Construction weekly march 25, 2016

30
Volume 28, Number 10 March25, 2016 Construction Weekly Phil Beghtel is the project manager of Stockton Fence Co. which is his family owned local company since 1949. He has served as Commodore, Vice Commodore and Harbor Master and as a Director for the Port Stockton Boat- ers for many years. During his term at the Port Stockton Boaters he has helped create a successful event called the Beef & Oyster Dinner which began in 2009. Phil is highly involved in the community as a cook. He cooks for the Golden Boys Softball Team every Wednesday as well as their event that occurs every year. He is looking to bring many new ideas to the Board of Directors at the Builders’ Exchange of Stockton. Robert “Bob” Harmon is a Senior Vice President and Stockton Area Manager for Farmers and Merchants Bank of Central California (F & M). F & M was established in 1916 and has offices throughout the Central Valley from Sacramento to Merced. Harmon started his banking career with Wells Fargo Bank in 1972 after serving in the US Army. He has worked the majority of his career in the San Joaquin County area with several locally owned financial institutions as a commercial lending officer as well as serving in various management functions. Along with work responsibilities, Harmon has been involved with numerous lo- cal organizations, including board membership with Goodwill Industries, Good- will Service Connection, San Joaquin Partnership and Business Council, Inc. A 1968 graduate of Chico State College, Harmon also graduated from the Pa- cific Coast Banking School in 1989. Jason Hjelmstad currently serves as the Vice President and the Board of Directors with the Builders Exchange of Stockton, Inc. He began his career with Holt of California in the Heavy Equipment business in 1997. Over the course of his 19 years at Holt, he has held several positions ranging from Ser- vice Technician, Sales and Management. Jason currently is the Compact Con- struction Equipment Territory Manager and is responsible for developing busi- ness in San Joaquin, Stanislaus, Calaveras, Amador and Merced Counties. 2016 Board of Directors Nominees Additional Nominees on Page 6

description

 

Transcript of Construction weekly march 25, 2016

Page 1: Construction weekly march 25, 2016

Volume 28, Number 10 • March25, 2016

Construction Weekly

Phil Beghtel is the project manager of Stockton Fence Co. which is his family owned local company since 1949. He has served as Commodore, Vice Commodore and Harbor Master and as a Director for the Port Stockton Boat-ers for many years. During his term at the Port Stockton Boaters he has helped create a successful event called the Beef & Oyster Dinner which began in 2009. Phil is highly involved in the community as a cook. He cooks for the Golden Boys Softball Team every Wednesday as well as their event that occurs every year. He is looking to bring many new ideas to the Board of Directors at the Builders’ Exchange of Stockton.

Robert “Bob” Harmon is a Senior Vice President and Stockton Area Manager for Farmers and Merchants Bank of Central California (F & M). F & M was established in 1916 and has offices throughout the Central Valley from Sacramento to Merced.Harmon started his banking career with Wells Fargo Bank in 1972 after serving in the US Army. He has worked the majority of his career in the San Joaquin County area with several locally owned financial institutions as a commercial lending officer as well as serving in various management functions.Along with work responsibilities, Harmon has been involved with numerous lo-cal organizations, including board membership with Goodwill Industries, Good-will Service Connection, San Joaquin Partnership and Business Council, Inc.A 1968 graduate of Chico State College, Harmon also graduated from the Pa-cific Coast Banking School in 1989.

Jason Hjelmstad currently serves as the Vice President and the Board of Directors with the Builders Exchange of Stockton, Inc. He began his career with Holt of California in the Heavy Equipment business in 1997. Over the course of his 19 years at Holt, he has held several positions ranging from Ser-vice Technician, Sales and Management. Jason currently is the Compact Con-struction Equipment Territory Manager and is responsible for developing busi-ness in San Joaquin, Stanislaus, Calaveras, Amador and Merced Counties.

2016 Board of Directors Nominees

Additional Nominees on Page 6

Page 2: Construction weekly march 25, 2016

2 • Construction Weekly

CLEAN PLANET, INC.

Construction Debris

Concrete & Asphalt

Wood/Lumber Debris

Green Waste

Open 6 Days a week 7 am to 5 pm

For Large Volume Pricing Call Kevin @ 209-715-1657

250 Port Road 23 • Stockton, CA 95203(209) 472-7422

Page 3: Construction weekly march 25, 2016

construction weeklyThe official publication of the

Builders’ Exchange of Stockton

7500 West Lane • Stockton, CA 95210Phone (209) 478-1000

Fax (209) 478-6507Plan Room (209) 478-1005

www.besonline.com

OFFICE HOURSMonday - Thursday 8-5

Friday 8-4

DIRECTORSTONY ARCEO, Grayson EngineeringDUSTIN SACCONE, Comfort Air, Inc.

RYAN HAGGERTY, Haggerty ConstructionJASON HJELMSTAD, Holt of California

J.J. JONES, United Rentals A&A Tool RentalsSCOTT LOVOTTI, Lovotti Air

TOM MAYO, Tom Mayo ConstructionTOM PATTI, Delta Cranes

AL TOCCOLI, Al Toccoli ConstructionNICK WOODY, Bockmon and Woody Electric Co.

OFFICERSAL TOCCOLI, President

JASON HJELMSTAD, Vice PresidentTONY ARCEO, Treasurer

TOM MAYO, Member at LargeNICK WOODY, Past President

STAFFMICHAEL SELF, Executive Director

[email protected] PUIG-HINK, Director of Events • Editor

[email protected] LARA, Bookkeeper

[email protected] ROBINSON, Administrative Assistant

[email protected]

• Contractor Connection Page 5

• Board of Director Nominees Page 6

• Weekly Economic Update Page 7

• Classified Page 8

• Projects Out to Bid Pages 12-24

• Lien Seminar Information Page 25

• Legal Notices Pages 26-27

• Tail Gate Topic Page 28

• Safety Calendar Page 29

Contents

Construction Weekly • 3

Page 4: Construction weekly march 25, 2016

4 • Construction Weekly

Tom Mayo has been the President/CEO of Tom Mayo Construction, Inc. for the past 40 years. He is currently serves on the Board of Directors and has been a Past President at the Ex-change. He has been the President of the Waterloo Athletic Club for 6 years. Tom’s experience with the Waterloo Athletic Club has benefited the Builders’ Exchange of Stockton tremendously with the efforts of fundraising events and during his 6 year term on the Stockton Exchange Board introduced the Bocci Tournament which has proven to be a successful. He has also helped to im-prove the current events that the Exchange offers such as the two golf tournaments, Membership BBQ and Crab Feed.

Scott Lovotti has served on the Board of Directors for the Builders’ Exchange for the last 3 years and would like to serve an-other term. He opened Lovotti, Inc. in 2006 after 20 years of expe-rience in HVAC as a lead service managerwhich just recently cel-ebrated its 10 year anniversary in January. In 2011, Scott opened a Commercial Refrigeration and Plumbing division. Lovotti Air has been a main sponsor at all Builder’s Exchange events for the last 5 years and he is also a member of the Event planning committee. His team recently won the Bocci Tournament in the Fall of 2015 and the Spring of 2016.

Commercial Doors, Builder’s Hardware,

Toilet Partitions, General Hardware & More

924 E. Church Street, Stockton, CA 95203 WWW.CVHARDWARE.COM

Phone (209) 464-7305 * Fax (209) 464-1737

Page 5: Construction weekly march 25, 2016

Construction Weekly • 5

Contractor Connection

2120 28th Street • Sacramento, California 95818 • 916-451-1114 direct • 916-451-1118 fax • [email protected]

Remember, CLC is ready to answer ALL of your licensing questions and/

or to assist you with ALL of your licensing, incorporation and

other business needs.

The Process for Requesting the CSLB to Create a New License Classification

Last week we discussed an inquiry we received on how to go about requesting that the Contractors License Board create a new license classification? Specifically, the request focused on the ever-growing specialty area of accessibility for persons with handicaps and the need for a new classification to address this ever-growing field of work.

We want to stress, the CSLB staff was extremely respon-sive to our initial inquiry and we are moving forward with setting up a meeting between the CSLB, our member association’s staff and the contractors making the request to ascertain if there is enough of a need to create a new specialty classification which most likely would be a C-61 D sub-classification.

Following is the response we received:“Before I can provide an informed response I will need additional information. What type of “handicap work” will be performed? Please be as detailed as possible, for instance which trades and/or materials will be involved? As you know there are many types of projects that could be labeled “handicap work” so I want to get as much information as possible to understand what exactly you are describing.”

Along with this reply came the following citation from the Business and Professions Code that provides the CSLB with the necessary authority to create a new license clas-sification:

Business and Professions Code 7059:(a) The board may adopt reasonably necessary rules and regulations to effect the classification of contractors in a manner consistent with established usage and procedure as found in the construction business, and may limit the field and scope of the operations of a licensedcontractor to those in which he or she is classified and qualified to engage, as defined by Sections 7055, 7056, 7057, and 7058.

So, the next step will be to set up a meeting between the interested parties to see if there is enough need to create a separate classification and whether there are enough contractors that perform this type of work to warrant the expense to create it. Stay tuned as we proceed further in this process.

Page 6: Construction weekly march 25, 2016

6 • Construction Weekly

300 W. Pine StreetLodi, California 95240

p 209.333.1116f 209.333.8597

Rich PiomboAdministrative Manager

[email protected]

New Workers Comp Program 5% off for BES Members

Call John Glover 209-465-5671

Brown & Brown Ins Svcs. of California Inc. DBA Debock & Muth Insurance Agency Lic. 0D04053 1330 W. Fremont St., Stockton CA. 95203 PH: 209-465-5671 [email protected]

This program is underwritten by Arrowhead GIA, Inc. , a Brown & Brown company. Call today for eligibility information and a free quote.

Commercial Residential Design/Build

Al Toccoli • General [email protected]

(209) 639-7608 • Fax (209) 931-3513License #522916

800-UR-RENTSunitedrentals.com

Rentals • Sales • Service • Supplies Consider it done.tm

• Widest selection of construction equipment• In-stock availability of over 9,000 contractor supply

items• Helpful, expert staff to assist with your project• On site maintenance, equipment and safety training• Delivery to your job site• Nearly 700 locations

Working with You from Start to Finish

Visit us today:Stockton #1 Rental Store2911 East Fremont StreetStockton, CA 95205209-948-9500

Branch hours: Weekdays 7:00am - 5:00pm

GSA #: GS-06F-0068R

Page 7: Construction weekly march 25, 2016

Construction Weekly • 7

Weekly Economic Update provided by Dennis Goldstrand

For disclosure information contact Dennis Goldstrand at (209) 472-7000. 2800 West March Lane, Suite 326 • Stockton, CA 95219

www.goldstrand.com • [email protected]

Income Needs Ads

Ohio National Cooperative Advertising Fund GuidelinesFormat ads may be altered in size and style, but not in content. The typestyle (Adobe Garamond) of the Ohio National Financial Services logo, as well as the logo itself, may not be altered.

Agent imprint: Agents may use their names, life insurance professional designations, and address and telephone numbers in this area. Designations such as JD and CPA may not be used (since agents are not representing the company in those capacities), as well as other titles containing terms such as insur-ance or financial consultant; financial, insurance or estate planner; financial or insurance counselor; insurance, financial or investment adviser; or other words implying an independent or non-representative capacity.

If this advertisement will be distributed in multiple states, particularly in states where you are not licensed, please include in the advertisement “licensed in ” For co-op reimbursement, general agents should submit: 1. a copy of the paid invoice. 2. tear sheet/photo of the ad. 3. completed Form 1914 (Request for Reimbursement), including approval number for the ad.

No payment will be made for advertising that does not comply with these guidelines.

How Will You Pay for Retirement?Ohio National can help.

Call today for more information.

Ohio National can help.

Call today for more information.

Approval Number: A-0078-IN-001 Rev. 8-07

The Ohio National Life Insurance CompanyOhio National Life Assurance CorporationGuarantees are based upon the claims-paying ability of the issuer. Product, product features and rider availability vary by state. Issuers not licensed to conduct business and products not distributed in AK, HI or NY.

How Will You Pay for Retirement?

The Ohio National Life Insurance CompanyOhio National Life Assurance Corporation

Guarantees are based upon the claims-paying ability of the issuer. Product, product features and rider availability vary by state. Issuers not licensed to conduct business and products not distributed in AK, HI or NY.

Dennis Goldstrand 2800 W. March Lane

Suite #326 Stockton, CA 95219

(209) 472-7000 Licensed in CA #0523376

Agent/Agency Name Street Address, Suite #

City, State Zip 000.000.0000

Licensed in (List all states that apply)

MC-03142016

Dennis J. Goldstrand Presents:

WEEKLY ECONOMIC UPDATE

WEEKLY QUOTE“Believe those who are seeking the truth. Doubt those who find it.”- Andre Gide WEEKLY TIP If your student will graduate from college with multiple, large student loans with different lenders, consolidating those loans may leave just one payment to one lender at one low interest rate. If your student has multiple but relatively small student loans, just paying them off as quickly as possible is often a better choice than consolidation.

WEEKLY RIDDLE What mathematical symbol can be put between 5 and 9 to get a number bigger than 5 and smaller than 9?

Last week’s riddle:You drop a coin into a bottle through its opening. Then, you push a cork into that same bottle opening to seal the opening. How do you get the coin out of the bottle without breaking the bottle or taking out the cork?

Last week’s answer:Push the cork into the bottle.

March 14, 2016 STOCKS SETTLE AT 2016 HIGHS A 5-day gain of 1.10% left the S&P 500 at 2,022.19 at the closing bell Friday. Settling at 17,213.31 Friday afternoon, the Dow Jones Industrial Average rose 1.20% for the week while the Nasdaq Composite advanced 0.67% to end the week at 4,748.47. On March 11, the S&P settled above its moving average for the first time since December 30, and both the S&P and DJIA had their highest closes of the year, reaching peaks unseen since intraday trading on January 4.1

OIL RALLIES, GOLD RETREATS Light sweet crude closed at $38.50 a barrel Friday on the NYMEX, going +7.2% in five trading days. It was the highest settlement for a most-active contract since December. Gold went -0.9% for the week as appetite for risk grew, settling Friday at $1,259.40 an ounce in COMEX trading.2,3

WALL STREET WATCHES ECB, WAITS ON FED Economists polled by Reuters widely believe the Federal Reserve will leave interest rates alone next week, but in their consensus estimate, they put the chance of a rate hike by mid-year at 60%. The European Central Bank went in for more easing last week, unexpectedly expanding the scope of its economic stimulus measures and reducing all three of its interest rates.4

BULL MARKET TURNS SEVEN At 84 months, this bull market is now the third-longest in history, and it could soon surpass the 1949-56 bull, which ended after 85½ months. The current bull market rose an astonishing 68.6% in its first year. It advanced more than 10% in five of its first six years. It has lost ground over the past 12 months, but it has been rebounding.5

THIS WEEK: On Monday, Wall Street considers Q1 earnings from Cintas and Lennar. February’s PPI, February retail sales numbers and earnings from Oracle arrive Tuesday. Wednesday, the Federal Reserve releases its latest policy statement; investors will also evaluate the February CPI, data on February housing starts and industrial output, and earnings announcements from FedEx, Guess?, Jabil Circuit, and Williams-Sonoma. Thursday brings a new initial jobless claims report, plus earnings from Adobe Systems, Aeropostale, Lands’ End, and Michaels Companies. The University of Michigan’s preliminary March consumer sentiment index appears Friday, along with Q4 results from Tiffany.

% CHANGE Y-T-D 1-YR CHG 5-YR AVG 10-YR AVG

DJIA -1.22 -2.39 +8.58 +5.54 NASDAQ -5.17 -2.09 +14.97 +10.99 S&P 500 -1.06 -0.88 +11.01 +5.78

REAL YIELD 3/11 RATE 1 YR AGO 5 YRS AGO 10 YRS AGO

10 YR TIPS 0.44% 0.39% 0.96% 2.23%Sources: wsj.com, bigcharts.com, treasury.gov - 3/11/166,7,8,9

Indices are unmanaged, do not incur fees or expenses, and cannot be invested into directly. These returns do not include dividends. 10-year TIPS real yield = projected return at maturity given expected inflation.

Please feel free to forward this article to family, friends or colleagues. If you would like us to add them to our distribution list, please reply with their address.

Page 8: Construction weekly march 25, 2016

Project EngineerOn-site project engineer needed for construction project in Jamestown, 28 months. Ability to read plans and specifications, coordinate with on-site project superintendent and construction manager. Responsible for daily activities, process RFI’s, sub-mittals and general correspondence. Construction experience preferred, computer Excel and Word mandatory. Salary TBD. Send resume to [email protected]

Collins Electrical Company, Inc. is currently seeking a quali-fied Safety Director with a proven track record in risk management to join our team. If you want to be part of a fun, collaborative, and innovative team, apply by submitting your resume to [email protected].

Project ManagerProactive, competitive construction professional Project Manager / Construction Estimator experienced in all levels of residential, com-mercial, light commercial and industrial projects including heating, ven-tilation & air conditioning, sheet metal, electrical, plumbing, foundation, carpentry, landscaping, solar, civil, architectural and structural design per all related code requirements. Contact Mark at 209-474-3894.

7 acres for sale in the Stockton area. 2424 El Dorado Street, Stockton, CA. Contracts to assign and related documents are attached. Thanks. $850,000 assignable purchase contract with a $300,000 seller carry back. $2.1 mil ARV. Previously permitted for 146 units, but expired. Currently zoned commercial/office and can build 4 stories with 29 units per acre. Total build able units 812 townhouse/condo complex. Next to McKinley Elementary and McKinley Park, located behind flea market.

8 • Construction Weekly

Employment OpportunitiesClassified

Account ManagerThe Account Manager position manages Service Providers from various angles including but not limited to: scheduling, workman-ship, cost, scope compliance and overall customer satisfaction. Additionally, they assist with Service Provider selection and ongoing management. 25-30 Hours per week. Please email resumes to Jaclyn Frenzel at [email protected] or to see a full job position description.

Office AdminstratorStockton based construction company seeking office administrator to perform accounts payable, accounts receivable and general office duties. Software skills required: knowledge of Microsoft Word and Excel. Knowledge of public works projects is preferable. Please email resumes to [email protected] is a well-established Stockton, CA firm specializing in public school design. We are looking to add an architect and a CADD designer/draftsman to our staff. Website: architechnica.netArchitect:Duties include project programming and management, design, drafting (Revit) and construction administration/management. Salary will range from 100K to 150K. Total compensation package includes holidays, vacation days, sick days, health care, dues, full auto (after 3 months: company truck, gas, insurance, maintenance), 401K and profit shar-ing. License required. School design experience preferred.CADD Designer/Draftsman:Duties include project programming, site surveying, design and draft-ing (Revit), and records management. Salary will range from 50K to 80K. Total compensation package includes holidays, vacation days, sick days, health care, dues, full auto (after 6 months: company truck, gas, insurance, maintenance), 401K and profit sharing. Graduation from an accredited school of architecture required. School design experience preferred.Contact: ARCHITECHNICAMark C. Holley AIA, Managing Partner209 952 [email protected]

SEEKING Employment

for sale

Page 9: Construction weekly march 25, 2016

Construction Weekly • 9

Local insurance solutions for the construction industryWells Fargo Insurance delivers an outstanding combination of resources with excellent local service and support. And, as part of Wells Fargo & Company, we can provide access to financial solutions to help ensure your success.

Bonds | Insurance | Construction risk management

Wells Fargo Insurance Services USA, Inc. Dave Weise10940 White Rock RoadRancho Cordova, CA 95670916-589-8035 | [email protected]

Products and services are offered through Wells Fargo Insurance Services USA, Inc., and Wells Fargo Insurance Services of West Virginia, Inc., non-bank insurance agency affiliates of Wells Fargo & Company.

Products and services are underwritten by unaffiliated insurance companies except crop and flood insurance, which may be underwritten by an affiliate, Rural Community Insurance Company. Some services require additional fees and may be offered directly through third-party providers. Banking and insurance decisions are made independently and do not influence each other.

© 2013 Wells Fargo Insurance Services USA, Inc. All rights reserved.

040113AMb_Builders_Exch_ad color.indd 1 4/3/2013 12:50:58 PM

Please make it home safe

today.

We believe you deserve more than just insurance. You deserve valuable risk management tools—like the “What is Important to You” distracted driving prevention program—designed to help you and your employees make it home safe today.

Federated Mutual Insurance CompanyFederated Service Insurance Company*

Federated Life Insurance CompanyOwatonna, Minnesota 55060

507.455.5200 | www.federatedinsurance.com 16.08 Ed Date. 11/15 *Not licensed in the states of NH, NJ, and VT. © 2016 Federated Insurance

Federated provides clients with access to services offered through wholly independent third parties. Neither Federated nor its employees provide legal advice.

Contact Your Local Representative Grant Willes P&C/Life Lic #0F07841 at 209-570-5664

Page 10: Construction weekly march 25, 2016

10 • Construction Weekly

Steven PerryTerritory ManagerModesto District - Ready Mix

131 Vultee AvenueShafter, California 93263 USADispatch (209) 529-4115 EXT 2/ FAX (661) 215-6054Mobile (209) [email protected] / WWW.CEMEXUSA.COM

Page 11: Construction weekly march 25, 2016

Construction Weekly • 11

Page 12: Construction weekly march 25, 2016

12 • Construction Weekly

Projects Out to Bid

Sacramento Valley Region Projects - 277­ Not Available ­ On Order ­ Processing ­ Available

Project # Addn Bid Date Time Project City Docs

2016­1149 0 TBD Emergency Levee Repairs Region 1 Hood

2016­114A 0 TBD Emergency Levee Repairs Region 2 Hood

2016­114B 0 TBD Emergency Levee Repairs Region 3 Hood

2016­106D 1 3/24/2016 09:00am PST Community Center and Finnish Temperance Hall HVAC Replacement Rocklin

2016­1870 0 3/24/2016 10:00am PST Gold Tailings Court Street and Sidewalk Repair Rancho Cordova

2016­1C48 0 3/24/2016 10:00am PST Point­To­Point Lit Fiber And Dark Fiber Build RFP Modesto

2016­0A93 2 3/24/2016 11:00am PST UT ICU 5th Floor Remodel Sacramento

2016­0C7E 1 3/24/2016 11:00am PST Children's Area Expansion Project Lodi

2016­1AD7 0 3/24/2016 12:00pm PST Bath & Body Works Vintage Faire Modesto

2016­17E9 0 3/24/2016 01:00pm PST Sodium Hypochlorite Tank #1 Sacramento

2015­3E36 1 3/24/2016 02:00pm PST Flooring Removal and Installation at N.A. Chaderjian Youth Correctional Facility, Dept.of Correction

Stockton

2016­09AD 0 3/24/2016 02:00pm PST Elk Grove Center Monument Sign Sacramento

2016­0B1B 1 3/24/2016 02:00pm PST Central Garage Improvements Vacaville

2016­0BAE 3 3/24/2016 02:00pm PST KM Building Automation System California State Prison, Solano Healthcare FacilityImprovements Project

Vacaville

2016­1027 1 3/24/2016 02:00pm PST Mitchell Drive Sidewalk Capital Improvement Project R­76 Saint Helena

2016­108B 0 3/24/2016 02:00pm PST 2015­16 Neighborhood Traffic Management Projects­Phase 1 Sacramento

2016­10B4 1 3/24/2016 02:00pm PST Convert 3 Storage Rooms to 3 Restrooms French Camp

2016­11E3 1 3/24/2016 02:00pm PST R74 – 2015/16 Pavement Rehabilitation St. Helena

2016­12D5 2 3/24/2016 02:00pm PST Montana Neighborhood Park Turlock

2016­12D6 0 3/24/2016 02:00pm PST New Intrusion Alarm Systems At Four Schools (Bohn, Hirsch, Jacobson & Villalovoz) Tracy

2016­1726 0 3/24/2016 02:00pm PST Bldg at 27 N Hunter Sq. Renovation Stockton Courthouse Project Stockton

2016­17AE 1 3/24/2016 02:00pm PST Army Reserve Center Sanitary Sewer Replacement Project Vallejo

2016­17EB 1 3/24/2016 02:00pm PST Super Duty BBQ's for City Parks Sacramento

2016­19F1 0 3/24/2016 02:00pm PST Renovation At Dover K8 Academy Fairfield

2016­1A7F 0 3/24/2016 02:00pm PST Popeye’s ­ Stockton Stockton

2016­1ABA 0 3/24/2016 02:00pm PST Orchard Elementary School Hard Court Improvements Vacaville

2016­12B3 1 3/24/2016 03:00pm PST Morse Watchmans Electronic Key Management System Fairfield

2016­12C5 2 3/24/2016 03:00pm PST Chenoweth Elementary School Sitework Upgrades Merced

2016­176C 0 3/24/2016 04:00pm PST 2016 Fourteen Mile Slough City of Stockton Levee Repair Project Stockton

2016­1BC1 0 3/24/2016 04:00pm PST Bus Maintenance Facility Hart­Ransom Union School District Modesto

2016­0FCF 1 3/24/2016 05:00pm PST SMUD Headquarters Rehabilitation Special Inspection Support Services RFP Sacramento

2016­120C 0 3/24/2016 05:00pm PST Zero Energy Building and Building Deep Energy Retrofit Research and DevelopmentConsulting RFP

Sacramento

2016­12A2 1 3/25/2016 10:00am PST 1144 Grand Avenue Modernization Sacramento

2016­177C 0 3/25/2016 10:00am PST Madison Elementary School ERP Roofing Replacement Stockton

2016­1802 0 3/25/2016 01:00pm PST LED Lithonia Lighting Sacramento

2016­17FE 0 3/25/2016 01:30pm PST Tree Service Project Tuolumne City Sonora

"PRINT FRIENDLY" ACTIVE PROJECT LISTSacramento Valley Region Project Count: 277

Home > My Deskpad > > Print Friendly Project List

ADMIN Home About Us Join News Resources Virtual Plan Room

My Account | Log off

Page 13: Construction weekly march 25, 2016

Construction Weekly • 13

Projects Out to Bid

­ Not Available ­ On Order ­ Processing ­ Available

Project # Addn Bid Date Time Project City Docs

2016­1149 0 TBD Emergency Levee Repairs Region 1 Hood

2016­114A 0 TBD Emergency Levee Repairs Region 2 Hood

2016­114B 0 TBD Emergency Levee Repairs Region 3 Hood

2016­106D 1 3/24/2016 09:00am PST Community Center and Finnish Temperance Hall HVAC Replacement Rocklin

2016­1870 0 3/24/2016 10:00am PST Gold Tailings Court Street and Sidewalk Repair Rancho Cordova

2016­1C48 0 3/24/2016 10:00am PST Point­To­Point Lit Fiber And Dark Fiber Build RFP Modesto

2016­0A93 2 3/24/2016 11:00am PST UT ICU 5th Floor Remodel Sacramento

2016­0C7E 1 3/24/2016 11:00am PST Children's Area Expansion Project Lodi

2016­1AD7 0 3/24/2016 12:00pm PST Bath & Body Works Vintage Faire Modesto

2016­17E9 0 3/24/2016 01:00pm PST Sodium Hypochlorite Tank #1 Sacramento

2015­3E36 1 3/24/2016 02:00pm PST Flooring Removal and Installation at N.A. Chaderjian Youth Correctional Facility, Dept.of Correction

Stockton

2016­09AD 0 3/24/2016 02:00pm PST Elk Grove Center Monument Sign Sacramento

2016­0B1B 1 3/24/2016 02:00pm PST Central Garage Improvements Vacaville

2016­0BAE 3 3/24/2016 02:00pm PST KM Building Automation System California State Prison, Solano Healthcare FacilityImprovements Project

Vacaville

2016­1027 1 3/24/2016 02:00pm PST Mitchell Drive Sidewalk Capital Improvement Project R­76 Saint Helena

2016­108B 0 3/24/2016 02:00pm PST 2015­16 Neighborhood Traffic Management Projects­Phase 1 Sacramento

2016­10B4 1 3/24/2016 02:00pm PST Convert 3 Storage Rooms to 3 Restrooms French Camp

2016­11E3 1 3/24/2016 02:00pm PST R74 – 2015/16 Pavement Rehabilitation St. Helena

2016­12D5 2 3/24/2016 02:00pm PST Montana Neighborhood Park Turlock

2016­12D6 0 3/24/2016 02:00pm PST New Intrusion Alarm Systems At Four Schools (Bohn, Hirsch, Jacobson & Villalovoz) Tracy

2016­1726 0 3/24/2016 02:00pm PST Bldg at 27 N Hunter Sq. Renovation Stockton Courthouse Project Stockton

2016­17AE 1 3/24/2016 02:00pm PST Army Reserve Center Sanitary Sewer Replacement Project Vallejo

2016­17EB 1 3/24/2016 02:00pm PST Super Duty BBQ's for City Parks Sacramento

2016­19F1 0 3/24/2016 02:00pm PST Renovation At Dover K8 Academy Fairfield

2016­1A7F 0 3/24/2016 02:00pm PST Popeye’s ­ Stockton Stockton

2016­1ABA 0 3/24/2016 02:00pm PST Orchard Elementary School Hard Court Improvements Vacaville

2016­12B3 1 3/24/2016 03:00pm PST Morse Watchmans Electronic Key Management System Fairfield

2016­12C5 2 3/24/2016 03:00pm PST Chenoweth Elementary School Sitework Upgrades Merced

2016­176C 0 3/24/2016 04:00pm PST 2016 Fourteen Mile Slough City of Stockton Levee Repair Project Stockton

2016­1BC1 0 3/24/2016 04:00pm PST Bus Maintenance Facility Hart­Ransom Union School District Modesto

2016­0FCF 1 3/24/2016 05:00pm PST SMUD Headquarters Rehabilitation Special Inspection Support Services RFP Sacramento

2016­120C 0 3/24/2016 05:00pm PST Zero Energy Building and Building Deep Energy Retrofit Research and DevelopmentConsulting RFP

Sacramento

2016­12A2 1 3/25/2016 10:00am PST 1144 Grand Avenue Modernization Sacramento

2016­177C 0 3/25/2016 10:00am PST Madison Elementary School ERP Roofing Replacement Stockton

2016­1802 0 3/25/2016 01:00pm PST LED Lithonia Lighting Sacramento

2016­17FE 0 3/25/2016 01:30pm PST Tree Service Project Tuolumne City Sonora

"PRINT FRIENDLY" ACTIVE PROJECT LISTSacramento Valley Region Project Count: 277

Home > My Deskpad > > Print Friendly Project List

ADMIN Home About Us Join News Resources Virtual Plan Room

My Account | Log off

2016­0C4C 0 3/25/2016 02:00pm PST Hoover Elementary School OH Building HVAC Replacement Stockton

2016­1087 1 3/25/2016 02:00pm PST CHP Golden Gate Communications Center – Carpet and Floor Panel Removal andReplacement Services

Vallejo

2016­1178 2 3/25/2016 02:00pm PST Kitchen Remodel Leo A. Palmiter School & Elinor L. Hickey Jr/Sr School Sacramento

2016­12AF 0 3/25/2016 02:00pm PST Pomegranate Ave. Siding & Windows Sacramento

2016­10EA 1 3/25/2016 03:00pm PST Revolving Door Replacement and Door Modification Mcclellan Afb

2016­1145 0 3/25/2016 03:00pm PST Installation of Cold Storage Doors with Construction Tracy

2016­172E 0 3/25/2016 03:00pm PST Measure J Local General Obligation Bond Proposition 39 Bond Performance Audit RFP Sacramento

2016­17AB 0 3/25/2016 05:00pm PST Moe’s Southwest TI Citrus Heights Citrus Heights

2016­178E 0 3/28/2016 02:00pm PST Auto­Body Holt 138 Remodel Stockton

2016­19F3 0 3/28/2016 02:00pm PST Hexavalent Chromium Treatment Systems Project Sacramento

2016­1257 0 3/28/2016 03:30pm PST Sewerline Spot Repair & Lateral Abandonment Services South Lake Tahoe

2016­127A 0 3/29/2016 09:00am PST 2016 Citrus Heights Water District On­Call Pavement Restoration Project Citrus Heights

2016­117C 2 3/29/2016 10:00am PST Building And Energy Efficiency Improvements Special Services Building & PersonalBuilding

Mather

2016­12AD 1 3/29/2016 10:00am PST 3833 Centinella Modernization North Highlands

2016­17FB 0 3/29/2016 11:00am PST Slurry Rock Modesto

2016­1342 0 3/29/2016 01:00pm PST Testing And Special Inspection Services for North Bowl Parking Phase 2 RFQ Merced

2016­1D24 0 3/29/2016 01:00pm PST Regal Collision Repair ­ Vallejo (Sub Bids Only) Vallejo

2016­0F17 0 3/29/2016 02:00pm PST Collaborative Design­Build Services University Union Renovation/Expansion RFQ Turlock

2016­10E7 2 3/29/2016 02:00pm PST North Bay Regional Water Treatment Plant Sludge Lagoon Nos. 2 & 3 Decant StructureImprovements

Fairfield

2016­1138 1 3/29/2016 02:00pm PST HVAC Replacement At Various Sites Modesto/ Westley/Patterson/ Newman/Turlock/ Oakd

2016­1A36 1 3/29/2016 02:00pm PST Downtown Street Improvements Livingston

2016­1B88 1 3/29/2016 02:00pm PST Roof Replacement (5 Residential Buildings in Project 23­01, Merced) Merced

2016­095A 2 3/29/2016 02:30pm PST Electronic Card Reader and Alarm System at 801 11th Street Modesto

2016­1243 0 3/29/2016 03:00pm PST Professional Engineering Services GIS and Hansen Integration RFP Placerville

2016­128A 0 3/29/2016 03:00pm PST Eisenhut Elementary School (3) 24'x40' Relocatable Classrooms Modesto

2016­1C2A 0 3/29/2016 03:00pm PST Walmart Supercenter Expansion # 2030­04 Sonora

2016­0E71 1 3/29/2016 04:00pm PST Landscape Maintenance Services For The Iris Garrett Juvenile Justice Facility Merced

2016­12EE 1 3/29/2016 04:00pm PST Two Rivers Trail (Phase II) Sacramento

2016­107A 2 3/29/2016 05:00pm PST Maintenance and Operation of the Auburn Jail Facility and the South Placer AdultCorrectional Facility RFP

Auburn/ Roseville

2016­1270 2 3/30/2016 10:00am PST Weed And Rubbish Abatement Rocklin

2016­1248 0 3/30/2016 11:00am PST Well 23 GAC Replacement Project Lodi

2016­0606 1 3/30/2016 02:00pm PST Folsom Powerplant UHA Switchgear Replacement Folsom

2016­0ED8 1 3/30/2016 02:00pm PST Shingle Springs Band of Miwok Indians Tribal Administration Building (Sub­Bid) Shingle Springs

2016­1031 1 3/30/2016 02:00pm PST Maintenance and Repair of Curbs, Gutters, Sidewalks, And Related Items Sacramento

2016­1214 1 3/30/2016 02:00pm PST Convention Center Roof Restoration Sacramento

2016­133C 0 3/30/2016 02:00pm PST Jacobson Elementary School Parking Lot Improvements Tracy

2016­1AF9 0 3/30/2016 02:00pm PST Landscape Maintenance Services Freeport Water Treatment Plant Buffer Zone Sacramento

2016­0F5C 0 3/30/2016 03:00pm PST Sylvan Elementary School Modernization Modesto

2016­124A 0 3/30/2016 11:00pm CST 2016 Extruded Traffic Stripes Lodi

2016­0E40 0 3/31/2016 Camino Union School District Pre­Qualification List Camino

2016­1C60 0 3/31/2016 Modesto City Schools Prime / Sub Contractor Prequalification Modesto

2016­12DF 0 3/31/2016 09:00am PST Roofing Project at Fairfield High School ­ F Wing Fairfield

2016­12E4 0 3/31/2016 09:00am PST Roofing Project at Matt Garcia Career & College Center Fairfield

2016­108E 2 3/31/2016 10:00am PST Construction Of The Homewood Bike Trail Homewood

2016­12E9 0 3/31/2016 10:00am PST Mowing Services, City of Patterson Patterson

2016­0511 0 3/31/2016 12:00pm PST Elk Grove Unified School District Pre­Qualification Precedures Elk Grove

2016­10B0 0 3/31/2016 12:00pm PST Folsom Dam Vessel Exclusion Barrier Connectors (Determination to Solicit From ASingle Source)

Folsom

2016­1041 1 3/31/2016 02:00pm PST Crack Seal and Remark Airfield Pavements Lincoln

2016­1172 3 3/31/2016 02:00pm PST Vista del Lago H.S. ­ Stadium Bleachers & Field House Folsom

Page 14: Construction weekly march 25, 2016

14 • Construction Weekly

Projects Out to Bid

2016­0C4C 0 3/25/2016 02:00pm PST Hoover Elementary School OH Building HVAC Replacement Stockton

2016­1087 1 3/25/2016 02:00pm PST CHP Golden Gate Communications Center – Carpet and Floor Panel Removal andReplacement Services

Vallejo

2016­1178 2 3/25/2016 02:00pm PST Kitchen Remodel Leo A. Palmiter School & Elinor L. Hickey Jr/Sr School Sacramento

2016­12AF 0 3/25/2016 02:00pm PST Pomegranate Ave. Siding & Windows Sacramento

2016­10EA 1 3/25/2016 03:00pm PST Revolving Door Replacement and Door Modification Mcclellan Afb

2016­1145 0 3/25/2016 03:00pm PST Installation of Cold Storage Doors with Construction Tracy

2016­172E 0 3/25/2016 03:00pm PST Measure J Local General Obligation Bond Proposition 39 Bond Performance Audit RFP Sacramento

2016­17AB 0 3/25/2016 05:00pm PST Moe’s Southwest TI Citrus Heights Citrus Heights

2016­178E 0 3/28/2016 02:00pm PST Auto­Body Holt 138 Remodel Stockton

2016­19F3 0 3/28/2016 02:00pm PST Hexavalent Chromium Treatment Systems Project Sacramento

2016­1257 0 3/28/2016 03:30pm PST Sewerline Spot Repair & Lateral Abandonment Services South Lake Tahoe

2016­127A 0 3/29/2016 09:00am PST 2016 Citrus Heights Water District On­Call Pavement Restoration Project Citrus Heights

2016­117C 2 3/29/2016 10:00am PST Building And Energy Efficiency Improvements Special Services Building & PersonalBuilding

Mather

2016­12AD 1 3/29/2016 10:00am PST 3833 Centinella Modernization North Highlands

2016­17FB 0 3/29/2016 11:00am PST Slurry Rock Modesto

2016­1342 0 3/29/2016 01:00pm PST Testing And Special Inspection Services for North Bowl Parking Phase 2 RFQ Merced

2016­1D24 0 3/29/2016 01:00pm PST Regal Collision Repair ­ Vallejo (Sub Bids Only) Vallejo

2016­0F17 0 3/29/2016 02:00pm PST Collaborative Design­Build Services University Union Renovation/Expansion RFQ Turlock

2016­10E7 2 3/29/2016 02:00pm PST North Bay Regional Water Treatment Plant Sludge Lagoon Nos. 2 & 3 Decant StructureImprovements

Fairfield

2016­1138 1 3/29/2016 02:00pm PST HVAC Replacement At Various Sites Modesto/ Westley/Patterson/ Newman/Turlock/ Oakd

2016­1A36 1 3/29/2016 02:00pm PST Downtown Street Improvements Livingston

2016­1B88 1 3/29/2016 02:00pm PST Roof Replacement (5 Residential Buildings in Project 23­01, Merced) Merced

2016­095A 2 3/29/2016 02:30pm PST Electronic Card Reader and Alarm System at 801 11th Street Modesto

2016­1243 0 3/29/2016 03:00pm PST Professional Engineering Services GIS and Hansen Integration RFP Placerville

2016­128A 0 3/29/2016 03:00pm PST Eisenhut Elementary School (3) 24'x40' Relocatable Classrooms Modesto

2016­1C2A 0 3/29/2016 03:00pm PST Walmart Supercenter Expansion # 2030­04 Sonora

2016­0E71 1 3/29/2016 04:00pm PST Landscape Maintenance Services For The Iris Garrett Juvenile Justice Facility Merced

2016­12EE 1 3/29/2016 04:00pm PST Two Rivers Trail (Phase II) Sacramento

2016­107A 2 3/29/2016 05:00pm PST Maintenance and Operation of the Auburn Jail Facility and the South Placer AdultCorrectional Facility RFP

Auburn/ Roseville

2016­1270 2 3/30/2016 10:00am PST Weed And Rubbish Abatement Rocklin

2016­1248 0 3/30/2016 11:00am PST Well 23 GAC Replacement Project Lodi

2016­0606 1 3/30/2016 02:00pm PST Folsom Powerplant UHA Switchgear Replacement Folsom

2016­0ED8 1 3/30/2016 02:00pm PST Shingle Springs Band of Miwok Indians Tribal Administration Building (Sub­Bid) Shingle Springs

2016­1031 1 3/30/2016 02:00pm PST Maintenance and Repair of Curbs, Gutters, Sidewalks, And Related Items Sacramento

2016­1214 1 3/30/2016 02:00pm PST Convention Center Roof Restoration Sacramento

2016­133C 0 3/30/2016 02:00pm PST Jacobson Elementary School Parking Lot Improvements Tracy

2016­1AF9 0 3/30/2016 02:00pm PST Landscape Maintenance Services Freeport Water Treatment Plant Buffer Zone Sacramento

2016­0F5C 0 3/30/2016 03:00pm PST Sylvan Elementary School Modernization Modesto

2016­124A 0 3/30/2016 11:00pm CST 2016 Extruded Traffic Stripes Lodi

2016­0E40 0 3/31/2016 Camino Union School District Pre­Qualification List Camino

2016­1C60 0 3/31/2016 Modesto City Schools Prime / Sub Contractor Prequalification Modesto

2016­12DF 0 3/31/2016 09:00am PST Roofing Project at Fairfield High School ­ F Wing Fairfield

2016­12E4 0 3/31/2016 09:00am PST Roofing Project at Matt Garcia Career & College Center Fairfield

2016­108E 2 3/31/2016 10:00am PST Construction Of The Homewood Bike Trail Homewood

2016­12E9 0 3/31/2016 10:00am PST Mowing Services, City of Patterson Patterson

2016­0511 0 3/31/2016 12:00pm PST Elk Grove Unified School District Pre­Qualification Precedures Elk Grove

2016­10B0 0 3/31/2016 12:00pm PST Folsom Dam Vessel Exclusion Barrier Connectors (Determination to Solicit From ASingle Source)

Folsom

2016­1041 1 3/31/2016 02:00pm PST Crack Seal and Remark Airfield Pavements Lincoln

2016­1172 3 3/31/2016 02:00pm PST Vista del Lago H.S. ­ Stadium Bleachers & Field House Folsom

2016­123F 0 3/31/2016 02:00pm PST Historic Folsom Station Modifications for UTDC Vehicles Folsom

2016­1279 0 3/31/2016 02:00pm PST Shropshire, Seabreeze And Weston Greenbelt Re­Wiring Stockton

2016­1744 0 3/31/2016 02:00pm PST Site Paving At Mark Twain Jr. High School And Marshall Elementary School Modesto

2016­180B 0 3/31/2016 02:00pm PST Williams Middle School Parking Lot Improvements Tracy

2016­1851 1 3/31/2016 02:00pm PST Meritage Commons ­ Napa Napa

2016­1A64 0 3/31/2016 02:00pm PST Vacaville High School New Modular Two­Story Classroom Building Vacaville

2016­1BC5 1 3/31/2016 02:00pm PST Measure U Concrete Improvements ­ Belle Cooledge Park Sacramento

2016­1BC8 0 3/31/2016 02:00pm PST Measure U Concrete Improvements ­ Cabrillo Park Sacramento

2016­1BC9 0 3/31/2016 02:00pm PST Measure U Concrete Improvements ­ Cottonwood Park Sacramento

2016­043E 0 3/31/2016 03:00pm PST Electric Substation and Radio Tower Co­Location Feasibility Report RFP Roseville

2016­12C9 0 3/31/2016 03:00pm PST Highway Landscaping Maintenance Services For Suisun Parkway And Old TownCordelia

Fairfield

2016­1763 0 3/31/2016 03:00pm PST Site Paving At Sonoma And El Vista Elementary Schools Modesto

2016­1B95 0 3/31/2016 03:00pm PST Wireless Access Points Upgrades at 5 HS’s: Casa Roble HS, Bella Vista HS, DelCampo HS, San Juan HS, & Mesa Verde HS

Sacramento

2016­0F57 0 3/31/2016 04:00pm PST Landscape Maintenance Services For Mental Health And Public Health Facilities Merced

2016­10E8 0 3/31/2016 05:00pm PST Golden West Community Services District Road Construction/Maintenance ContractorsPrequalification

El Dorado

2016­17B2 0 3/31/2016 05:00pm PST Planning Services For the City of Livingston RFP Livingston

2016­19EE 0 3/31/2016 05:00pm PST Placerville Union School District Pre­Qualification List Placerville

2016­1A83 0 3/31/2016 10:00pm PST Willow Hill Pipeline Rehabilitation Project Phase 2 Folsom

2016­19F7 0 4/1/2016 10:00am PST Asphalt Sealing at Various School Sites Fairfield

2016­19F5 0 4/1/2016 11:00am PST Asphalt Project at Fairfield High School Fairfield

2016­12CF 1 4/1/2016 02:00pm PST Firewall Appliances E­Rate Yr 19 (2016­2017) Carmichael/ CitrusHeights/ Gold River/Sacramento

2016­1A88 0 4/1/2016 02:00pm PST Cold Springs Road At Mount Shasta Lane Realignment Placerville

2016­1812 0 4/1/2016 03:00pm PST Bonita And Hunt Exterior Painting Project Newman / CrowsLanding

2016­1B01 0 4/1/2016 03:00pm PST On­Call Gardening and Landscape Maintenance Services Placerville

2016­1C17 0 4/1/2016 04:00pm PST The Eye Center (Prequalification) Sacramento

2016­1857 0 4/1/2016 04:30pm PST Fell 14 Hazard Trees, Treat Stumps, and Remove all Slash and Debris From Site Foresthill

2016­021D 0 4/1/2016 05:00pm PST Truck Terminal Project Rocklin

2016­124C 0 4/3/2016 05:00pm PST Apartment Complex 2215 Q Street (No GC Openings) Sacramento

2016­1818 1 4/4/2016 11:00am PST Building 200 Kitchen Renovation Project Fairfield

2016­1273 1 4/4/2016 01:00pm PST Asphalt Project to Renovate Parking Lots Modesto

2016­12FB 0 4/4/2016 03:00pm PST Roseville Fire Station Landscape Assessment and Upgrades ­ Landscape ArchitecturalServices RFP

Roseville

2016­1A24 2 4/4/2016 03:00pm PST Fire Sprinklers And Suppression System Inspection And Repair And MaintenanceServices Of City of Turlock Buildings

Turlock

2016­1BBB 0 4/4/2016 03:00pm PST McSwain USD – Mechanical and Electrical Upgrades Merced

2016­1ACE 0 4/5/2016 09:00am PST Mariposa Avenue 12­Inch Water Main Replacement Project Citrus Heights

2016­12ED 0 4/5/2016 10:00am PST Howe Avenue Air­Release Valve Relocation Sacramento

2016­1825 1 4/5/2016 10:00am PST Edison High School ERP Roof Replacement Stockton

2016­1314 0 4/5/2016 11:00am PST Digester Cleaning Services Modesto

2016­1317 0 4/5/2016 11:00am PST Contractor Services For Airport Hangar Roofing Replacement Modesto

2016­1B78 0 4/5/2016 11:00am PST Site Lighting Improvements Project Fairfield

2016­1CEB 0 4/5/2016 01:30pm PST Oakmont High School Track Improvements Roseville

2016­0E4A 0 4/5/2016 02:00pm PST Category 2 Components Internal Connections RFP Georgetown

2016­105A 0 4/5/2016 02:00pm PST Asphalt, Hot and Cold mix for Eldorado National Forest El Dorado NF

2016­114E 0 4/5/2016 02:00pm PST Pleasant Hills Water Treatment Plant Vacaville

2016­11C7 0 4/5/2016 02:00pm PST Anatolia II Elementary School Rancho Cordova

2016­125D 0 4/5/2016 02:00pm PST First Street Reconstruction Project ­ Phase 2 Escalon

2016­12CA 0 4/5/2016 02:00pm PST Pool Deck Repair Project Fairfield

2016­17D5 0 4/5/2016 02:00pm PST Riverbank High School Walk­In Refrigerator Riverbank

2016­1AAE 0 4/5/2016 02:00pm PST AT&T Conduit Installation Project Fairfield

2016­1BE4 0 4/5/2016 02:00pm PST Littlejohn Portable Fair Oaks

Page 15: Construction weekly march 25, 2016

Construction Weekly • 15

Projects Out to Bid

2016­123F 0 3/31/2016 02:00pm PST Historic Folsom Station Modifications for UTDC Vehicles Folsom

2016­1279 0 3/31/2016 02:00pm PST Shropshire, Seabreeze And Weston Greenbelt Re­Wiring Stockton

2016­1744 0 3/31/2016 02:00pm PST Site Paving At Mark Twain Jr. High School And Marshall Elementary School Modesto

2016­180B 0 3/31/2016 02:00pm PST Williams Middle School Parking Lot Improvements Tracy

2016­1851 1 3/31/2016 02:00pm PST Meritage Commons ­ Napa Napa

2016­1A64 0 3/31/2016 02:00pm PST Vacaville High School New Modular Two­Story Classroom Building Vacaville

2016­1BC5 1 3/31/2016 02:00pm PST Measure U Concrete Improvements ­ Belle Cooledge Park Sacramento

2016­1BC8 0 3/31/2016 02:00pm PST Measure U Concrete Improvements ­ Cabrillo Park Sacramento

2016­1BC9 0 3/31/2016 02:00pm PST Measure U Concrete Improvements ­ Cottonwood Park Sacramento

2016­043E 0 3/31/2016 03:00pm PST Electric Substation and Radio Tower Co­Location Feasibility Report RFP Roseville

2016­12C9 0 3/31/2016 03:00pm PST Highway Landscaping Maintenance Services For Suisun Parkway And Old TownCordelia

Fairfield

2016­1763 0 3/31/2016 03:00pm PST Site Paving At Sonoma And El Vista Elementary Schools Modesto

2016­1B95 0 3/31/2016 03:00pm PST Wireless Access Points Upgrades at 5 HS’s: Casa Roble HS, Bella Vista HS, DelCampo HS, San Juan HS, & Mesa Verde HS

Sacramento

2016­0F57 0 3/31/2016 04:00pm PST Landscape Maintenance Services For Mental Health And Public Health Facilities Merced

2016­10E8 0 3/31/2016 05:00pm PST Golden West Community Services District Road Construction/Maintenance ContractorsPrequalification

El Dorado

2016­17B2 0 3/31/2016 05:00pm PST Planning Services For the City of Livingston RFP Livingston

2016­19EE 0 3/31/2016 05:00pm PST Placerville Union School District Pre­Qualification List Placerville

2016­1A83 0 3/31/2016 10:00pm PST Willow Hill Pipeline Rehabilitation Project Phase 2 Folsom

2016­19F7 0 4/1/2016 10:00am PST Asphalt Sealing at Various School Sites Fairfield

2016­19F5 0 4/1/2016 11:00am PST Asphalt Project at Fairfield High School Fairfield

2016­12CF 1 4/1/2016 02:00pm PST Firewall Appliances E­Rate Yr 19 (2016­2017) Carmichael/ CitrusHeights/ Gold River/Sacramento

2016­1A88 0 4/1/2016 02:00pm PST Cold Springs Road At Mount Shasta Lane Realignment Placerville

2016­1812 0 4/1/2016 03:00pm PST Bonita And Hunt Exterior Painting Project Newman / CrowsLanding

2016­1B01 0 4/1/2016 03:00pm PST On­Call Gardening and Landscape Maintenance Services Placerville

2016­1C17 0 4/1/2016 04:00pm PST The Eye Center (Prequalification) Sacramento

2016­1857 0 4/1/2016 04:30pm PST Fell 14 Hazard Trees, Treat Stumps, and Remove all Slash and Debris From Site Foresthill

2016­021D 0 4/1/2016 05:00pm PST Truck Terminal Project Rocklin

2016­124C 0 4/3/2016 05:00pm PST Apartment Complex 2215 Q Street (No GC Openings) Sacramento

2016­1818 1 4/4/2016 11:00am PST Building 200 Kitchen Renovation Project Fairfield

2016­1273 1 4/4/2016 01:00pm PST Asphalt Project to Renovate Parking Lots Modesto

2016­12FB 0 4/4/2016 03:00pm PST Roseville Fire Station Landscape Assessment and Upgrades ­ Landscape ArchitecturalServices RFP

Roseville

2016­1A24 2 4/4/2016 03:00pm PST Fire Sprinklers And Suppression System Inspection And Repair And MaintenanceServices Of City of Turlock Buildings

Turlock

2016­1BBB 0 4/4/2016 03:00pm PST McSwain USD – Mechanical and Electrical Upgrades Merced

2016­1ACE 0 4/5/2016 09:00am PST Mariposa Avenue 12­Inch Water Main Replacement Project Citrus Heights

2016­12ED 0 4/5/2016 10:00am PST Howe Avenue Air­Release Valve Relocation Sacramento

2016­1825 1 4/5/2016 10:00am PST Edison High School ERP Roof Replacement Stockton

2016­1314 0 4/5/2016 11:00am PST Digester Cleaning Services Modesto

2016­1317 0 4/5/2016 11:00am PST Contractor Services For Airport Hangar Roofing Replacement Modesto

2016­1B78 0 4/5/2016 11:00am PST Site Lighting Improvements Project Fairfield

2016­1CEB 0 4/5/2016 01:30pm PST Oakmont High School Track Improvements Roseville

2016­0E4A 0 4/5/2016 02:00pm PST Category 2 Components Internal Connections RFP Georgetown

2016­105A 0 4/5/2016 02:00pm PST Asphalt, Hot and Cold mix for Eldorado National Forest El Dorado NF

2016­114E 0 4/5/2016 02:00pm PST Pleasant Hills Water Treatment Plant Vacaville

2016­11C7 0 4/5/2016 02:00pm PST Anatolia II Elementary School Rancho Cordova

2016­125D 0 4/5/2016 02:00pm PST First Street Reconstruction Project ­ Phase 2 Escalon

2016­12CA 0 4/5/2016 02:00pm PST Pool Deck Repair Project Fairfield

2016­17D5 0 4/5/2016 02:00pm PST Riverbank High School Walk­In Refrigerator Riverbank

2016­1AAE 0 4/5/2016 02:00pm PST AT&T Conduit Installation Project Fairfield

2016­1BE4 0 4/5/2016 02:00pm PST Littlejohn Portable Fair Oaks

2016­1CD0 0 4/5/2016 02:00pm PST CA ISO Lincoln Operations Center ­ BP 5 Masonry (Sub Bids Only) Lincoln

2016­1CED 0 4/5/2016 02:00pm PST Woodcreek High School Protective Netting Roseville

2016­1BE6 0 4/5/2016 02:30pm PST Littlejohn Slope Repair Fair Oaks

2016­1791 1 4/5/2016 03:00pm PST New Portable Buildings Project At Farmdale Elementary Merced

2016­17BB 0 4/5/2016 03:00pm PST Exterior Painting At California Avenue Elementary School Riverbank

2016­19F0 0 4/5/2016 03:00pm PST Asphalt Repair Project Fairfield

2016­1AF2 0 4/5/2016 04:00pm PST Replace Existing Ceiling Tiles Atwater

2016­1284 0 4/6/2016 02:00am PST 2016 Placerville Herbs Camino

2016­1C72 0 4/6/2016 10:00am PST Sierra Joint Community College District Path of Travel Improvements & Flatwork ­Rocklin Campus

Rocklin

2016­1A8C 1 4/6/2016 11:00am PST Lodi Bus Wash Improvements Lodi

2016­1060 0 4/6/2016 11:30am PST Liquid Asphalt Emulsion & Oil for Chipping for ElDorado & Stanislaus National Forest El Dorado & StanislausNational Forest

2016­1CFA 0 4/6/2016 01:00pm PST Plymouth Elementary School 2016 Paving Plymouth

2016­1CF4 0 4/6/2016 01:30pm PST 2016 Roofing Projects Amador County USD Jackson

2016­107E 0 4/6/2016 02:00pm PST Aggregate & Chips for Road Improvement, for El Dorado & Stanislaus National Forest El Dorado & StanislausNational Forest

2016­1206 2 4/6/2016 02:00pm PST Expansion Of The Public Safety Center First Responder Distributed Antenna SystemRFQ/P

Modesto

2016­135C 0 4/6/2016 02:00pm PST Fencing Summer 2016 At Ralph Richardson & Starr King Projects Carmichael

2016­1753 0 4/6/2016 02:00pm PST CADOT 10­1C9904 Rubberized­HMA Resurfacing, Repair Failed Areas, ReplaceGuardrail

San Joaquin County

2016­17B3 1 4/6/2016 02:00pm PST Fire Alarm Inspection, Certification and Preventative Maintenance Sacramento

2016­1A22 0 4/6/2016 02:00pm PST J St. 33rd Street Sewer Easement Abandonment Sacramento

2016­1A38 0 4/6/2016 02:00pm PST 2nd ­ 3rd Avenue Sewer Replacement, Alhambra Blvd to 33rd Street Sacramento

2016­1A3A 0 4/6/2016 02:00pm PST Water System Security Surveillance System Sacramento

2016­1BCB 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Chorley Park Sacramento

2016­1BCC 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Garcia Bend Park Sacramento

2016­1BCE 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Hagginwood Park Sacramento

2016­1E07 0 4/6/2016 02:00pm PST Landscape Maintenance Services Basin # 5 Sacramento

2016­1D66 0 4/6/2016 04:00pm PST Pedestrian and ADA Improvements to Colfax Transit Center Project (East Oak StreetSidewalk Improvements)

Colfax

2016­1D7B 0 4/7/2016 10:00am PST District Wide Seismic Valve Project Stockton

2016­1CD1 0 4/7/2016 11:00am PST Madison ES ERP Parking Lot Improvements Stockton

2016­1A81 0 4/7/2016 01:30pm PST New York Ranch Road/Ridge Intersection Improvement Project Sutter Creek

2016­1AFB 0 4/7/2016 01:30pm PST Slurry Seal Local Roads 2015­2016 Stockton

2016­0F78 0 4/7/2016 02:00pm PST Mohr Hall Chiller Replacement Sacramento

2016­135B 0 4/7/2016 02:00pm PST CHP Modesto, Mariposa and Merced Area Roof Maintenance/Repairs Modesto, Mariposa andMerced

2016­1781 0 4/7/2016 02:00pm PST Music Building & Classroom Replacement ­ Natomas USD Sacramento

2016­181E 0 4/7/2016 02:00pm PST 2014 Sanitary Sewer Rehabilitation Project ­ Phase 1 Stockton

2016­19F2 0 4/7/2016 02:00pm PST Harry Dewey Fundamental Elementary School and Mariemont Elementary SchoolKitchen Upgrades

Sacramento / Fair Oaks

2016­1A1D 0 4/7/2016 02:00pm PST 2016 Accessibility & Drainage Improvement Project Citrus Heights

2016­1B04 0 4/7/2016 02:00pm PST Sewer & Water Main Replacement In Alley Between 21 St ­ 22 nd & W­U Street Merced

2016­1B70 0 4/7/2016 02:00pm PST CADOT 10­1E0004 Rubberized Hot Mix Asphalt Resurfacing Stanislaus County

2016­1B9E 0 4/7/2016 02:00pm PST Patterson Migrant Center Improvements Westley

2016­1BB3 0 4/7/2016 02:00pm PST Westley Migrant Center Improvements Westley

2016­1BB5 0 4/7/2016 02:00pm PST Westley Migrant Center (RD) Improvement Westley

2016­1BB8 0 4/7/2016 02:00pm PST Empire Migrant Center Improvements Westley

2016­1C1A 0 4/7/2016 02:00pm PST Sierra College Boulevard/I80 Interchange Planting and Irrigation Project Rocklin

2016­110E 0 4/7/2016 03:00pm PST Dolly Varden Water Main Replacement Project Tahoe Vista

2016­1816 0 4/7/2016 03:00pm PST Audio Visual System Upgrade To The Emergency Operations Center (EOC) Fairfield

2016­1B31 0 4/7/2016 03:00pm PST Water System Improvements for Domestic Water System at the Westley MigrantCenter

Westley

2016­1BB4 0 4/7/2016 03:00pm PST Engineering Design & Construction Services for Rehabilitation of Wastewater Facilitiesat the Westley Migrant Center

Westley

Page 16: Construction weekly march 25, 2016

16 • Construction Weekly

Projects Out to Bid

2016­1CD0 0 4/5/2016 02:00pm PST CA ISO Lincoln Operations Center ­ BP 5 Masonry (Sub Bids Only) Lincoln

2016­1CED 0 4/5/2016 02:00pm PST Woodcreek High School Protective Netting Roseville

2016­1BE6 0 4/5/2016 02:30pm PST Littlejohn Slope Repair Fair Oaks

2016­1791 1 4/5/2016 03:00pm PST New Portable Buildings Project At Farmdale Elementary Merced

2016­17BB 0 4/5/2016 03:00pm PST Exterior Painting At California Avenue Elementary School Riverbank

2016­19F0 0 4/5/2016 03:00pm PST Asphalt Repair Project Fairfield

2016­1AF2 0 4/5/2016 04:00pm PST Replace Existing Ceiling Tiles Atwater

2016­1284 0 4/6/2016 02:00am PST 2016 Placerville Herbs Camino

2016­1C72 0 4/6/2016 10:00am PST Sierra Joint Community College District Path of Travel Improvements & Flatwork ­Rocklin Campus

Rocklin

2016­1A8C 1 4/6/2016 11:00am PST Lodi Bus Wash Improvements Lodi

2016­1060 0 4/6/2016 11:30am PST Liquid Asphalt Emulsion & Oil for Chipping for ElDorado & Stanislaus National Forest El Dorado & StanislausNational Forest

2016­1CFA 0 4/6/2016 01:00pm PST Plymouth Elementary School 2016 Paving Plymouth

2016­1CF4 0 4/6/2016 01:30pm PST 2016 Roofing Projects Amador County USD Jackson

2016­107E 0 4/6/2016 02:00pm PST Aggregate & Chips for Road Improvement, for El Dorado & Stanislaus National Forest El Dorado & StanislausNational Forest

2016­1206 2 4/6/2016 02:00pm PST Expansion Of The Public Safety Center First Responder Distributed Antenna SystemRFQ/P

Modesto

2016­135C 0 4/6/2016 02:00pm PST Fencing Summer 2016 At Ralph Richardson & Starr King Projects Carmichael

2016­1753 0 4/6/2016 02:00pm PST CADOT 10­1C9904 Rubberized­HMA Resurfacing, Repair Failed Areas, ReplaceGuardrail

San Joaquin County

2016­17B3 1 4/6/2016 02:00pm PST Fire Alarm Inspection, Certification and Preventative Maintenance Sacramento

2016­1A22 0 4/6/2016 02:00pm PST J St. 33rd Street Sewer Easement Abandonment Sacramento

2016­1A38 0 4/6/2016 02:00pm PST 2nd ­ 3rd Avenue Sewer Replacement, Alhambra Blvd to 33rd Street Sacramento

2016­1A3A 0 4/6/2016 02:00pm PST Water System Security Surveillance System Sacramento

2016­1BCB 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Chorley Park Sacramento

2016­1BCC 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Garcia Bend Park Sacramento

2016­1BCE 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Hagginwood Park Sacramento

2016­1E07 0 4/6/2016 02:00pm PST Landscape Maintenance Services Basin # 5 Sacramento

2016­1D66 0 4/6/2016 04:00pm PST Pedestrian and ADA Improvements to Colfax Transit Center Project (East Oak StreetSidewalk Improvements)

Colfax

2016­1D7B 0 4/7/2016 10:00am PST District Wide Seismic Valve Project Stockton

2016­1CD1 0 4/7/2016 11:00am PST Madison ES ERP Parking Lot Improvements Stockton

2016­1A81 0 4/7/2016 01:30pm PST New York Ranch Road/Ridge Intersection Improvement Project Sutter Creek

2016­1AFB 0 4/7/2016 01:30pm PST Slurry Seal Local Roads 2015­2016 Stockton

2016­0F78 0 4/7/2016 02:00pm PST Mohr Hall Chiller Replacement Sacramento

2016­135B 0 4/7/2016 02:00pm PST CHP Modesto, Mariposa and Merced Area Roof Maintenance/Repairs Modesto, Mariposa andMerced

2016­1781 0 4/7/2016 02:00pm PST Music Building & Classroom Replacement ­ Natomas USD Sacramento

2016­181E 0 4/7/2016 02:00pm PST 2014 Sanitary Sewer Rehabilitation Project ­ Phase 1 Stockton

2016­19F2 0 4/7/2016 02:00pm PST Harry Dewey Fundamental Elementary School and Mariemont Elementary SchoolKitchen Upgrades

Sacramento / Fair Oaks

2016­1A1D 0 4/7/2016 02:00pm PST 2016 Accessibility & Drainage Improvement Project Citrus Heights

2016­1B04 0 4/7/2016 02:00pm PST Sewer & Water Main Replacement In Alley Between 21 St ­ 22 nd & W­U Street Merced

2016­1B70 0 4/7/2016 02:00pm PST CADOT 10­1E0004 Rubberized Hot Mix Asphalt Resurfacing Stanislaus County

2016­1B9E 0 4/7/2016 02:00pm PST Patterson Migrant Center Improvements Westley

2016­1BB3 0 4/7/2016 02:00pm PST Westley Migrant Center Improvements Westley

2016­1BB5 0 4/7/2016 02:00pm PST Westley Migrant Center (RD) Improvement Westley

2016­1BB8 0 4/7/2016 02:00pm PST Empire Migrant Center Improvements Westley

2016­1C1A 0 4/7/2016 02:00pm PST Sierra College Boulevard/I80 Interchange Planting and Irrigation Project Rocklin

2016­110E 0 4/7/2016 03:00pm PST Dolly Varden Water Main Replacement Project Tahoe Vista

2016­1816 0 4/7/2016 03:00pm PST Audio Visual System Upgrade To The Emergency Operations Center (EOC) Fairfield

2016­1B31 0 4/7/2016 03:00pm PST Water System Improvements for Domestic Water System at the Westley MigrantCenter

Westley

2016­1BB4 0 4/7/2016 03:00pm PST Engineering Design & Construction Services for Rehabilitation of Wastewater Facilitiesat the Westley Migrant Center

Westley

Page 17: Construction weekly march 25, 2016

Construction Weekly •17

Projects Out to Bid

2016­1CD0 0 4/5/2016 02:00pm PST CA ISO Lincoln Operations Center ­ BP 5 Masonry (Sub Bids Only) Lincoln

2016­1CED 0 4/5/2016 02:00pm PST Woodcreek High School Protective Netting Roseville

2016­1BE6 0 4/5/2016 02:30pm PST Littlejohn Slope Repair Fair Oaks

2016­1791 1 4/5/2016 03:00pm PST New Portable Buildings Project At Farmdale Elementary Merced

2016­17BB 0 4/5/2016 03:00pm PST Exterior Painting At California Avenue Elementary School Riverbank

2016­19F0 0 4/5/2016 03:00pm PST Asphalt Repair Project Fairfield

2016­1AF2 0 4/5/2016 04:00pm PST Replace Existing Ceiling Tiles Atwater

2016­1284 0 4/6/2016 02:00am PST 2016 Placerville Herbs Camino

2016­1C72 0 4/6/2016 10:00am PST Sierra Joint Community College District Path of Travel Improvements & Flatwork ­Rocklin Campus

Rocklin

2016­1A8C 1 4/6/2016 11:00am PST Lodi Bus Wash Improvements Lodi

2016­1060 0 4/6/2016 11:30am PST Liquid Asphalt Emulsion & Oil for Chipping for ElDorado & Stanislaus National Forest El Dorado & StanislausNational Forest

2016­1CFA 0 4/6/2016 01:00pm PST Plymouth Elementary School 2016 Paving Plymouth

2016­1CF4 0 4/6/2016 01:30pm PST 2016 Roofing Projects Amador County USD Jackson

2016­107E 0 4/6/2016 02:00pm PST Aggregate & Chips for Road Improvement, for El Dorado & Stanislaus National Forest El Dorado & StanislausNational Forest

2016­1206 2 4/6/2016 02:00pm PST Expansion Of The Public Safety Center First Responder Distributed Antenna SystemRFQ/P

Modesto

2016­135C 0 4/6/2016 02:00pm PST Fencing Summer 2016 At Ralph Richardson & Starr King Projects Carmichael

2016­1753 0 4/6/2016 02:00pm PST CADOT 10­1C9904 Rubberized­HMA Resurfacing, Repair Failed Areas, ReplaceGuardrail

San Joaquin County

2016­17B3 1 4/6/2016 02:00pm PST Fire Alarm Inspection, Certification and Preventative Maintenance Sacramento

2016­1A22 0 4/6/2016 02:00pm PST J St. 33rd Street Sewer Easement Abandonment Sacramento

2016­1A38 0 4/6/2016 02:00pm PST 2nd ­ 3rd Avenue Sewer Replacement, Alhambra Blvd to 33rd Street Sacramento

2016­1A3A 0 4/6/2016 02:00pm PST Water System Security Surveillance System Sacramento

2016­1BCB 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Chorley Park Sacramento

2016­1BCC 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Garcia Bend Park Sacramento

2016­1BCE 0 4/6/2016 02:00pm PST Measure U Concrete Improvements ­ Hagginwood Park Sacramento

2016­1E07 0 4/6/2016 02:00pm PST Landscape Maintenance Services Basin # 5 Sacramento

2016­1D66 0 4/6/2016 04:00pm PST Pedestrian and ADA Improvements to Colfax Transit Center Project (East Oak StreetSidewalk Improvements)

Colfax

2016­1D7B 0 4/7/2016 10:00am PST District Wide Seismic Valve Project Stockton

2016­1CD1 0 4/7/2016 11:00am PST Madison ES ERP Parking Lot Improvements Stockton

2016­1A81 0 4/7/2016 01:30pm PST New York Ranch Road/Ridge Intersection Improvement Project Sutter Creek

2016­1AFB 0 4/7/2016 01:30pm PST Slurry Seal Local Roads 2015­2016 Stockton

2016­0F78 0 4/7/2016 02:00pm PST Mohr Hall Chiller Replacement Sacramento

2016­135B 0 4/7/2016 02:00pm PST CHP Modesto, Mariposa and Merced Area Roof Maintenance/Repairs Modesto, Mariposa andMerced

2016­1781 0 4/7/2016 02:00pm PST Music Building & Classroom Replacement ­ Natomas USD Sacramento

2016­181E 0 4/7/2016 02:00pm PST 2014 Sanitary Sewer Rehabilitation Project ­ Phase 1 Stockton

2016­19F2 0 4/7/2016 02:00pm PST Harry Dewey Fundamental Elementary School and Mariemont Elementary SchoolKitchen Upgrades

Sacramento / Fair Oaks

2016­1A1D 0 4/7/2016 02:00pm PST 2016 Accessibility & Drainage Improvement Project Citrus Heights

2016­1B04 0 4/7/2016 02:00pm PST Sewer & Water Main Replacement In Alley Between 21 St ­ 22 nd & W­U Street Merced

2016­1B70 0 4/7/2016 02:00pm PST CADOT 10­1E0004 Rubberized Hot Mix Asphalt Resurfacing Stanislaus County

2016­1B9E 0 4/7/2016 02:00pm PST Patterson Migrant Center Improvements Westley

2016­1BB3 0 4/7/2016 02:00pm PST Westley Migrant Center Improvements Westley

2016­1BB5 0 4/7/2016 02:00pm PST Westley Migrant Center (RD) Improvement Westley

2016­1BB8 0 4/7/2016 02:00pm PST Empire Migrant Center Improvements Westley

2016­1C1A 0 4/7/2016 02:00pm PST Sierra College Boulevard/I80 Interchange Planting and Irrigation Project Rocklin

2016­110E 0 4/7/2016 03:00pm PST Dolly Varden Water Main Replacement Project Tahoe Vista

2016­1816 0 4/7/2016 03:00pm PST Audio Visual System Upgrade To The Emergency Operations Center (EOC) Fairfield

2016­1B31 0 4/7/2016 03:00pm PST Water System Improvements for Domestic Water System at the Westley MigrantCenter

Westley

2016­1BB4 0 4/7/2016 03:00pm PST Engineering Design & Construction Services for Rehabilitation of Wastewater Facilitiesat the Westley Migrant Center

Westley

2016­1813 0 4/7/2016 05:00pm PST HVAC Systems Preventative Maintenance Auburn

2016­1290 0 4/8/2016 02:00pm PST Folsom Phase 5 Streetscape Enhancement Project RFQ Rancho Cordova

2016­1213 2 4/8/2016 03:00pm PST The Rio Cosumnes Correctional Center Expansion & Infrastructure Project(Prequalification For GC)

Elk Grove

2016­1224 1 4/8/2016 03:00pm PST The Rio Cosumnes Correctional Center Expansion & Infrastructure Project(Prequalification For Detention Equipment Contractors)

Elk Grove

2016­1226 1 4/8/2016 03:00pm PST The Rio Cosumnes Correctional Center Expansion & Infrastructure Project(Prequalification For Security System Integrators)

Elk Grove

2016­1BF9 0 4/11/2016 02:00pm PST 3661 4th Ave. Interior Rehab Sacramento

2016­1E08 0 4/11/2016 02:00pm PST Prop 39, Year Three, Exterior Lighting Project for South Campus at Mountain Houseand Manteca Centers

Stockton

2016­1C11 0 4/11/2016 03:00pm PST Steel Substation Structure RFQ Roseville

2016­1B92 0 4/12/2016 09:00am PST Dry Rot Repair At Dan O Root II Elementary Fairfield

2016­11C0 1 4/12/2016 11:00am PST Landscape Maintenance Services RFP Modesto

2016­1C19 0 4/12/2016 11:00am PST Hospital Seismic Upgrade ­ Increment 2 Fire and Life/Safety Upgrades Sacramento

2016­116D 0 4/12/2016 01:00pm PST Supervisory Control and Data Acquisition (SCADA) Computer System Maintenanceand Repair Services (Rebid)

Stockton

2016­1358 0 4/12/2016 02:00pm CST Westlake K­8 Charter School Sacramento

2016­1A1B 0 4/12/2016 02:00pm PST ACP Lining Project No. 1B Napa

2016­1AF3 0 4/12/2016 02:00pm PST Water Efficient Fixture Replacement at Hot Creek Fish Hatchery, Mono County Mammoth Lakes

2016­1AF7 0 4/12/2016 02:00pm PST Primary Clarifier #1 and Headworks Rehabilitation Fairfield

2016­1B08 0 4/12/2016 02:00pm PST Mariposa Elementary School (Library & Kindergarten Building) & Mariposa High School(Auditorium Building) Reroofing Project

Mariposa

2016­1B72 0 4/12/2016 02:00pm PST Highway 12/Gardiner Way Lighted Crosswalk Rio Vista

2016­1D29 0 4/12/2016 02:15pm PST CADOT 22A0803 Countertop Removal and Installation Sacramento

2016­1192 0 4/12/2016 02:30pm PST Preventative Maintenance and Unscheduled Repair Services for Multiple Roll­UpDoors/Sliding Gates, and Provide Annual Drop Test Certifications for Fou

Sacramento

2016­1A8A 0 4/12/2016 03:00pm PST Data And Voice Cabling Services Placerville

2016­1C0E 1 4/12/2016 03:00pm PST Roseville Road Improvement Project Roseville

2016­1A43 0 4/13/2016 10:00am PST Administration Building Modernization Sybil N. Crookham Elementary School Winton

2016­17AA 1 4/13/2016 02:00pm PST Inmate Video Visitation System Solution For The Stanislaus County Safety CenterExpansion Project RFP

Modesto

2016­1BE1 0 4/13/2016 02:00pm PST Central Enrollment – Garfield Modernization Carmichael

2016­1C45 0 4/13/2016 02:00pm PST Williams Middle School New Floor Coverings Tracy

2016­1C4A 0 4/13/2016 02:00pm PST Measure U Concrete Improvements ­ McKinley Park Sacramento

2016­1C4B 0 4/13/2016 02:00pm PST Measure U Concrete Improvement ­ Tahoe Park Sacramento

2016­1BE7 0 4/14/2016 10:00am PST Thomas Kelly and Sierra Oaks ES CSR Temp Projects Sacramento/Carmichael

2016­1A80 0 4/14/2016 01:30pm PST Professional Airport Consulting Services (Engineering, Environmental,Project/Construction Management and Inspection) RFQ

Jackson

2016­1D51 0 4/14/2016 01:30pm PST Walnut Grove Road Resurfacing (Sacramento County Line to New Hope Bridge) Lodi

2016­1D54 0 4/14/2016 01:30pm PST Thornton Road Resurfacing ( Eight Mile Road to De Vries Road) Stockton

2016­129C 0 4/14/2016 02:00pm PST Jesse Unruh Building Roof Replacement Sacramento

2016­17AD 0 4/14/2016 02:00pm PST Zone 41 Groundwater Well Downhole Construction: Arden Way Well (W­23) Sacramento

2016­1A40 0 4/14/2016 02:00pm PST Security Fencing III Project Sacramento

2016­1A7E 0 4/14/2016 02:00pm PST Lift Station 16 Improvements Project Groveland

2016­1B30 0 4/14/2016 02:00pm PST Fair Oaks Boulevard At Mariemont Ave Sidewalk Improvement Project Sacramento

2016­1C43 0 4/14/2016 02:00pm PST 2016 Various Schools Dry Rot Repair Projects (Bohn, Poet­Christian, Jacobson andWilliams Schools)

Tracy

2016­1C46 0 4/14/2016 02:00pm PST 2016 Various Schools Exterior Painting Projects (Bohn, Poet­Christian, Jacobson andWilliams Schools)

Tracy

2016­1C49 0 4/14/2016 02:00pm PST Nut Tree Road/ Summerfield Drive Signal Improvements Project Vacaville

2016­1C50 0 4/14/2016 02:00pm PST Measure U Concrete Improvements ­ Miller Park Sacramento

2016­1D11 0 4/14/2016 02:00pm PST Hoover Middle School Modernization Improvement Project Merced

2016­1D15 0 4/14/2016 02:00pm PST Chenoweth Elementary School Modernization Improvement Project Merced

2016­1D22 0 4/14/2016 02:00pm PST Science Complex Laboratory Controls Retrofit Building 200 & 400 Sacramento

2016­1D30 0 4/14/2016 02:00pm PST Parking Lot and Tennis Courts Project ­ Vacaville High School Vacaville

2016­1D4C 0 4/14/2016 02:00pm PST Sutter Middle School Measure G Modernization ­ Phase 1A Folsom

Page 18: Construction weekly march 25, 2016

18 • Construction Weekly

Projects Out to Bid

2016­1813 0 4/7/2016 05:00pm PST HVAC Systems Preventative Maintenance Auburn

2016­1290 0 4/8/2016 02:00pm PST Folsom Phase 5 Streetscape Enhancement Project RFQ Rancho Cordova

2016­1213 2 4/8/2016 03:00pm PST The Rio Cosumnes Correctional Center Expansion & Infrastructure Project(Prequalification For GC)

Elk Grove

2016­1224 1 4/8/2016 03:00pm PST The Rio Cosumnes Correctional Center Expansion & Infrastructure Project(Prequalification For Detention Equipment Contractors)

Elk Grove

2016­1226 1 4/8/2016 03:00pm PST The Rio Cosumnes Correctional Center Expansion & Infrastructure Project(Prequalification For Security System Integrators)

Elk Grove

2016­1BF9 0 4/11/2016 02:00pm PST 3661 4th Ave. Interior Rehab Sacramento

2016­1E08 0 4/11/2016 02:00pm PST Prop 39, Year Three, Exterior Lighting Project for South Campus at Mountain Houseand Manteca Centers

Stockton

2016­1C11 0 4/11/2016 03:00pm PST Steel Substation Structure RFQ Roseville

2016­1B92 0 4/12/2016 09:00am PST Dry Rot Repair At Dan O Root II Elementary Fairfield

2016­11C0 1 4/12/2016 11:00am PST Landscape Maintenance Services RFP Modesto

2016­1C19 0 4/12/2016 11:00am PST Hospital Seismic Upgrade ­ Increment 2 Fire and Life/Safety Upgrades Sacramento

2016­116D 0 4/12/2016 01:00pm PST Supervisory Control and Data Acquisition (SCADA) Computer System Maintenanceand Repair Services (Rebid)

Stockton

2016­1358 0 4/12/2016 02:00pm CST Westlake K­8 Charter School Sacramento

2016­1A1B 0 4/12/2016 02:00pm PST ACP Lining Project No. 1B Napa

2016­1AF3 0 4/12/2016 02:00pm PST Water Efficient Fixture Replacement at Hot Creek Fish Hatchery, Mono County Mammoth Lakes

2016­1AF7 0 4/12/2016 02:00pm PST Primary Clarifier #1 and Headworks Rehabilitation Fairfield

2016­1B08 0 4/12/2016 02:00pm PST Mariposa Elementary School (Library & Kindergarten Building) & Mariposa High School(Auditorium Building) Reroofing Project

Mariposa

2016­1B72 0 4/12/2016 02:00pm PST Highway 12/Gardiner Way Lighted Crosswalk Rio Vista

2016­1D29 0 4/12/2016 02:15pm PST CADOT 22A0803 Countertop Removal and Installation Sacramento

2016­1192 0 4/12/2016 02:30pm PST Preventative Maintenance and Unscheduled Repair Services for Multiple Roll­UpDoors/Sliding Gates, and Provide Annual Drop Test Certifications for Fou

Sacramento

2016­1A8A 0 4/12/2016 03:00pm PST Data And Voice Cabling Services Placerville

2016­1C0E 1 4/12/2016 03:00pm PST Roseville Road Improvement Project Roseville

2016­1A43 0 4/13/2016 10:00am PST Administration Building Modernization Sybil N. Crookham Elementary School Winton

2016­17AA 1 4/13/2016 02:00pm PST Inmate Video Visitation System Solution For The Stanislaus County Safety CenterExpansion Project RFP

Modesto

2016­1BE1 0 4/13/2016 02:00pm PST Central Enrollment – Garfield Modernization Carmichael

2016­1C45 0 4/13/2016 02:00pm PST Williams Middle School New Floor Coverings Tracy

2016­1C4A 0 4/13/2016 02:00pm PST Measure U Concrete Improvements ­ McKinley Park Sacramento

2016­1C4B 0 4/13/2016 02:00pm PST Measure U Concrete Improvement ­ Tahoe Park Sacramento

2016­1BE7 0 4/14/2016 10:00am PST Thomas Kelly and Sierra Oaks ES CSR Temp Projects Sacramento/Carmichael

2016­1A80 0 4/14/2016 01:30pm PST Professional Airport Consulting Services (Engineering, Environmental,Project/Construction Management and Inspection) RFQ

Jackson

2016­1D51 0 4/14/2016 01:30pm PST Walnut Grove Road Resurfacing (Sacramento County Line to New Hope Bridge) Lodi

2016­1D54 0 4/14/2016 01:30pm PST Thornton Road Resurfacing ( Eight Mile Road to De Vries Road) Stockton

2016­129C 0 4/14/2016 02:00pm PST Jesse Unruh Building Roof Replacement Sacramento

2016­17AD 0 4/14/2016 02:00pm PST Zone 41 Groundwater Well Downhole Construction: Arden Way Well (W­23) Sacramento

2016­1A40 0 4/14/2016 02:00pm PST Security Fencing III Project Sacramento

2016­1A7E 0 4/14/2016 02:00pm PST Lift Station 16 Improvements Project Groveland

2016­1B30 0 4/14/2016 02:00pm PST Fair Oaks Boulevard At Mariemont Ave Sidewalk Improvement Project Sacramento

2016­1C43 0 4/14/2016 02:00pm PST 2016 Various Schools Dry Rot Repair Projects (Bohn, Poet­Christian, Jacobson andWilliams Schools)

Tracy

2016­1C46 0 4/14/2016 02:00pm PST 2016 Various Schools Exterior Painting Projects (Bohn, Poet­Christian, Jacobson andWilliams Schools)

Tracy

2016­1C49 0 4/14/2016 02:00pm PST Nut Tree Road/ Summerfield Drive Signal Improvements Project Vacaville

2016­1C50 0 4/14/2016 02:00pm PST Measure U Concrete Improvements ­ Miller Park Sacramento

2016­1D11 0 4/14/2016 02:00pm PST Hoover Middle School Modernization Improvement Project Merced

2016­1D15 0 4/14/2016 02:00pm PST Chenoweth Elementary School Modernization Improvement Project Merced

2016­1D22 0 4/14/2016 02:00pm PST Science Complex Laboratory Controls Retrofit Building 200 & 400 Sacramento

2016­1D30 0 4/14/2016 02:00pm PST Parking Lot and Tennis Courts Project ­ Vacaville High School Vacaville

2016­1D4C 0 4/14/2016 02:00pm PST Sutter Middle School Measure G Modernization ­ Phase 1A Folsom

2016­1D5A 0 4/14/2016 02:00pm PST NARS Pavement Replacement ­ Unloaded Trailer Parking Area North Highlands

2016­1E0B 0 4/14/2016 02:00pm PST Park and Landscape Improvements (FY 15­16) Lincoln

2016­1E0D 0 4/14/2016 02:00pm PST Antelope Road Safe Routes To School Project Citrus Heights

2016­1A49 0 4/15/2016 10:00am PST Infrastructure Equipment /Network Cabling RFP Merced

2016­1CAC 0 4/15/2016 02:00pm PST Sweeney ­ McCune Creek Outflow Recovery And Automation Project Vacaville

2016­1C64 0 4/17/2016 02:00pm PST Fire Station No. 10 Driveway And Parking Lot Repairs Stockton

2016­1C1E 0 4/18/2016 09:00am PST Garden Valley Elementary School Painting Project Sacramento

2016­1C3A 0 4/18/2016 09:15am PST Hagginwood Elementary School Painting Project Sacramento

2016­1C1F 0 4/18/2016 09:30am PST Martin Luther King Jr. Tech Academy Painting Project Sacramento

2016­1C3B 0 4/18/2016 09:45am PST Madison Elementary School Painting Project North Highlands

2016­1C3F 0 4/18/2016 10:00am PST Regency Park Elementary School Painting Project Sacramento

2016­1C3E 0 4/18/2016 10:15am PST Oakdale Elementary School Painting Project North Highlands

2016­1C41 0 4/18/2016 10:30am CST Vista Nueva Career & Tech High School Painting Project Sacramento

2016­1D6F 0 4/18/2016 03:00pm PST 5650 Fiddyment Road Demolition RFQ Roseville

2016­181C 0 4/18/2016 04:00pm PST Sanitary Sewer Rate Study RFP Vallejo

2016­1A6C 0 4/19/2016 02:00pm PST Mariposa County Courthouse Rehabilitation Mariposa

2016­1B74 0 4/19/2016 02:00pm PST CADOT 04­2G9404 Construct Roadway Retaining System Napa County

2016­1C6A 0 4/19/2016 02:00pm PST Foothill Horizon Dining Hall Improvements (Sub Bids Only) Sonora

2016­1C6F 0 4/19/2016 02:00pm PST North Bay Regional Water Treatment Plant Chiller Replacement Fairfield

2016­1CAF 0 4/19/2016 02:00pm PST District Office 2016 Paving Improvements Tracy

2016­1BF3 0 4/19/2016 02:30pm PST Board Room Upgrade And Expansion At Stancera Modesto

2016­1A6A 1 4/19/2016 03:00pm CST Environmental and Engineering Services For the Woodcreek Oaks Boulevard WideningProject RFP

Roseville

2016­1211 1 4/20/2016 11:00am PST Ox Bow Marina Mutual Water Company Water Supply Project Isleton

2016­120D 0 4/20/2016 02:00pm PST Carl Sundahl Elementary Modernization Increment 1 & Carl Sundahl ElementaryModernization Increment 2 (Pre­Qualification)

Folsom

2016­1735 1 4/20/2016 03:00pm PST SMUD Headquarters (HR) Rehabilitation Sacramento

2016­1BF6 0 4/20/2016 03:00pm PST Design­Assist Construction Contract with Guaranteed Maximum Price for Fire StationNo. 1 RFP

Roseville

2016­1C15 0 4/21/2016 02:00pm PST Hirsch Elementary School Window Replacement Tracy

2016­0A90 3 4/21/2016 03:00pm PST Temporary Services: Mechanical Maintenance Technician RFP Elk Grove

2016­1C05 0 4/21/2016 03:00pm PST Fish and Game Building Re­Roof & HVAC Replacement Lake Yesemite Park Merced

2016­1C14 0 4/21/2016 03:00pm PST Generation ­ Owner's Engineering Services Rocklin

2016­1CCD 0 4/21/2016 03:00pm PST Architectural Services Twin River USD RFQ North Highlands

2016­1D43 0 4/21/2016 03:30pm PST LBRID Water Tank Replacement Project Pope Valley

2016­0E94 2 4/22/2016 02:00pm PST CHP Napa Area Office –Flooring Replacement Services Napa

2016­126F 1 4/22/2016 02:00pm PST Engineering Design And Right of Way Services For The Rocklin Road At Pacific St.Roundabout

Rocklin

2016­1C9C 0 4/22/2016 04:30pm PST Old Sonoma Road Property Master Plan Consultant RFP Napa

2016­1D05 0 4/26/2016 10:00am PST Exterior Painting Project At Dan O Root II Elementary School Fairfield

2016­1A30 0 4/26/2016 02:00pm PST Clover School Modernization (TLC) Two Story Modular Building Tracy

2016­1A63 0 4/26/2016 02:00pm PST Lassen Elevator Addition & Modernization 2016 Sacramento

2016­1B39 0 4/26/2016 02:00pm PST Primary Clarifier 1 / Aeration Basin 2 Rehabilitation Project South Lake Tahoe

2016­0EE2 0 4/26/2016 03:00pm PST EDHWWTP Solar Rehab El Dorado Hills

2016­1CAD 0 4/27/2016 03:00pm PST Reservoir A WTP Chemical Containment Improvements Pollock Pines

2016­1BFD 0 4/28/2016 02:00pm PST Intrusion Alarm System Stockton

2016­1BE2 0 4/29/2016 02:00pm PST 2016 District Wide HMA Trench Paving Sonora

2016­1B8E 0 5/2/2016 02:00pm PST Family Entertainment Zone Infrastructure Improvements Project Entertainment Phase 1Underground Utilities

Manteca

2016­1AA2 0 5/3/2016 11:00am PST Fireproofing System at California State Prison­Solano Vacaville

2016­1144 0 5/3/2016 02:00pm PST Folsom High School Auxiliary Gymnasium Folsom

2016­1D1B 0 5/3/2016 04:00pm PST Landscape Maintenance Services For Workforce Investment Facility, Lake Road Path,Planada Streetscape And Animal Services Facility

Merced

2016­1A19 1 5/5/2016 02:00pm PST Single­Family Home Developer for Del Paso Nuevo Phase 6 RFQ Sacramento

2016­1AAC 0 5/5/2016 02:00pm PST Landscape Maintenance Contract For Region 2 HDM Vallejo

2016­1B2C 0 5/23/2016 02:00pm PST Design­Build Services For El Camino High School Performing Arts Center RFQ Sacramento

Page 19: Construction weekly march 25, 2016

Construction Weekly •19

Projects Out to Bid

Bay Area / Central Coast Region Projects - 203

2016­1D5A 0 4/14/2016 02:00pm PST NARS Pavement Replacement ­ Unloaded Trailer Parking Area North Highlands

2016­1E0B 0 4/14/2016 02:00pm PST Park and Landscape Improvements (FY 15­16) Lincoln

2016­1E0D 0 4/14/2016 02:00pm PST Antelope Road Safe Routes To School Project Citrus Heights

2016­1A49 0 4/15/2016 10:00am PST Infrastructure Equipment /Network Cabling RFP Merced

2016­1CAC 0 4/15/2016 02:00pm PST Sweeney ­ McCune Creek Outflow Recovery And Automation Project Vacaville

2016­1C64 0 4/17/2016 02:00pm PST Fire Station No. 10 Driveway And Parking Lot Repairs Stockton

2016­1C1E 0 4/18/2016 09:00am PST Garden Valley Elementary School Painting Project Sacramento

2016­1C3A 0 4/18/2016 09:15am PST Hagginwood Elementary School Painting Project Sacramento

2016­1C1F 0 4/18/2016 09:30am PST Martin Luther King Jr. Tech Academy Painting Project Sacramento

2016­1C3B 0 4/18/2016 09:45am PST Madison Elementary School Painting Project North Highlands

2016­1C3F 0 4/18/2016 10:00am PST Regency Park Elementary School Painting Project Sacramento

2016­1C3E 0 4/18/2016 10:15am PST Oakdale Elementary School Painting Project North Highlands

2016­1C41 0 4/18/2016 10:30am CST Vista Nueva Career & Tech High School Painting Project Sacramento

2016­1D6F 0 4/18/2016 03:00pm PST 5650 Fiddyment Road Demolition RFQ Roseville

2016­181C 0 4/18/2016 04:00pm PST Sanitary Sewer Rate Study RFP Vallejo

2016­1A6C 0 4/19/2016 02:00pm PST Mariposa County Courthouse Rehabilitation Mariposa

2016­1B74 0 4/19/2016 02:00pm PST CADOT 04­2G9404 Construct Roadway Retaining System Napa County

2016­1C6A 0 4/19/2016 02:00pm PST Foothill Horizon Dining Hall Improvements (Sub Bids Only) Sonora

2016­1C6F 0 4/19/2016 02:00pm PST North Bay Regional Water Treatment Plant Chiller Replacement Fairfield

2016­1CAF 0 4/19/2016 02:00pm PST District Office 2016 Paving Improvements Tracy

2016­1BF3 0 4/19/2016 02:30pm PST Board Room Upgrade And Expansion At Stancera Modesto

2016­1A6A 1 4/19/2016 03:00pm CST Environmental and Engineering Services For the Woodcreek Oaks Boulevard WideningProject RFP

Roseville

2016­1211 1 4/20/2016 11:00am PST Ox Bow Marina Mutual Water Company Water Supply Project Isleton

2016­120D 0 4/20/2016 02:00pm PST Carl Sundahl Elementary Modernization Increment 1 & Carl Sundahl ElementaryModernization Increment 2 (Pre­Qualification)

Folsom

2016­1735 1 4/20/2016 03:00pm PST SMUD Headquarters (HR) Rehabilitation Sacramento

2016­1BF6 0 4/20/2016 03:00pm PST Design­Assist Construction Contract with Guaranteed Maximum Price for Fire StationNo. 1 RFP

Roseville

2016­1C15 0 4/21/2016 02:00pm PST Hirsch Elementary School Window Replacement Tracy

2016­0A90 3 4/21/2016 03:00pm PST Temporary Services: Mechanical Maintenance Technician RFP Elk Grove

2016­1C05 0 4/21/2016 03:00pm PST Fish and Game Building Re­Roof & HVAC Replacement Lake Yesemite Park Merced

2016­1C14 0 4/21/2016 03:00pm PST Generation ­ Owner's Engineering Services Rocklin

2016­1CCD 0 4/21/2016 03:00pm PST Architectural Services Twin River USD RFQ North Highlands

2016­1D43 0 4/21/2016 03:30pm PST LBRID Water Tank Replacement Project Pope Valley

2016­0E94 2 4/22/2016 02:00pm PST CHP Napa Area Office –Flooring Replacement Services Napa

2016­126F 1 4/22/2016 02:00pm PST Engineering Design And Right of Way Services For The Rocklin Road At Pacific St.Roundabout

Rocklin

2016­1C9C 0 4/22/2016 04:30pm PST Old Sonoma Road Property Master Plan Consultant RFP Napa

2016­1D05 0 4/26/2016 10:00am PST Exterior Painting Project At Dan O Root II Elementary School Fairfield

2016­1A30 0 4/26/2016 02:00pm PST Clover School Modernization (TLC) Two Story Modular Building Tracy

2016­1A63 0 4/26/2016 02:00pm PST Lassen Elevator Addition & Modernization 2016 Sacramento

2016­1B39 0 4/26/2016 02:00pm PST Primary Clarifier 1 / Aeration Basin 2 Rehabilitation Project South Lake Tahoe

2016­0EE2 0 4/26/2016 03:00pm PST EDHWWTP Solar Rehab El Dorado Hills

2016­1CAD 0 4/27/2016 03:00pm PST Reservoir A WTP Chemical Containment Improvements Pollock Pines

2016­1BFD 0 4/28/2016 02:00pm PST Intrusion Alarm System Stockton

2016­1BE2 0 4/29/2016 02:00pm PST 2016 District Wide HMA Trench Paving Sonora

2016­1B8E 0 5/2/2016 02:00pm PST Family Entertainment Zone Infrastructure Improvements Project Entertainment Phase 1Underground Utilities

Manteca

2016­1AA2 0 5/3/2016 11:00am PST Fireproofing System at California State Prison­Solano Vacaville

2016­1144 0 5/3/2016 02:00pm PST Folsom High School Auxiliary Gymnasium Folsom

2016­1D1B 0 5/3/2016 04:00pm PST Landscape Maintenance Services For Workforce Investment Facility, Lake Road Path,Planada Streetscape And Animal Services Facility

Merced

2016­1A19 1 5/5/2016 02:00pm PST Single­Family Home Developer for Del Paso Nuevo Phase 6 RFQ Sacramento

2016­1AAC 0 5/5/2016 02:00pm PST Landscape Maintenance Contract For Region 2 HDM Vallejo

2016­1B2C 0 5/23/2016 02:00pm PST Design­Build Services For El Camino High School Performing Arts Center RFQ Sacramento

­ Not Available ­ On Order ­ Processing ­ Available

Project # Addn Bid Date Time Project City Docs

2016­12D0 5 3/24/2016 11:00am PST Saratoga High School New Music Building & Cafeteria Renovation Project Saratoga

2016­109D 1 3/24/2016 02:00pm PST College of Alameda Painting Services for Buildings E, F, L, A, B, the Gym and theAviation School Building

Alameda

2016­1171 0 3/24/2016 02:00pm PST CADOT 05­1G3304 Seal Bridge Decks and Replace Joint Seals Monterey / San Benito /Santa Cruz Cos

2016­11C9 0 3/24/2016 02:00pm PST College of San Mateo Marie Curie Parking Lot Renovation San Mateo

2016­12BD 3 3/24/2016 02:00pm PST Prop 39 High Bay Lighting Upgrades ­ 2026C San Jose

2016­1821 2 3/24/2016 02:00pm PST Demolition of Annex Buildings at Youth Park, SFUSD San Francisco

2016­1ADF 2 3/24/2016 02:00pm PST Roof Replacement at Thousand Oaks Elementary, Longfellow Middle, Berkeley HighSchool, Bldg C

Berkeley

2016­1BC6 1 3/24/2016 02:00pm PST Well 11 Generator Marina

2016­12B8 4 3/24/2016 02:30pm PST Prop 39 High Bay Lighting Upgrades 2027C San Jose

2016­19EF 0 3/24/2016 03:00pm PST Del Monte Boulevard Pavement Rehabilitation Seaside

2016­1AEE 3 3/24/2016 03:00pm PST Wounds/Brookwood Terrace CDBG Pedestrian Improvements San Jose

2016­1B00 0 3/24/2016 03:00pm PST Penitencia Creek Trail, Reach 1B­Rebid San Jose

2016­1B09 1 3/24/2016 03:00pm PST Sanitary Sewer Repairs and Rehabilitation FY 2015­2016 San Jose

2016­1B0D 1 3/24/2016 03:00pm PST Reservoir Staircase & Railing Installation San Jose

2016­1B9D 0 3/24/2016 03:00pm PST Bracher Park Improvements and Carli Park Playground Renovation­RFP Santa Clara

2016­1739 0 3/25/2016 10:00am PST 2016­ On­Call Sewer Replacement San Carlos

2016­09C7 0 3/25/2016 02:00pm PST RFP­Operation of Fixed Route Transit and Paratransit Bus Services Antioch

2016­12A7 8 3/25/2016 02:00pm PST Security Camera Upgrade Project ­ Group 1 San Jose

2016­1826 0 3/25/2016 03:00pm PST The Dunes Shopping Center Marina

2016­10BC 0 3/28/2016 10:00am PST Tennis Court Resurfacing­ RFP #2345 Concord

2016­0B5B 1 3/28/2016 02:00pm PST Prequalification Questionnaire for Prospective Design/Build Entities Parking Lot 5Station District

Union City

2016­11FF 1 3/28/2016 02:00pm PST MacDorsa Tank Recoating and Roof Replacement Scotts Valley

2016­1205 0 3/28/2016 02:00pm PST Hunters Point Shipyard Phase 1, Block 52 Building 3 & 4 San Francisco

2016­1207 0 3/28/2016 02:00pm PST Hunters Point Shipyard Phase 1, Block 52 Building 5 San Francisco

2016­17A8 2 3/28/2016 02:00pm PST Frick Middle School Painting & Cabinet Renovations Oakland

2016­1C3D 2 3/28/2016 02:00pm PST Cinemark (9 Screens) Recliner Remodel San Francisco

2016­12D4 0 3/29/2016 10:00am PST Boiler Replacement at Roosevelt Middle School San Francisco

2016­1272 1 3/29/2016 01:00pm PST Invasive Species Management 2016­2020 Various

2016­17A5 0 3/29/2016 01:00pm PST Improve Campus Walkways VA Medical Center Palo Alto

2016­0FC8 0 3/29/2016 02:00pm PST Repair of Damaged and Displaced Sections of Curbs, Gutters, & Sidewalks, Unit No.19

Eden Township

2016­111E 0 3/29/2016 02:00pm PST Camino Tassajara Shoulder Widening San Ramon

2016­11A8 1 3/29/2016 02:00pm PST Serramonte Library Restroom and Accessibility Entry Upgrade Daly City

2016­120F 1 3/29/2016 02:00pm PST William C. (WC) Overfelt High School San Jose

2016­12DD 1 3/29/2016 02:00pm PST Frank McCoppin Elementary School Modernination San Francisco

"PRINT FRIENDLY" ACTIVE PROJECT LISTBay Area/Central Coast Region Project Count: 203

Home > My Deskpad > > Print Friendly Project List

ADMIN Home About Us Join News Resources Virtual Plan Room

My Account | Log off

Page 20: Construction weekly march 25, 2016

20 • Construction Weekly

Projects Out to Bid

­ Not Available ­ On Order ­ Processing ­ Available

Project # Addn Bid Date Time Project City Docs

2016­12D0 5 3/24/2016 11:00am PST Saratoga High School New Music Building & Cafeteria Renovation Project Saratoga

2016­109D 1 3/24/2016 02:00pm PST College of Alameda Painting Services for Buildings E, F, L, A, B, the Gym and theAviation School Building

Alameda

2016­1171 0 3/24/2016 02:00pm PST CADOT 05­1G3304 Seal Bridge Decks and Replace Joint Seals Monterey / San Benito /Santa Cruz Cos

2016­11C9 0 3/24/2016 02:00pm PST College of San Mateo Marie Curie Parking Lot Renovation San Mateo

2016­12BD 3 3/24/2016 02:00pm PST Prop 39 High Bay Lighting Upgrades ­ 2026C San Jose

2016­1821 2 3/24/2016 02:00pm PST Demolition of Annex Buildings at Youth Park, SFUSD San Francisco

2016­1ADF 2 3/24/2016 02:00pm PST Roof Replacement at Thousand Oaks Elementary, Longfellow Middle, Berkeley HighSchool, Bldg C

Berkeley

2016­1BC6 1 3/24/2016 02:00pm PST Well 11 Generator Marina

2016­12B8 4 3/24/2016 02:30pm PST Prop 39 High Bay Lighting Upgrades 2027C San Jose

2016­19EF 0 3/24/2016 03:00pm PST Del Monte Boulevard Pavement Rehabilitation Seaside

2016­1AEE 3 3/24/2016 03:00pm PST Wounds/Brookwood Terrace CDBG Pedestrian Improvements San Jose

2016­1B00 0 3/24/2016 03:00pm PST Penitencia Creek Trail, Reach 1B­Rebid San Jose

2016­1B09 1 3/24/2016 03:00pm PST Sanitary Sewer Repairs and Rehabilitation FY 2015­2016 San Jose

2016­1B0D 1 3/24/2016 03:00pm PST Reservoir Staircase & Railing Installation San Jose

2016­1B9D 0 3/24/2016 03:00pm PST Bracher Park Improvements and Carli Park Playground Renovation­RFP Santa Clara

2016­1739 0 3/25/2016 10:00am PST 2016­ On­Call Sewer Replacement San Carlos

2016­09C7 0 3/25/2016 02:00pm PST RFP­Operation of Fixed Route Transit and Paratransit Bus Services Antioch

2016­12A7 8 3/25/2016 02:00pm PST Security Camera Upgrade Project ­ Group 1 San Jose

2016­1826 0 3/25/2016 03:00pm PST The Dunes Shopping Center Marina

2016­10BC 0 3/28/2016 10:00am PST Tennis Court Resurfacing­ RFP #2345 Concord

2016­0B5B 1 3/28/2016 02:00pm PST Prequalification Questionnaire for Prospective Design/Build Entities Parking Lot 5Station District

Union City

2016­11FF 1 3/28/2016 02:00pm PST MacDorsa Tank Recoating and Roof Replacement Scotts Valley

2016­1205 0 3/28/2016 02:00pm PST Hunters Point Shipyard Phase 1, Block 52 Building 3 & 4 San Francisco

2016­1207 0 3/28/2016 02:00pm PST Hunters Point Shipyard Phase 1, Block 52 Building 5 San Francisco

2016­17A8 2 3/28/2016 02:00pm PST Frick Middle School Painting & Cabinet Renovations Oakland

2016­1C3D 2 3/28/2016 02:00pm PST Cinemark (9 Screens) Recliner Remodel San Francisco

2016­12D4 0 3/29/2016 10:00am PST Boiler Replacement at Roosevelt Middle School San Francisco

2016­1272 1 3/29/2016 01:00pm PST Invasive Species Management 2016­2020 Various

2016­17A5 0 3/29/2016 01:00pm PST Improve Campus Walkways VA Medical Center Palo Alto

2016­0FC8 0 3/29/2016 02:00pm PST Repair of Damaged and Displaced Sections of Curbs, Gutters, & Sidewalks, Unit No.19

Eden Township

2016­111E 0 3/29/2016 02:00pm PST Camino Tassajara Shoulder Widening San Ramon

2016­11A8 1 3/29/2016 02:00pm PST Serramonte Library Restroom and Accessibility Entry Upgrade Daly City

2016­120F 1 3/29/2016 02:00pm PST William C. (WC) Overfelt High School San Jose

2016­12DD 1 3/29/2016 02:00pm PST Frank McCoppin Elementary School Modernination San Francisco

"PRINT FRIENDLY" ACTIVE PROJECT LISTBay Area/Central Coast Region Project Count: 203

Home > My Deskpad > > Print Friendly Project List

ADMIN Home About Us Join News Resources Virtual Plan Room

My Account | Log off

2016­12E1 1 3/29/2016 02:00pm PST Cesar Chavez Elementary School & Monroe ES Greening San Francisco

2016­17DC 0 3/29/2016 02:00pm PST Service Center Concrete Pad Repair Newark

2016­1810 1 3/29/2016 02:00pm PST Demolition/Dismantle & Removal for Recycling of Modular Building at 399 MadisonStreet

Monterey

2016­19EB 1 3/29/2016 02:00pm PST Coyote Valley Educational Center, Increment #2 Low Voltage Package San Jose

2016­1AE9 3 3/29/2016 02:00pm PST John Muir Elementary School Modernization Manual Berkeley

2016­1B0E 0 3/29/2016 02:00pm PST Habit Burger Grill #141 Oakland

2016­1B3F 0 3/29/2016 02:00pm PST City Hall LED Marquee Sign San Ramon

2016­1BFC 0 3/29/2016 02:00pm PST 2015­16 Pavement Rehabilitation Project Martinez

2016­1C47 0 3/29/2016 02:00pm PST Treasure Island Abatement and Demolition San Francisco

2016­1CB3 0 3/29/2016 02:00pm PST 2016 Surface Seal Project Santa Cruz

2016­1B12 1 3/29/2016 03:00pm PST Track and D­Zones Improvements & TRX Fitness Equipment Pad at Lowell HighSchool

San Francisco

2016­1B6E 2 3/29/2016 03:00pm PST Oakes Dormitory E, F, G and H Interior Finish Upgrades Santa Cruz

2016­1BBD 0 3/29/2016 03:00pm PST Architectural/Engineering Services for the Tilden Park Environmental Education CenterStudy­RFQ

Contra Costa

2016­1B98 0 3/30/2016 10:00am PST Lawton Elementary School & Lafayette Elementary School Security Cameras Project San Francisco

2016­1C4C 0 3/30/2016 10:00am PST Boyd Road/Elinora Drive Sidewalk Installation Project Pleasant Hill

2016­1B61 0 3/30/2016 11:00am PST Balboa High School Computer Lab Renovations San Francisco

2016­11DE 3 3/30/2016 01:30pm PST Food Waste Facility ­ Site Utilities and Improvements Oakland

2016­0F9B 1 3/30/2016 02:00pm PST Design­Build Services for Airport Security Infrastructure Program RFQ San Francisco

2016­1215 1 3/30/2016 02:00pm PST IH IAC Building L Modernization at Independence High San Jose

2016­12C6 2 3/30/2016 02:00pm PST Arlington Boulevard & Brewster Drive Intersection Safety Improvements El Cerrito

2016­1750 0 3/30/2016 02:00pm PST CADOT 04­3J4604 Individual Slab Replacement (RSC) Alameda County

2016­17A7 0 3/30/2016 02:00pm PST Relocatable Classrooms at Le Conte Elementary School Berkeley

2016­17DE 1 3/30/2016 02:00pm PST HOB Improvements Martinez

2016­1ACA 0 3/30/2016 02:00pm PST Evans Hall Gender Inclusive Restroom Berkeley

2016­1AFD 0 3/30/2016 02:00pm PST A.P. Giannini Middle School remediation of Leaking Cafeteria San Francisco

2016­1BE9 0 3/30/2016 02:00pm PST Southland Mall­Entry 3 & Cinema Egress in Hayward Hayward

2016­06C5 2 3/30/2016 02:30pm PST As­Needed Curb Ramp Construction for Street Resurfacing Program No. 6 San Francisco

2016­1A23 0 3/30/2016 02:30pm PST Bowdoin Street, Bryant Street, & Hale Street Pavement Renovation & SewerReplacement

San Francisco

2016­11CB 0 3/30/2016 03:00pm PST Alameda Municipal Power Service Center Asphalt Paving Project Alameda

2016­121A 1 3/31/2016 02:00pm PST Peninsula Pipelines Seismic Upgrade ­ Phase III San Francisco

2016­122F 0 3/31/2016 02:00pm PST Hampton Park Improvement Project Oakland

2016­12E5 0 3/31/2016 02:00pm PST Miraloma Elementary School & Sunnyside ES Green Schoolyard San Francisco

2016­1B9A 0 3/31/2016 02:00pm PST IH Paving Repair, Seal and Stripe at Independence High School San Jose

2016­1B05 0 3/31/2016 03:00pm PST 324 Florida Avenue Site Remediation Project San Bruno

2016­1B07 0 3/31/2016 04:00pm PST Inclusion Letter, Woodside Elementary School District Woodside

2016­1A7C 1 4/1/2016 11:00am PST Street Light Pole Painting Dublin

2016­1BDE 0 4/1/2016 02:30pm PST Lincoln­Roosevelt Elementary Schools Window Replacement Salinas

2016­11DD 1 4/4/2016 02:00pm PST Effluent Filtration Project­Master Plan No. 5, 7, 10, and 12 Discovery Bay

2016­1294 0 4/4/2016 02:00pm PST L­1061 Roof Replacement Project Pittsburg

2016­1CE1 1 4/4/2016 02:00pm PST Bldgs 1400 & 1500 HVAC & Lightning Renovations Aptos

2016­1AF8 0 4/4/2016 03:00pm PST Low/Medium Voltage Electrical Repairs San Jose

2016­1D26 0 4/4/2016 04:00pm PST Traffic Signals Street Lights & Lighted Crosswalks Maintenance Palo Alto

2016­1B36 0 4/4/2016 05:00pm PST Big O Tires Dublin

2016­1D0F 0 4/5/2016 2:00 pm PST Parker Elementary School Yard Improvements Oakland

2016­1D7A 0 4/5/2016 2:00 pm PST Old Canyon Road Bridge Foundation Projection Repair Project Fremont

2016­11CE 1 4/5/2016 02:00pm PST Bridge Wingwall & Foundation Repair on Mines Road at Mile Marker 14.04 Murray Township

2016­1221 1 4/5/2016 02:00pm PST Reroof at Campus Center at De Anza College Los Altos

2016­1319 0 4/5/2016 02:00pm PST Water Pollution Control Facility ­ Digester Improvements Project Hayward

2016­17CC 0 4/5/2016 02:00pm PST 2016 On­Call Sweeping Services Contracts for Various Road Maintenance Work Various

2016­17F9 2 4/5/2016 02:00pm PST Revenue Enhancement & Customer Hospitality (REACH) ­ International TerminalBuilding Boarding Areas A & G Project

San Francisco

2016­180C 0 4/5/2016 02:00pm PST Robert L. Stevenson Elementary School San Francisco

Page 21: Construction weekly march 25, 2016

Construction Weekly •21

Projects Out to Bid

2016­12E1 1 3/29/2016 02:00pm PST Cesar Chavez Elementary School & Monroe ES Greening San Francisco

2016­17DC 0 3/29/2016 02:00pm PST Service Center Concrete Pad Repair Newark

2016­1810 1 3/29/2016 02:00pm PST Demolition/Dismantle & Removal for Recycling of Modular Building at 399 MadisonStreet

Monterey

2016­19EB 1 3/29/2016 02:00pm PST Coyote Valley Educational Center, Increment #2 Low Voltage Package San Jose

2016­1AE9 3 3/29/2016 02:00pm PST John Muir Elementary School Modernization Manual Berkeley

2016­1B0E 0 3/29/2016 02:00pm PST Habit Burger Grill #141 Oakland

2016­1B3F 0 3/29/2016 02:00pm PST City Hall LED Marquee Sign San Ramon

2016­1BFC 0 3/29/2016 02:00pm PST 2015­16 Pavement Rehabilitation Project Martinez

2016­1C47 0 3/29/2016 02:00pm PST Treasure Island Abatement and Demolition San Francisco

2016­1CB3 0 3/29/2016 02:00pm PST 2016 Surface Seal Project Santa Cruz

2016­1B12 1 3/29/2016 03:00pm PST Track and D­Zones Improvements & TRX Fitness Equipment Pad at Lowell HighSchool

San Francisco

2016­1B6E 2 3/29/2016 03:00pm PST Oakes Dormitory E, F, G and H Interior Finish Upgrades Santa Cruz

2016­1BBD 0 3/29/2016 03:00pm PST Architectural/Engineering Services for the Tilden Park Environmental Education CenterStudy­RFQ

Contra Costa

2016­1B98 0 3/30/2016 10:00am PST Lawton Elementary School & Lafayette Elementary School Security Cameras Project San Francisco

2016­1C4C 0 3/30/2016 10:00am PST Boyd Road/Elinora Drive Sidewalk Installation Project Pleasant Hill

2016­1B61 0 3/30/2016 11:00am PST Balboa High School Computer Lab Renovations San Francisco

2016­11DE 3 3/30/2016 01:30pm PST Food Waste Facility ­ Site Utilities and Improvements Oakland

2016­0F9B 1 3/30/2016 02:00pm PST Design­Build Services for Airport Security Infrastructure Program RFQ San Francisco

2016­1215 1 3/30/2016 02:00pm PST IH IAC Building L Modernization at Independence High San Jose

2016­12C6 2 3/30/2016 02:00pm PST Arlington Boulevard & Brewster Drive Intersection Safety Improvements El Cerrito

2016­1750 0 3/30/2016 02:00pm PST CADOT 04­3J4604 Individual Slab Replacement (RSC) Alameda County

2016­17A7 0 3/30/2016 02:00pm PST Relocatable Classrooms at Le Conte Elementary School Berkeley

2016­17DE 1 3/30/2016 02:00pm PST HOB Improvements Martinez

2016­1ACA 0 3/30/2016 02:00pm PST Evans Hall Gender Inclusive Restroom Berkeley

2016­1AFD 0 3/30/2016 02:00pm PST A.P. Giannini Middle School remediation of Leaking Cafeteria San Francisco

2016­1BE9 0 3/30/2016 02:00pm PST Southland Mall­Entry 3 & Cinema Egress in Hayward Hayward

2016­06C5 2 3/30/2016 02:30pm PST As­Needed Curb Ramp Construction for Street Resurfacing Program No. 6 San Francisco

2016­1A23 0 3/30/2016 02:30pm PST Bowdoin Street, Bryant Street, & Hale Street Pavement Renovation & SewerReplacement

San Francisco

2016­11CB 0 3/30/2016 03:00pm PST Alameda Municipal Power Service Center Asphalt Paving Project Alameda

2016­121A 1 3/31/2016 02:00pm PST Peninsula Pipelines Seismic Upgrade ­ Phase III San Francisco

2016­122F 0 3/31/2016 02:00pm PST Hampton Park Improvement Project Oakland

2016­12E5 0 3/31/2016 02:00pm PST Miraloma Elementary School & Sunnyside ES Green Schoolyard San Francisco

2016­1B9A 0 3/31/2016 02:00pm PST IH Paving Repair, Seal and Stripe at Independence High School San Jose

2016­1B05 0 3/31/2016 03:00pm PST 324 Florida Avenue Site Remediation Project San Bruno

2016­1B07 0 3/31/2016 04:00pm PST Inclusion Letter, Woodside Elementary School District Woodside

2016­1A7C 1 4/1/2016 11:00am PST Street Light Pole Painting Dublin

2016­1BDE 0 4/1/2016 02:30pm PST Lincoln­Roosevelt Elementary Schools Window Replacement Salinas

2016­11DD 1 4/4/2016 02:00pm PST Effluent Filtration Project­Master Plan No. 5, 7, 10, and 12 Discovery Bay

2016­1294 0 4/4/2016 02:00pm PST L­1061 Roof Replacement Project Pittsburg

2016­1CE1 1 4/4/2016 02:00pm PST Bldgs 1400 & 1500 HVAC & Lightning Renovations Aptos

2016­1AF8 0 4/4/2016 03:00pm PST Low/Medium Voltage Electrical Repairs San Jose

2016­1D26 0 4/4/2016 04:00pm PST Traffic Signals Street Lights & Lighted Crosswalks Maintenance Palo Alto

2016­1B36 0 4/4/2016 05:00pm PST Big O Tires Dublin

2016­1D0F 0 4/5/2016 2:00 pm PST Parker Elementary School Yard Improvements Oakland

2016­1D7A 0 4/5/2016 2:00 pm PST Old Canyon Road Bridge Foundation Projection Repair Project Fremont

2016­11CE 1 4/5/2016 02:00pm PST Bridge Wingwall & Foundation Repair on Mines Road at Mile Marker 14.04 Murray Township

2016­1221 1 4/5/2016 02:00pm PST Reroof at Campus Center at De Anza College Los Altos

2016­1319 0 4/5/2016 02:00pm PST Water Pollution Control Facility ­ Digester Improvements Project Hayward

2016­17CC 0 4/5/2016 02:00pm PST 2016 On­Call Sweeping Services Contracts for Various Road Maintenance Work Various

2016­17F9 2 4/5/2016 02:00pm PST Revenue Enhancement & Customer Hospitality (REACH) ­ International TerminalBuilding Boarding Areas A & G Project

San Francisco

2016­180C 0 4/5/2016 02:00pm PST Robert L. Stevenson Elementary School San Francisco

2016­12E1 1 3/29/2016 02:00pm PST Cesar Chavez Elementary School & Monroe ES Greening San Francisco

2016­17DC 0 3/29/2016 02:00pm PST Service Center Concrete Pad Repair Newark

2016­1810 1 3/29/2016 02:00pm PST Demolition/Dismantle & Removal for Recycling of Modular Building at 399 MadisonStreet

Monterey

2016­19EB 1 3/29/2016 02:00pm PST Coyote Valley Educational Center, Increment #2 Low Voltage Package San Jose

2016­1AE9 3 3/29/2016 02:00pm PST John Muir Elementary School Modernization Manual Berkeley

2016­1B0E 0 3/29/2016 02:00pm PST Habit Burger Grill #141 Oakland

2016­1B3F 0 3/29/2016 02:00pm PST City Hall LED Marquee Sign San Ramon

2016­1BFC 0 3/29/2016 02:00pm PST 2015­16 Pavement Rehabilitation Project Martinez

2016­1C47 0 3/29/2016 02:00pm PST Treasure Island Abatement and Demolition San Francisco

2016­1CB3 0 3/29/2016 02:00pm PST 2016 Surface Seal Project Santa Cruz

2016­1B12 1 3/29/2016 03:00pm PST Track and D­Zones Improvements & TRX Fitness Equipment Pad at Lowell HighSchool

San Francisco

2016­1B6E 2 3/29/2016 03:00pm PST Oakes Dormitory E, F, G and H Interior Finish Upgrades Santa Cruz

2016­1BBD 0 3/29/2016 03:00pm PST Architectural/Engineering Services for the Tilden Park Environmental Education CenterStudy­RFQ

Contra Costa

2016­1B98 0 3/30/2016 10:00am PST Lawton Elementary School & Lafayette Elementary School Security Cameras Project San Francisco

2016­1C4C 0 3/30/2016 10:00am PST Boyd Road/Elinora Drive Sidewalk Installation Project Pleasant Hill

2016­1B61 0 3/30/2016 11:00am PST Balboa High School Computer Lab Renovations San Francisco

2016­11DE 3 3/30/2016 01:30pm PST Food Waste Facility ­ Site Utilities and Improvements Oakland

2016­0F9B 1 3/30/2016 02:00pm PST Design­Build Services for Airport Security Infrastructure Program RFQ San Francisco

2016­1215 1 3/30/2016 02:00pm PST IH IAC Building L Modernization at Independence High San Jose

2016­12C6 2 3/30/2016 02:00pm PST Arlington Boulevard & Brewster Drive Intersection Safety Improvements El Cerrito

2016­1750 0 3/30/2016 02:00pm PST CADOT 04­3J4604 Individual Slab Replacement (RSC) Alameda County

2016­17A7 0 3/30/2016 02:00pm PST Relocatable Classrooms at Le Conte Elementary School Berkeley

2016­17DE 1 3/30/2016 02:00pm PST HOB Improvements Martinez

2016­1ACA 0 3/30/2016 02:00pm PST Evans Hall Gender Inclusive Restroom Berkeley

2016­1AFD 0 3/30/2016 02:00pm PST A.P. Giannini Middle School remediation of Leaking Cafeteria San Francisco

2016­1BE9 0 3/30/2016 02:00pm PST Southland Mall­Entry 3 & Cinema Egress in Hayward Hayward

2016­06C5 2 3/30/2016 02:30pm PST As­Needed Curb Ramp Construction for Street Resurfacing Program No. 6 San Francisco

2016­1A23 0 3/30/2016 02:30pm PST Bowdoin Street, Bryant Street, & Hale Street Pavement Renovation & SewerReplacement

San Francisco

2016­11CB 0 3/30/2016 03:00pm PST Alameda Municipal Power Service Center Asphalt Paving Project Alameda

2016­121A 1 3/31/2016 02:00pm PST Peninsula Pipelines Seismic Upgrade ­ Phase III San Francisco

2016­122F 0 3/31/2016 02:00pm PST Hampton Park Improvement Project Oakland

2016­12E5 0 3/31/2016 02:00pm PST Miraloma Elementary School & Sunnyside ES Green Schoolyard San Francisco

2016­1B9A 0 3/31/2016 02:00pm PST IH Paving Repair, Seal and Stripe at Independence High School San Jose

2016­1B05 0 3/31/2016 03:00pm PST 324 Florida Avenue Site Remediation Project San Bruno

2016­1B07 0 3/31/2016 04:00pm PST Inclusion Letter, Woodside Elementary School District Woodside

2016­1A7C 1 4/1/2016 11:00am PST Street Light Pole Painting Dublin

2016­1BDE 0 4/1/2016 02:30pm PST Lincoln­Roosevelt Elementary Schools Window Replacement Salinas

2016­11DD 1 4/4/2016 02:00pm PST Effluent Filtration Project­Master Plan No. 5, 7, 10, and 12 Discovery Bay

2016­1294 0 4/4/2016 02:00pm PST L­1061 Roof Replacement Project Pittsburg

2016­1CE1 1 4/4/2016 02:00pm PST Bldgs 1400 & 1500 HVAC & Lightning Renovations Aptos

2016­1AF8 0 4/4/2016 03:00pm PST Low/Medium Voltage Electrical Repairs San Jose

2016­1D26 0 4/4/2016 04:00pm PST Traffic Signals Street Lights & Lighted Crosswalks Maintenance Palo Alto

2016­1B36 0 4/4/2016 05:00pm PST Big O Tires Dublin

2016­1D0F 0 4/5/2016 2:00 pm PST Parker Elementary School Yard Improvements Oakland

2016­1D7A 0 4/5/2016 2:00 pm PST Old Canyon Road Bridge Foundation Projection Repair Project Fremont

2016­11CE 1 4/5/2016 02:00pm PST Bridge Wingwall & Foundation Repair on Mines Road at Mile Marker 14.04 Murray Township

2016­1221 1 4/5/2016 02:00pm PST Reroof at Campus Center at De Anza College Los Altos

2016­1319 0 4/5/2016 02:00pm PST Water Pollution Control Facility ­ Digester Improvements Project Hayward

2016­17CC 0 4/5/2016 02:00pm PST 2016 On­Call Sweeping Services Contracts for Various Road Maintenance Work Various

2016­17F9 2 4/5/2016 02:00pm PST Revenue Enhancement & Customer Hospitality (REACH) ­ International TerminalBuilding Boarding Areas A & G Project

San Francisco

2016­180C 0 4/5/2016 02:00pm PST Robert L. Stevenson Elementary School San Francisco

Page 22: Construction weekly march 25, 2016

22 • Construction Weekly

Projects Out to Bid2016­1AA1 1 4/5/2016 02:00pm PST Tractor Supply Co. Brentwood

2016­1AC5 1 4/5/2016 02:00pm PST Kroeber Hall­PA Hearst Museum Gallery Renovation Berkeley

2016­1B96 0 4/5/2016 02:00pm PST Hesperian Boulevard Uitility Potholing Alameda

2016­1C6B 0 4/5/2016 02:00pm PST 2016 Wheelchair Ramp Installation San Mateo

2016­1B11 2 4/5/2016 02:30pm PST Franklin Square and Garfield Square Field Synthetic Turf Replacement Project San Francisco

2016­135D 0 4/5/2016 03:00pm PST Construction Testings & Special Inspection Service RFQ Los Altos

2016­19E7 1 4/5/2016 03:00pm PST ADA Transition Plan San Leandro

2016­1B9B 0 4/5/2016 03:00pm PST George Peabody Elementary School Schoolyard Project San Francisco

2016­1B99 0 4/5/2016 03:30pm PST Yick Wo Elementary School Green Schoolyard Project San Francisco

2016­1092 1 4/6/2016 02:00pm PST Hilltop Green Lift Station Replacement San Pablo

2016­17A0 1 4/6/2016 02:00pm PST Storage Yard Improvements & Furnished Pipe Santa Clara

2016­186F 0 4/6/2016 02:00pm PST Pump and Blower Building Seismic Upgrades Martinez

2016­1B6A 0 4/6/2016 02:00pm PST CADOT 04­3J5104 Cold Plane Asphalt Concrete Pavement and RHMA Overlay San Mateo County

2016­1B93 0 4/6/2016 02:00pm PST Bernal Property Off Leash Dog Park Pleasanton

2016­1C54 0 4/6/2016 02:00pm PST San Jose State University Flooring and Floor Covering Maintenance San Jose

2016­1CB7 0 4/6/2016 02:00pm PST Rigging and Repair of Port Of Oakland Cranes for the Period Commencing July 1, 2016and Ending June 30, 2017, 2018 or 2019

Oakland

2016­1CD9 0 4/6/2016 02:00pm PST Green Bike Lane Pilot Project Mountain View

2016­1D03 0 4/6/2016 02:00pm PST Migrant Labor Camp Sewer Line Repair Hollister

2016­1D50 0 4/6/2016 02:00pm PST Baxter on Broadway (Formerly B51 Temescal Apartments) Oakland

2016­1A93 1 4/6/2016 02:30pm PST Painting and Epoxy Flooring Bid Package for Moscone Expansion Project San Francisco

2016­1AA9 1 4/6/2016 02:30pm PST Expansion Joints Bid Package for Moscone Expansion Project San Francisco

2016­1CB0 0 4/6/2016 03:00pm PST Cathodic Protection Upgrade of The Recycled Water First Steps Pipeline Redwood City

2016­1E0E 0 4/6/2016 03:00pm PST Santa Clara Valley Medical Center Resource Service Center (RSC) for Shelving San Jose

2016­1BF4 0 4/6/2016 11:00pm CST Rosedale Area Paving Project Capitola

2016­11B6 1 4/7/2016 02:00pm PST Colma Town Hall Campus­Renovation & Addition Project Colma

2016­11EC 0 4/7/2016 02:00pm PST Structural Reach Replacement, PCR (A)­S1­2011 Car A Sewer Replacement, Phase 1 Los Altos

2016­1277 1 4/7/2016 02:00pm PST Senador Mine Restoration Project Santa Clara

2016­17C7 1 4/7/2016 02:00pm PST Soma/Bernal Heights/Exculsior Districts Sewer Replacement & Pavement Renovation San Francisco

2016­1B97 2 4/7/2016 02:00pm PST Pump Station Improvements­Rebid Oakland

2016­1C16 0 4/7/2016 02:00pm PST International Terminal Media Room San Francisco

2016­1C57 0 4/7/2016 02:00pm PST Aragon High School CTE Classrooms, Phase 2 San Mateo

2016­1CAE 0 4/7/2016 02:00pm PST Emergency Standby 230 KW Stationary Generator Pleasanton

2016­1CC0 0 4/7/2016 02:00pm PST Marsh Road Channel Repair Project Atherton

2016­1CD5 0 4/7/2016 02:00pm PST Relocatable Classroom Placement, Reconfiguration and Alterations at Del Mar &Prospect High School Campuses

Saratoga

2016­1D20 0 4/7/2016 02:00pm PST Preschool Playground at Lynhaven E.S. San Jose

2016­1D21 0 4/7/2016 02:30pm PST Campbell Care @ Marshall Lane E.S. Saratoga

2016­1B0B 0 4/7/2016 03:00pm PST Fourth Major Interceptor Rehabilitation Phase II B­Rebid San Jose

2016­1B90 0 4/7/2016 03:00pm PST Big Creek Reserve Prop 84 Improvements Big Sur

2016­1D7F 0 4/7/2016 03:00pm PST Construction Enabling Improvement Project San Jose

2016­1D8A 1 4/8/2016 10:30am PST Modernization Group II Package 1B Kitchen Hood Replacement at Various Sites ­REBID

Concord

2016­1D36 0 4/8/2016 02:00pm PST Hall of Justice Duct Cleaning San Francisco

2016­17D3 0 4/8/2016 02:30pm PST Restroom/Concession & Maintenance Building Electric Installtion at Polo GroundsCounty Parks

Aptos

2016­1AB0 0 4/8/2016 02:30pm PST Miscellaneous Metals Bid Package for Moscone Expansion Project San Francisco

2016­1A8B 0 4/12/2016 10:00am PST Boardroom Upgrade Oakland

2016­1D23 0 4/12/2016 10:00am PST San Carlos Library Improvements San Carlos

2016­1267 1 4/12/2016 02:00pm PST Installation of Electric Vehicle Charging Stations at Various Locations Various

2016­1732 0 4/12/2016 02:00pm PST Beacon West M­26 Well Project Bethel Island

2016­1867 0 4/12/2016 02:00pm PST Center Street Parking Garage Berkeley

2016­1BD5 0 4/12/2016 02:00pm PST Danville Library Restroom Improvements Danville

2016­1C01 1 4/12/2016 02:00pm PST FY 2016 City­Wide Upper Lateral Rehabilitation Phase II Berkeley

2016­1C63 0 4/12/2016 02:00pm PST 2015 Polar Corridor Safety Improvement Project San Mateo

2016­1C68 0 4/12/2016 02:00pm PST 2016 Community Development Block Grant Curb Ramp and Sidewalk Installations San Mateo

Page 23: Construction weekly march 25, 2016

Construction Weekly •23

Projects Out to Bid

2016­1AA1 1 4/5/2016 02:00pm PST Tractor Supply Co. Brentwood

2016­1AC5 1 4/5/2016 02:00pm PST Kroeber Hall­PA Hearst Museum Gallery Renovation Berkeley

2016­1B96 0 4/5/2016 02:00pm PST Hesperian Boulevard Uitility Potholing Alameda

2016­1C6B 0 4/5/2016 02:00pm PST 2016 Wheelchair Ramp Installation San Mateo

2016­1B11 2 4/5/2016 02:30pm PST Franklin Square and Garfield Square Field Synthetic Turf Replacement Project San Francisco

2016­135D 0 4/5/2016 03:00pm PST Construction Testings & Special Inspection Service RFQ Los Altos

2016­19E7 1 4/5/2016 03:00pm PST ADA Transition Plan San Leandro

2016­1B9B 0 4/5/2016 03:00pm PST George Peabody Elementary School Schoolyard Project San Francisco

2016­1B99 0 4/5/2016 03:30pm PST Yick Wo Elementary School Green Schoolyard Project San Francisco

2016­1092 1 4/6/2016 02:00pm PST Hilltop Green Lift Station Replacement San Pablo

2016­17A0 1 4/6/2016 02:00pm PST Storage Yard Improvements & Furnished Pipe Santa Clara

2016­186F 0 4/6/2016 02:00pm PST Pump and Blower Building Seismic Upgrades Martinez

2016­1B6A 0 4/6/2016 02:00pm PST CADOT 04­3J5104 Cold Plane Asphalt Concrete Pavement and RHMA Overlay San Mateo County

2016­1B93 0 4/6/2016 02:00pm PST Bernal Property Off Leash Dog Park Pleasanton

2016­1C54 0 4/6/2016 02:00pm PST San Jose State University Flooring and Floor Covering Maintenance San Jose

2016­1CB7 0 4/6/2016 02:00pm PST Rigging and Repair of Port Of Oakland Cranes for the Period Commencing July 1, 2016and Ending June 30, 2017, 2018 or 2019

Oakland

2016­1CD9 0 4/6/2016 02:00pm PST Green Bike Lane Pilot Project Mountain View

2016­1D03 0 4/6/2016 02:00pm PST Migrant Labor Camp Sewer Line Repair Hollister

2016­1D50 0 4/6/2016 02:00pm PST Baxter on Broadway (Formerly B51 Temescal Apartments) Oakland

2016­1A93 1 4/6/2016 02:30pm PST Painting and Epoxy Flooring Bid Package for Moscone Expansion Project San Francisco

2016­1AA9 1 4/6/2016 02:30pm PST Expansion Joints Bid Package for Moscone Expansion Project San Francisco

2016­1CB0 0 4/6/2016 03:00pm PST Cathodic Protection Upgrade of The Recycled Water First Steps Pipeline Redwood City

2016­1E0E 0 4/6/2016 03:00pm PST Santa Clara Valley Medical Center Resource Service Center (RSC) for Shelving San Jose

2016­1BF4 0 4/6/2016 11:00pm CST Rosedale Area Paving Project Capitola

2016­11B6 1 4/7/2016 02:00pm PST Colma Town Hall Campus­Renovation & Addition Project Colma

2016­11EC 0 4/7/2016 02:00pm PST Structural Reach Replacement, PCR (A)­S1­2011 Car A Sewer Replacement, Phase 1 Los Altos

2016­1277 1 4/7/2016 02:00pm PST Senador Mine Restoration Project Santa Clara

2016­17C7 1 4/7/2016 02:00pm PST Soma/Bernal Heights/Exculsior Districts Sewer Replacement & Pavement Renovation San Francisco

2016­1B97 2 4/7/2016 02:00pm PST Pump Station Improvements­Rebid Oakland

2016­1C16 0 4/7/2016 02:00pm PST International Terminal Media Room San Francisco

2016­1C57 0 4/7/2016 02:00pm PST Aragon High School CTE Classrooms, Phase 2 San Mateo

2016­1CAE 0 4/7/2016 02:00pm PST Emergency Standby 230 KW Stationary Generator Pleasanton

2016­1CC0 0 4/7/2016 02:00pm PST Marsh Road Channel Repair Project Atherton

2016­1CD5 0 4/7/2016 02:00pm PST Relocatable Classroom Placement, Reconfiguration and Alterations at Del Mar &Prospect High School Campuses

Saratoga

2016­1D20 0 4/7/2016 02:00pm PST Preschool Playground at Lynhaven E.S. San Jose

2016­1D21 0 4/7/2016 02:30pm PST Campbell Care @ Marshall Lane E.S. Saratoga

2016­1B0B 0 4/7/2016 03:00pm PST Fourth Major Interceptor Rehabilitation Phase II B­Rebid San Jose

2016­1B90 0 4/7/2016 03:00pm PST Big Creek Reserve Prop 84 Improvements Big Sur

2016­1D7F 0 4/7/2016 03:00pm PST Construction Enabling Improvement Project San Jose

2016­1D8A 1 4/8/2016 10:30am PST Modernization Group II Package 1B Kitchen Hood Replacement at Various Sites ­REBID

Concord

2016­1D36 0 4/8/2016 02:00pm PST Hall of Justice Duct Cleaning San Francisco

2016­17D3 0 4/8/2016 02:30pm PST Restroom/Concession & Maintenance Building Electric Installtion at Polo GroundsCounty Parks

Aptos

2016­1AB0 0 4/8/2016 02:30pm PST Miscellaneous Metals Bid Package for Moscone Expansion Project San Francisco

2016­1A8B 0 4/12/2016 10:00am PST Boardroom Upgrade Oakland

2016­1D23 0 4/12/2016 10:00am PST San Carlos Library Improvements San Carlos

2016­1267 1 4/12/2016 02:00pm PST Installation of Electric Vehicle Charging Stations at Various Locations Various

2016­1732 0 4/12/2016 02:00pm PST Beacon West M­26 Well Project Bethel Island

2016­1867 0 4/12/2016 02:00pm PST Center Street Parking Garage Berkeley

2016­1BD5 0 4/12/2016 02:00pm PST Danville Library Restroom Improvements Danville

2016­1C01 1 4/12/2016 02:00pm PST FY 2016 City­Wide Upper Lateral Rehabilitation Phase II Berkeley

2016­1C63 0 4/12/2016 02:00pm PST 2015 Polar Corridor Safety Improvement Project San Mateo

2016­1C68 0 4/12/2016 02:00pm PST 2016 Community Development Block Grant Curb Ramp and Sidewalk Installations San Mateo

2016­1D25 0 4/12/2016 02:00pm PST Stone Valley Middle School Increment 1 Grading and Utilities Alamo

2016­1D87 0 4/12/2016 02:00pm PST Electrical Maintenance Services San Carlos

2016­1B38 0 4/12/2016 02:30pm PST Library Capital Maintenance HVAC Replacement Project Danville

2016­1D3B 0 4/12/2016 03:00pm PST FY16 Asphalt Paving Project Palo Alto

2016­1811 0 4/12/2016 05:00pm PST Request for Qualification for Three Seperate Services Brentwood

2016­1CDA 0 4/13/2016 11:00am PST Rispin/Peery Park ADA Pathway Improvements­Phase II Capitola

2016­1D88 0 4/13/2016 11:00am PST Modernization Group II Restroom Renovations at Various Sites ­ REBID Concord

2016­1140 0 4/13/2016 02:00pm PST Canoas Creek Rodent Damage Repair Project San Jose

2016­1141 3 4/13/2016 02:00pm PST San Francisquito Creek Flood Reduction, Ecosystem Restoration & Recreation Project Palo Alto

2016­180A 1 4/13/2016 02:00pm PST Project Management Support Services for the Wayfinding Enhancement Program San Francisco

2016­1BCD 0 4/13/2016 02:00pm PST Southeast Hills Water Transmission Pipeline Project Pittsburg

2016­1BD1 0 4/13/2016 02:00pm PST Fuel Storage Tank Replacement Project Pittsburg Water Treatment Plant andShadybrook Pump Station

Pittsburg

2016­1D0A 0 4/13/2016 02:00pm PST CADOT 04­2A3314 Install Delineators, Groove Existing Concrete Pavement, RumbleStrips

Alameda County

2016­1D73 0 4/13/2016 02:00pm PST San Jose State University Concrete Maintenance San Jose

2016­1BDA 0 4/13/2016 03:00pm PST Brokaw Substation Feeders 101 and 102 Installation Project Santa Clara

2016­1CDC 0 4/13/2016 03:00pm PST Smart Station Main Service Switchboard Replacement Project Sunnyvale

2016­0582 2 4/14/2016 01:00pm PST Stevens Creek Elementary School Modernization Cupertino

2016­17BD 1 4/14/2016 02:00pm PST Sunol Long Term Improvements ­ This Project Will Not Be Uploaded San Francisco

2016­1A69 0 4/14/2016 02:00pm PST Point Pinole Regional Shoreline Breuner Marsh Restoration & Public AccessImprovements

Richmond

2016­1A7D 1 4/14/2016 02:00pm PST Alexander Park Restroom Project Belmont

2016­1BE0 0 4/14/2016 02:00pm PST Iron Horse Trail Improvements San Ramon

2016­1C4F 0 4/14/2016 02:00pm PST ITT and Accounting Work Area Renovations San Francisco

2016­1CC1 0 4/14/2016 02:00pm PST Woodside High School ­ Wing J New Classroom Building Woodside

2016­1C12 0 4/14/2016 02:30pm PST Smoke Containment Bid Package for Moscone Expansion Project San Francisco

2016­1D78 0 4/14/2016 03:00pm PST Sanitary Sewer Condition Assessment 2015­2016 Julian­Sunol I San Jose

2016­1D82 0 4/14/2016 03:00pm PST Cast Iron Replacement FY 2015­2016 (Package I) San Jose

2016­1D85 0 4/15/2016 03:00pm PST LED Runway Guard Light Fixtures/Isolation Transformers/Remote Control Devises San Jose

2016­1B42 0 4/18/2016 02:00pm PST Davey Glen Park Project Belmont

2016­1D38 0 4/18/2016 05:00pm PST Hillside Block 48 Phase 1A (Subs Bids Only) San Francisco

2016­0C44 0 4/19/2016 Storm Water Mitigation Project Orinda

2016­1CFC 0 4/19/2016 11:00am PST 2016 Pavement Management Program Project Saratoga

2016­1337 0 4/19/2016 01:00pm PST Dilworth Elementary Modernization San Jose

2016­1D28 0 4/19/2016 2:00 pm PST Buchanan Airport Taxiway Echo & Kilo Improvements Concord

2016­1321 0 4/19/2016 02:00pm PST De Vargas Elementary School Modernization San Jose

2016­1B94 0 4/19/2016 02:00pm PST BART Earthquake Safety Program Fruitvale Station and Coliseum Station Oakland

2016­1CCC 0 4/19/2016 02:00pm PST 2015/16 Pavement Slurry Seal Project Danville

2016­1CE8 0 4/19/2016 02:00pm PST C­633/Pac­Seismic Retrofit Performing Arts Center San Pablo

2016­1D7E 0 4/19/2016 3:00pm PST Pinole Creek Fish Passage Project Pinole

2016­1D2F 0 4/20/2016 01:00pm PST Dilworth Interim Housing San Jose

2016­1C81 0 4/20/2016 01:30pm PST Main Wastewater Treatment Plant Digester Lighting Oakland

2016­1CB6 0 4/20/2016 02:00pm PST Runway 12­30 Light Can Rehabilitation South Field, Oakland International Airport Oakland

2016­1D49 0 4/20/2016 02:00pm PST Construction of Taxiway P Pavement Rehabilitation North Field Oakland InternationalAirport

Oakland

2016­1E0C 0 4/20/2016 02:00pm PST Yera Buena High School San Jose

2016­1B48 0 4/21/2016 10:00am PST Carpet & Baseboard Installation at La Joya Elementary School­RFP Salinas

2016­1B4F 0 4/21/2016 10:00am PST Classroom Modernization at La Joya Elementary School­RFP Salinas

2016­1B53 0 4/21/2016 10:00am PST ADA Compliant Ramps at La Joya Elementary School­RFP Salinas

2016­1B56 0 4/21/2016 10:00am PST Carpet & Baseboard Installation at Santa Rita Elementary School­RFP Salinas

2016­1B59 0 4/21/2016 10:00am PST Classroom Modernization at Santa Rita Elementary School­RFP Salinas

2016­1B5F 0 4/21/2016 10:00am PST ADA Compliant Ramps at Santa Rita Elementary School­RFP Salinas

2016­1D2D 0 4/21/2016 02:00pm PST De Vargas Elementary Interim Housing San Jose

2016­1D75 0 4/21/2016 03:00pm PST Park Avenue Green Street Pilot Project San Jose

Page 24: Construction weekly march 25, 2016

24 • Construction Weekly

Projects Out to Bid

For a complete list of Statewide projects please visit www.calbx.com.

2016­1D25 0 4/12/2016 02:00pm PST Stone Valley Middle School Increment 1 Grading and Utilities Alamo

2016­1D87 0 4/12/2016 02:00pm PST Electrical Maintenance Services San Carlos

2016­1B38 0 4/12/2016 02:30pm PST Library Capital Maintenance HVAC Replacement Project Danville

2016­1D3B 0 4/12/2016 03:00pm PST FY16 Asphalt Paving Project Palo Alto

2016­1811 0 4/12/2016 05:00pm PST Request for Qualification for Three Seperate Services Brentwood

2016­1CDA 0 4/13/2016 11:00am PST Rispin/Peery Park ADA Pathway Improvements­Phase II Capitola

2016­1D88 0 4/13/2016 11:00am PST Modernization Group II Restroom Renovations at Various Sites ­ REBID Concord

2016­1140 0 4/13/2016 02:00pm PST Canoas Creek Rodent Damage Repair Project San Jose

2016­1141 3 4/13/2016 02:00pm PST San Francisquito Creek Flood Reduction, Ecosystem Restoration & Recreation Project Palo Alto

2016­180A 1 4/13/2016 02:00pm PST Project Management Support Services for the Wayfinding Enhancement Program San Francisco

2016­1BCD 0 4/13/2016 02:00pm PST Southeast Hills Water Transmission Pipeline Project Pittsburg

2016­1BD1 0 4/13/2016 02:00pm PST Fuel Storage Tank Replacement Project Pittsburg Water Treatment Plant andShadybrook Pump Station

Pittsburg

2016­1D0A 0 4/13/2016 02:00pm PST CADOT 04­2A3314 Install Delineators, Groove Existing Concrete Pavement, RumbleStrips

Alameda County

2016­1D73 0 4/13/2016 02:00pm PST San Jose State University Concrete Maintenance San Jose

2016­1BDA 0 4/13/2016 03:00pm PST Brokaw Substation Feeders 101 and 102 Installation Project Santa Clara

2016­1CDC 0 4/13/2016 03:00pm PST Smart Station Main Service Switchboard Replacement Project Sunnyvale

2016­0582 2 4/14/2016 01:00pm PST Stevens Creek Elementary School Modernization Cupertino

2016­17BD 1 4/14/2016 02:00pm PST Sunol Long Term Improvements ­ This Project Will Not Be Uploaded San Francisco

2016­1A69 0 4/14/2016 02:00pm PST Point Pinole Regional Shoreline Breuner Marsh Restoration & Public AccessImprovements

Richmond

2016­1A7D 1 4/14/2016 02:00pm PST Alexander Park Restroom Project Belmont

2016­1BE0 0 4/14/2016 02:00pm PST Iron Horse Trail Improvements San Ramon

2016­1C4F 0 4/14/2016 02:00pm PST ITT and Accounting Work Area Renovations San Francisco

2016­1CC1 0 4/14/2016 02:00pm PST Woodside High School ­ Wing J New Classroom Building Woodside

2016­1C12 0 4/14/2016 02:30pm PST Smoke Containment Bid Package for Moscone Expansion Project San Francisco

2016­1D78 0 4/14/2016 03:00pm PST Sanitary Sewer Condition Assessment 2015­2016 Julian­Sunol I San Jose

2016­1D82 0 4/14/2016 03:00pm PST Cast Iron Replacement FY 2015­2016 (Package I) San Jose

2016­1D85 0 4/15/2016 03:00pm PST LED Runway Guard Light Fixtures/Isolation Transformers/Remote Control Devises San Jose

2016­1B42 0 4/18/2016 02:00pm PST Davey Glen Park Project Belmont

2016­1D38 0 4/18/2016 05:00pm PST Hillside Block 48 Phase 1A (Subs Bids Only) San Francisco

2016­0C44 0 4/19/2016 Storm Water Mitigation Project Orinda

2016­1CFC 0 4/19/2016 11:00am PST 2016 Pavement Management Program Project Saratoga

2016­1337 0 4/19/2016 01:00pm PST Dilworth Elementary Modernization San Jose

2016­1D28 0 4/19/2016 2:00 pm PST Buchanan Airport Taxiway Echo & Kilo Improvements Concord

2016­1321 0 4/19/2016 02:00pm PST De Vargas Elementary School Modernization San Jose

2016­1B94 0 4/19/2016 02:00pm PST BART Earthquake Safety Program Fruitvale Station and Coliseum Station Oakland

2016­1CCC 0 4/19/2016 02:00pm PST 2015/16 Pavement Slurry Seal Project Danville

2016­1CE8 0 4/19/2016 02:00pm PST C­633/Pac­Seismic Retrofit Performing Arts Center San Pablo

2016­1D7E 0 4/19/2016 3:00pm PST Pinole Creek Fish Passage Project Pinole

2016­1D2F 0 4/20/2016 01:00pm PST Dilworth Interim Housing San Jose

2016­1C81 0 4/20/2016 01:30pm PST Main Wastewater Treatment Plant Digester Lighting Oakland

2016­1CB6 0 4/20/2016 02:00pm PST Runway 12­30 Light Can Rehabilitation South Field, Oakland International Airport Oakland

2016­1D49 0 4/20/2016 02:00pm PST Construction of Taxiway P Pavement Rehabilitation North Field Oakland InternationalAirport

Oakland

2016­1E0C 0 4/20/2016 02:00pm PST Yera Buena High School San Jose

2016­1B48 0 4/21/2016 10:00am PST Carpet & Baseboard Installation at La Joya Elementary School­RFP Salinas

2016­1B4F 0 4/21/2016 10:00am PST Classroom Modernization at La Joya Elementary School­RFP Salinas

2016­1B53 0 4/21/2016 10:00am PST ADA Compliant Ramps at La Joya Elementary School­RFP Salinas

2016­1B56 0 4/21/2016 10:00am PST Carpet & Baseboard Installation at Santa Rita Elementary School­RFP Salinas

2016­1B59 0 4/21/2016 10:00am PST Classroom Modernization at Santa Rita Elementary School­RFP Salinas

2016­1B5F 0 4/21/2016 10:00am PST ADA Compliant Ramps at Santa Rita Elementary School­RFP Salinas

2016­1D2D 0 4/21/2016 02:00pm PST De Vargas Elementary Interim Housing San Jose

2016­1D75 0 4/21/2016 03:00pm PST Park Avenue Green Street Pilot Project San Jose

2016­1D86 0 4/21/2016 03:00pm PST Park Avenue Multimodal Streetscape Improvements­Rebid San Jose

2016­1B8B 0 4/22/2016 02:30pm PST Los Padres And Monterey Park Elementary School Asphalt Pavement RehabilitationProject

Salinas

2016­1B10 0 4/22/2016 03:00pm PST New Telecommunications Platform for San Francisco State University­RFP San Francisco

2016­1D7D 0 4/22/2016 03:00pm PST Pumps Maintenance and Repair/Replacement Services San Jose

2016­1D27 0 4/26/2016 2:00 pm PST Dougherty Road Improvements Dublin

2016­1D6C 0 4/26/2016 2:00 pm PST Port Chicago Highway & Willow Pass Road Bike & Pedestrian Improvements Concord

2016­1CB2 0 4/26/2016 02:00pm PST City Hall Campus Emergency Generator Replacement Project Santa Cruz

2016­1E09 0 4/26/2016 02:00pm PST LAWMA Medium Voltage Cable Replacement Project Pleasanton

2016­1C88 0 4/27/2016 01:30pm PST Berkeley View No. 2, Potrero and Muir Reservoirs Demolition Berkeley/Richmond

2016­0E8C 0 4/27/2016 02:00pm PST Flint Parking Structure Repair Project Los Altos

2016­1CF0 0 4/27/2016 02:00pm PST Theatre Acoustical Improvements, Building 400 Las Positas College Livermore

2016­1D89 0 4/27/2016 02:30pm PST West Sunset Playground Renovation­Rebid San Francisco

2016­1278 0 4/27/2016 04:00pm PST Recycled Water Project ­ Sharon Heights ­ RFQ Menlo Park

2016­1E10 0 4/28/2016 02:00pm PST Lakeside Green Street Oakland

2016­1B3B 0 4/28/2016 04:00pm PST San Ramon Service Center Fuel Tank Replacement Project San Ramon

BETTER. STRONGER. TOGETHER. BUILDING SUCCESS BEGINS HERE.

Home | About Us | Join | News | Resources | Virtual Plan Room | Log off

2015 Virtual Plan Room Network, Ltd. ­ All Rights Reserved Worldwide

Page 25: Construction weekly march 25, 2016

Construction Weekly •25

LIENLADY

THE

The Lien Lady has successfully prepared and utilized pre-liens and other related

construction documents to secure accounts receivables for material suppliers,

contractors and equipment rental companies for 25 years.

MECHANICS LIENS 201

THE COMPLETE GUIDE TO ACCURATELY RESEARCHING A PRE-LIEN- This class is for those who have taken MechanicsLiens 101 or who have solid knowledge of Pre-Liens and Mechanics Liens. Learn on-line/telephone research processes to help ensure youprepare the most accurate pre-lien possible.

September 07, 20168:30 a.m. - 11:30 a.m.$40.00 - Members, $55.00 - Non-Members

RSVP Now! Email - [email protected] Phone - 209-478-1000Fax - 209-478-2132On-line - www.besonline.com

101

MECHANICS LIENS 101

THE WHO, WHAT, WHEN, WHERE, WHY & HOW OF MECHANICS LIENS-Learn what mechanics liens and pre-liens are andhow you can use them to protect your accountsreceivables.

April 27, 20168:30 a.m. - 11:30 a.m.$50.00 - Members, $65.00 - Non-Members

201

THE LIEN LADY SeminarBuilders Exchange of Stockton2016 Schedule

2016­1D25 0 4/12/2016 02:00pm PST Stone Valley Middle School Increment 1 Grading and Utilities Alamo

2016­1D87 0 4/12/2016 02:00pm PST Electrical Maintenance Services San Carlos

2016­1B38 0 4/12/2016 02:30pm PST Library Capital Maintenance HVAC Replacement Project Danville

2016­1D3B 0 4/12/2016 03:00pm PST FY16 Asphalt Paving Project Palo Alto

2016­1811 0 4/12/2016 05:00pm PST Request for Qualification for Three Seperate Services Brentwood

2016­1CDA 0 4/13/2016 11:00am PST Rispin/Peery Park ADA Pathway Improvements­Phase II Capitola

2016­1D88 0 4/13/2016 11:00am PST Modernization Group II Restroom Renovations at Various Sites ­ REBID Concord

2016­1140 0 4/13/2016 02:00pm PST Canoas Creek Rodent Damage Repair Project San Jose

2016­1141 3 4/13/2016 02:00pm PST San Francisquito Creek Flood Reduction, Ecosystem Restoration & Recreation Project Palo Alto

2016­180A 1 4/13/2016 02:00pm PST Project Management Support Services for the Wayfinding Enhancement Program San Francisco

2016­1BCD 0 4/13/2016 02:00pm PST Southeast Hills Water Transmission Pipeline Project Pittsburg

2016­1BD1 0 4/13/2016 02:00pm PST Fuel Storage Tank Replacement Project Pittsburg Water Treatment Plant andShadybrook Pump Station

Pittsburg

2016­1D0A 0 4/13/2016 02:00pm PST CADOT 04­2A3314 Install Delineators, Groove Existing Concrete Pavement, RumbleStrips

Alameda County

2016­1D73 0 4/13/2016 02:00pm PST San Jose State University Concrete Maintenance San Jose

2016­1BDA 0 4/13/2016 03:00pm PST Brokaw Substation Feeders 101 and 102 Installation Project Santa Clara

2016­1CDC 0 4/13/2016 03:00pm PST Smart Station Main Service Switchboard Replacement Project Sunnyvale

2016­0582 2 4/14/2016 01:00pm PST Stevens Creek Elementary School Modernization Cupertino

2016­17BD 1 4/14/2016 02:00pm PST Sunol Long Term Improvements ­ This Project Will Not Be Uploaded San Francisco

2016­1A69 0 4/14/2016 02:00pm PST Point Pinole Regional Shoreline Breuner Marsh Restoration & Public AccessImprovements

Richmond

2016­1A7D 1 4/14/2016 02:00pm PST Alexander Park Restroom Project Belmont

2016­1BE0 0 4/14/2016 02:00pm PST Iron Horse Trail Improvements San Ramon

2016­1C4F 0 4/14/2016 02:00pm PST ITT and Accounting Work Area Renovations San Francisco

2016­1CC1 0 4/14/2016 02:00pm PST Woodside High School ­ Wing J New Classroom Building Woodside

2016­1C12 0 4/14/2016 02:30pm PST Smoke Containment Bid Package for Moscone Expansion Project San Francisco

2016­1D78 0 4/14/2016 03:00pm PST Sanitary Sewer Condition Assessment 2015­2016 Julian­Sunol I San Jose

2016­1D82 0 4/14/2016 03:00pm PST Cast Iron Replacement FY 2015­2016 (Package I) San Jose

2016­1D85 0 4/15/2016 03:00pm PST LED Runway Guard Light Fixtures/Isolation Transformers/Remote Control Devises San Jose

2016­1B42 0 4/18/2016 02:00pm PST Davey Glen Park Project Belmont

2016­1D38 0 4/18/2016 05:00pm PST Hillside Block 48 Phase 1A (Subs Bids Only) San Francisco

2016­0C44 0 4/19/2016 Storm Water Mitigation Project Orinda

2016­1CFC 0 4/19/2016 11:00am PST 2016 Pavement Management Program Project Saratoga

2016­1337 0 4/19/2016 01:00pm PST Dilworth Elementary Modernization San Jose

2016­1D28 0 4/19/2016 2:00 pm PST Buchanan Airport Taxiway Echo & Kilo Improvements Concord

2016­1321 0 4/19/2016 02:00pm PST De Vargas Elementary School Modernization San Jose

2016­1B94 0 4/19/2016 02:00pm PST BART Earthquake Safety Program Fruitvale Station and Coliseum Station Oakland

2016­1CCC 0 4/19/2016 02:00pm PST 2015/16 Pavement Slurry Seal Project Danville

2016­1CE8 0 4/19/2016 02:00pm PST C­633/Pac­Seismic Retrofit Performing Arts Center San Pablo

2016­1D7E 0 4/19/2016 3:00pm PST Pinole Creek Fish Passage Project Pinole

2016­1D2F 0 4/20/2016 01:00pm PST Dilworth Interim Housing San Jose

2016­1C81 0 4/20/2016 01:30pm PST Main Wastewater Treatment Plant Digester Lighting Oakland

2016­1CB6 0 4/20/2016 02:00pm PST Runway 12­30 Light Can Rehabilitation South Field, Oakland International Airport Oakland

2016­1D49 0 4/20/2016 02:00pm PST Construction of Taxiway P Pavement Rehabilitation North Field Oakland InternationalAirport

Oakland

2016­1E0C 0 4/20/2016 02:00pm PST Yera Buena High School San Jose

2016­1B48 0 4/21/2016 10:00am PST Carpet & Baseboard Installation at La Joya Elementary School­RFP Salinas

2016­1B4F 0 4/21/2016 10:00am PST Classroom Modernization at La Joya Elementary School­RFP Salinas

2016­1B53 0 4/21/2016 10:00am PST ADA Compliant Ramps at La Joya Elementary School­RFP Salinas

2016­1B56 0 4/21/2016 10:00am PST Carpet & Baseboard Installation at Santa Rita Elementary School­RFP Salinas

2016­1B59 0 4/21/2016 10:00am PST Classroom Modernization at Santa Rita Elementary School­RFP Salinas

2016­1B5F 0 4/21/2016 10:00am PST ADA Compliant Ramps at Santa Rita Elementary School­RFP Salinas

2016­1D2D 0 4/21/2016 02:00pm PST De Vargas Elementary Interim Housing San Jose

2016­1D75 0 4/21/2016 03:00pm PST Park Avenue Green Street Pilot Project San Jose

2016­1D86 0 4/21/2016 03:00pm PST Park Avenue Multimodal Streetscape Improvements­Rebid San Jose

2016­1B8B 0 4/22/2016 02:30pm PST Los Padres And Monterey Park Elementary School Asphalt Pavement RehabilitationProject

Salinas

2016­1B10 0 4/22/2016 03:00pm PST New Telecommunications Platform for San Francisco State University­RFP San Francisco

2016­1D7D 0 4/22/2016 03:00pm PST Pumps Maintenance and Repair/Replacement Services San Jose

2016­1D27 0 4/26/2016 2:00 pm PST Dougherty Road Improvements Dublin

2016­1D6C 0 4/26/2016 2:00 pm PST Port Chicago Highway & Willow Pass Road Bike & Pedestrian Improvements Concord

2016­1CB2 0 4/26/2016 02:00pm PST City Hall Campus Emergency Generator Replacement Project Santa Cruz

2016­1E09 0 4/26/2016 02:00pm PST LAWMA Medium Voltage Cable Replacement Project Pleasanton

2016­1C88 0 4/27/2016 01:30pm PST Berkeley View No. 2, Potrero and Muir Reservoirs Demolition Berkeley/Richmond

2016­0E8C 0 4/27/2016 02:00pm PST Flint Parking Structure Repair Project Los Altos

2016­1CF0 0 4/27/2016 02:00pm PST Theatre Acoustical Improvements, Building 400 Las Positas College Livermore

2016­1D89 0 4/27/2016 02:30pm PST West Sunset Playground Renovation­Rebid San Francisco

2016­1278 0 4/27/2016 04:00pm PST Recycled Water Project ­ Sharon Heights ­ RFQ Menlo Park

2016­1E10 0 4/28/2016 02:00pm PST Lakeside Green Street Oakland

2016­1B3B 0 4/28/2016 04:00pm PST San Ramon Service Center Fuel Tank Replacement Project San Ramon

BETTER. STRONGER. TOGETHER. BUILDING SUCCESS BEGINS HERE.

Home | About Us | Join | News | Resources | Virtual Plan Room | Log off

2015 Virtual Plan Room Network, Ltd. ­ All Rights Reserved Worldwide

Page 26: Construction weekly march 25, 2016

26 • Construction Weekly

LEGALNoticesP (209) 599-8895 F (209) 599-6530 • PO Box 554 Ripon CA 95366

NOTICE OF COMPLETION Recordation Completion Date Owner Name Date Contractor Name Property Address 03/07/16 City of Ripon 01/12/16 American Pavement Systems Asphalt Rubber Cape Seal City of Ripon 01/12/16 AM Stephens Const Co Inc Jack Tone Rd Park & Ride Lot County of San Joaquin 02/23/16 Taylor Backhoe Service Inc North 99 Frontage Rd Interconnection Proj Meritage Homes of Calif Inc 03/04/16 2359 Mathar Dr, Mtca Union Ranch Partners LLC 02/04/16 Atherton Homes 1662 Tulipano Ct, Mtca03/08/16 County of San Joaquin 03/08/16 Tom Mayo Const Inc East Country Club Reconst Ph 2 Crivello Estates LP 03/01/16 Raymus Const Inc 821 Granite Ln, Mtca Glenbriar Homes LLC 02/08/16 498 Delaney Ct, Trcy Lionsgate Inv 2 LLC 12/22/15 Kapital Bldg Group 734 7th St, Rpn Pulte Home Corp 03/04/16 1461 Arbor Brook Dr, Mtca TRI Pointe Homes Inc 03/07/16 1118 Vecindad St, Mtn Hse03/09/16 Reclamation Dist 1614 03/08/16 Robert Burns Const Inc South Bank Calaveras River Reclamation Dist 2085 02/25/16 Robert Burns Const Inc West Bank Levee of San Joaquin River Shea Homes LP 03/03/16 681 N Colcannon Dr, Mtn Hse Union Ranch Partners LLC 02/17/16 Atherton Homes 1654 Tulipano Ct, Mtca Woodside 05N LP 02/26/16 Woodside Homes 687 Tantaros Ln, Trcy Woodside 05N LP 02/18/16 Woodside Homes No Address Listed03/10/16 Bright Dev 03/03/16 1369 Brandon Dewey Ln, Trcy Brookfield Windrift LLC 03/10/16 878 River Bend Dr, Lthrp CPG River Island 03/03/16 DeNova Homes Inc 18302 Millbrook Ave, Lthrp Communities LLC DR Horton Bay Inc 03/07/16 1762 W Woodward Ave, Mtca KB Home Central Valley Inc 02/29/16 3624 Jagger Ln, Stkn Oleander LP 03/02/16 Raymus Const Inc 1491 Maehl Dr, Mtca Pedro Duran 03/09/16 2566 Canal Dr, Lodi Pulte Home Corp 03/08/16 2988 Clear Point Wy, Mtca Richmond American Homes of 03/09/16 188 W Aldrich Pl, Mtn Hse Maryland Inc TL Shoreline LP 03/10/16 690 Channel Dr, Lthrp TRI Pointe Homes Inc 03/09/16 1110 Vecindad St, Mtn Hse William Lyon Homes Inc 03/10/16 2593 Daniel Hansen Wy, Trcy03/11/16 Bright Dev 03/07/16 744 Grizzly Ct, Trcy County of San Joaquin 03/08/16 Ford Const Co Inc Landfill Area 5 at North County Sanitary Landfill Glenbriar Homes LLC 02/08/16 467 Delaney Ct, Trcy Meritage Homes of Calif Inc 02/28/16 2320 Emigrant Pl, Mtca Oakwood LT Ventures LLC 03/09/16 Casner Communities Inc APN 241-570-44 Oleander LP 02/25/16 Raymus Const Inc 1517 Toy St, Mtca Pulte Home Corp 03/09/16 1649 Union Ln, Trcy Union Ranch Partners LLC 02/25/16 Atherton Homes 1038 Clearwater Creek Blvd, Mtca

Page 27: Construction weekly march 25, 2016

Construction Weekly •27

MECHANICS LIENS Date Lien Recorded Owner Name Amount Contractor Name Property Address 03/07/16 Luciano & Shelly Silveria $15,000 Robert L Reis 1735 Paloma, Stkn Luciano & Shelly Silveria $15,000 Robert L Reis 1824 Del Rio Dr, Stkn03/10/16 Gertrude Holding LLC $15,111 David Hall Masonry Inc 2 W Pine St, Stkn Tan United Properties LLC $3,265 Doncam American Inc dba 2429 Delaware Ave, Stkn Discount Plumbing03/11/16 Ray Rangel $27,710 Ace Comm Plastering Inc 26174 Magnolia Rd, Escln LIEN RELEASES Date Recorded Owner Name Contractor Name Property Address 03/09/16 David Rapisura Moorman’s Water Systems Inc 9920 S Lockhart Rd, Frnch Cmp

LEGALNoticesP (209) 599-8895 F (209) 599-6530 • PO Box 554 Ripon CA 95366

Finding just the right people, recruiting and managing… that takes a very specialized, quali-fied team of experts. Our team of recruiters are the best in the field, because they have been there. They have lived it. In each and every case, we strategically identify and qualify every candidate, ensuring you always get a far higher level of value in each person on staff.

VForce really stands apart by offering unique, tailored solutions that fit your very specific needs.

VForce Staffing SolutionsFor The Construction Industry

Alan Freeman - Business Development Manager (209) 744-6344 – [email protected](855)625-0005 | Web: vforcestaff.com

• Skilled Trades Construction Workers• General Labor• Specialty Workers• Salespeople

• Temporary• Temp to hire• Employee Leasing• Direct Hire

Page 28: Construction weekly march 25, 2016

28 • Construction Weekly

by State Compensation Insurance Fund

builders’ safety services!

Underground Safety Alerts

Meeting Attended By

Employee Recommendations

Reviewed MSDS# Subject

Supervisor’s Signature

This information does not supercede local, State, or Federal regulations.

Mar

ch

11,

201

6

Before you dig in California, call for an Underground Service Alert (USA) or you could accidentally hit power, cable, or pipelines with dangerous or explosive gases. Accidental con-tact with underground utilities can cause property damage, injury and even death. This notification is required for small holes in private yards or large excavations on construction sites.

Whether you use hand tools, power tools, or mobile equip-ment to dig, mark the site of your planned excavation in white and call the USA hotline or log into the website to submit a dig notice. Notify USA at least 2 to 14 days before you dig to allow service providers that have wires, lines, or pipes in the area a chance to mark them.

From anywhere in California notify the local one call center at 811. Their website is www.call811.com.

When you notify the USA service of your excavation by phone or email, your excavation will be assigned a ticket number good for 28 days. You need an active ticket number for the duration of your excavation. Keep the ticket number to vali-date your excavation permit.When utility service providers mark their lines and pipes, they use color-coded markings for each type of installation. Keep these marks visible during your excavation. If the markings are not visible or become damaged, contact the local call center at 811 to have them re-marked.

When you are excavating, use hand tools to locate and ex-pose the underground utilities. Dig gently; excessive force can damage pipes. Use tools with fiberglass handles to reduce the risk of shock. An air or vacuum excavation may be the safest way to expose underground utilities. If you damage under-ground utilities, notify USA and/or the owner immediately.

Page 29: Construction weekly march 25, 2016

Construction Weekly •29

builders’ safety services!

builders’ safety services!

CLASS DATE TIME

First Aid/CPR April 13th 8 am - 12 pmMechanic Lien Seminar 101 April 27th 8:30 - 11:30 am

Membership Orientation May 3rd 12 - 1:30 pm

First Aid/CPR June 8th 8 am - 12 pm

Membership Orientation August 2nd 12 - 1:30 pm

Mechanic Lien Seminar 201 September 7th 8:30 - 11:30 am

First Aid/CPR November 9th 8 am - 12 pm

Page 30: Construction weekly march 25, 2016

BUILDERS’ EXCHANGEOF STOCKTON

7500 West Lane • Stockton, CA 95210

RETURN SERVICE REQUESTED

844-4CenCal www.cencalglass.com

AUTO H STORES H HOMES

H Window Film H Table Tops H Storefronts H Screens

H Windows H Mirrors H Tenant Improvements

H Door Repair Service H Glass Replacement

H Shower Enclosures

Email: [email protected] Phone(209)467-0000 Fax(209)467-0400

The Central Valley’s Newest Glass Shop