    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: #eneral

    Audit Findin$s Anne%ure & a

    ' No( )bser*ation +ate$ory )N#+ +omment

    1 Safety layout is not available A

    ,N-.#/ +omments0Recommendations

    Provide safety layout atall entry and exit pointson each deck

    Requirement for the safetylayout for wellhead platformis placed

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    2/98

    2 ALSA items like Lifebuoy rin!life raft! scramble net! etc"found to be kept on deck #oor

    LSA items like lifebuoy!life raft etc" to be kept inthe desinated areas asper the safety layout andproper stand to beprovided

    $L%&1!2!'!(!) *!+!1,! -&1).A! /$&1 0 /$&2 all LSAare kept at its desinatedplace and rest shall keepwith the completion ofsafety revamp proect"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    3/98

    . A

    3 is not operationalincludin all instruments!safety devices! shut downvalves etc" All the associatedpipin and overboard drainsare heavily corroded

    larify if 3 is notrequired and prvide %4

    Letter sent to base forcompliance"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    4/98

    5 A

    6eavy corrosion below cellardeck area in the structures!handrails and ratinsobserved

    ordon&o7 the area anddisplay a warnin sinboard 1,o not *enturebelo cellar dec3ithout earin$ or3*est1

    Paintin contract is awaitedfor wellhead platform" -oarddisplayed"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    5/98

    ' A

    ( A

    ) A

    8L manifold is heavilycorroded and all shut downvalves are by&passed9notoperational9not available

    1" arry out remaininthickness assessmentbefore takin up paintinactivity2" %ake all shut downvalves operational

    1":hickness measurement isalready taken!draft reportreceived"Review report isawaited"Paintin contract isawaited for wellheadplatform"2";ndividual as lift line

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    6/98

    * -

    + A

    1, -

    11 A

    12 A

    1. A

    15 A

    =olume bottle and associatedpipin is heavily corroded

    Provide %4 and ta itas 1Not in Use1

    Paintin contract is awaitedfor wellhead platform":aindone"

    yclone separator andassociated pipin is heavilycorroded

    arry out thicknessassessment beforetakin up paintin

    Paintin contract is awaitedfor wellhead platform

    38 Set is not available oroperational

    Provide %4 and9or taas 1Not in Use1

    %4 is received! taindone"

    %arkin of #ow direction inthe pipin is not available

    Provide colour coadin

    and markin of #owdirections on all pipinfor identi?cation

    Paintin contract is awaitedfor wellhead platform

    6eli&deck platin has startedcorrodin

    arry out paint coatinas per approvedprocedure

    e ec p a e o &is replaced and $L%&2 0 5replacement shall be takenup durin safety revampproect"Rest shall paint inpaintin contract for thewellhead latform"

    6eli 3eck Safety net isdamaed at many locations

    Replace the heli decksafety net

    Requirement forreplacement of safety net isplaced under ;R

    Revampin of the @ixed 3Psystem is under proress

    Provide the 3 for therevampin activity for allunmanned platforms

    $ew ?xed 3P skid areinstalled at $L%&1!2!'!(!)*!+ 0 /$&2 and for otherwellhead platform work isunder proress

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    7/98

    1' A Provide %4hane over from instrumentair to as taken up

    Provision to use as as aninstrument air is in existindesin"6ence %4 doesnBtrequire

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    8/98

    ,N-.#/ Remar3s 'tatus 4,+

    4pen Cul&1($oted

     :o be ensured durinannual surveillance audit

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    9/98

    4pen Cun&1)

    $L%&1 and Life buoy is notkept in @RP boxes9cradle

    Scramble net! escape ladder!life raft on the east side is yetto be installed for $L%&2 0 Cumpin ropes are installed

    scape ladder is not availablefor $L%&'

     Cumpin rope found ok 0 Life

     acket not in a ood conditionand not stored in @RP boxproperly for $L%&(

    $o umpin ropes and lifebuoynot kept properly 0 Life ackets not in ood conditionfor $L%&*

    scape ladder is not available0 lifebuoy not kept in cradleor boxes for $L%&+

    Scramble net and escapeladder is not available for$L%&1,

    scape ladder is not available0 Life raft is tied with ropeand quick release is notpossible for $L%&11

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    10/98

    4pen -ase

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    11/98

    4pen

    Spider deck ratins foundreplaced for $L%&1! $L%&'

    Paintin of sub&cellar deckand handrail replacement isunder proress for $L%&2

    Spider deck and meDaninedeck damaed ratinsreplaced for $L%&(

    Spider deck damaedratins replaced for $L%&1,

    Sub&cellar deck ratins tobe replaced for -1).&A

     :o be veri?ed durin annualsurveillance audit

    1"2"Cun&2,1(

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    12/98

    4pen

    4pen -ase

    4pen -ase

    1" 2"3ec&2,1(

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    13/98

    =eri?ed 4pen -ase

    4pen -ase

    =eri?ed closed

    4pen -ase

    4pen

    4pen 3ec&1(

    4pen Cun&1)

    1"Cun&2,1(

    =eri?ed :o be ensured durinannual surveillance audit

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    14/98

    =eri?ed closed

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    15/98

    Neelam Unmanned Platforms Topside RecerticationFinal Audit: 25th to 28th February 2!"

    Platform: N/.!

    Audit Findin$s Anne%ure &b

    ' No( )bser*ation +ate$ory )N#+ +omments

    1 SS= for wells E 5! 2! 1, 0 12 are partially open A Rectify or replace the SS=Fs

    2 SS= of well E ' was found capped -

    . A

    5 A

    ' A Provide proper supports

    ( scape ladder is not available A Provide escape ladder

    ) Lot of materials lyin on the main deck -

    ,N-.#/ +omments0Recommendations

    SS= for E 2!1,!12 madeoperational 0 planned forE 5

    SS= should not be in forcedopen position

    SS= of well E' is plannedfor replacement

    /ell head access platform is heavily corrodedand is havin unsafe openins

    Provide missin ratinsand handrails

    Planned in modular ristructural ob proect

    $o doors in the ?re wall and also there areopenins in the wall

    Restore the interity of ?rewall

    Requirement of the door inthe ?re wall require or notshall be assessed by thebase

    >nsupported instrument tubins found near theadd&on wells

    Shall be taken up in safetyrevamp proect

    Shall be taken up in safetyrevamp proect

    >nwanted materials to bebackloaded

    >nwanted material isbackloaded

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    16/98

    * $o shutdown valve in main oil line to $eelam" A Provide S3=

    + A

    1, -

    11 -

    12 Staircase to 6ellideckG 6and rails tied with rope A

    1.

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    17/98

    1( A Powered up

    1) - heck and rectify" planned to rectify

    Additional point from nal audit

    1* A :o be replaced

    1+ A 6ousekeepin to be done

    @ire 0 8as 3ectection G System is not poweredup

    Power up the system andmake it functional"

    Solar hare ontrollerG arth fault alarm isthere"

    ellar deck west side chequered plate is heavilycorroded

    6ouse keepin is required in the well head areanear the south side ?re wall

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    18/98

    ,N-.#/ Remar3s 'tatus 4,+

    4pen Apr&1(

    4pen Apr&1(

    4pen %ar&1(

    4pen -ase

    4pen Cun&1)

    4pen Cun&1)

    4pen

    SS= for well E 2 0 12

    veri?ed and found okSS= of well E1, is closedfrom remote

     Jet to be backloaded andwork is under proress

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    19/98

    4pen Cun&1)

    open Cun&1(

    4pen -ase

    $oted losed 3ec&1(

    4pen %ar&1(

    PS6L is in service! veri?ed losed

    losed

    4pen Cun&1)

    PS6L is normalised=eri?ed

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    20/98

    =eri?ed losed

    losed @eb&1(

    4pen

    4pen

    arth fault alarm is notthere

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    21/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.2

    Audit Findin$s Anne%ure &c

    ' No( )bser*ation +at )N#+ +omments

    1 A

    2 PS6L *'1 is in bypass A $ormaliDe the PS6L : o be normalised

    . PS6L *)1 is in bypass A $ormaliDe the PS6L $ormalised

    5 /ell $o (G Remote SS= sinal is present and not resettin" A heck 0 Rectify

    ' 8as Lift ;nection Pipin is 6eavily corroded" A

    ( Safety Layout is not available" A Provide Safety Layout

    ) @ire 0 8as 3ectection G System is not powered up A Powered up"

    * A Provide 6andrails

    Additional points from nal audit

    ,N-.#/ +omments0Recommendations

    /ell head access platform is heavily corroded and unsafe foroperation

    Recti?cation and paintinto be taken up

    $ew platform

    fabricated and installedunder safety revampproect

    ssv sinal is resettedfound ok

    Paintin contract isawaited for wellheadplatform

    Requirement of safetylayout iven to base

    Power up the system andmake it functional"

    Staicase from ellar 3eck to %aindeckG 6andrails notavailable

    ;nstalled under safetyrevamp Proect

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    22/98

    + - :rapped pressure in the pi barrel of the $L%&2 to $L%&1 8Lline found 2' k9cm2

     :rapped pressure to bebled and check if valve ispassin

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    23/98

    ,N-.#/ Remar3s 'tatus 4,+

    =eri?ed closed

    $ot normalised 4pen

    =eri?ed closed

    =eri?ed closed

    4pen -ase

    4pen Cun&1(

    =eri?ed closed

    =eri?ed losed

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    24/98

    4pen

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    25/98

    Neelam Unmanned Platforms Topside RecerticationFinal Audit: 25th to 28th February 2!"

    Platform: N/.6

    Audit Findin$s Anne%ure &d

    ' No( )bser*ation +ate$ory

    1 Lihtin at Spider 3eck not available - Provide lihtin"

    2 PS= not available for yclone separator" A Provide PS="

    . A Provide :a number

    5 A

    ' @in cooler is isolated" - larify"

    ( A

    ) A larify

    * A ;nstall 8ratins

    ,N-.#/ +omments0Recommendations

    $o :a number visible for yclone Separator 0 Air receiverH;nstrumentsI"

    4ne heavily corroded line is directed to open atmospherewith out any #ame arrester"

    heck and provide #amearrester"

    4pen hole observed in the 3eck plate"And thinnin of 3eckplate observed"

    heck!nsure foracceptable remainin wallthickness and paint as perapproved procedure"

    Position of SS= and /in =alves are interchaned in /ellnoE.!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    26/98

    + :ubes are not properly supported and @P loops tray broken" A Provide support"

    1, - Rectify

    2I L8 is corroded"

    11 A

    2I able :ray found broken" 2I Provide able :ray"

    12 A Rectify

    1. A

    .I $3: is to be carried out"

    #lycol seal pot:1I Level 8aue not leible"

    Production manifold7F9G&

    1I 3rain and =ent connections are choked"

    1I 3rain and =ent is tomake workable condition"

    ain ,ec3 G&Some 6and rails damaed"

    +raneG&

    1I Paintin not carried out"

    Paint as per approvedprocedure"

    2I compliance to the ?ndins of :P; durin load :estin to be

    completed"

    'itch #ear RoomG&

    1I 38 connected panel not workin thouh Solar Panelavailable and workin condition"

    1I Redaudant Panelremove from switch earroom with %4"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    27/98

    15

    2I 8as detection system not workin

    A

    .I >nwanted material to be removed from Switch 8ear Room"

    1' A Rectify and remove"

    1( A heck!on?rm and larify"

    2I :elementary C- not in use and hanin"

    1) - 6ouse keepin

    1* A2I2 nos of Cumpin Rope short lenth

    .I Life Raft not in place

    5I Servicin of 3P and Portable @ is due since 2*",+"2,1'

    2I nsure 8as detectionsystem workable condition"

    attery roomG&Acid proof tiles #oorin damaed">nwanted -attery standsnot removed"

    Telementary PanelG&

    1I:ole switches are observed in o7 position forinstrumentsGP:1(1!1)1!1*1 0 1(,"

    #eneralG&Layin of obstructive extraneous materialHtransit

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    28/98

    1+ A %4 required

    2, A

    21 allibration status of instruments not updated" A

    22 A

    2. A

    25 Safety sin -oards and symbols to be placed as appropriate" A

    Additional points from nal audit

    2' A 6ouse keepin to be done

    haneover from instrument air to instrument as isundertaken

    3eck of Solar Panel Hdeck approach to helideck"I badlycorroded"

    ables not clampled toable :ray near Airreceiver 0 =olume -ottle ofellar 3eck"

    >: thickness check of pipin and =essels still balance andanalsis balance"

    orroded pipins and structural to be replaced on prioritybasis"

    ellar deck plate is heavily corroded and lot of unwantedmaterials lyin near the test separator and air storae tank

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    29/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

     :o be provided open 1(&%ar

    =eri?ed losed

    open %ar&1(

    =eri?ed losed

    losed

    open 1(&3ec

    @or operational ease" $oted losed

    open 1(&3ec

    ;t is 52Kpipe! not avessel hence PS= is notrequired"

    Planned to provide ta$o"

    3iesel tank removed!system not in use"

    $ew alternate systemcooler is proposed"

     :o be taken up under

    safety revamp proect

     :o be taken up undersafety revamp proect

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    30/98

    losed 1(&3ec

    open 3ec&1(

    open 3ec&1(

    open 3ec&1(

    open Cul&1(

    .I $3: planned"

     :o be taken up undersafety revamp proect

    @usible plus areproperly routed throuhtray

    1I Requirement shall beplaced for L8

    2I paintin contract isawaited for unmannedplatfrom

    1I leared drain andvent "

    2I able tray to beprovided durin safetyrevamp proect"

     :o be taken up undersafety revamp proect

    1I Paintin contractawaited"

    2I Planned for

    compliance"

    1I K $ot ;n >seK boarddisplayed" %4 forremoval of 38 received"

    1I %4 =eri?ed

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    31/98

    open

    open 1(&3ec

    =eri?ed losed

    2I C- removed"

    Properly placed" =eri?ed losed

    1" @irst aid box updated"

    open 1(&3ec

    2I 8as detection systemis workin"

    2I 83S is powered onand dectector 81&5"( isin fault condition

    .I >nwanted materialremoved"

    /ork order placed underL-% contract"

    1I $ormalised"

    2"Replacement to bedone in safety revemp

    proect"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    32/98

    =eri?ed with P0;3 losed

    open 1(&3ec

    %ade updated ;RR&( =eri?ed losed

    open 1(&Cun

    open -ase

    open -ase

    open

    Provision to use as asan instrument air is inexistin desin"6ence%4 doesnBt require

     :o be taken up undersafety revamp proect

    >: of pipin done by%et lab ! 3raft reportavailable " Analysisreport awaited

    Paintin contract isawaited for wellheadplatform

    Requirement of safetylayout to be iven

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    33/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.5

    Audit Findin$s Anne%ure &e

    ' No( )bser*ation +ate$ory

    1 3eck for Air Storae tank =&52, is heavily corroded A -arricade the area

    2 SS= for wells E ) 0 . are partially open A Rectify or replace the SS=Fs

    . 3eck plates around test header is heavily corroded A Recti?cation to be taken up

    5 A

    ' PS6L *'1 is in bypass A $ormaliDe the PS6l

    ( PS6L *)1 is in bypass A $ormaliDe the PS6L

    ) A heck 0 Rectify

    * 8as Lift ;nection Pipin is 6eavily corroded" A

    + @ire 0 8as 3ectection G System is not powered up A

    ,N-.#/ +omments0Recommendations

    Spare cable entries not plued in telemetry panel Pluspare cable entries

    4pen entries for sparecables to be plued

    /ell $o (G Remote SS= shutdown sinal is present and notresettin"

    Power up the system andmake it functional"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    34/98

    1, A Provide 6andrails

    Additional points durin$ nal audit

    11 -attery room acid resistant tiles pendin A Replacement to be done

    12 @low arms are corroded and needs to be painted A Paintin to be taken up

    Staicase from ellar 3eck to %aindeckG 6andrails notavailable

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    35/98

    'tatus 4,+

    Area barricaded =eri?ed losed

    =eri?ed losed

    open 1(&Cun

    =eri?ed losed

    $ormalised =eri?ed losed

    $ormalised =eri?ed losed

    $ormalised =eri?ed losed

    open -ase

    Powered up =eri?ed losed

    )N#++omments

    ,N-.#/Remar3s

    Servicied andmade 4M 

    Planned forreplacement undermodular ri Proect

    4pen entries forspare cablesplued"

    Paintin contractfor unmannedplatform awaited

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    36/98

    =eri?ed losed

    4pen

    4pen

    $ew hand railsinstalled"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    37/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/."

    Audit Findin$s

    ' No( )bser*ation +ate$ory

    1 SS= for wells E '! * 0 1 are partially open A Rectify or replace the SS=Fs

    Additional points from nal audit

    2 A

    .:rapped pressure observed in the well #uid pi barrel -

    5 8as lift line no fusible plu present A

    ' 8as lift

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    38/98

    )N#+ +omments 'tatus 4,+

    @ully opened" 4pen

    4pen

    4pen

    4pen

    4pen

    4pen

    SS=Fs of well E' 0 1are found stuck inopen condition andwell E* is under /4R

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    39/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.;

    Audit Findin$s Anne%ure &$

    ' No( )bser*ation +ate$ory

    1 A

    bI ;ntruder Alaram not available" bI Provide ;nruder Alram

    cI athodic protection able insulation damae" cI Provide Riser 8uard"

    dI $o Riser 8uard for 5 nos of Riser Hwest sideI"

    1I Replace =alve 6andles

    ,N-.#/ +omments0Recommendations

    aI Lihtin at Spider 3eck not available" And lihtin ablehanin ust above the ladder to spider 3eck

    aI Provide lihtin"Rectifyfor able 0 able :ray

    +4//AR ,4+

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    40/98

    .I/E)!- section pressure indicates 2* k per cm sq" .I -rin normal"

    5I /E( > 0 L !rown =alve am as per ;RR5 documents"

    .

    1I Life -uoyG&%isssin Liht"

    A

    1I Place liht"

    2I Portable @ire extinuisher servicin due .,"11"1' 2I >pdate servicin of P@"

    .I Cumpin rope 5 nos short lenth" .I Cumpin rope replace"

    5

    1I (K 8as lift from $LPG

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    41/98

    ( A larify"

    ) Air storae :ank not in operation - larify

    * A

    + A.I rane abin over damaed" .I rane 3oor replace"

    5I $3: is to be carried out"

    'I 8aues for -oom!-lock and swin not workin 'I Replace 8aues

    ;nstrument Air98as Receiver!=5+,G&allibration of PS= checkbalance"Paintin not carried out found corrosion in manyplaces"

    ain ,ec3 G&

    1Iast side @/6RGRedaudant N

    ;f redaudant!remove andmaintain house keepin"

    +raneG&@ollowin points to be compliedG

    1IPaintin not carried out"

    1I Paintins to be carriedout

    2I ompliance to the ?ndins of :P; durin load :estin 0mentioned in :P; erti?cate9Report to be completed"

    2I :P;?ndins9observationsdurin last load test are tobe treated as balance workand to be carried out

    5I arry out $3: as pernorms"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    42/98

    (I 6orn not functional" (I Provide horn

    1, - Rectify

    11 A Provide :iles

    12 A

    heck and normaliDe"

    2I:elementary 3eck paintin required"

    Additional points from nal audit

    1. A

    'itch #ear RoomG&$o Solar ontrol Panal K4$Kindiacation"

    attery RoomG&-attery room :iles not available"

    Telementary Panel:.

    1I%any of the PSL!LSL!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    43/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    =eri?ed losed

    aI4ne liht ?ttin

    installed in boat landin"omplied"

    bI$ot available sincecommissionin"

    cI;nsulation of cablesdone properly" omplied

    dIRiser protection onwest side not providedsince commissionin ofwater inection lines"

    1I Requirement of valvehandle placed

    1"

    2I Planned tosecure9reinstall"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    44/98

    1I Replaced lihts Lihts not provided

    4pen

    4pen

    ." =eri?ed

    =eri?ed with P0;3 losed

     "

    5".I - section depressured0 is found Dero"

    5I Plan to replace as andwhen Riavailable!valves areavailable at $P

    2I Servicin of portable

    ?re ext carried out"

    .I Replaced umpinropes"

    1I As 8L line tappin istaken from main line of'!(!)!*!+ sector hencepiin facility is notthere hence PS= is notrequired!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    45/98

    4pen

    =eri?ed losed

    =eri?ed losed

    4pen

    2"Partially completed"

    5"$3: Planned

    '">nder procurredment

    PS=& NN! Paintin contractfor unmanned platformawaited

    PS= alibration recordsveri?ed

    $ot in operation!sincesystem is chaned fromair to as based as perdesin

    $o ?re water basedsytem available! %4 istaken for removal of ?repump"

    1" Paintin contract isawaited"

    1"2"."

    5"%arch&1('"("

    ."3amaed cover

    repaired! waitin for newone"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    46/98

    4pen

    =eri?ed losed

    1I:o be checked" 1" =eri?ed ok

    losed

    %oved to 8eneral

    4pen

    ("6orn is not required asall crane operations aredone in day time only"

    Solar ontrol Panelindication liht madeokay

    Solar control panel 4$indication not workin

     :iles replaced with newone

    1"2"

    2IPaintin contract isawaited"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    47/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.8

    Audit Findin$s Anne%ure &h

    ' No( )bser*ation +ate$ory

    1 /ell #uid line Launcher PS6L sensed pressure is , psi A

    2 SS= for wells E + is partially open A Rectify or replace the SS=Fs

    . SSS= control line needle valve knob is missin -

    5 onnections on top of Pi barrel are corroded A

    Additional points durin$ nal sur*ey

    * @low arms for all wells are corroded A

    ,N-.#/ +omments0Recommendations

    heck whether faulty or

    by&passed

    Rectify or replace theneedle valve

    heck remainin wallthickness before carryinout paint coatin as perapproved procedure"

     :o be taken up durinpaintin

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    48/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    to be checked PS6L in service closed

    Serviced and made 4k =eri?ed closed

    $eedle valve replaced =eri?ed closed

    4pen

    4pen

    paintin contract forunmanned platformawaited

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    49/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.=

    Audit Findin$s Anne%ure &i

    ' No( )bser*ation +ate$ory

    1 HaILife buoyG&Life buoys are available without bulb" Ha IProvide liht"

    ,N-.#/ +omments0Recommendations

    +4//AR ,4+

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    50/98

    .

    AIyclone separatorG=alve handle corroded"

    A

    I8as SeparatorG&Pipin and ;nstruments corroded"

    5 - larify

    ' %%R: no stand available - Place Stand

    ( A Rectify"

    ) -

    cI 8as lift line Launcher9receiverG&iI $o identi?cation markin in the lineiiI Pi launchin9receivin facilities are not available for aslift and water inection lines"iiiI :hickness measurement is to be carried out for 8as liftlines"ivI /; line #anes 0 Pipins are corroded"

    cIiI %arkins of ;denti?cationis required"iiI Provide Pilaunchin9receivin facility"iiiI:hickness measurementis required to check forwith in accetance limit"

    ivI Replace 9Paint"

     :hickness measurement isrequired to check with in

    accetance limit"Replace orpaint as applicable"

    -I;>8 sytemG@ound corroded 0 2 =ent pipes are routedthrouh 8lycol seal pot"

    3IAir ReceiverH=5+,IG=essel 0 attached pipins foundcorroson"

    /ell head areaG&Pressure 8aue not available on the top ofman wells"

    ables are found hanin in the approach platform of

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    51/98

    * HAIellar 3eck #oor separator area is corroded" A HAIPaint as applicable

    + A Rectify

    1, - larify

    11 8lycolseal potG&L8 0 LS are found corroded" A

    12Production manifoldG&:: for /ell noG1 is clamped in handrails" A lamp on stand"

    1. @ire wall south side openin found" A

    15 :elesolar panel!dcdb to be checked for functionality" A heck functionality

    1' 4; and related pipins are found corroded" A Paint as applicable"

    1( A

    1) A

    1* A on?ure"

    1+ 6elideckGHAI-elow helideck structure paint not done HAIPaint required"

    H-I/ellhead control PanelG&PS6L for the wells1.,!15,!1',!1*,!1+,!2,, bypassed

    /ell no 12, is water inection well"=alves are forcedopen!isolated from /6P"

    Replace9Paint asapplicable"

    lose the openin of@irewall"

    raneG&1Ihydraulic 8aues not workin2ILoad indicator not workins.IAir ompressor not functional 0 nine anopy broken5IPaintin not carried out'IPeriodic $3: not carried out after load :estin"(I$o protection for radiator fan"

    Require attention to closethe points"

     :elementry Room 0 -attery RoomG1I3oor not available"2ISpare able entries in :elementary Panel not closed"

    Replace 3oor and loseentries"

    SA3AG8raphics of all well SS= show open SSS= show closeand pressure and :emp show Dero"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    52/98

    2, -A sets only 2 nos available -

    21 3rainsG%ostly all open drains are chocked - lear drain

    22 Life Raft servicin due since %ay 2,1' A Service before due time

    2. @irst Aid -ox renew due since %ay 2,1' A Renew before due time

    25 A Service before due time

    2' /ellhead =alve shows am in record A Service the =alve

    Additional points from nal audit

    2( 4penin in the ?rewall in the well head area found A 4penin to be closed

    Place the -A sets as perrequirement"

    @ire xtinuisher servicin due since 1(",*"1' and 3P skidservicin due since 1'"11"15

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    53/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    ;nstalled the bulbs in life buoys $ot available 4pen

    aIiI %arkin done on Line and pi barreliiI valve replaced

    aIiI%arkin is not done

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    54/98

    pen ase

    4pen AI Cune&1( -I

    P8s made available =eri?ed losed

    =eri?ed losed

    able dressin done in

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    55/98

    4pen -ase

    to be checked 4pen

    =eri?ed losed

    4pen -ase

    Plan for fabrication of stand 4pen 3ec&1(

    open 3ec&1)

    hecked! 4k =eri?ed losed

    4pen base

    4pen

    4pen 1" 3ec&1(

     %ade 4M =eri?ed losed

    4pen -ase

    Paintin contract awaited for unmannedplatform"

    -ein /; it is always kept opened! notforced"

    Paintin contract awaited for unmannedplatform"

    Planned under punch point clearance ofSafety revamp Proect"

    Paintin contract awaited for unmannedplatform"

    1"8aues under procurrement"2"Load indicator procured! installation inproress"."/aitin for spares"5"Paintini contract awaited"'"$3: planned"("@an uard provided"

    1" 3ec&1(2" %arch&1(

    ."5"

    '"%ach&1(

    1I Replacement of door planned underL-%2I %ade 4M 

    Paintin contract awaited for unmannedplatform"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    56/98

    =eri?ed losed

    Planned for replacement 4pen 1(&3ec

    Relaced life rafts with serviced one" 4pen

    @irst aid box updated" =eri?ed losed

    $ew 3P skids are installed" =eri?ed losed

    Serviced the valves! 4M Records veri?ed ;RR&5 losed

    4pen

    ,2S-A sets are placed at each /6platform"

    Life raft near 8L manifold is due forservice

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    57/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.!

    Audit Findin$s Anne%ure &>

    ' No( )bser*ation +ate$ory

    1 A

    2 @low arm of wells E+ 0 ) and wells E1 0 ( are combined A

    . A %ake S3= operational

    5 A Provide safety devices

    ' (K as lift line from $L% to $L%&1, is non piable A

    ( A

    ,N-.#/ +omments0Recommendations

    6andle of PS6L isolation valves on the #ow arms of wells E1! 2! .! 5 0 * are damaed

    Rectify or replace thedamaed valves

    Provide separate #ow armsfor each well

     :est Separator S3= is not operational! it is only operatedmanually

    $o PS6L!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    58/98

    Additional points from nal audit

    ) A :o be normalised

    * Switch ear room door is damaed - Replace door

    + Staircase from meDanine deck to spider deck found damaed A Recti?cation to be done

    8as 3etection system! detectors 6&. 0 6&( are in faultcondition

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    59/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    open 1(&3ec

    =eri?ed closed

    open 3ec&1)

    $oted closed

    $oted closed

    $oted closed

    Replacement of valvehandle planned

    E) 0 + separated" E1is closed! E( is#owin separately"

    Requirement for

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    60/98

    open

    open

    open

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    61/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N/.!!

    Audit Findin$s Anne%ure &3 

    ' No( )bser*ation +ate$ory

    1 A

    1I Provide handle

    2I:appin connections are all corroded"

    2 A

    HbI$o piin facility!$o shutdown valve" 2I larify

    . A Put :a no and name plate

    5 Air Receiver H=&5+,IG&Pipins and =lave handles are corroded" A

    ' 62S apsuleG$ot operational A Remove if not required"

    ,N-.#/ +omments0Recommendations

    +4//AR ,4+

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    62/98

    ( A 3eck plate to be replaced"

    ) A

    2Ilarify

    .I Pipins are not properly supported"

    5I 3rain lines and =ent lines of /@ manifold are corroded"

    * A Replace

    + A

    1I larify

    2I 6andles of the =alves found corroded"

    .I $o fusible Plu available .I Provide fusible plu

    5I $o PS6L available" 5I%ake PS6L available"1, /ater inection lineGSome PS= =ent is isolated A larify

    11 Production %anifoldG;nstrument mounted on 6andrail A

    /ell head areaG4ne no of hole found in 3eck near well headdue to thinnin due to corrosion"

    ell head area:

    1I

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    63/98

    12 A

    1. 6andrails GSome handrails are damaed" A Replace 6andrails

    15 Switch 8ear RoomG&3oor not available A 3oor to be installed"

    1' Redaudant at wellhead near ?re wall C- is to be replaced" A Action to be taken

    1( scape Ladder not available A Action to be taken

    1) ;ndividual drain line H1KI near :est 6eader corroded" A Action to be taken

    1* @ixed 3P 6ose reel Hat ellar 3eckI $oDDle missin" A Action to be taken

    1+ -attery room tiles not available" A Action to be taken

    2, Redaudant supports and lines of 3iesel line to be removed A Action to be taken

    21 $L% 11 to $LP /@ line below ellar 3eck supports corroded A Action to be taken

    22 A Action to be taken

    2. C- near drum to be positoned" - Action to be taken

    25 Redaudant transfer pump and lines to be replaced" A Action to be taken

    2' Portable @ire xtinuisher Servicin 3ue since 2+",("1'" A Action to be taken

    2( Life Raft Servicin dueG %ay 1' A Action to be taken

    raneG&8aues for 6draulic oil pressure -oom!-lock!Swinnot workin"RP% meter not workin"6orn not functional"Loadindicator not functional"Periodic $3: not carried out"

    %ake functional of8aues!%eter!;ndicatorand do $3:"

    Rest point handrails of %onkey Ladder of -2 0 A2 lecorroded"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    64/98

    2) Life -uoys 5 nos not 4k A Action to be taken

    2* scape Ladder not installed A Action to be taken

    2+ -A sets 1 no available but not 4k A Action to be taken

    Additional points from nal audit

    ., A Paintin to be carried outellar 3eck platform is heavily corroded and paintin to becarrried out

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    65/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    4pen base

    4pen

    2I $ot piable"

    =eri?ed losed

    4pen base

    4pen 1)&Cun

    1I Replacement of valve handleplanned

    2I paintin contract forunmanned awaited"

    1I Planned under as liftrevamp"

    a" 3ec&1(

    Since it is a pipe it is havin lineno"52K98>&1$&1',1 and hencePS= is not required

    paintin contract for unmannedawaited"

    %4 in place! Planned forremoval under safety revamp"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    66/98

    open 1)&Cun

    1I ;nserted wooden wedes"

    4pen

    4pen 3ec&1(

    4pen 3ec&1(

     :o be checked 4pen

    Planned under safety revamp 4pen 1)&Cun

    repplacement planned undersafety revamp Proect

    2" 3ec&1(." Cune&1)

    5" -ase

    2I /ork order placed for 8Lmanifold with distribution line"

    .I Support replacement plannedunder Safety revamp Proect"

    5I Paintin contract awaited forwell head platforms

    Plan for replacement!valve isavailable at Location

    Requirement for new headerwith

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    67/98

    4pen 3ec&1(

    Planned under safety revamp 4pen 1)&Cun

    Planned under L-% contract" 4pen 3ec&1(

    to be done" 4pen

    4pen 1)&Cun

    4pen base

    4pen 1)&Cun

    4pen 1(&Cun

    4pen 1)&Cun

    open base

    4pen -ase

    Planned under safety revamp 4pen 1)&Cun

    4pen base

    4pen

    Replaced with serviced one" 4pen

    /aitin for aues! RP% meterprovided" 6orn not required asall crane operations are beindone in day time only" Sparesprocured! installation inproress"$3: planned"

     :o be replaced durin safetyrevamp"

    paintin contract for unmannedawaited"

     :o be replaced durin safetyrevamp"

    /ork order placed under L-%contract"

    removal planned with Safetyrevamp Proect

    Supports will be provided undersafety revamp"

    Paintin contract awaited forunmanned platform

    Planned under wellhead revampproect"

    Replaced extinuishers withserviced one"

    Servicin of portable exchanersis due

    $ew ones arrived but not yetinstalled

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    68/98

    Replaced damaed life buoys" :o be included in eneral sheet losed

    4pen 1)&Cun

    Replaced ,2nos $ot complied 4pen

    4pen

     :o be replaced durin safetyrevamp"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    69/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N.!

    Audit Findin$s Anne%ure &l

    ' No( )bser*ation +ate$ory

    1 A2I -elow ellar 3eck Pipes corroded9disinterated"

    .I -are -umper one vertical post missin"

    2 A

    2I 3rainsG3rains are choked" 2I 3rains to be serviced"

    . A Paint as applicable"

    5 H1IAccess PlatformG%ost ratins are disinterated" A H1I;nstall 8ratins"

    ,N-.#/ +omments0Recommendations

    4verboard lineG

    1I6ihly corroded and seems non functional"

    1I Redaudant line to be

    removed"

    2IPaintins required tobelow ellar 3eck pipins"

    +4//AR ,4+

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    70/98

    '

    H1Iellar 3eck hequred PlateG&Saverely corroded"

    A

    2I 6and railsG-roken9damaed9missin $orth side handrails"

    .I 8ratins damaed

    ( A

    2I @ull unit 9skid totally corroded"

    ) A arryout paintin"

    * A

    + 6ydraulic power unit skid with + ylindersG:otally corroded" A

    1, A larify"

    11 LihtinG& /est side liht broken" A Rectify

    H1Iheck by >: !forremainin thickness ofdeck plate to veryfy with inacceptable limit"Andreplace the plate asappropriate"paintinrequred as applicable"

    2I ;nstall 6and rails 08ratins as applicable"

    %anifoldG&1I /ater accumulated in SkidGdrains are choked"

    1I lear drain as applicable

    2Iheck remainin wallthickness before carry outpaintin"

    @low lines from manifold to LauncherG8eneral corrosion needpaintin"

    1,K /$2 to /$1 Receiver&/ater ;nectionGAssociated smallbore pipin corroded"

    Replace as applicable andPaint as applicable"

     Redaudant to be removedwith %4"

    /ell Shut down PanelHS3P 1,,,IG&All tubin found disconnectedto S3P 1,,,

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    71/98

    12 A larify

    1. A larify"

    15 A Attend on priority"

    1' A Attend on priority"

    2I$o anti two blocks

    .I$o Anle indicator is available"

    5I nine room9abin&sheet corroded9disinterated"

    'I 6and rails missin"

    (I $3: not carried out"

    1( Life rinG&H1I$o rope attached to Life Rin .nos A Attend on priority"

    Shutdown panelG$o shutdown panel!$o ;nstrument airconnection and no instruments found"

    Launcher and Receiver areaG&$o shutdown valve on Launcherarea"

    -attery RoomG&-atteries are completely isolated!@loorin is notanti&acid type and no -attery shrouds"

    raneG&1I-oom not in the -oom rest"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    72/98

    1) Life raft 2 nos servicin due since $ov1. and Can15 A Attend on priority"

    1* Cumpin rope 'nos short lenth and 1no missin A Attend on priority"

    1+ Stretcher not available A Attend on priority"

    2, scape Ladder not available A Attend on priority"

    21 A larify

    22 A

    2. A

    25 >: thickness auin not done" A Action required"

     :elemetry ontrol Panel roomGR:> Panel not connected!!Radioontrol Panel not workin!= sat transmitter9receiver modem ismissin

    3iesel :ankGAssociated pipin corroded!Level 8aueorroded!$o handrails arround the tank"

    Appropriate actionrequired"

    8eneralG&xtaneous material to be removed"/ell headcapsuleHredaudantI to be removed!ellar 3eck chequered platebadl corroded"$o handrails in %ain 3eck northside and /estside!6andrails broken at ellar 3eck!rane -oom Rest -adlycorroded!-oat landin not in use!scape lader not

    available!Small bore line corroded!Safety la out and scaperoute markins not found"@low directions and oloure codin ofPipin with ;denti?cation not available"

    Appropriate actionrequired"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    73/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    1I Planned for removal

    4pen -ase

    4pen 1(&Cun

    open 1(&Cun

    4pen 1(&Cun

    2I 433 line are plannedfor replacement

    .IRequirement iven to;%R

    Replacement in proressunder safety revamp

    Pipin replacementplanned under well #uidline replacement proect

    Replacement in proressunder safety revamp

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    74/98

    4pen 1(&Cun

    4pen 1(&Cun

    4pen -ase

    4pen 1(&3ec

    4pen %ay&1(

    =eri?ed losed

    =eri?ed losed

    Replacement in proressunder safety revamp

    Replacement in proressunder safety revamp

    Replacement plannedunder well #ow armproect"

    Receiver 0 Launcher areplanned for replacement"

    Plan to remove durinsafety revamp proect

    K $ot ;n >seK taindone"

    ,* nos broken liht?ttins removed"omplied

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    75/98

    4pen -ase

    $oted losed

    4pen 1(&Cun

    4pen

    5">nder revamp"

    ("$3: planned"

    =eri?ed losed

    Alternate arranementfor control systemrequired! for whichrequirement sent tobase"

    Since it is water inectionplatform! isolation valveis available"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    76/98

    =eri?ed losed

     Cumpin ropes replaced" =eri?ed losed

    Stretcher replaced" =eri?ed losed

    4pen 1(&Apr

    4pen

    4pen 1(&Apr

    4pen 1(&Apr

    4pen 1(&3ec

    Replaced with servicedlife rafts"

     :o be replaced durinsafety revamp"

    1" $o power available

    2" =sat not in use"Alternate system will beprovided afterrevampin"

    removal planned undersafety revamp Proect

    Replacement in proressunder safety revamp

    ;nstallation of new linesare planned under well#uid line replacementProect

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    77/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: N.2

    Audit Findin$s Anne%ure &m

    ' No( )bser*ation +ate$ory

    1 @low arm of wells E . 0 1 are broken A

    2 /ell head shut down panel is not operational A %ake the S3P operational

    ,N-.#/ +omments0Recommendations

    Rectify the damaed #owarm

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    78/98

    )N#+ +omments 'tatus 4,+

    open 3ec&1(

    open

    Replacement isplanned under /ell#uid lines replacementproect

    Alternate arranementfor control systemrequired! for whichrequirement sent tobase"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    79/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Platform: !;?.A

    Audit Findin$s Anne%ure &n

    ' No( )bser*ation +ate$ory

    1 A

    b ILevel 8aue and Pipin at bottom corroded"

    2

    H1IReplace the 8ratins"

    2I 6962S detection system not operational"

    5I :hemal insulation damaed for some line"

    'I $o uard9cae in $ side ladder"

    ,N-.#/ +omments0Recommendations

    'P&,4R ,4+

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    80/98

    (I @usible Plu does not cover to /E("

    )I >nterminated ables hanin near /ell noE2"

    5 A larify

    ' A larify

    ( A

    ) A

    * A

    (I Provide @usible Plu asappropiriate"

    )IRemove the able if notrequired"

    H-I 8as Lift H8as ;nectionIGH1I$o Pi -arrel in 8as lift line H2IPS= replaced in ;>8 line but isolated

    H I $L% LauncherGH1I=alve found replaced but still pressureshows 2, k Per cm sq"H2I6oistin arranement $ orner&

    non operational

    H I Production9:est 6eaderG H1I :est header pressure and :emperature 8aues broken"H2I6eat :racin in Productionheader disconnected"

    H1IProvide 8aues H2IRectify for heat tracinconnection"

    H3I H1IRemote :elemetry >nitG3isplay found 6an"H2I 3oor of :elemantary room not avaliable"

    H1I orrect to thenormalH2IProvide 3oor of :elemantary Room

    H IH1IPortable @ire xtinuisherG&Servicin not up to date anddue since April 2,1'"H2ICumpin rope 2 nos not 4kH.IscapeLadder not availableH5I@irst Aid -ox not availableH'IScrablenet G1 no in hanin position

    >pdate servicin as earlyas possible"And keep allthe LSA items ready for allthe time"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    81/98

    11 8as Lift lineG $o Pi Launcher in 8as Lift line" A larify

    12 A

    Additional points from nal audit

    1. A :o be recti?ed

    15 -oat landin ratins are missin and corroded A :o be replaced

    attery Room:&H1I@loorin is not acid proof"H2I Some shroudsmissin on -attery link"

    H1IProvide Acid proof#oorinH2IProvide shroudsat -attery link"

    $orth side handrail and ratins on the cellar deck is corrodedand needs to be replace

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    82/98

    )N#+ +omments ,N-.#/ Remar3s 'tatus 4,+

    open 1)&3ec

    open

    2I System operational" $ot 4perational

    support installation planned undersafety revamp Proect

    1I Planned for replacement undersafety revamp Proect"

    .I Safety redundant valvesremoved"

    5I ;nsulation not required! to beremoved as temprature of well#uid is increased due to hih watercut"

    'I Planned for installation durinSafety revamp proect

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    83/98

    (I @usible plus to be provided"

    )I able dressin done" =eri?ed

    open

    open

    closed 1(&%ar

    open 1(&3ec

    open 1)&3ec

    1I$o provision made for piinsince it is as line 2I madeonline

    1I =eri?ed ok2I PS= is not in service

    1IMick o7 valve replaced hencepressure is Dero"2IAssistance of %S= is taken forhoistin

    1I :rapped pressure of 1) M89cm2is still there

    2I 4k

    1I NNH:o be verify by ;nst"I2I 6eat tracin is not

    required hence /@ temp" is hihdue to increase of water content

    1I ;nstalled new2I 4k

    1"3isplay normalised"2":o be replaced under L-%contract"

    1I ok2I -alance

    1"xt serviced"2",.nos umpin

    ropes provided"."scape ladder tobe installed durin safetyrevemp"5"@ist aid boxinstalled"'"Scramble net to beinstalled durin safety revemp

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    84/98

    $oted closed

    open 1(&3ec

    open

    4pen

    $o provision made for piinhence no pi receiver is required

    1"/ork order placed under L-%contract"2" Shrouds provided"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    85/98

    Neelam Unmanned Platforms Topside Recertication

    Final Audit: 25th to 28th February 2!"

    Functional +hec3s

    Anne%ure &&

    ' No( Platform Functional +hec3 )bser*ations Results

    1 $L%&1

    2 $L%&2 SS= operation of well E. checked from /6P 4penin and closin of SS= observed Satisfactory

    . $L%&2 SS= operation of well E) checked from remote 4penin and closin of SS= observed Satisfactory

    5 $L%&' Local operation of SS= for well E) 0 . checked 4penin and closin of SS= observed Satisfactory

    ' $L%&( @ound to be in stuck position

    ( $L%&) 4penin and closin of SS= observed Satisfactory

    ) $L%&) /ell E5 remote operation of SS= checked 4penin and closin of SS= observed Satisfactory

    * $L%&* Remote operation of SS= for well E+ checked 4penin and closin of SS= observed Satisfactory

    + $L%&+ Remote operation of well E* SS= checked 4penin and closin of SS= observed Satisfactory

    1, $L%&+ 4penin and closin of SS= observed Satisfactory

    11 $L%&1, 4penin and closin of SS= observed Satisfactory

    12 $L%&1, Remote operation of well E' SS= checked 4penin and closin of SS= observed Satisfactory

    SS= operation of wells E5! 2 0 12 checked from/6P!

    SS=Fs E2 0 12 found to be ok and SS=E5 is stuck

    SS= E5 to bereplaced

    4peration SS=Fs of wells E' 0 1 checked from/6P

    SS=Fs to bereplaced

    /ell E2 #owarm PS6L is bled and SS= operationis checked

    4peration of well E) SS= checked from the /6control panel

    PS6L of #ow arm for well E2 bled and SS=operation checked

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    86/98

    1. -1).&A 4penin and closin of SS= observed SatisfactorySS= operation of well E2 checked from bothremote and /6P

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    87/98

    )bser*ation +ate$or

    $L%&1

    A Rectify or replace the SS=Fs

    SS= of well E ' was found capped -

    A Provide proper supports

    A

    - Replace the damaed parts

    -

    A

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    88/98

    $L%&5

    A larify

    A ;nstall 8ratins

    A Provide support"

    A

    A Rectify

    A

    A heck!on?rm and larify"

    A 6ouse keepin

    A

    Position of SS= and /in =alves areinterchaned in /ell noE.!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    89/98

    A

    A

    A

    $L%&'

    PS6L *'1 is in bypass A $ormaliDe the PS6l

    PS6L *)1 is in bypass A $ormaliDe the PS6l

    A heck 0 Rectify

    Safety Layout is not available" A Provide Safety Layout

    A

    $L%&)

    A

    A larify

    A larify"

    $L%&* A

    A

    3eck of Solar Panel Hdeckuproaches to helideck"I badlycorroded"

    ables not clampled toable :ray near Air receiver0 =olume -ottle of ellar3eck"

    allibration status of instrumentsnot updated"

    Safety sin -oards and symbols tobe placed as appropriate"

    /ell $o (G Remote S3 sinal ispresent and not resettin"

    @ire 0 8as 3ectection G System is

    not powered up

    Power up the system and

    make it functional"

    +4//AR ,4+

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    90/98

    $L%&1,

    A

    A %ake S3= operational

    A Provide safety devices

    A

    A

    -&1).A 83>

    @low arm of wells E+ 0 ) and wellsE1 0 ( are combiled

    Provide separate #ow armsfor each well

     :est Separator S3= is notoperational! it is only operatedmanually

    $o PS6L!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    91/98

    'tatus )N#+ +omments 'tatus 4,+ 'ection

    4pen 4pen Apr&1( /6

    4pen 4pen Apr&1( /6

    4pen 4pen Cun&1) 4$S:

    4pen >nwanted material is backloaded losed /6

    4pen Requirements of new handles placed 4pen -ase /6

    4pen 4pen 3ec&1( /6

    4pen %ar&1( 4$S:

    4pen losed ;$S:

    4pen losed ;$S:

    4pen Powered up losed ;$S:

    4pen 4pen ;$S:

    4pen 4pen ;$S:

    4pen S3 sinal is resetted found ok closed /6

    4pen 4pen Cun&1( 6S

    4pen Powered up" closed ;$S:

    4pen Planned to provide ta $o" open %ar&1( /6

    4pen open 1(&3ec 4$S:

    SS= for E 2!1,!12 made operational 0planned for E 5

    SSv of well E' is planned forreplacement

    Shall be taken up in safety revampproect

    ;nsulation not required" Paintin to be

    done"

    Planned in modular ri structural obproect

    PS6L is calibrated and used when 6A&$L%&1 line is operational

    PS6L is calibrated and used when $L%&1&$LP line is operational

    Requirement of safety layout to beiven

     :o be taken up under safety revampproect

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    92/98

    4pen Planned for repositioned open Cun&1( /6

    4pen open 1(&3ec 4$S:

    4pen open 1(&3ec 4$S:

    4pen open 3ec&1( /6

    4pen open 3ec&1( 4$S:

    4pen losed /6

    losed 1(&%ar ;$@44%

    4pen Properly placed" losed /6

    4pen open 1(&3ec 6S

     :o be taken up under safety revampproect

     :o be taken up under safety revampproect

    1I leared drain and vent "2INN .Iable tray to be provided durin safetyrevamp proect"

     :o be taken up under safety revamp

    proect

    1":o be checked"2"8as detection system is workin".">nwanted material removed"

    1":o be checked"2":o be checked"

    1" @irst aid box updated"2"Replacement to be done in safetyrevemp proect"

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    93/98

    4pen open 1(&3ec 4$S:

    4pen %ade updated losed /6

    4pen open 6S

    4pen $ormalised losed

    4pen :o be normalised open

    4pen $ormalised open

    4pen open

    4pen Powered up losed

    4pen 4pen

    4pen 4pen

    4pen 4pen

    4pen to be checked 4pen ;$S:

    4pen Replacement of valve handle planned open

     :o be taken up under safety revampproect

    Requirement of safety layout to beiven

    Requirement of safety layout to beiven

    1I Requirement of valve handle placed2I:o be verifyN.I- section depressured 0 is foundDero"5IPlan to replace as and when Riavailable!valves are available at $P

    1"2"5"

    1I As 8L line tappin is taken frommain line of '!(!)!*!+ sector hencepiin facility is not there hence PS=is not required!

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    94/98

    4pen closed

    4pen open

    4pen  :o be checked open

    4pen ;t is not piable closed

    4pen open

    E) 0 + separated" E1 is closed! E( is#owin separately"

    Requirement for

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    95/98

    ,U4

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    96/98

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    97/98

  • 8/18/2019 Copy of Final Audit Neelam Unmanned

    98/98