7
ffiRICULARS SCHEDULE A PREAMBLE TO DAY WORK RATES Any work ordered by the S.O. to be carried out by day work shall be paid for at the rates entered heieunder subject to the foltowing conditions:- 1. The rates entered for abour shall be deemed to include all on-costs associated with the employmeni oi tr.f t labour including (inter alia)'.head -office"n.'g"',overtreaocharges,profit,-site.expenses,..subsistence allowances, time lost due to inciernent weather, bonus, holiday and sick pay and any other "rptoyut;' fting" benefi(s)' small tools and consumable stores, temporary equipment such as wedges, temporary tracks, faOOers, staging, scaffoiding a;O all items of a similar nature unless these are provided or iet up exclusively for day work' 2. The wages of gangers and leading hands working with.their gangs shall be paid for at the appropriate ratei but the time. oi walking gangers' sub- foremen and foremen witl not ue'included and shall be deemed to be included in the rates entered for iabour under site supervision and staff' 3. Payment for overtime work if chargeable and.approved by the S'O' shall be made at the rates enteruO f,eie'in, but the time so worked as overtime shall be adjusted in the rr*.'ptoportion as that used for the paying the normalworkmenonthesiteandapprovedbytheS.o..Thusifaman works t hour overtime for wnicfr ihe iate pryu'bl" is double time' payment shall be made for 2 hours at the rate enteieO in tfre day works schedule' Overtime is working time over and above B hours per ;;kilg day includin! Saturday or 48 hours per week' OTE: 4. The cost of special watching and lighting necessitated by day works shall be included in the rates. 5. The rates entered for plant shall apply only to plant which the contractor has available on the site. Sutn'i#t s'halt be deemed to include all overhead charges, profit, site supervision and staff, hire charges' fuel' maintenance, consumable stores, tprt" parts, insurances, depreCiation etc.. but shall exclude the .oti oi'*iges for drivers and operators which shall be payable separately as dealt with under paragrapih 1 above. 6. Payment for echanically operated plant shall be made only at such.times as the plant is engaged in daywork'and shall exclude all standing' idle or down time. SPAJl

Transcript of Daywork Rates for Bq

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 1/7

ffiRICULARSSCHEDULE A

PREAMBLE TO DAY WORK RATES

Any work ordered by the S.O. to be carried out by day work shall be paid for at

the rates entered heieunder subject to the foltowing conditions:-

1. The rates entered for tabour shall be deemed to include all on-costs

associated with the employmeni oi tr.f t labour including (inter alia)'.head

-office"n.'g"',overtreaocharges,profit,-site.expenses,..subsistence

allowances, time lost due to inciernent weather, bonus, holiday and sick

pay and any other "rptoyut;'fting" benefi(s)' small tools and

consumable stores, temporary equipment such as wedges, temporary

tracks, faOOers, staging, scaffoiding a;O all items of a similar nature unless

these are provided or iet up exclusively for day work'

2. The wages of gangers and leading hands working with.their gangs shall

be paid for at the appropriate ratei but the time. oi walking gangers' sub-

foremen and foremen witl not ue'included and shall be deemed to be

included in the rates entered for iabour under site supervision and staff'

3. Payment for overtime work if chargeable and.approved by the S'O' shall

be made at the rates enteruO f,eie'in, but the time so worked as overtime

shall be adjusted in the rr*.'ptoportion as that used for the paying the

normalworkmenonthesiteandapprovedbytheS.o..Thusifamanworks t hour overtime for wnicfr ihe iate pryu'bl" is double time' payment

shall be made for 2 hours at the rate enteieO in tfre day works schedule'

Overtime is working time over and above B hours per

;;kilg day includin! Saturday or 48 hours per week'OTE:

4. The cost of special watching and lighting necessitated by day works shall

be included in the rates.

5. The rates entered for plant shall apply only to plant which the contractorhas available on the site. Sutn'i#t s'halt be deemed to include all

overhead charges, profit, site supervision and staff, hire charges' fuel'

maintenance, consumable stores, tprt" parts, insurances, depreCiation

etc.. but shall exclude the .oti oi'*iges for drivers and operators which

shall be payable separately as dealt with under paragrapih 1 above.

6. Payment for mechanically operated plant shall be made only at such.times

as the plant is engaged in daywork'and shall exclude all standing' idle or

down time.

SPAJl

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 2/7

7.

8.

9.

lf any workmen or items of plant on daywork do not readily belong to any

classification incluol-d i. in" schedule 6rinserteO by the Contractor at the

timeof tendering, td S.O. shall deter;it; th; equivalent classification

to

be adopted ror sucn *orkmen or items'oiprrnt, and payment for such will

be made accordinglY.

The rates inserted by the Contractor.shallbe realistic rates in conformity

with those on wnici'nis tender n.t Uu.n Uased andshall be based on

conditions prevaiting at the time of ffi;; Uui Uearing in mind that claims

for escalation will not be entertained'

The rates inserted snail ue subjected to agreementwith the s.o' as to

their reasonableness and subiect to .i,.n dreumentshall be used as day

work rates.

Thedayworksratesenteredhereunderandagreed.bytheS'o.shallnotbe further subjected to the fifteen

p";;;;i 11Si,f') uOOiiion as stipulated in

ei"fu 25(d) 6ttte conditions of Contract'

The contractor shalt produce for verificationto the s'o' vouchers

specifying the time and'materiaft "'pfoytO 9t 11'"*of lf required' the

Contractor shall also produce nit iSfJipGJ Uitttand wages books in

supPort of his accounts.

Wherespecialmechanicalplantisrequired|or.yseonlavworks,thecostto be paid to the #;il;1oljjr'uu tuni".t to the agreement bv the S'o'

onlytimeonworkactuallydonewillbeallowed.A.day'isconsideredtobe normal working day of B hours. rraction

of a day will be paid for pro-

rata.

Rates for power driven tools are not includedin the labour rates but

"iuigu. foi nano toots snatt be deemed to

be included'

10.

11.

12.

13.

14.

SPAJ2

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 3/7

DAY WORK RATES

1, LABOUR

Only time on work will allowed. A 'DAY' is considered to be a normal working

darof eight (8) hours. Fractions of a day will be paid for'pro-rata'.

Item Description Unit Rate

'1 .

2.

3.

4.

5.

6.

7.

8.

L

10.

11.

12.

13.

14.

15.

16.

17.

18.

GeneralLabour (Male)

General Labour (Female)

Mason

Carpenter and Joiner

Concretor

Stqel Bar Bender & Fixer

Steel and lron Worker

Painter

Plasterer

Bricklayer

Welder

Welder

Charge Hand/Ganger

Plant Operator

Fitter

Pneumatic Tool Operator

Lorry Driver

Blasting Operator

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

Manday

IManday

I

I uanoay

I

I Manday

SPA/3

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 4/7

1. LABOUR (cont'd)

PLANT(persons tendering are to enter the size or capacity of plant they propose

to have on site, where not stated)

Manday

Manday

Manday

Manday

Manday

Manday

Blasting Labourer

Bitumen Worker

Watchman

Piling Labourer

Piling Serang

Piling Rigger

19.

20

21.

22.

2g.

24.

Hour

Hour

Hour

HourHour

HourHour

Hour

Hour

Hour

(a) Bulldozer(b) - ditto -

(c) - ditto -

(a) Bulldozer with riPPer

(b) - ditto -

(a) Motor - grader

(b) - ditto -

(a) Fully hydrauJic excavator

(b) - ditto -

Hydraulic rock breaker

2.

3.

4.

5.

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 5/7

PLANT (cont'd)

Tractors(a) - crawler type with bullor angle

Dozer blade and/or riPPer

(b) - ditto -

(c) - wheel(d) - shovel(e) - agriculture

(a) Wheeled hYdraulic shovel

(b) - ditto -

(a) Tracked hYdraulic shovel

(b) - ditto -

Backhoe excavation/loader

Wheel loader

(a) Draglineexcavator

(b) - ditto -

(a) ScraPPer

(b) - ditto -

(a) Clamshellexcavator(b) - ditto -

Bucket - wheeled excavator

(a) Asphalt Paver

(b) - ditto -

(a) DumP-truck(dumPer)

(b) - ditto -

(ri Mobile craner

(b) - ditto -

(a) Self propelled single vibrating

roller

(b) - ditto -

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 6/7

PLANT (cont'd)

Self proPelled single vibrating

roller

- ditto -

Pneumatic tYred roller

- ditto -

SheePfoot roller

- ditto -

Steelwheeled roller

- ditto -

Towed vibrating roller

- ditto -

Rammer- ditto -

(a) TamPer(b) - ditto -

ConcreteiAsPhalt cutterr

Lorries(a) ordinary(b) heavY haulage

Water truck . (tYPe)

lncluding sPraYing equiPment

(a) Pile driving machine

(b) - ditto -

(a) Concrete mixer

(b) - ditto -

i.i - ditro - (oPen drum)

idi - ditto - (weigh batcher)

SPAU6

7/30/2019 Daywork Rates for Bq

http://slidepdf.com/reader/full/daywork-rates-for-bq 7/7

PLANT (contd)

(Tenderer)(Witness)

Date:Date: ... ...

SPAl/7