BIM: The UK GovernmentStrategyProfessor David Philp – Head of BIM Implementation
Cabinet Office, UK Government
UK Government BIM Task Group
The What
16/02/2013
2
BIM: A way of workingA smart way of thinking (“start to start”, not cradle to grave)
Purpose drivenBIM
Value creating collaboration
BIM
BIM: A way of working
McLaren F1managed the world's fastest pit stop at the F1 German Grand Prix over the weekend. All four tires were swapped out in only 2.31 seconds
Simulate to optimize4D to digital project managementent
16/02/2013
3
Where next?
Bridge the FM gap
It will still be about people and behaviours!
Technology not the problem!
16/02/2013
4
Where next?
Still about people and teams
2011 2012
Where next?
BIM and GSL 2013
16/02/2013
5
BIM Policy
BIM Growth
Engagement
Everyone has read the
Government ConstructionStrategy
and realises thatBIM is only part of the
15‐20% Savings equation
16/02/2013
6
Where next?
Measure the benefits (TPSG) /Lessons learned & POE feedback into standard
1+1 = 3?BIM / GSL are not trial projects
2.32 Government will require
fully collaborative 3D BIM(with all project and asset information, documentation and data being electronic) as a minimum
by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.
16/02/2013
7
Level 2 BIM: a minimum standard
2012 2013 2014 2015
Data – Manual Checking Data – Digital Checking
• Core team / Steering formed• BIM4 Groups established• CIC BIM Regional Hubs (go‐live)• Departmental workshops start• Education & Training framework• TG Website / Twitter goes live• MOJ Dept Training Launched• GSL mandated• Training modules launched• Support Officers employed• Engagement with 10,000+• BIM pipeline report / EU prospecting• EIRs initial document suite available
• PAS1192‐2 / UK Protocol published• Information Manager defined• Dept BIM/GSL workshops complete• GSL leads identified• BIM E&T NOS completed• Pan‐Departmental Training • Digital Plans of Work (v1)• Expand info exchange e.g. COBie• Level 3 Discovery / Conference• BIM Publications issued• BIM 4CXO Investors Reports• Labs area launched• MOJ pilot(s) lessons learned• Data server goes live
Discovery, Mobilise & Test L2 Model
EmbeddingBIM/GSL in Depts
MOJ Pilot
MOJ 100%BIM &2# Pilots / Dept
All Govt departmentshave published
BIM/GSLStrategies andRoadmaps and
forward pipelines
All Government
Departments 100%Level 2
BIM / GSL Enabled
Accelerate DeptPilot Delivery
BIM/GSL ,Benefits Realisation
2016 Le
gacy –Digital B
uilt B
ritain (B
IM In
finity)
UK BIM Task Group – Level 2 BIM / GSL Maturity Road MapDraft (18/12/12 DPhilp/Roadmap00) Key Supporting Activities
16/02/2013
8
The Why
Keep it simple; our hypothesis is:BIMGovernment as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information
16/02/2013
9
Customers not getting the assets & outcomes they need / wanted?
Dropping the baton at key stages
Turn data into accurate insight360 Process
Data set refined Optimal asset performance
In use data feedback
16/02/2013
10
The VP
Have greater understanding of the entire life-cycle process (especially design intent) through the models: data and 3D
Better business outcomes through early collaborative decision making
In use data feed-back loop
16/02/2013
11
Our Plan
Perfect Landing: Construction to CAFMDrop 4 Tested
16/02/2013
12
© Autodesk 2011
Germany
UK
France
Netherlands
Sweden
Finland
Italy
Denmark
Norway
Spain
0
0.5
1
1.5
2
2.5
3
3.5
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
Pro
ject
Ba
sed
BIM
Ad
op
tion
BIM Policy and Contract Documentation
BIM Policy Stage by Adoption Rating - EMEA
UK#1 Global BIM Leader
A newImage.A legacyvehicle
DigitalBuilt Britain
16/02/2013
13
BIM4
Steering
BIM4Water
BIM4FM
BIM4SupplyChainDelivery
BIM4PrivateClients
Sub Groups:NFBUKCGSEC
BIM Academic Forum
BIM Forum
Tech Vendor Alliance
Engaging with industry
26 | WWW.BENTLEY.COM
PAS 1192/2
16/02/2013
14
27 | WWW.BENTLEY.COM
Answer ‘English Questions’
PAS 1192:2 - Data checking
PAS1192‐2 In‐use and digital checking of data quality
Collaborative working is a key means of eliminating waste and unnecessary costDefines core project processes including the Common Data Environment and Collaborative Information Exchange
16/02/2013
15
Process & deliverables that let all the supply chain contribute
Lab Space / dPoW
MOJ: Testing theLevel 2 Model
16/02/2013
16
What did we do?
Process Workshop
Final process chart showing key decision points (red diamonds) and associated data drops (green footballs)
GovernmentSoft Landings
An Overview
16/02/2013
17
33 | WWW.BENTLEY.COM
GSL Powered by BIM
Have a look at our web-sitewww.bimtaskgroup.org