Corpro Coring Presentation (3)

80

description

muestras de rocas

Transcript of Corpro Coring Presentation (3)

Page 1: Corpro Coring Presentation (3)
Page 2: Corpro Coring Presentation (3)

• Our exclusive focus: The CORE;

• Oilfield Service Company incorporated in 1988 in Aberdeen;

• Independent;

• Innovative, Creative & Service Oriented;

• Operating in more than 45 countries including the most remote areas;

• Nowadays cutting more than 50,000 ft / year worldwide.

“ FORMATION EVALUATION THROUGH THE CORE ”

General CommentsGeneral Comments

Page 3: Corpro Coring Presentation (3)

BRAZIL

INDIA

TUNISIA

RUSSIA

NORWAYU.K.

EGYPTLIBYA

ITALY

SAUDIARABIA

SUDAN

NIGERIA

ANGOLA

INDONESIA

AUSTRALIA

QATARU.A.E.

COLOMBIAVENEZUELA MALAYSIA

THAILAND

NEW ZEALAND

PHILIPPINES

SYRIAIRAN

IVORY COAST

USKAZAKHSTAN

PAKISTAN

VIETNAM

CHINA

AZERBAIJANTURKMENISTAN

MEXICO

ALGERIA

ARGENTINA

MOZAMBIQUE

UGANDA

Corpro – A global networkCorpro – A global network

Page 4: Corpro Coring Presentation (3)

Types of Damage due to Coring and Core Handling

•Fractures during drilling-inner barrel rotation

•Loss of core prior to entering core barrel

•Dilation / gas expansion during tripping out

•Loss of core during tripping out

•Mechanical damage during the pipe tripping process

•Mechanical damage during recovery at surface (rotation, shock and flexure)

FlexureFlexureDamageDamage

IntroductionIntroduction

Page 5: Corpro Coring Presentation (3)

PlanningPlanningCore Acquisition Program :

•Prepared based on meetings and all data made available,•All the aspects of the coring operations are covered with:

·Responsibilities,·Safety issues,·Mud design,·Procedures,·Coring Equipment,·Tripping Out Program,·Core Processing & Transportation,

•Require participation of all the teams (drilling, geology, reservoir,…)•Final details are discussed through 2 way email communications.

Page 6: Corpro Coring Presentation (3)

Tripping Out Program :·Designed based on local PVT data (Bubble point, Bo, Rs, reservoir pressure and temperature, range of permeability, etc…),·Reduce risks of core damage due to gas expansion

PlanningPlanning

0

1

2

3

4

5

6

7

8

9

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Depth (ft)

Trip

Out

Spe

ed (M

in/S

tand

)

Example:·From TD to 5000ft 2min/stand·From 5000 to 900ft 4min/stand·From 900ft to surface 8min/stand

Page 7: Corpro Coring Presentation (3)

Down Hole EquipmentDown Hole EquipmentBHA :

Page 8: Corpro Coring Presentation (3)

Down Hole EquipmentDown Hole Equipment

Core Barrel: 7” x 4”

Top Connection: 4 1/2” IF

Core Barrel Length: 6m

Page 9: Corpro Coring Presentation (3)

Core Barrel - Main ComponentsCore Barrel - Main Components

Outer Barrel Head

Stabiliser

Outer Barrel

Core Bit

Inner Barrel Head

TSS Inner Barrel

Lower Shoe

Core BarrelCore Barrel Down-hole OpDown-hole Op Core ProcessingCore Processing

Core BarrelCore Barrel

Page 10: Corpro Coring Presentation (3)

Corpro Core Barrel

Thin Sleeve System

Half Moon

Shoe

Outer Head

Corehead

Outer Assembly:•20-foot modular system•Automatic spacing

Inner Assembly:•2 component inner tube system

Half Moon Liner:•Pre split aluminium inner tube

Down Hole EquipmentDown Hole EquipmentCore Barrel :

Page 11: Corpro Coring Presentation (3)

Down Hole EquipmentDown Hole Equipment

Page 12: Corpro Coring Presentation (3)

Down Hole EquipmentDown Hole Equipment

Page 13: Corpro Coring Presentation (3)

Down Hole EquipmentDown Hole Equipment

Page 14: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 15: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Page 16: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 17: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 18: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 19: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 20: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 21: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 22: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 23: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 24: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 25: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 26: Corpro Coring Presentation (3)

Inner TubeInner TubeRecovery ProcedureRecovery Procedure

Core HandlingCore Handling

Page 27: Corpro Coring Presentation (3)

Core Bit TechnologyCore Bit Technology

Leading to:

• Increase Bit Life

• Improve Core Recovery

• Improve Core Quality

Page 28: Corpro Coring Presentation (3)

Core Bit TechnologyCore Bit Technology

Spiral BladesTo ensure the best stabilisation of

the corehead

Radial BearingTo prevent any lateral movement

of the inner barrel Thrust BearingTo provide an efficient rotational independence between the inner

and outer barrel

Controlled Spacing

To guarantee a minimal flow in the throat

Page 29: Corpro Coring Presentation (3)

Core Bit TechnologyCore Bit TechnologyLowInvasion

Flow PortsEnsure 95% of the fluid to flow through the port and not to wash

or invade the core

Deflection AngleDirect the flow towards the OD of the hole, away from the core Throat Ports

Reduce the speed of the flow that will be

seen by the coreInner Gauge

As short as possible to minimise any further

damage to the core one it has been cut

Page 30: Corpro Coring Presentation (3)

Coreheads :MCP 6628 ½” x 4”

MCP 6828 ½” x 4”

MCP 5818 ½” x 4”

Core Bit TechnologyCore Bit Technology

MCP 4728 ½” x 4”

Core Bit TechnologyCore Bit Technology

Page 31: Corpro Coring Presentation (3)

Lower Shoe – Core catcher

Down Hole EquipmentDown Hole Equipment

Core Catcher

Lower Shoe

Upper Shoe

Page 32: Corpro Coring Presentation (3)

Coreheads 8 ½” x 4”Coreheads 8 ½” x 4”

MCT543MCP580

Page 33: Corpro Coring Presentation (3)

Core QualityCore Quality

Page 34: Corpro Coring Presentation (3)

Processing AreaProcessing Area

Core ProcessingCore Processing

Page 35: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Processing AreaProcessing Area

Page 36: Corpro Coring Presentation (3)

Laydown Cradle

Shear Boot Clamp

Inner Tube Clamp

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 37: Corpro Coring Presentation (3)

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 38: Corpro Coring Presentation (3)

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 39: Corpro Coring Presentation (3)

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 40: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 41: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 42: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 43: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 44: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 45: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 46: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 47: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 48: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 49: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 50: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 51: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 52: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 53: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 54: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump4.4. Close ValveClose Valve

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 55: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump4.4. Close ValveClose Valve5.5. Push Liner away from pistonPush Liner away from piston

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 56: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump4.4. Close ValveClose Valve5.5. Push Liner away from pistonPush Liner away from piston

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 57: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump4.4. Close ValveClose Valve5.5. Push Liner away from pistonPush Liner away from piston

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 58: Corpro Coring Presentation (3)

1.1. Remove Shear BootRemove Shear Boot2.2. Open ValveOpen Valve3.3. PumpPump4.4. Close ValveClose Valve5.5. Push Liner away from pistonPush Liner away from piston

Core ProcessingCore Processing

TSS – Pump Out ProcedureTSS – Pump Out Procedure

Page 59: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Processing AreaProcessing Area

Page 60: Corpro Coring Presentation (3)

Core HandlingCore HandlingCore Measuring & Marking-up :

Cie – well XXX

Core#1 - Box#1 - X of YTopDep

th

Bot

tom

Dep

th

·Measuring from the top,·Marking-up every one metre (or 3 feet) and labelling.

Page 61: Corpro Coring Presentation (3)

Core Cutting :·Half Moon Tube extraction from the steel tube TSS,·Core cutting (Air driven Saw)

Core HandlingCore Handling

Page 62: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 63: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 64: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 65: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 66: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 67: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 68: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 69: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 70: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 71: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 72: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 73: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 74: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 75: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 76: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 77: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 78: Corpro Coring Presentation (3)

Core ProcessingCore Processing

Page 79: Corpro Coring Presentation (3)

Core Container :·Offer to the Core a safe, robust, protective and transportable environment,·Ensure that Core Quality is maintained through handling & transportation and brought to the Core Analysis Laboratory.

Core TransportationCore Transportation

Page 80: Corpro Coring Presentation (3)

Thank you,Visit us at

www.corpro-group.com

You can also visit our partner’s website at:www.corias.com

www.kirkpetrophysics.com