ffiRICULARSSCHEDULE A
PREAMBLE TO DAY WORK RATES
Any work ordered by the S.O. to be carried out by day work shall be paid for at
the rates entered heieunder subject to the foltowing conditions:-
1. The rates entered for tabour shall be deemed to include all on-costs
associated with the employmeni oi tr.f t labour including (inter alia)'.head
-office"n.'g"',overtreaocharges,profit,-site.expenses,..subsistence
allowances, time lost due to inciernent weather, bonus, holiday and sick
pay and any other "rptoyut;'fting" benefi(s)' small tools and
consumable stores, temporary equipment such as wedges, temporary
tracks, faOOers, staging, scaffoiding a;O all items of a similar nature unless
these are provided or iet up exclusively for day work'
2. The wages of gangers and leading hands working with.their gangs shall
be paid for at the appropriate ratei but the time. oi walking gangers' sub-
foremen and foremen witl not ue'included and shall be deemed to be
included in the rates entered for iabour under site supervision and staff'
3. Payment for overtime work if chargeable and.approved by the S'O' shall
be made at the rates enteruO f,eie'in, but the time so worked as overtime
shall be adjusted in the rr*.'ptoportion as that used for the paying the
normalworkmenonthesiteandapprovedbytheS.o..Thusifamanworks t hour overtime for wnicfr ihe iate pryu'bl" is double time' payment
shall be made for 2 hours at the rate enteieO in tfre day works schedule'
Overtime is working time over and above B hours per
;;kilg day includin! Saturday or 48 hours per week'OTE:
4. The cost of special watching and lighting necessitated by day works shall
be included in the rates.
5. The rates entered for plant shall apply only to plant which the contractorhas available on the site. Sutn'i#t s'halt be deemed to include all
overhead charges, profit, site supervision and staff, hire charges' fuel'
maintenance, consumable stores, tprt" parts, insurances, depreCiation
etc.. but shall exclude the .oti oi'*iges for drivers and operators which
shall be payable separately as dealt with under paragrapih 1 above.
6. Payment for mechanically operated plant shall be made only at such.times
as the plant is engaged in daywork'and shall exclude all standing' idle or
down time.
SPAJl
7/30/2019 Daywork Rates for Bq
http://slidepdf.com/reader/full/daywork-rates-for-bq 2/7
7.
8.
9.
lf any workmen or items of plant on daywork do not readily belong to any
classification incluol-d i. in" schedule 6rinserteO by the Contractor at the
timeof tendering, td S.O. shall deter;it; th; equivalent classification
to
be adopted ror sucn *orkmen or items'oiprrnt, and payment for such will
be made accordinglY.
The rates inserted by the Contractor.shallbe realistic rates in conformity
with those on wnici'nis tender n.t Uu.n Uased andshall be based on
conditions prevaiting at the time of ffi;; Uui Uearing in mind that claims
for escalation will not be entertained'
The rates inserted snail ue subjected to agreementwith the s.o' as to
their reasonableness and subiect to .i,.n dreumentshall be used as day
work rates.
Thedayworksratesenteredhereunderandagreed.bytheS'o.shallnotbe further subjected to the fifteen
p";;;;i 11Si,f') uOOiiion as stipulated in
ei"fu 25(d) 6ttte conditions of Contract'
The contractor shalt produce for verificationto the s'o' vouchers
specifying the time and'materiaft "'pfoytO 9t 11'"*of lf required' the
Contractor shall also produce nit iSfJipGJ Uitttand wages books in
supPort of his accounts.
Wherespecialmechanicalplantisrequired|or.yseonlavworks,thecostto be paid to the #;il;1oljjr'uu tuni".t to the agreement bv the S'o'
onlytimeonworkactuallydonewillbeallowed.A.day'isconsideredtobe normal working day of B hours. rraction
of a day will be paid for pro-
rata.
Rates for power driven tools are not includedin the labour rates but
"iuigu. foi nano toots snatt be deemed to
be included'
10.
11.
12.
13.
14.
SPAJ2
7/30/2019 Daywork Rates for Bq
http://slidepdf.com/reader/full/daywork-rates-for-bq 3/7
DAY WORK RATES
1, LABOUR
Only time on work will allowed. A 'DAY' is considered to be a normal working
darof eight (8) hours. Fractions of a day will be paid for'pro-rata'.
Item Description Unit Rate
'1 .
2.
3.
4.
5.
6.
7.
8.
L
10.
11.
12.
13.
14.
15.
16.
17.
18.
GeneralLabour (Male)
General Labour (Female)
Mason
Carpenter and Joiner
Concretor
Stqel Bar Bender & Fixer
Steel and lron Worker
Painter
Plasterer
Bricklayer
Welder
Welder
Charge Hand/Ganger
Plant Operator
Fitter
Pneumatic Tool Operator
Lorry Driver
Blasting Operator
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
Manday
IManday
I
I uanoay
I
I Manday
SPA/3
7/30/2019 Daywork Rates for Bq
http://slidepdf.com/reader/full/daywork-rates-for-bq 4/7
1. LABOUR (cont'd)
PLANT(persons tendering are to enter the size or capacity of plant they propose
to have on site, where not stated)
Manday
Manday
Manday
Manday
Manday
Manday
Blasting Labourer
Bitumen Worker
Watchman
Piling Labourer
Piling Serang
Piling Rigger
19.
20
21.
22.
2g.
24.
Hour
Hour
Hour
HourHour
HourHour
Hour
Hour
Hour
(a) Bulldozer(b) - ditto -
(c) - ditto -
(a) Bulldozer with riPPer
(b) - ditto -
(a) Motor - grader
(b) - ditto -
(a) Fully hydrauJic excavator
(b) - ditto -
Hydraulic rock breaker
2.
3.
4.
5.
7/30/2019 Daywork Rates for Bq
http://slidepdf.com/reader/full/daywork-rates-for-bq 5/7
PLANT (cont'd)
Tractors(a) - crawler type with bullor angle
Dozer blade and/or riPPer
(b) - ditto -
(c) - wheel(d) - shovel(e) - agriculture
(a) Wheeled hYdraulic shovel
(b) - ditto -
(a) Tracked hYdraulic shovel
(b) - ditto -
Backhoe excavation/loader
Wheel loader
(a) Draglineexcavator
(b) - ditto -
(a) ScraPPer
(b) - ditto -
(a) Clamshellexcavator(b) - ditto -
Bucket - wheeled excavator
(a) Asphalt Paver
(b) - ditto -
(a) DumP-truck(dumPer)
(b) - ditto -
(ri Mobile craner
(b) - ditto -
(a) Self propelled single vibrating
roller
(b) - ditto -
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
7/30/2019 Daywork Rates for Bq
http://slidepdf.com/reader/full/daywork-rates-for-bq 6/7
PLANT (cont'd)
Self proPelled single vibrating
roller
- ditto -
Pneumatic tYred roller
- ditto -
SheePfoot roller
- ditto -
Steelwheeled roller
- ditto -
Towed vibrating roller
- ditto -
Rammer- ditto -
(a) TamPer(b) - ditto -
ConcreteiAsPhalt cutterr
Lorries(a) ordinary(b) heavY haulage
Water truck . (tYPe)
lncluding sPraYing equiPment
(a) Pile driving machine
(b) - ditto -
(a) Concrete mixer
(b) - ditto -
i.i - ditro - (oPen drum)
idi - ditto - (weigh batcher)
SPAU6