Concrete Cloth Vent Wall/Stopping MarblaegisGypsum Mine England

Page 2: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Why Vent WallsIncoming clean air is kept separately from dirty dust filled air being pumped out by placing divides between the supporting pilars.

Page 3: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Competition – Brattice ClothLooks like a tarp and is hung up using eyelets fixed to the rock. Very quick but a temporary measure.

Page 4: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Competition – Gypsum/Plaster BoardThis mine produced gypsum board so the material cost was minimal, however they do rot and may only last 2-3 months.

Page 5: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Competition – Concrete Block Walls (Stock Photo)Durable, expensive, slow to build and may require specialist contractors.

Page 6: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

FrameFrame created using British Gypsum branded aluminium stud wall system (“Channel”) for the horizontal and timber for the vertical. Timber can be used but the channel system was readily available. You can screw into both materials using standard fixings.

Page 7: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

The vertical timbers were placed at 950mm centres to allow for 50mm overlap of the 1000mm wide CC5.

Page 8: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Concrete Cloth is cut to the required length using a knife.

Page 9: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

The cloth was held in place and screwed to the frames. We first secured it with two screws to allow us to fine tune the positioning and then finally secure around the perimeter of the cloth.

Page 10: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

A batten fixed the CC to the wall using hammer screw anchors. A batten was also used to secure the CC at the top. In this case we didn't hydrate underneath the battens or overlaps as the joints were not too tight and would not let the water in.

Page 11: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Fixing to the top frame prior to the batten being added

Page 12: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Final fixing of the first panel

Page 13: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

The mine used steels which were about 200mm long and were very quick and provided a strong fixing when used with standard screws. These steels formed part of the British Gypsum stud wall system.

Page 14: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

The top edge secured with steels and then a wooden batten

Page 15: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

This photograph shows the CC panel secured with a screw whilst the position of the panel is being adjusted.

Page 16: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

The second CC panel was added with a 50mm overlap to the first panel along the vertical edge. In this case it was not deemed necessary to fix the bottom and it left to set in place.

Page 17: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Vertical Overlap Joint

Page 18: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Subsequent Panels fixed

Page 19: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

CC hydrated in accordance with CC hydration guide

Page 20: Concrete Cloth Vent Wall/Stopping Marblaegis Gypsum Mine ...taffysgroup.com/products/resources/mining_ventwall_presentation.pdf · Concrete Cloth is cut to the required length using

Benefits of a CC Vent Wall

• Similar erection speed to temporary vent walls (e.g. Gypsum boards)

• More durable than temporary vent walls• No specialised labour required – Concrete

block walls require contractors• Cheaper than concrete block walls.