CCompaction of -arthwork lai( 'y .illa&ers" )#*+ "+ +./, #$%++.++ cftor %0%.%0 cum ,."*# "$."0" )#*+ * #%#$+.++ Sftor #$)*.%% s1m #)%.*") -3tra rate for Bricks#$)*.%% ,/., "$+##) 'ricks $$.$Laying First Class Dry Brick on edge flooring or paving in ordinarybondedcoursesorinherringbondorother specialcourses/bondalongwithpreparationofsub gradewithrough dressingofsoil,finaldressing ofearth togivelevelsurfaceandcomberincludingwatering, rolling with road roller. ll !oints shall be thoroughly filled / grouted with dry sand, applied to a thickness of not less than "# mm over the surface of flooring and brushed into the!oints,rollingthesurfacewithlightroadrollerafter sprinkling with water complete in all respects.Analysis for Dry Brick Kharwanza2remium Amount,0 "#+*/#"$ $""$,+ *%%#$0+ %##%00/$%"