Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

download Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

of 41

Transcript of Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    1/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page1, Total41

    Product name Confidentiality level

    RF For internal use only

    Product versionTotal 41 pages

    V1R2

    Data Performance Optimization Service V100R002 DeliveryGuide

    (For internal use only)

    Prepared by Hong Weifeng Date 2012-02-15

    Reviewed by Date

    Reviewed by Date

    Approved by Date

    Huawei Technologies Co., Ltd.

    All Rights Reserved

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    2/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page2, Total41

    Revision Records

    Date Version Description Author

    2012-02-15 0.8 Draft Hong Weifeng

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    3/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page3, Total41

    Contents

    1 Overview of UMTS KPI Improvement Service ...................................................................... 81.1 Objective .................................................................................................................. ........................................ 81.2 Application Scope .................................................................................................... ........................................ 81.3 Intended Audience ......................................................... ................................................................. .................. 8

    2 Workflow and Task ...................................................................................................................... 92.1 Workflow ............................................................ ................................................................. ............................. 92.2 Task ......................................................... ................................................................. ...................................... 11

    3 Delivery Guide ............................................................................................................................ 133.1 Prerequisites ................................................................................................................................................... 133.2 Procedure ....................................................................................................................................................... 13

    3.2.1 Service Preparation ......................................................................................... ...................................... 133.2.2 RAN Data Reporting ................................................................. ............................................................ 133.2.3 PS Core Reporting .................................................................... ............................................................ 143.2.4 GSM or UMTS? .............................................................. ................................................................. ..... 153.2.5 Performance Audit for GSM ......................................................................................................... ........ 153.2.6 Field Test Report for GSM ......................................................... ........................................................... 163.2.7 PDCH Audit ......................................................... ................................................................. ................ 183.2.8 PS Capacity Audit for GSM ................................................................. ................................................. 183.2.9 Performance Audit for UMTS .............................................................. ................................................. 193.2.10 Field Test Report for UMTS ................................................... ............................................................ 203.2.11 R99\HSPA Audit ..................................................................... ............................................................ 223.2.12 PS Capacity Audit for UMTS .................................................................................. ........................... 223.2.13 PS Core KPI Audit ........................................................ ................................................................. ..... 233.2.14 Resource Utilization Audit ................................................................. ................................................. 243.2.15 System Parameter Proposal ................................................................ ................................................. 243.2.16 UMTS Multi-Carrier Optimization Proposal ...................................................................................... 253.2.17 Feature Introduction ....................................................................................................................... ..... 263.2.18 GUL network cooperation strategy optimization ................................................................................ 273.2.19 Resource Utilization Optimization Proposal ............................................................ ........................... 283.2.20 Approved? .......................................................... ................................................................. ................ 293.2.21 Radio Optimization ............................................................................................................. ................ 293.2.22 PS Core Optimization ......................................................................................................................... 30

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    4/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page4, Total41

    3.2.23 Trouble Shooting ........................................................... ................................................................. ..... 313.2.24 Meet KPIs Requirment? ........................................................... ........................................................... 313.2.25 Acceptance ......................................................... ................................................................. ................ 32

    4 Deliverables ................................................................................................................................. 33

    5 Checklist & Remark.................................................................................................................... 346 Responsibility Matrix ................................................................................................................. 357 Time Lines .................................................................................................................................... 378 Resource Plan ............................................................................................................................... 399 SLA ................................................................................................................................................. 41

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    5/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page5, Total41

    Figures

    Figure 2-1Workflow of Data Performance Optimization Service ................................................................ ...... 10Figure 2-2Workflow of Field Test Report ................................... ............................................................... ........ 10Figure 2-3Workflow of Feature Introduction .......................................................................... ........................... 10Figure 2-4Workflow of Trouble Shooting .......................................................................................... ................ 11

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    6/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page6, Total41

    Tables

    Table 2-1Tasks of Data Performance Optimization ................................................................. ........................... 11Table 4-1Deliverable of Data Performance Optimization Service...................................................................... 33Table 5-1Data Performance Optimization Service Checklist ................. ............................................................ 34Table 6-1Responsibility Matrix .......................................................................................................................... 35

    Table 7-1Time line ............................................................. ................................................................. ................ 37Table 8-1Resource plan of UMTS KPI Improvement Service ........................................................................... 39Table 8-2Tools plan for Huawei Data Performance Optimization Service ......................................................... 40Table 9-1SLA Classification ......................................................... ................................................................. ..... 41

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    7/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page7, Total41

    Data Performance Optimization Service Delivery Guide

    Key words:

    Data Performance Optimization, E2E Network Optimization

    Abstract:

    This document mainly describes technical activities of radio network performance

    troubleshooting service delivery with an overview of workflow, main prerequisites,deliverables and tools involved in each task as well as links to the available documentation(template, guidelines, tools overview etc.), which help to make a detailed understanding of

    methodology, concepts or activities involved. Responsibility matrix, project timeline andresource plan are recommended for an actual project of service delivery.

    Acronyms and abbreviations:

    Acronyms and abbreviations Full Spelling

    CQT Call Quality Test

    CR Change Request

    DT Drive Test

    KPI Key Performance Indication

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    8/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page8, Total41

    1 Overview of UMTS KPI ImprovementService

    1.1 ObjectiveThis guide defines the prerequisites, workflow, deliverables, checklist for deliverables,organization structure, responsibility matrix, time line and resource plan of Huawei Data

    Performance Optimization service. It aims to guide the related service delivery departmentsand personnel to get familiar with the service delivery content and to deliver the service by

    following the standard flow, thus delivering the service with a high efficiency and a goodquality.

    1.2 Application ScopeThis guide applies to the post-sales delivery of Data Performance Optimization service.

    1.3 Intended Audience

    This guide is used by the on-site delivery engineers, project leader/managers, servicemanagers, service sales and marketing personnel of Huawei for service delivery, selling or

    marketing.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    9/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page9, Total41

    2 Workflow and Task2.1 Workflow

    This section will describe an example of the workflow for radio network Performanceoptimization.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    10/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page10, Total41

    Figure 2-1Workflow of Data Performance Optimization Service

    START

    GSM or UMTS?

    004

    END

    Service Preparation

    001

    RAN Data Reporting

    002

    PS Core Reporting

    003

    Performance Audit

    005

    Field Test Report

    006

    PS Capacity Audit

    008

    Every Week

    DataPerformanceMonitoring

    PDCH Audit

    007

    GSM

    DataPerformanceAssessment

    UMTSData

    PerformanceAssessment

    A

    A

    Performance Audit

    009

    Field Test Report

    010

    PS Capacity Audit

    012

    R99\HSPA Audit

    011

    UMTSGSM

    System Parameter

    Proposal

    015

    UMTS Multi-Carrier

    Optimization Proposal

    016

    Feature Introduction

    017

    GUL network

    Cooperation Strategy

    Optimization

    018

    Resource Utilization

    Optimization Proposal

    019

    DataOptimizationSolution

    Design

    PS Core Optimization

    022

    Radio Optimization

    021

    Trouble Shooting

    023

    Ticket Received

    SolutionImplementationA

    nd

    Verification

    Yes Yes

    No

    Yes

    No

    Acceptance

    025

    PS Core KPI Audit

    013

    Resource UtilizationAudit

    014

    PSCoreData

    Per

    formance

    As

    sessment

    Approved?

    020

    Meet KPI

    Requirment?

    024

    Legend

    Huawei

    Operator

    Huawei &

    Operator

    NOC

    Figure 2-2Workflow of Field Test Report

    Figure 2-3Workflow of Feature Introduction

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    11/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page11, Total41

    Figure 2-4Workflow of Trouble Shooting

    2.2 Task

    Table 2-1Tasks of Data Performance Optimization

    No. Task Task Description Tools

    MVCapability

    Remote

    Outsourcing

    EngineerLevel

    1 Service

    Preparation

    Kick off meeting /Tools

    platform setup/ Outsourcing

    N/A N L3

    2 RAN Data

    Reporting

    Monitoring the RAN

    performance (by Performancestatistic)

    Y N L2

    3 PS Core

    Reporting

    Monitoring the PS Core

    performance (by Performancestatistic)

    Y N L2

    5 Performance

    Audit

    Perform a detail performance

    audit (not limited to KPI in

    contract)

    Y N L2

    6.1 Drive Test for

    GSM

    Drive test for E2E data

    performance if operator

    required.

    N Y L1

    6.2 CQT for GSM Call Quality Test for E2E data

    performance if operatorrequired.

    N Y L1

    7 PDCH Audit Perform the PS channel resource

    utilization for air interface.N N L2

    8 PS Capacity Audit Perform resource utilization for

    Board/ Transmission/ Interface.

    N N L2

    9 Performance

    Audit

    Perform a detail performance

    audit (not limited to KPI in

    contract)

    Y N L2

    10.1 Drive Test for

    UMTS

    Drive test for E2E data

    performance if operatorrequired.

    N Y L1

    10.2 CQT for UMTS Call Quality Test for E2E data

    performance if operator

    required.

    N Y L1

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    12/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page12, Total41

    11 R99\HSPA Audit Perform the PS channel resource

    utilization for air interface.N N L2

    12 PS Capacity Audit Perform resource utilization for

    Board/ Transmission/ Interface.N N L2

    13 PS Core KPI

    Audit

    Perform a PS core KPI audit

    base on performance statistic

    data. Such as Accessibility/Integrity/ Mobility.

    N L2

    14 Resource

    Utilization Audit

    Perform a Resource utilization

    for GGSN/ SGSN and Interfaceetc.

    N L2

    15 System Parameter

    Proposal

    Design the solution for system

    parameter tuning and propose to

    operator

    N N L3

    16 UMTS

    Multi-Carrier

    OptimizationProposal

    Propose an improved or proper

    multi-carrier network planning

    for current network.

    N N L3

    17 FeatureIntroductionProposal

    Introduce a new feature for PSnetwork performanceimprovement. Such as HSPA+/

    Edge etc.

    N N L3

    18 GUL Network

    Cooperation

    StrategyOptimization

    Proposal

    Consider of GUL co-existing

    network and propose the

    optimization proposal.

    N N L3

    19 Resource

    Utilization

    OptimizationProposal

    Design the solution for system

    resource utilization

    enhancement and propose tooperator.

    N N L3

    21 Radio

    Optimization

    Execute the radio optimization

    solution and verify it.N N L2

    22 PS Core

    Optimization

    Execute the PS core

    optimization solution and verifyit.

    N N L2

    23 Trouble shooting Handle the problems met from

    optimization or subscriber

    complaint.

    N N L3

    25 Acceptance Get the acceptance paper signed. N N L3

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    13/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page13, Total41

    3 Delivery Guide3.1 Prerequisites

    Operator should purchase the Data Performance Optimization Service.

    Huawei will not be responsible for any tuning activities if its not included in the scope of thisservice.

    No optimization service for indoor coverage system is included in this service.

    Deliverables of this proposal should be under confidentiality. Without Huaweis writtenapproval, no audit and optimization results or any other related reports shall be release to third

    party.

    3.2 Procedure

    3.2.1 Service Preparation

    1) Brief description

    At the beginning of the service, PM should organize the kick-off meeting with the operator.

    The meeting agenda should include the structure of the project team, team member from

    Huawei and the operator, the interface between each other. Some documents need to preparefor this meeting by AMS TL:

    a) Hold a kick off meeting which includes self introduction and service team

    introduction.

    b) Tools Platform should be ready in this period.

    c) Outsourcing should be ready in this period

    2) Reference

    3.2.2 RAN Data Reporting

    1) Brief description

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    14/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page14, Total41

    This task is to confirm the KPI list and definition of monitoring KPI with operator. After thatwe could customize the monitoring KPI on M2000, post process the statistic data by PRS or

    others tools. Report the monitoring KPIs to operator daily or weekly.

    2) Input

    Performance data, KPI list in contract or agreement

    3) Procedure

    a) Base on contract; confirm KPI list and formula with operator

    b) Confirm the template of monitoring report with Operator

    c) Install and commission hardware, software and database

    d) Version mapping

    e) Customize KPI formula and template in tools

    f) Output RAN KPI monitoring report

    4) Tools recommended

    PRS V1R7

    NIC

    OMStar V5R6 Standalone

    5) Output

    KPI Monitoring Report

    6) Reference

    PRS V1R7 Manual

    OMStar V5R6 Manual

    PRS

    3.2.3 PS Core Reporting

    1) Brief description

    This task is to report the PS core KPIs to operator daily, weekly or monthly. Such as AttachSuccessful Rate/PDP Activity Successful Rate/ RAU Successful Rate etc.

    2) Input

    SGSN configuration file

    SGSN Performance Data

    KPI list in contract or agreement

    3) Procedure

    a) Base on contract; review the monitoring KPIs and formulas.

    b) Export the monitoring report template by MPA.

    c) Confirm the template of monitoring report with Operator

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    15/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page15, Total41

    d) Install and commission hardware, software and database

    e) Customized KPI formula and template in tools

    f) Output KPI monitoring report

    4) Tools recommended

    MPA

    5) Output

    KPI monitoring report

    6) Reference

    3.2.4 GSM or UMTS?

    1) Brief description

    This task is to choose suitable assessment service to adapt the network.

    2) Input

    Network architecture

    3) Procedure

    a) Choose GSM or UMTS assessment task to adapt the current network

    b) If current network contains both of GSM and UMTS, we should audit them both.

    4) Tools recommended

    None

    5) Output

    None

    6) Reference

    None

    3.2.5 Performance Audit for GSM

    1) Brief description

    GSM PS data performance audit is performed in this task. KPIs before optimization aresurveyed in this task. For example, Accessibility (TBF establish successful rate),

    Retain-ability (TBF drop rate) and Integrity (LLC uplink and down-link throughput) etc.

    2) Input

    Configuration data

    Performance data

    KPIs listed in contract

    3) Procedure

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    16/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page16, Total41

    a) Get the configuration data of current network.

    b) Collect the Performance data of current network by NIC Tools.

    c) Import data to OMStar and export KPI audit report which could cover all KPIs

    listed in contract.d) Analyze performance data, current KPIs compare with KPI baseline and output the

    top 10 worse cell and ensure the optimization object. Add these results(recommendations & Actions) into KPI audit report.

    4) Tools recommended

    NIC

    OMStar V5R6 Server

    OMStar V5R6 Standalone

    5) Output

    GSM PS Performance Audit Report

    6) Reference

    3.2.6 Field Test Report for GSM

    This task is composed by two parts which are Drive Test /Call Quality Test/ (fixed-point test)

    3.2.6.1 Drive Test1) Brief description

    This task is for monitoring network PS data performance from DT side. The period of test

    should follow the contract and confirm with operator. The result of this task can be also used

    by trouble shooting.

    DT (the Drive Test) compared with the CQT (Call Quality Test), it existing bigger C/I

    fluctuations and existing cell reselection. Compare with the CQT, you can also examine theradio coverage, interference, performance of coding/encoding etc. For example, cellreselection, RAU rate, Throughput for WAP/FTP, Ping delay and Coverage rate.

    2) Input

    Engineering Table

    Digital Map

    Test Route

    Test Case Defined by operator &Huawei

    3) Procedure

    a) Define the test route and confirm it with operator.

    b) Confirm with operator about DT KPIs & Test case.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    17/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page17, Total41

    c) Preparing Test tools and related resources, for example: SIM card \Test cars\Outsourcing etc.

    d) Collect drive test data and post process them.

    e) Output Drive Test report which should contain DT KPI analysis and Top problemanalysis.

    f) Perform trace or retest in case of it needs further investigation.

    4) Tools recommended

    Probe V2.3 and Assistant V3.1

    MML

    5) Output

    Drive Test Report

    6) Reference

    3.2.6.2 Call Quality Test

    1) Brief description

    This task is for monitoring network PS data performance from fix-point test. The period& test

    points should follow the contract and confirm with operator. The result of this task can be also

    used by trouble shooting.

    CQT (Call Quality Test) for PS data performance is used for verify transmission from Um to

    Gi interface, and to verify resources management algorithm. For example, Attach, Ping, WAP,FTP and Web related KPI is collected in this task.

    2) Input

    Engineering Parameter Table

    Test Point list

    Test Case defined by operator &Huawei

    3) Procedure

    a) Define the test points list and confirm it with operator.

    b) Confirm with operator about CQT KPIs & Test case.

    c) Preparing test tools and related resources, for example: SIM card \Test cars\Outsourcing etc.

    d) Collect call quality test data and post process them.

    e) Output CQT Test report which should contain CQT KPI analysis and Top problemanalysis.

    f) Perform trace or retest in case of it needs further investigation.

    4) Tools recommended

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    18/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page18, Total41

    Probe & Assistant

    5) Output

    Call Quality Test Report

    6) Reference

    GPRS&EGPRS

    GRFSTG00331-GSM -V2R1-C.doc

    3.2.7 PDCH Audit

    1) Brief description

    This task is to audit the air interface capacity of GSM. For example, PDCH utilization/

    SDCCH Congestion Ratio/ TCH Congestion Ratio/ Uplink GPRS TBF Congestion Ratio/Downlink GPRS TBF Congestion Ratio/ Uplink EGPRS TBF Congestion Ratio etc.

    2) Input

    GSM Network configuration data

    Current hardware specification

    BSS Performance statistic data

    3) Procedure

    a) Collect & confirm configuration data \ Current hardware specification, Collectperformance statistic data for 1 week (at least).

    b) Import the configuration data and performance statistic data to OMStar, audit RFresource utilization.

    c) Compare the RF resource utilization with baseline. If current KPI exceed thebaseline (or KPI committed), it should be optimized.

    d) Consider to the balance of CS/PS RF traffic, redistribute the RF resource.

    e) If network need expansion, we could refer to next task.

    4) Tools recommended

    OMStar V500R006C03SPC400

    5) Output

    GSM Resource Utilization Audit Report

    6) Reference

    < PS E2E>

    3.2.8 PS Capacity Audit for GSM

    1) Brief description

    This task is to audit the Board/ Transmission capacity, evaluate that whether the capacity

    adapt to traffic.

    2) Input

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    19/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page19, Total41

    Network configuration information of BSS

    Specification of hardware

    Performance data of BSS

    License of BSS

    3) Procedure

    a) Collect & confirm configuration data/ Current hardware specification/ License ofBSS, Collect performance statistic data for 1 week (at least).

    b) Import the configuration data and performance statistic data to OMStar, create BSStraffic model for current network. The traffic model can be used to guide the currentnetwork resource capacity assessment, predict the future development and guide the

    expansion.

    c) Perform the BSC resource audit which should include XPU board/ Dpud board/

    DSP module inside board/ Abis interface.d) Perform the resource capacity forecast for BSS which should include the prediction

    of BSC user numbers/ user number of current network.

    e) Output the resource utilization audit report base on the audit result.

    4) Tools recommended

    NIC

    OMStar V500R006C03SPC400

    5) Output

    GSM Resource Utilization Audit Report

    6) Reference

    < PS E2E>

    3.2.9 Performance Audit for UMTS

    1) Brief description

    UMTS PS data performance audit is performed in this task. KPIs before optimization are

    surveyed in this task. Such as Accessibility (RRC Access Successful Rate), Retain-ability (PS

    Call Drop Rate), Mobility (SHO Successful Rate) and Integrity (Cell HSDPA Throughput)

    were audited in this part.

    2) Input

    RNC and NodeB configuration files

    RNC and NodeB traffic statistic files

    PCHR files

    Guides for tools

    3) Procedure

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    20/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page20, Total41

    a) Get the configuration data of current network.

    b) Collect the Performance data of current network by NIC Tools.

    c) Import data to OMStar and export KPI audit report which could cover all KPIs

    listed in contract.d) Analyze performance data, compare current KPIs with KPI baseline and output the

    top 10 worst cells (or sector). Output the UMTS audit report by OMStar. Add theseresults (recommendations & Actions) into KPI audit report.

    e) Collect configuration files, traffic statistic files, PCHR files by NIC and M2000.

    f) Output report of excel and word by mini-OMStar function.

    g) Obtain other related KPI data which cant be taken from report by OMStar otherrelated information (such as RRC access failure reason and call abnormal release

    reason) by .

    h) Analyze the report and relative information and evaluate PS KPI performance.

    4) Tools recommended

    NIC

    OMStar V5R6 Server

    OMStar V5R6 Standalone

    5) Output

    UMTS PS Performance Audit Report

    6) Reference

    < UMTS RAN12.0>

    3.2.10 Field Test Report for UMTS

    This task is composed by two parts which are Drive Test /Call Quality Test/ (fixed-point test)

    3.2.10.1 Drive Test1) Brief description

    This task is for monitoring network PS data performance from DT side. The period of test

    should follow the contract and confirm with operator. The result of this task can be also usedby trouble shooting.

    DT (the Drive Test) compared with the CQT (Call Quality Test), it existing bigger C/Ifluctuations and existing cell reselection. Compare with the CQT, you can also examine the

    radio coverage, interference, performance of coding/encoding etc. For example, cell

    reselection, RAU rate, Throughput for WAP/FTP, Ping delay and Coverage rate.

    2) Input

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    21/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page21, Total41

    Engineering Table

    Digital Map

    Test Route

    Test Method or Test Case Defined by operator &Huawei

    3) Procedure

    a) Refer to3.2.6.1 Drive Test

    4) Tools recommended

    Probe V2.3 and Assistant V3.1

    MML

    5) Output

    Drive Test Report6) Reference

    GPRS&EGPRS

    GRFSTG00331-GSM -V2R1-C.doc

    3.2.10.2 Call Quality Test

    1) Brief description

    This task is for monitoring network PS data performance from fix-point test. The period& test

    points should follow the contract and confirm with operator. The result of this task can be also

    used by trouble shooting.

    CQT (Call Quality Test) for PS data performance is used for verify transmission from Um toGi interface, and to verify resources management algorithm. For example, Attach, Ping, WAP,FTP and Web related KPI is collected in this task.

    2) Input

    Engineering Parameter Table

    Test Point list

    Test Case defined by operator &Huawei

    3) Procedure

    a) Please refer to3.2.6.2 Call Quality Test

    4) Tools recommended

    Probe & Assistant

    5) Output

    Call Quality Test Report

    6) Reference

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    22/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page22, Total41

    3.2.11 R99\HSPA Audit

    1) Brief description

    To be update

    2) Input

    To be update

    3) Procedure

    To be update

    4) Tools recommended

    To be update

    5) Output

    To be update

    6) Reference

    None

    3.2.12 PS Capacity Audit for UMTS

    1) Brief description

    This task could audit DL throughput rate per R99, HSUPA user, per cell or user number per

    cell.

    2) Input

    UL PS capacity audit report and results

    RNC and NodeB configuration files

    RNC and NodeB traffic statistic files

    3) Procedure

    a) Collect RAN configuration and traffic statistic data.

    b) Divide the UL PS capacity limitation into different scenarios according to audit

    results and relative information; the scenarios include external interference,frequency spectrum limitation, Um resource limitation and equipment resourcelimitation.

    c) Make corresponding optimization solution According to UL PS capacity limitationscenario, the solution include feature solution, parameters solution and external

    interference cancellation solution.

    4) Tools recommended

    OMStar V5R6C03, NIC V1R5, iManager M2000

    5) Output

    UMTS Resource Utilization Audit Report

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    23/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page23, Total41

    6) Reference

    3.2.13 PS Core KPI Audit

    1) Brief description

    This task descript that how to perform a PS core audit. This audit should cover KPIs

    mentioned in contract. For example, Attach Successful Rate, PDP Activity Successful Rate,

    RAU Successful Rate, Paging Successful Rate etc.

    2) Input

    Configuration data for SGSN

    Performance statistic data for SGSN

    CHR For SGSN

    3) Procedure

    a) Prepare test tools &analysis tools.

    b) Get the NOC operation rights approved by operator. Confirm with operator aboutaccess method.

    c) Collect performance data & CHR of SGSN in a certain period.

    d) Start MPA tools and export the PS core KPI audit report.

    e) Start CHR Import tools &SDAP tools, analyze CHR data and export Top 5 faultsreasons.

    f) Identify RF reason and PS core reason, and Gives the solution for PS core(SGSN/GGSN/Interface) reasons.

    4) Tools recommended

    WebUI/ NIC

    FTP tools

    LMT

    OMStar

    MPA

    CHR Import

    SDAP

    5) Output

    PS core KPI audit report

    6) Reference

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    24/41

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    25/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page25, Total41

    UMTS PS Performance Audit Report

    Drive Test Report (GSM/UMTS)

    CQT Report (GSM/UMTS)

    3) Procedure

    a) Combine the optimization results listed in the reports, and output optimizationproposal considering the conflict between each action.

    b) List the changing request in the proposal.

    c) Recollect data and analyze them in case of solution redesign or adapting operatorsrequirement.

    d) Complete the optimization proposal report bass on latest analysis and submit thereport to customer for approval.

    4) Tools recommended

    None

    5) Output

    Optimization proposal with CR

    6) Reference

    3.2.16 UMTS Multi-Carrier Optimization Proposal

    1) Brief description

    This task is to give a proper multi-carrier planning to improve current UMTS network. After

    the UMTS network assessment, the planning problem might be found or the network needs

    expansion, this task gives the solution for these kinds of problems.

    2) Input

    Current UMTS network architecture

    Terminal capacity specification

    BSS hardware specification

    Feature list of BSS

    3) Procedure

    a) Communicate with operator and identify operators requirement.

    b) Survey the preset conditions; check whether the current network could deploymulti-carrier planning.

    c) Identify scenario which adapts current network.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    26/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page26, Total41

    d) Output the multi-carrier planning proposal.

    e) Submit the Proposal to operator and communicate with them.

    4) Tools recommended

    TG Pending

    5) Output

    UMTS Multi-carrier Planning Proposal

    6) Reference

    3.2.17 Feature Introduction

    New feathers could obviously improve network performance. Lots of new feature

    introduction are recommended in optimization proposal. The following section will describenew features could be used in our network.

    3.2.17.1 HSPA+

    1) Brief description

    This task is to implement CN network system parameter optimization. We can get these

    operation from the section 3.2.12 Performance Troubleshooting.

    This task is optional.

    2) Input

    Optimization Proposal & CR

    3) Procedure

    Implement the Optimization Proposal & CR.

    4) Tools recommended

    None

    5) Output

    Optimization proposal with CR

    6) Reference

    None

    3.2.17.2 Edge

    1) Brief description

    This task is to implement CN network system parameter optimization. We can get theseoperation from the section 3.2.12 Performance Troubleshooting.

    This task is optional.

    2) Input

    Optimization Proposal & CR

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    27/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page27, Total41

    3) Procedure

    Implement the Optimization Proposal & CR.

    4) Tools recommended

    None

    5) Output

    Optimization proposal with CR

    6) Reference

    None

    3.2.17.3 for GSM1) Brief description

    This task is to implement CN network system parameter optimization. We can get theseoperation from the section 3.2.12 Performance Troubleshooting.

    This task is optional.

    2) Input

    Optimization Proposal & CR

    3) Procedure

    Implement the Optimization Proposal & CR.

    4) Tools recommended

    None

    5) Output

    KPI Improvement Report

    6) Reference

    None

    3.2.18 GUL network cooperation strategy optimization

    1) Brief description

    This task is to evaluate & optimize a GUL coexisting network. It includes GUL networkstrategy, network assessment and interoperability optimization.

    2) Input

    Performance statistic Data of GUL Network

    Configuration data of GUL network

    MML

    PCHR

    3) Procedure

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    28/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page28, Total41

    a) Perform an interoperation audit for each GUL network.

    b) Perform a traffic and loading audit for each GUL network

    c) Choose suitable audit way base on operators requirement.

    Coverage based strategy audit

    Loading based strategy audit

    Performs them both and choose a suitable one.

    d) Perform the terminal capacity audit.

    e) Execute a RF coverage optimization for each GUL network base on audit result.

    f) Execute a GUL cooperation optimization solution, this solution is chosen base onthe audit result.

    4) Tools recommended

    OMStar V500R006C02SPC400

    5) Output

    Optimization proposal with CR

    6) Reference

    3.2.19 Resource Utilization Optimization Proposal

    1) Brief description

    This task is to design resource utilization solution base on assessment results. This solutionwill refer to the assessment result executed before. For example, GSM PS Performance AuditReport/ GSM Resource Utilization Audit Report/ UMTS Resource Utilization Audit Report

    etc. should be referred.

    2) Input

    Drive Test Report (GSM/UMTS)

    CQT Report (GSM/UMTS)

    GSM Resource Utilization Audit Report

    UMTS Resource Utilization Audit Report

    3) Procedure

    a) Combine the optimization results listed in the reports, and output optimizationproposal considering the conflict between each action.

    b) List the changing request in the proposal.

    c) Recollect data and analyze them in case of solution redesign or adapting operatorsrequirement.

    d) Complete the optimization proposal base on latest analysis and submit the proposalto customer for approval.

    4) Tools recommended

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    29/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page29, Total41

    None

    5) Output

    Optimization proposal with CR

    6) Reference

    TGs of G/U Assessment part

    Template

    3.2.20 Approved?

    1) Brief description

    Customer approves the adjustment suggestion proposed by Huawei. If not, make further

    analysis in Performance Assessment section.

    2) InputOptimization Proposals & CR

    3) 3) Procedure

    a) Submit the Optimization Proposals & CR to operator and communicate with them.

    b) Get the Proposals &CR approved by operator.

    c) If Huawei scheme is not approved, go to 3.2.15 System Parameter Proposal toredesign the solution.

    4) Tools recommended

    None

    5) Output

    CR paper with operators signature

    6) Reference

    None

    3.2.21 Radio Optimization

    1) Brief description

    This task is to execute all RF & RAN changing requests approved by operator, and to verifywhether the KPI is improved after optimization. All the optimization solution approved byoperator will be executed in this task, such as system parameter optimization/ UMTSmulti-carrier optimization/ new feature introduction/ resource utilization optimization

    etc.

    2) Input

    KPIs listed in Service Contract

    Optimization proposals

    Approved Changing request

    3) Procedure

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    30/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page30, Total41

    a) Execute RF optimization. This part could be finished by subcontractors.

    b) Monitor the KPIs by DT/CQT & Performance statistic, to ensure if these RFoptimization actions do benefit to network or not. If the KPIs getting worse, a datare-collection, re-analysis and optimization should be taken. DT/CQT part could be

    finished by subcontractors.

    c) Execute RAN optimization.

    d) Monitor the KPIs after solution was executed.

    e) Compare the KPIs optimized and target (listed in contract), whether optimized KPIsreach the target.

    f) If not, make further analysis.

    4) Tools recommended

    PRS V1R7

    OMStar V5R6 Standalone

    5) Output

    KPI Verification Report

    6) Reference

    < URFSDT00022-UMTS Radio Network Performance optimization ReportNo.####.-V2R1doc >

    3.2.22 PS Core Optimization

    1) Brief descriptionThis task is to execute all PS core changing requests approved by operator, and to verifywhether the KPIs are improved after optimization. All the optimization solution approved by

    operator will be executed in this task, such as system parameter optimization/ UMTS

    multi-carrier optimization/ new feature introduction/ resource utilization optimizationetc.

    2) Input

    KPIs listed in Service Contract

    Optimization proposals

    Approved Changing request

    3) Procedure

    a) Execute PS core optimization.

    b) Monitor the KPIs after solution was executed.

    c) Compare the KPIs optimized and target (listed in contract), whether optimized KPIsreach the target.

    d) If not, make further analysis.

    4) Tools recommended

    PRS V1R7

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    31/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page31, Total41

    OMStar V5R6 Standalone

    5) Output

    KPI Verification Report

    6) Reference

    < PS E2E>

    3.2.23 Trouble Shooting

    1) Brief description

    Trouble shooting will handle the customer complaint ticket or problems met during

    optimization.

    2) Input

    Problem tickets

    Collected data for trouble shooting

    3) Procedure

    a) Analyze problem tickets and make the problem classified.

    b) Choosing suitable TG to analyze the problem, refer to TGs in assessment part.

    4) Tools recommended

    PRS V1R7

    OMStar V5R6 Standalone

    5) Output

    Trouble shooting Report

    6) Reference

    TGs in assessment part

    3.2.24 Meet KPIs Requirment?

    1) Brief description

    Acquire KPI report after optimization, to calculate KPIs and evaluate if KPIs are satisfied.

    2) Input

    KPI Agreement

    KPI Monitoring Report

    Drive Test Report or CQT Report

    3) Procedure

    a) Collect the performance data to output the KPI report from PRS/OMStar.

    b) Talk with the operator to confirm the verification condition.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    32/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page32, Total41

    c) For network KPI, to calculate KPIs and evaluate if KPIs are satisfied

    d) For subscriber complain, to get customer feedback and check if subscriber issatisfied

    e) Otherwise, go to go to 3.2.15 System Parameter Proposal to redesign the solution.4) Tools recommended

    None

    5) Output

    None

    6) Reference

    None

    3.2.25 Acceptance1) Brief description

    Communicate with customer about the KPI Verification Report, and get signature foracceptance.

    2) Input

    KPI Verification Report, Acceptance paper

    3) Procedure

    a) Communicate with operator on the procedure, result and possible remaining issuesof the KPI improvement service and achieve mutual agreement on the final report;

    otherwise, make further analysis on the remain problem or complaint

    b) Explore the opportunities for further service selling, such as expansion, other KPIimprovement module and etc.

    c) Make sure that the Data Performance Optimization service is closed.

    4) Tools recommended

    None

    5) Output

    Acceptance paper with operators signature

    6) Reference

    None

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    33/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page33, Total41

    4 DeliverablesTable 4-1Deliverable of Data Performance Optimization Service

    Item Description Contents Remark

    KPI Monitoring Report

    GSM PS Performance Audit

    Report

    Drive Test Report GSM or UMTSor both

    Call Quality Test Report GSM or UMTSor both

    GSM Resource Utilization AuditReport

    UMTS PS Performance AuditReport

    UMTS Resource Utilization

    Audit Report

    PS core KPI audit report

    PS Core Resource Utilization

    Audit Report

    Optimization proposal

    CR ChangingRequest

    KPI Verification Report

    Trouble shooting Report

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    34/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page34, Total41

    5 Checklist & RemarkTable 5-1Data Performance Optimization Service Checklist

    Task Item Checked by

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    35/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page35, Total41

    6 Responsibility MatrixTable 6-1Responsibility Matrix

    No. Task Huawei Customer

    1 Service Preparation R R

    2 RAN Data Reporting R

    3 PS Core Reporting R

    4 GSM or UMTS? S R

    5 Performance Audit R S

    6.1 Drive Test for GSM R S

    6.2 CQT for GSM R S

    7 PDCH Audit R S

    8 PS Capacity Audit R S

    9 Performance Audit R S

    10.1 Drive Test for UMTS R S

    10.2 CQT for UMTS R S

    11 R99\HSPA Audit R S

    12 PS Capacity Audit R S

    13 PS Core KPI Audit R S

    14 Resource Utilization Audit R S

    15 System Parameter Proposal R S

    16 UMTS Multi-Carrier Optimization

    ProposalR S

    17 Feature Introduction Proposal R S

    18 GUL Network Cooperation Strategy

    Optimization Proposal

    R S

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    36/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page36, Total41

    19 Resource Utilization Optimization

    ProposalR S

    20 Approved? R

    21 Radio Optimization R S

    22 PS Core Optimization R S

    23 Trouble shooting R S

    25 Acceptance S R

    Notes:

    Rmeans: Responsibility; Smeans: Support

    The definition of responsibility matrix is just an example. The exact responsibility matrix definition is

    base on the project contract.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    37/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page37, Total41

    7 Time LinesThe time duration for this service proposal is defined in the corresponding contract. Minimalquarterly time span is suggested.

    1) Assumption:

    There are 500 Sites/ (RNC/BSC) in the Data Performance Optimization Service Project. Theproject duration will be 3 month. And the Man Power per unit in the table is for 1 month.

    For each task, consuming time is estimated as following table.

    2) Resource Plan:

    PM/RNO TD = 1,

    TS = 3-6 (If operator purchase all the items)

    3) Responsibility definition

    a) PM/RNO TD: the owner of this project and responsible for the whole projectmanagement including human resource management, communication with customer

    and other department, progress management, main problem analysis andmanagement, report review, etc.

    b) TS: the owner of technical issue, responsible for information collection, tooloperation, problem analysis, network audit, optimization solution making andimplementation, and report preparation.

    Table 7-1Time line

    Task Outsourced Unit Unit

    Amount

    Man Power per Unit

    Service Preparation No project 1 56

    RAN Data Reporting No RNC 2 2

    PS Core Reporting No RNC 2 1

    Performance Audit No site 400 0.5

    Drive Test for GSM Yes site 400 0.25

    CQT for GSM Yes site 400 0.5

    http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A8http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A8http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A8http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A10http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A8http://d/Hongweifeng(Breezer)/Desktop/GSM/06%20%E6%88%90%E6%9C%AC%E6%B5%8B%E7%AE%97%E5%B7%A5%E5%85%B7%20Cost%20Dimensioning%20Tool/GRFCDT01195-Data%20Performance%20Optimization%20SBOM%20Cost%20Dimension%20Tool_v1.2.xlsx%23%E5%A1%AB%E5%86%99%E8%AF%B4%E6%98%8E!A8
  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    38/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page38, Total41

    PDCH Audit No site 400 0.5

    PS Capacity Audit No site 400 0.5

    Performance Audit No site 400 0.5

    Drive Test for UMTS Yes site 400 0.25

    CQT for UMTS Yes site 400 0.5

    R99\HSPA Audit No site 400 0.5

    PS Capacity Audit No site 400 0.5

    PS Core KPI Audit No site 400 0.5

    Resource Utilization

    AuditNo site 400 0.5

    System ParameterProposal

    No RNC 2 2

    UMTS Multi-Carrier

    Optimization ProposalNo RNC 2 2

    Feature Introduction

    ProposalNo RNC 2 2

    GUL Network

    Cooperation StrategyOptimization Proposal

    No RNC 2 2

    Resource Utilization

    Optimization ProposalNo RNC 2 2

    Radio Optimization No site 200 1

    PS Core Optimization No RNC 2 4

    Trouble shooting No site 100 4

    Acceptance No project 1 8

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    39/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page39, Total41

    8 Resource PlanSince radio network troubleshooting is an ongoing & on-demand kind of service, therequirement of resource is mainly determined by customer budget or other financial concerns.

    So here just types of resource & tools are recommended.

    Table 8-1Resource plan of Data Performance Optimization Service

    No. Tasks DurationWeekly Progress

    1st 2nd 3rd 4st 5th 6th 7th 8th

    1 Service Preparation 7 days

    2 RAN Data Reporting 1 days/Week

    3 PS Core Reporting 1 day/Week4 GSM or UMTS? 1 day/Month

    5 Performance Audit 7 day/Month

    6.1 Drive Test for GSM 1 day/Month*Cluster

    6.2 CQT for GSM 1 day/Month*

    7 PDCH Audit 1 day/Month

    8 PS Capacity Audit 2 day/Month

    9 Performance Audit 2 day/Month

    10.1 Drive Test for UMTS 2 day/Month

    10.2 CQT for UMTS 7 days/Per time

    11 R99\HSPA Audit 4 days/Month

    12 PS Capacity Audit 4 days/Month

    13 PS Core KPI Audit 4 days/Month

    14 Resource Utilization Audit 4 days/Month

    15 System Parameter Proposal 3 days/Per

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    40/41

    Data Performance Optimization Service Delivery Guide Internal Open

    2014-02-03 HUAWEI Confidential Page40, Total41

    16 UMTS Multi-Carrier Optimization

    Proposal3 days/Per

    17 Feature Introduction Proposal 3 days/Per

    18 GUL Network Cooperation StrategyOptimization Proposal

    3 days/Per

    19 Resource Utilization Optimization

    Proposal3 days/Per

    20 Approved? Depends on Operator

    21 Radio Optimization 21 days/Per

    22 PS Core Optimization 7 days/per

    23 Trouble shooting 1 day/Per

    25 Acceptance Depends on Operator

    Table 8-2Tools plan for Huawei Data Performance Optimization Service

    No. Tools

    1 OMStar V5R6 Standalone

    2 OMStar V5R6 Server

    3 U-Net V3

    4 PRS V1R7

    5 Nastar V6R9

    6 NPMaster V1R2

    7 RNC LMT

    8 UMAT

    9 Symena ACP

    10 DT Tools (e.g. Probe V2R3, QXDM, TEMS, Swissqual)

    11 Post-processing tool (e.g. Assistant V3R3 Actix, Mapinfo, TEMS routes

    analysis,etc)

    12 Basic Troubleshooting Tools (e.g. Site master, DuMeter, Clinometers, Compass,

    WirShark, Flashget/Thunder etc.)

    13 DT accessories

    14 DT Laptop

    15 RF database server(e.g. DT log file, RF parameters, Change Request,etc)

    Notes:

    This part of resource plan is just an example. The detail resource requirement is base on project.

  • 7/22/2019 Data Performance Optimization Service V100R002 Delivery Guide V0.8 (20120320)

    41/41

    Data Performance Optimization Service Delivery Guide Internal Open

    9 SLASLA classification for radio network performance troubleshooting service is recommended asfollowing table.

    Table 9-1SLA Classification

    Category SLA

    Availabletime

    Responsetime

    Restorationtime(Critical) /Remedy time(Major/Minor)

    Resolution time

    (without HW/SWproblem)

    Critical 7*24 15 mins 2/4/6/8 hrs, 98% 2-10 days, 98%

    Major 5*8 2 hrs 1-7 days, 98% 5-15 BDs, 95%

    Minor 5*8 4 hrs 3-30 days, 98% 10-30 BDs, 95%

    Note:

    Traveling time and any delay caused by Huawei uncontrollable factor are excluded from the time

    committed above.

    Response times are only valid for service request tracked in MOS7100 or ITR or likely serviceworkflow management system.

    For the definition of critical event, please refer to The Category of Radio Network Performance

    Critical Event

    For critical problems, restoration time is only valid when emergency recovery service is available,which is normally categorized into four class 2/4/6/8 corresponding specific recovering time.

    The differentiation of major and minor category is defined by customer according to the emergencyof a problem.

    BD refers to business day.