AUDIT REPORT
File Information
File No. : P5-007229File Status : Pre-CertificationProduct : PRECAST CONCRETE MASONRY UNIT (LIGHTWEIGHT CONCRETE BLOCK)Standard : MS 2282-3 : 2010, BS 476 : PART 22 : 1987Customer Code : 10000180Customer Name : CSL TECHNOLOGIES (M) SDN BHDCustomer Address : LOT 9896-B, BATU 4
JALAN KAMPUNG JAWA,KAMPUNG JAWA,40460, SHAH ALAMSELANGOR, MALAYSIA
Manufacturer Information
Manufacturer Name : CSL TECHNOLOGIES (M) SDN BHDManufacturer Address : LOT 9896-B, BATU 4
JALAN KAMPUNG JAWA,KAMPUNG JAWA,40460, SHAH ALAMSELANGOR, MALAYSIA
Job No. : J201305-026Job Type : Initial InspectionJob Auditor : NURUL IZZAH BINTI NORZARIJob Start Date : 02/05/2013 Job Start Time : 09:30Job End Date : 02/05/2013 Job End Time : 17:00
Product Audit Information
Item ObservationsRaw material 1) Portland cement
Brand: PHOENIX by LAFARGESupplier: Hiap Guan Chan Timber Hardware Sdn Bhd
2) SandSupplier: Hiap Guan Chan Timber Hardware Sdn Bhd
3) Cellulose fibreSupplier: KPT Recycle Sdn Bhd
4) Foam - RBM Foam AdditiveSupplier: RBM Trading Sdn Bhd
5) Polystyrene chipsSupplier: Styrene Foam Sdn Bhd
6) WaterSupplier: Tap Water + Rain water
Mixing composition per 1m3
Cement: 335kgSand: 660kgCellulose Fibre: 48 litreFoam additive: 6 litrePolystyrene chips: 4kgWater: 130 litre
Final product Size: 600mm x 208mm x 100mmWeight: 13kgGross density: 1041.7kg/m3
Marking Requirements
Marking Compliant : NOMethod of Marking : -
Record ObservationsThis report shall not be reproduced except in full with the approval of SIRIM QAS International Sdn. Bhd. and the party requesting the audit.
Page 1 of 5
-nil-
1. To establish incoming inspection record.2. To amend in-process (mixing) inspection record.3. To establish final checking inspection.4. To calibrate compressive strength machine.5. To propose marking with SIRIM mark.
Overall, quality system are established and well maintained. Manufacturer has a capability to produce Lightweight Cement Block.However, manufacturer shall take action on above item prior to certification. The manufacturer also certified with ISO 9001:2008 bySIRIM. Sampling will be conducted later due to no stock of block with new mixing.
To award licence after verified action taken on raised NCR.
Record ObservationsIncoming NIN 1 (I1/2013)In process System established and maintained.Final NIN 2 (I1/2013)Customer complaint System established.Handling of product failure System established.Calibration NIN 3 (I1/2013)
Sampling, Testing and Results
Were sample selected? NO
Corrective action for previous non-conformance(s)
Changes required for continued certification and other instructions
Summary of current findings
Recommendations
This is a computer generated document. No signature is required.
End of Report
This report shall not be reproduced except in full with the approval of SIRIM QAS International Sdn. Bhd. and the party requesting the audit.
Page 2 of 5
FILE NO. : P5-007229JOB NO. : J201305-026
Non-Conformance Report
NCR No. : NCR001090Reference No. : NIN 1 (I1/2013)
1.0 Details of Non-Conformance : Clause
3.1 Incoming inspection
Findings :
No record for incoming inspection.
2.0 Corrective Action PlanCorrection during auditCorrective action plan to be submitted for approval within 30 days
C.A Submission Date :Completion Date :Detail Action :
3.0 Verification of Corrective Action
NCR Status : Open
This is a computer generated document. No signature is required.
End of Report
This report shall not be reproduced except in full with the approval of SIRIM QAS International Sdn. Bhd. and the party requesting the audit.
Page 3 of 5
FILE NO. : P5-007229JOB NO. : J201305-026
A new form, Form CS-F43, has been created to be used for incoming inspection for raw materials that will be used for the manufacture of EKO-Block. Attached is the sample of CS-F43.
Attached is a copy of the form CS-F43 that has been filled in.
Non-Conformance Report
NCR No. : NCR001091Reference No. : NIN 2 (I1/2013)
1.0 Details of Non-Conformance : Clause
3.2 Final inspection
Findings :
Final checking inspection parameter and frequency are not sufficient
2.0 Corrective Action PlanCorrection during auditCorrective action plan to be submitted for approval within 30 days
C.A Submission Date :Completion Date :Detail Action :
3.0 Verification of Corrective Action
NCR Status : Open
This is a computer generated document. No signature is required.
End of Report
This report shall not be reproduced except in full with the approval of SIRIM QAS International Sdn. Bhd. and the party requesting the audit.
Page 4 of 5
FILE NO. : P5-007229JOB NO. : J201305-026
For final inspection, 2 forms has been created for the purpose of final inspection on EKO-Block. The forms are:
1. CS-F30A - Daily inspection on the dimension of eko-block after demoulding. Frequency will be 10pcs per batch.
2. CS-F32A - Inspection and Test Records. This form will be used for the final inspection of eko-block where 2pcs per batch will be chosen at random to perform the dimension test, weight test as well as the compressive strength test.
Attached are samples of the said forms.
Attached is a copy of the forms CS-F30A and CS-F32A which has been filled in.
Non-Conformance Report
NCR No. : NCR001092Reference No. : NIN 3 (I1/2013)
1.0 Details of Non-Conformance : Clause
3.5 Calibration
Findings :
Compressive strength machine are not calibrated.
2.0 Corrective Action PlanCorrection during auditCorrective action plan to be submitted for approval within 30 days
C.A Submission Date :Completion Date :Detail Action :
3.0 Verification of Corrective Action
NCR Status : Open
This is a computer generated document. No signature is required.
End of Report
This report shall not be reproduced except in full with the approval of SIRIM QAS International Sdn. Bhd. and the party requesting the audit.
Page 5 of 5
FILE NO. : P5-007229JOB NO. : J201305-026
The compressive strength test machine has been calibrated on the 15th of May 2013. Attached is a copy of the calibration certificate. The certificate number is : SM13278209.
Attached is a copy of the calibration certificate of the Strength Test Machine.