Constrcution Site Forms for site data
description
Transcript of Constrcution Site Forms for site data
\\sce_sce_ho\projects\al juhaini\forms
Consultant: Project: Contractor:
LOGO TITL
DRAWING SUBMITTALNew Submittal
Ref. No. : Date : Resubmittal
Architectural Electrical Civil Others Specs. No.
Structural Mechanical Interior Design Drwg. No.
Please find enclosed the following documents/drawings: No. Drawing No. Description / Title Code
Submitted For:
1. For Approval 3. For Further Action
2. For Information 4. For Your File
The submittal documents are in strict conformity with the design drawings and the specification. Minor deviations are indicated
in the submitted documents. All aspects of associated works have been considered and coordinated.
Technical Manager : ______________________
Received by:
Name: _________________ Date: ____________ Signature: _______________ Original + 2 Copy
Remarks / Comments:
Status Approved Revise & Resubmit, Work shall not proceed. No Action
Approved as noted Rejected - Resubmit
Date Name & Signature of Engineer Authorized by P.M.
A
B
C
D
N
Consultant: Project: Main Contractor:
LOGO TITL
DOCUMENTS SUBMITTALNew Submittal
Ref. No. : Date : Resubmittal
Architectural Electrical Civil Furniture/Equipment Specs. No.
Structural Mechanical Interior Design Others Drwg. No.
Description* Manufacturer Supplier No. of Catalogue/Sample Code
* Description: (Manufacture, Model, Type, Size, Colour, etc.)
Catalogue Drawing Sample Certificate Calculation Document
Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein ( )
Material Engineer/Name & Signature : ____________________ Project Manager/Name & Signature : ___________________
Received by:
Date Name & Signature of Consultant
Remarks / Comments:
Status Approved Revise & Resubmit, Work shall not proceed No Action
Approved as noted Rejected - Resubmit
Consultant Site Office Consultant Head Office
Engineer: Project Manager:
_________ _______________
Date Name & Signature Name & Signature Date Name & Signature
A
B
C
D
N
Consultant: Project: Main Contractor:
TITLE LOGO
REQUEST FOR OVERTIME
Request Ref. No. : R F 0 T - Building Ref:
Date: - - Area Ref:
Level Ref:
Description: Planned Date of Overtime - -
Requested Time : Hrs
Inspections No Starting Time Ending Time Signature Remarks
1. Civil/Structural inspection
2. Civil/Structural inspection
3. Structural inspection
4. Structural inspection
5. Architectural inspection
6. Electrical inspection
7. Electrical inspection
8. Mechanical inspection
9. Plumbing inspection
10. Interior inspection
11. Document Controller
Al-Latifia Engineer Incharge Eng.A.A.Hamed,Project Director
Signature: Signature:Date : Date :
O&A Engineer Incharge O&A Project Manager
Signature: Signature:Date : Date :
Consultant: Project: Main Contractor:
LOGO TITLE
ACKNOWLEDGEMENT OF OVERTIME WORKED
Acknow. No Building Ref:
Date: Area Ref:
OT Request No
DescrIption: Date:
Starting Time :
Ending Time :
Inspections No Starting Time Ending Time Signature Remarks
1. Civil/Structural inspection
2. Civil/Structural inspecti
3. Structural inspection
4. Structural inspection
5. Architectural inspection
6. Electrical inspection
7. Electrical inspection
8. Mechanical inspection
9. Plumbing inspection
10. Document Controller
Al-Latifia Engineer Incharge Contractor's Manager
Signature: Signature:
Date : Date :
Consultant's Engineer Incharge Consultnat Project Manager
Signature: Signature:
Date : Date :
Consultant: Project: Contractor:
LOGO TITLE
REQUEST FOR INSPECTION (…………………………..)
Request Ref. No. : RFI - S Building Ref:
Date of Request Area Ref:
Level Ref:
Descreption: Planned Date of Inspection
Time of Inspection : Hrs
Inspections Contractors QC Consultant
Name Signature Date Name Signature Date Code
1. Civil inspection
2. Structural inspection
3. Architectural inspection
4. Electrical inspection
5. Mechanical inspection
6. Survey inspection
7. QA/QC Head
8. Site Engineer Signature: ________________________
9. Sr. Site Engineer
10 Construction Manager
11. Project Coordinator Sub Contractor (1)
Sub Contractor (2)
STATUS:
A. Approved B. Approved as Noted C. Reinspection required
Consultant's Project Manager Signature:
Date :
Code: Work to Proceed Reinspection required
Consultant's Engineer Incharge:
Consultant's Comments:
Consultant: Project: Contractor:
TITLE LOGO
DELIVERY INSPECTION REQUEST
Delivery Note No. : Date :
Item No.: Date of Arrival:
Item Description: Location Stored:
Please be advised that said material and / or equipment has been delivered to site and safely stored as agreed in the location indicated. Further, we hereby certify that the material and/or equipment delivered and stored is/are as specified and approved as per sample / certification sheet list and item number indicated. It is understood that your approval does only constitute a review of general conformance to the contract document and accepted standards at the time of inspection.
Attachment: Packaging List Invoice
Contractor Date _____________________ Construction Manager ___________________
Following the inspection of above material which was conducted on the date mentioned below, please be advised that we confirm receipt of your delivery note with the following comments as noted: Our review of approval/delivery note of above material does not relieve the contractor of his responsibility under the terms of the contract nor authorize additional compensation.
Location as agreed Recommend for paymentChecked and accepted Not recommended for paymentAccepted subject to compliance as noted Payment not applicableRejected
Engineer Incharge _____________________
Technical Manager : ______________________ Date _____________________
To: Consultant
To: Contractor
Project: DAILY MANAGEMENT SUMMARY REPORTProject No: CONSTRUCTION EMPLOYEES (Total)
Client: Title No. Title No.
Consultant: DAILY REPORT
DATE: DAY: REPORT #
SITE WORKING HOURS :DAY SHIFT : AM TO PM - PM - PM WEATHER : [ ] Clear [ ] Windy [ ] RainNIGHT SHIFT : PM TO AM - AM TO AM : [ ] Cloudy [ ] Dusty [ ] OthersOTHERS :
TEMPERATURE Overnight Minimum
◦C at 07 : 00 Hrs ; ◦C at 14 : 00 Hrs
ACTIVITIES : Area/Building :
GRAND TOTAL :
SEE DETAILS NOTES: 0 0
ELECTRO MECHANICAL WORKS 0Construction Equipment
Equipment No. Equipment No.
Area/Building:
ELECTRO MECHANICAL WORKS
SEE DETAILSSUB-CONTRACTOR
Title No. Sub-Con. Name TradeArea/Building:
Area/Building:
ELECTRO MECHANICAL WORKS
Area/Building: Area/Building:
Area/Building
Area/Building: Area/Building:
NameSignature : Name :Date : Signature :
: Date :Attachments : 1 of 3
ACKNOWLEDGED BY : (For Consultant ____________)
Project :Project No. :From :To :
Date :
DAILY STAFF/LABOUR REPORT No. Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Main Site Office Staff
1 PROJECT DIRECTOR
2 ADMIN MANAGER
3 TECHNICAL MANAGER
4 ENGINEERING MANAGER
5 PLANNING MANAGER
6 PROCUREMENT HEAD
7 MEP MANAGER
8 CONTRACT ADMINISTRATOR
9 PROJECT COORDINATOR
10 SENIOR ARCHITECT ENG.
11 SENIOR ELECTRICAL ENG.
12 SENIOR MECHANICAL ENG.
13 ARCHITECT & CIVIL ENGR.
14 ELECTRICAL ENGINEER
15 MECHANICAL ENGINEER
16 PLANNING ENGINEER
17 PROCUREMENT ENGINEER
18 QUANTITY SURVEYOR
19 DRAFTSMAN
20 ACCOUNTANT
21 LOGESTIC IN-CHARGE
Project :Project No. :From :To :
Date :
DAILY STAFF/LABOUR REPORT No. Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
22 IT
23 DOCUMENT CONTROLLER
24 PURCHASER
25 OFFICE SECRETARY
26 RECEPTIONIST
27 OFFICE BOY
Site Staff
28 CONSTRUCTION MANAGER
29 AREA / ZONE MANAGER
30 SENIOR ARCH. / CIVIL ENG.
31 QA/QC MANAGER
32 SAFETY MANAGER
33 SENIOR Q.C. ENG
34 SENIOR ELEC. ENG
35 SENIOR MEP ENG
36 SITE ENGINEER (CIVIL / ARCH )
37 SITE ENGINEER (MECH)
38 SITE ENGINEER (ELEC)
39 QA/QC ENGINEER
44 LAND. SURVEYOR
40 CIVIL FOREMAN
42 ELEC. FOREMAN
43 MECH. FOREMAN
41 CIVIL GANG LEADER
Project :Project No. :From :To :
Date :
DAILY STAFF/LABOUR REPORT No. Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
45 LAB. TEAM
46 TIMEKEEPER
Workers
47 SAFETY OFFICER
48 ELECTRICIAN
49 PLUMBER
50 WELDER
51 PAINTER
52 CARPENTER
53 MASON
54 STEEL FIXER
55 LABOUR
56 MECHANIC
57 EQUIPMENT OPERATOR
58 MOBILE CRANE OPERATOR
59 TOWER CRANE OPERATOR
60 DRIVER
61 WAREHOUSE STAFF
62 STORE KEEPER
63 SECURITY GUARD
64 OFFICE BOY (SITE)
65 OTHERS
Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Project :Project No. :From :To :
Date :
MACHINERY REPORT No. MACHINE DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 Front Loaders
2 Mobile Crane
3 Generators (Large)
4 Generators (Small)
5 Vibrator
6 Air Compressor ( electric )
7 Air Compressor ( diesel )
8 Bar Bending Machine
9 Backhoe Loader (JCB)
10 Diesel Tanks
11 Water Tanks (Large)
12 Water Tanks (Small)
13 Water Trucks
14 Bobcats
15 Radial Saw
16 Jack Hammer
17 Tower crane
18 Water Pump
19 Welding machine
20 Helicopter
21 Dump Trucks
22 Tower light
23 Dump Trailer
24 Power Screed
Project :Project No. :From :To :
Date :
25 Screeder machine
26 Plate Compactor
27 Forklift
28 Poukling
29 Roller Compactor ( 10 / 7 / 1.5 ton )
30 Placing Boom
31 Spider Pump
32
33
Grand Total0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Project :Project No. :From :To :
Date :
DAILY SUBCONTRACTOR STAFF / LABOUR REPORT
No. Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Project :Project No. :From :To :
Date :
DAILY SUBCONTRACTOR STAFF / LABOUR REPORT
No. Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
44
40
42
43
41
Project :Project No. :From :To :
Date :
DAILY SUBCONTRACTOR STAFF / LABOUR REPORT
No. Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Project :Project No. :From :To :
Date :
SUBCONTRACTOR MACHINERY REPORT No. MACHINE DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Project :Project No. :From :To :
Date :
25
26
27
28
29
30
31
32
33
Grand Total0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Consultant: Project: Main Contractor:
LOGO TITL
MATERIAL SUBMITTALNew Submittal
Ref. No. : Date : Resubmittal
Architectural Electrical Civil Furniture/Equipment Specs. No.
Structural Mechanical Interior Design Others Drwg. No.
Description* Manufacturer Supplier No. of Catalogue/Sample Code
* Description: (Manufacture, Model, Type, Size, Colour, etc.)
Catalogue Drawing Sample Certificate Calculation Document
Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein ( )
Material Engineer/Name & Signature : ____________________ Project Manager/Name & Signature : ___________________
Received by:
Date Name & Signature of Consultant
Remarks / Comments:
Status Approved Revise & Resubmit, Work shall not proceed No Action
Approved as noted Rejected - Resubmit
Consultant Site Office Consultant Head Office
Engineer: Project Manager:
_________ _______________
Date Name & Signature Name & Signature Date Name & Signature
A
B
C
D
N
Project:: Hilton Riyadh Hotel & Residence
Project No.: J-142
From: Eng/ Ahmed Rady
To: All DepartmentsDoc.No: WP001
Work Permit Rev.0Date:28-Dec-2011
This to inform you that as per our schedule we are going to start the work described below
Drawing Ref.: Attachments':
S/N Description of Work Location Hot Cold Start Date End Date
1 Mass concrete around raft foundation Hotel tower Z1-1 31-Dec-11 8-Jan-12
2
3
4
5
6
7
8
9
10
Departments Approval
S/N Department Approval Comments Revised Date Name Signature
1 Electrical
2 Mechanical
3 Construction
4 QA/QC
5 Safety
S/N Managers Comments Signature
1 Planning Manager
2 Construction Manager
Hot Work Cold WorkWelding Painting
Grinding Insulation
Cutting/Burning Electrical Work
Breaking out the concrete Mechanical work
Electrical 1st Fix Conduit Activities
Electrical 2nd Fix
Electrical 3rd Fix
Filed connection Activities
Miscellaneous Civil work
…………………………………. PROJECTActivity Schedule Date:
Particular Resources No
Mon
thly
Fee
Tot
al F
ee
Qty Budget Cost
Date: Date: Date: Date: Date: Date:
RemarksDay (1/2) Day (3/4) Day (5/6) Day (8/9) Day (10/11) Day (12/13)
FOOTING Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
COLUMNS Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
RETAINING WALL Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
SHEAR WALL Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
SLABS Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
OTHERS Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
0
Total Hours
* This Construction Package # 2 is subject to be divided into a multiple packages * This Construction Package # 2 is subject to be divided into a multiple packages
Bi-weekly
All Major Activities to be confirmed
PLANNED: ACTUAL
* This Construction Package # 2 is subject to be divided into a multiple packages
* This Construction Package # 2 is subject to be divided into a multiple packages * This Construction Package # 2 is subject to be divided into a multiple packages
* This Construction Package # 2 is subject to be divided into a multiple packages * This Construction Package # 2 is subject to be divided into a multiple packages
* This Construction Package # 2 is subject to be divided into a multiple packages
* This Construction Package # 2 is subject to be divided into a multiple packages * This Construction Package # 2 is subject to be divided into a multiple packages
* This Construction Package # 2 is subject to be divided into a multiple packages
* This Construction Package # 2 is subject to be divided into a multiple packages
Project :Project No. :From :To :
Date :
Man Power Distribution SchedulePeriod From:
To:
S/N
Actual Start
Du
rati
on Activities/Description
Qty
/ N
oS
Gro
up
Car
pen
ter
Ste
el F
ixer
Lab
our
Mas
on
Oth
ers Remarks
;l
Planned Start
Planned Finish
Actual Finish
Project :Project No. :From :To :
Date :
Manpower Distribution Report
Sl. No. Trade
Act
ivit
y 1
/ Zon
e 1
Act
ivit
y 2
/ Zon
e 2
Act
ivit
y 3
/ Zon
e 3
Act
ivit
y 4
/ Zon
e 4
Act
ivit
y 5
/ Zon
e 5
Act
ivit
y 6
/ Zon
e 6
Act
ivit
y 7
/ Zon
e 7
Act
ivit
y 8
/ Zon
e 8
Act
ivit
y 9
/ Zon
e 9
Act
ivit
y 10
/ Z
one
10
Act
ivit
y 11
/ Z
one
11
Act
ivit
y 1
2 Z
one
12
Act
ivit
y 13
/ Z
one
13
Act
ivit
y 14
/ Z
one
14
Tot
al R
equi
red
Tot
al a
vaila
ble
Ren
tal
Bal
ance
1 A.C. Technician 0 02 Carpenter Shuttering 14 14 10 2 23 Carpenter Finishing 0 04 Carpenter (Group Leader) 0 05 CAD Operator 0 06 Cook 0 07 Crane Operator (Tower) 0 08 Crane Operator (Mobile) 0 09 Driver 0 010 Document Controller 0 011 Document Messenger 0 012 Electrician 0 013 Engineer Civil 0 014 Engineer Architect 0 015 Engineer Electrial 0 016 Enginner Mechanical 0 017 Erector 0 018 Foreman Civil 0 019 Foreman Electrical 0 020 Foreman Mechanical 0 021 Foreman Plumber 0 022 Foreman Finishing 0 023 Guard 0 0
Project :Project No. :From :To :
Date :
Manpower Distribution Report
Sl. No. Trade
Act
ivit
y 1
/ Zon
e 1
Act
ivit
y 2
/ Zon
e 2
Act
ivit
y 3
/ Zon
e 3
Act
ivit
y 4
/ Zon
e 4
Act
ivit
y 5
/ Zon
e 5
Act
ivit
y 6
/ Zon
e 6
Act
ivit
y 7
/ Zon
e 7
Act
ivit
y 8
/ Zon
e 8
Act
ivit
y 9
/ Zon
e 9
Act
ivit
y 10
/ Z
one
10
Act
ivit
y 11
/ Z
one
11
Act
ivit
y 1
2 Z
one
12
Act
ivit
y 13
/ Z
one
13
Act
ivit
y 14
/ Z
one
14
Tot
al R
equi
red
Tot
al a
vaila
ble
Ren
tal
Bal
ance
24 Labour 0 025 Lab Technician 0 026 Mason 0 027 Mason (Tile Fixing) 0 0
Project :Project No. :From :To :
Date :
Manpower Distribution Report
Sl. No. Trade
Act
ivit
y 1
/ Zon
e 1
Act
ivit
y 2
/ Zon
e 2
Act
ivit
y 3
/ Zon
e 3
Act
ivit
y 4
/ Zon
e 4
Act
ivit
y 5
/ Zon
e 5
Act
ivit
y 6
/ Zon
e 6
Act
ivit
y 7
/ Zon
e 7
Act
ivit
y 8
/ Zon
e 8
Act
ivit
y 9
/ Zon
e 9
Act
ivit
y 10
/ Z
one
10
Act
ivit
y 11
/ Z
one
11
Act
ivit
y 1
2 Z
one
12
Act
ivit
y 13
/ Z
one
13
Act
ivit
y 14
/ Z
one
14
Tot
al R
equi
red
Tot
al a
vaila
ble
Ren
tal
Bal
ance
28 Mason (Marble Fixing) 0 029 Mason (Group Leader) 0 030 Mechanic 0 031 Office Boy 0 032 Office Assistant 0 033 Operator (Showel) 0 034 Operator (Forklift) 0 035 Painter 0 036 Plumber 0 037 QC Engineer (Civil) 0 038 QC Engineer (Architectural) 0 039 QC Engineer (Electrical) 0 040 QC Engineer (Mechanical) 0 041 QC Inspector (Civil) 0 042 QC Inspector (Architectural) 0 043 QC Inspector (Electrical) 0 044 QC Inspector (Mechanical) 0 045 Secretary 0 046 Steel Fixer 0 047 Steel Fixer (Group Leader) 0 048 Store Keeper 0 049 Surveyor 0 050 Safety Engineer 0 051 Safety Officer 0 052 Safety Group Leader 0 053 Welder 0 0
Total 0 0
Project :Project No. :From :To :
Date :
DAILY TASK PERFORMANCE REPORT
ZONE # ……………SUBZONE #.............. TYPE OF WORK : DATE………………………
NAME OF GANG LEADER : NAME OF FOREMAN : ……………………………….
TALLY NO. OF GANG LEADER : TALLY NO OF FOREMAN : ………………………….
S/NASSIGNED TASK OR ACTIVITY TARGETED COMPLETED REMARKS
DESCRIPTIONS QUANTITIES QUANTITIES
ENGAGE MANPOWER OR WORKERS DETAILS : TOTAL NOS.OF MANPOWER OR WORKERS : NO. TALLY # TRADE P/A O/T NO. TALLY # TRADE P/A O/T NO. TALLY # TRADE P/A O/T NO. TALLY # TRADE P/A O/T
1 8 15 22
2 9 16 23
3 10 17 24
4 11 18 25
5 12 19 26
6 13 20 27
7 14 21 28
ZONE MANAGER SIGNATURE SR. SITE ENGINEER SIGNATURE SITE ENGINEER SIGNATURE FOREMAN SIGNATURE
COMMENTS & RECOMMENDATION
Daily Construction Activity ReportCALENDER TEMPERATURE/DEGREE ATMOSPHERIC CONDITIONS ZONE REFERENCE
Day of Week: Date Temp 9 AM Temp NOON Temp 3 PM Temp 5PM Cloudy Sunny Rainy Dusty HIGH R. LOW R CAR PK B.U
Observation Of Daily Work
Activity Desccription Activity ID Early Start Actual Start Early Fin Act. Finish Estimated Work Performed for Day Time AM Time PM Quantity Unit
Critical Activity Look Ahead
Activity Description Activity ID Early Start Actual Start Early Fin Act. Finish General Comments
AccidentsActivity Description Subcontractor Location Report filed Hospital First Aid General Comments
WorkForceMan power Equipment & Plant
AL- LATIFIA
Type # Men # Hours Type Qty # hrs Notes/ProblemsForemanGang LeaderSkilledLaborerTrainee
Subcontractor
ForemanSkilledLaborerTrainee
WEATHER IMPACT ON DAILY ACTIVITIES
TRADE/SUBCONTRACTOR DESCRIPTION OF IMPACT TO WORK AND REASON NO EFFECT NO WORK ALL DAY
SIGNATURE OF PREPARING ENGINEER RANK/POSITION HOURS AT JOB
Eng'r. : FROM TO TOTAL
7:00 AM 6:00PM 11:00 Hrs.
IMPACT LESS THAN 50% OF DAY
IMPACT GREATER THAN 50% OF DAY
Project :Project No. :From :To :
Date :
CONCRETE POURING SCHEDULE
Fax No. ……………To:M/s: From: -------------------Date: To: -----------------------Reference to our schedule of concrete for day ________, please note that the revised quanity will be as follows:
Date Location Item Qty. in M3 Pouring Time Strength Type Pump Remarks
Prepared by: ----------------------------- CC:
Time interval
Project :Project No. :From :To : Date :
41
MATERIALS REQUEST
Mat. Req No. …………….
Delivery Date Required:-----------------------
Please supply the following materils/services:
Sl No. Description Unit Qty Notes
Name: ……………………..Approval
…………….
…………………….. Sign:
Project :Project No. :From :To : Date :
Reminder for Material
Reminder no. :
S/N Delayed Item Unit Qty Request No. & Date Requested by Remarks
Prepared BY: NOTED BY:
Store Keeper: PURCHASE MGR.
Copy to: Purchase Manager & Purchase Responsible.
Project :Project No. :From :To : Date :
STEEL ORDER FORM
Order No :Building :Storey :Member Location :Zone/Area/Building :Shop Drawing Reference :
Item Shape & Dimentions
Site Engineer Project/ Zone Manager
Bar Mark
Bar Dia. (mm)
Qty. Req'd (pcs)
Unit Length (m)
Unit Weight (kg/m)
Total Weight (kg.)
Project :Project No. :From :To : Date :
DRAWING REQUEST FORM
To,
The Engineering Dept.
Please issue the following drawings for the purpose of:______________
Sl.No. Dwg.No. DescriptionNo. of
Paper Size RemarksCopies
Requested By: Approved By: Issued By: Received By:
Name:________________ Name:_______________ Name___________ Name__________
Sign.________________ Sign._______________ Sign.___________ Sign.__________
Date________________ Date_______________ Date___________ Date__________
From: Date: 23.02.2011To:
Cycle of 6 week Look ahead Schedule & 2 week Look ahead Schedule
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12
-21 -14 -7 0 7 14 21 28 35 42 `PL. S.E P.M.T 1 2 3 4 5 6
S.E P.M.T 3 4
S.E P.M.T 5 6
PL. S.E P.M.T 7 8 9 10 11 12
1-Planing issued 6 week look ahead schedule to the Senior Engineer 3-Senior Engineers issued 2 week look ahead schedule, along with all related requierments to the concern departments as well as the P.M.T
2-All departments & Project Management Team (P.M.T) to arrange the requirements within 15 days.