COMPANY CAPABILITY
THAI BINH DUONG CONSTRUCTION AND
INVESTMENT JOINT STOCK COMPANY
ADDRESS : R.806 - 21T1 BUILDING, HAPULICO COMPLEX ,
83 VU TRONG PHUNG STR. - THANH XUAN - HA NOI
TELEPHONE : (04) 73000078 FAX : (04) 35 56 25 97
EMAIL : [email protected]
WEB : www.thabico.com.vn or www.thabico.vn
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
I. Company name: Thai Binh Duong Construction and Investment Joint Stock Company
(THABICO.Co.,JSC)
Headquarters: No. 12, lane 102 – Nguy Nhu Kon Tum str. - Thanh Xuan district – Hanoi
Office: R.806 – 21T1 Building, Hapulico complex, 83 Vu Trong Phung str. Thanh Xuan district -
Hanoi
Tel : 84-4-73000078 Fax : 84-4-35562597
Email : [email protected] Web: www.thabico.com.vn; www.thabico.vn
Account No: 22210000152485 at Bank for Investment and Development of Viet Nam – Thanh Xuan
Branch
Tax code: 0104223522
II. Certificate of business registration
No The business sector
1 Specialized construction activities
2 Housing Construction
3 Construction and civil engineering work
4 Preparing the ground
5 Installation of water supply & drainage systems, heating and air conditioning
6 Construction of roads and railways
7 Building puplic works
8 Demolition of buildings
9 Wholesale material, equipment installed in the building
10 Installation of building
11 Retail hardware, paints, glass and equipment installed in the building in specialized stores
12 Installation of electrical systems (power transmission line construction to 35 KVA)
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
III. Foundation purpose and operation
Thai Binh Duong Construction & Investment Joint-stock Company foundation purpose is conformable
to the indispensable social tendency and is originated from the ideas of the confidential shareholders
who have been working for construction companies for many years. Our founding members determine
that only a joint-stock company can take full advantage of the financial and brainpower abilities of the
employees and from this reason, Thai Binh Duong Construction & Investment Joint-stock Company
was founded from 10/2009.
The business line of our company is multidirectional, but the main field is construction of industrial
and civil projects and it will be expanded after a few years of operation.
Our shareholder guideline: Considering the company as the second home. So, the entire shareholder
will be as brothers and together we share the responsibility of building up the development of the
company.
We all firmly determine that: The everlasting development of the company must be achieved by the
project quality and the work schedule.
For our operation slogan: Losing money is losing nothing, losing the trust is losing everything. So, any
member whose activity leads to a bad influence for the company prestige shall be considered as guilty
before the company and the shareholders.
Our motto in working: Finishing the works, not finishing the working-hours, so everyone must think:
Do not leave the today work for tomorrow, even if no more work to do then.
In the market economy, we determine that our profit must be gained through the brainpower of each
member, manifesting in production and execution management, advanced method statement and
technology application as well as the labor productivity increment.
In order to have more jobs and increase the turnover; we will provide a reasonable price for every
project, with the not-high profit ratio but the augmentation of turnover is the augmentation of profit.
For these above reasons, we, the founding members, will hope that in a brief period, Thai Binh Duong
JSC will deserve the title of a powerful company in the field of industrial and civil construction
project.
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
IV. HUMAN RESOURCES
1. Total staffs and skilled workers: 149 people
In which the professional management staffs are:
Director: 1 person
Vice Director: 2 person
Office & Business Manager: 4 people
Site Supervisors & Manager: 7 people
Specialized Engineers: 30 people.
No Professional Title Q’ty
(people) Year of Experience
<=5year <=10year >10year
Total 44 8 12 24
1 Civil & Engineering Civil Engineer 20 5 3 12
2 Architectural Architect 2 1 1
3 Mechanical Mechanic Engineer 3 2 1
4 Electrical and
Automation
Electrical/Automation
Engineer 3 1 2
5 Water Supply / Drainage Water Supply / Drainage
Engineer 1 1
6 Surveying Surveying Engineer 2 1 1
7 Safety, HSE Safety Engineer 2 1 1
8 Construction Economic Economical Engineer 3 2 1
9 Business Administration Business Bachalor 5 1 1 3
10 Economic Economical Bachelor 3 1 2
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Skilled Workers:
No. Profesional Q’ty
(people)
Ranking
Level 2 Level 3 Level 4 Level 5 Level 6 Level #
Total 105 13 52 35 5
1 Mason 50 10 15 20 5
2 Carpenter 20 15 5
3 Steel Worker 10 4 6
4 Electrical Worker 5 5
5 Welder 10 2 5 3
6 Driver 5 5
7 Bulldoze, Excavate,
Demolition
4 1 2 1
8 Crane driver 1 1
Mobilized unskilled labours : depend on project
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
V. PHYSICAL RESOURCES (EQUIPMENTS)
No Equipment Unit Quan’ty Capacity Status
1. Steel formwork m2 5000 Good
2. Scaffolding PAL Set 50 Good
3. Finishing Scaffolding Pole 2000 Good
4. Soil Compactor Pcs 03 15Tons Good
5. Excavator Pcs 02 0.8m3 Good
6. Bulldozer Pcs 01 9 tons Good
7. Flat Concrete Vibrator Pcs 04 80kg Good
8. Stick Vibrator Pcs 07 1.2 KW Good
9. Plate Virbrator Pcs 04 1,5 KW Good
10. Concrete Mixer Pcs 05 250 litre Good
11. Mortar Mixer Pcs 12 80 litre Good
12. Bar Cutter / Bender Pcs 04 4,5KW Good
13. Welding Machine Pcs 09 14 KW Good
14. Water Pump Pcs 05 20m3/h Good
15. Stand-by generator Pcs 01 200KVA Good
16. Truck >5 tons Pcs 03 >5 tons Good
17. Mobile Crane Pcs 01 >10 tons Good
18. Leveling Machine Pcs 02 Good
19. Electric Techometer Pcs 01 Good
20. Theodollite Pcs 05 Good
21. Air Compressor Pcs 02 5m3/min Good
22. Safety Mesh m2 2.200 Good
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
VI. TYPICAL PROJECTS OF THE FOUNDING MEMBERS’S PERFORMANCES
No Project name Owner Location Completion
1
Crown-vinalimex factory
- Pre-fabricated steel frame
- Power, water install
usa ha tay 1998
2
Dong giao pineapple processing plant
- Pre-fabricated steel frame
- Machine installation
dong giao
agriculture
products and
food
company
tam diep 2000
3
LG-meca factory
- Pre-fabricated steel frame
- Floor hardener chapdura
korea hai duong 2000
4
LG-nhu quynh factory
- Pre-fabricated steel frame
- Power, water install
korea ha noi 2000
5 Vietnam industrial construction
corporation head-office
- concrete frame 7-floors
vietnam
industrial
construction
corporation
ha noi 2000
6
Parker processing factory
- Pre-cast steel frame
- Floor painting
japan ha noi 2001
7
Hung yen garment factory
- Bamboo pile foundation
- Pre-cast steel frame
- Metal sheet roof
hung yen
garment
company
hung yen
province 2001
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
No Project name Owner Location Completion
8
Ha nam garment factory
- Pre-cast steel frame
- Ceramic paving
- Metal sheet roof
- Power, water install
thang long
garment
company
phu ly
province 2002
9
Fruit processing plant
- Pre-cast steel frame
- Power, water install
bac giang
fruit
processing
company
luc ngan
bac giang 2002
10
VKX station
- Concrete frame
- 3-floors building
korea ha noi 2002
11
Cassava processing
- Pre-cast steel frame
- Power, water install
thanh hoa
agriculture
products and
food
company
thanh hoa 2003
12
Hai phong garment factory
- Upgraded warehouse
- Lighting installation
- Power installation
hai phong
garment
company
hai phong
city 2004
13
Doximex - Finishing shop
- Bamboo pile foundation
- Floor hardener
- Pre-cast steel frame
- Metal sheet roof
- Power, water install
- Machine installation
doximex hanoi 2004
14
Doximex - Knitting shop
- Concrete frame 4-floor
- Concrete pile fdn.
- Metal sheet roof
doximex hanoi 2004
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
No Project name Owner Location Completion
15
Bac giang cattle food
processing plant
- Concrete pile fdn.
- Pre-cast steel frame
bac giang
agriculture
products and
food
company
bac giang
city 2005
16
Condominium hotel - hoa binh golf
resort
- concrete frame 5-floors
korea luong son
hoa binh 2007
17
Pho noi knitting factory
- Concrete pile fdn.
- Pre-cast steel frame
- Metal sheet ceiling
- Metal sheet roof
- Power, water install
hanosimex pho noi, hung
yen 2009
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
VII. RECENT PROJECTS UP TO NOW
No Project name Owner Location Completion
Industrial factory
1
CJ - Vina agri warehouse expansion
- pre cast steel frame
- metal sheet roof and wall
- concrete floor and foundation
cj vina agri co.
ltd. – korea
pho noi a
industrial zone,
hung yen
2010
2
Expansion of warehouse
- pre cast steel frame
- metal sheet roof and wall
- concrete floor and foundation
hung yen k&d
co. ltd. – italia
pho noi b
industrial zone,
hung yen
2011
3
Sumidenso 4 vn factory
-concrete floor and foundation
- Brick wall.
- Plastring wall
- Tiling work
Sumidenso
vietnam
ninh giang, hai
duong 2011
4
Iko-thompson factory phase 2
-concrete floor and foundation
- Brick wall.
- Tiling work
Iko-thompson
vietnam
nomura
industrial park,
hai phong
2011
5 Icam factory renovation
- concrete floor and foundation
Icam viet nam
Co, ltd
pho noi a
industrial park,
hung yen
2012
6
Kyocera factory
- concrete floor and foundation
- Brick wall.
- Tiling work
vinata
international
joint venture
co. ltd.
thang long 2
industrial park,
hung yen
2012
8
Hungyen kniting & dyeing factory
- epc project.
- precast steel frame.
- power, water install
hung yen k&d
co. ltd. – italia
pho noi b
industrial zone,
hung yen
2012
9
Expand manufacturing Hungyen
kniting & dyeing factory stage 1,2,3
- epc project.
- precast steel frame.
- power, water install
hung yen k&d
co. ltd. – italia
pho noi b
industrial zone,
hung yen
2014
10
Line Aqua viet nam garment factory
- epc project.
- precast steel frame.
- power, water install
Linea aqua viet
nam – srilan ka
pho noi b
industrial zone,
hung yen
2015
11
HOANG MAI garment factory
- epc project.
- precast steel frame.
- power, water install
Hoang mai
garment factory
Hoang mai,
Nghe an 2015
12
Dong xuan 2 garment factory
- epc project.
- precast steel frame.
- power, water install
VINATEX
group viet nam
Khoai chau,
hung yen 2015
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
No Project name Owner Location Completion
Waste water treatment; water tank
13
6.000m3 Water tank
- concrete floor and foundation
- concrete wall and slab
- Waterproofing and finishing
hung yen k&d
co. ltd. – italia
pho noi b
industrial zone,
hung yen
2010
14
C-Tech tank construction
(5.000 cubic meter concrete tank)
- concrete floor and foundation
- concrete wall and slab
- Waterproofing and finishing
vsip bac ninh co.
ltd
vsip bac ninh
industrial park,
bac ninh
2010
13
1000m3 water tank
- concrete floor and foundation
- concrete wall and slab
- Waterproofing and finishing
vsip bac ninh co.
ltd
vsip bac ninh
industrial park,
bac ninh
2010
10
Hoa phat steel processing plant
(underground silo system)
- concrete floor and foundation
- concrete wall and slab
- Waterproofing and finishing
hoa phat group –
viet nam
kinh mon, hai
duong 2013
Infrastructure construction
14 Package 3b – infrastructure
- drainage, sewage, water & power
supply, telecom, road system for 60ha
vsip bac ninh co.
ltd.
vsip bac ninh
industrial park,
bac ninh
2011
15 Package 2 – infrastructure
- drainage, sewage, water supply system
for 5km road
vsip hai phong
co. ltd.
vsip hai phong
industrial park,
hai phong
2012
16 Package 4d – infrastructure
- concrete box culvert crossing highway
vsip bac ninh co.
ltd.
vsip bac ninh
industrial park,
bac ninh
2012
17 Package 1 – Asphalt road at vsip Hp
- stone base, asphalt layer for 120.000
square meter of industrial park road
vsip hai phong
co. ltd.
vsip hai phong
industrial park,
hai phong
2012
18
Package 2 – Asphalt road at vsip Hp
- stone base, asphalt layer for 35.000
square meter of industrial park road
vsip hai phong
co. ltd.
vsip hai phong
industrial park,
hai phong
2013
20 Package 6a – infrastructure
- concrete box culvert crossing highway
vsip bac ninh co.
ltd. – singapore
vsip bac ninh
industrial park,
bac ninh
2013
19 Package 5 – infrastructure
- waste- water drainage treatsment
vsip hai phong
co. ltd.
vsip hai phong
industrial park,
hai phong
2014
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: HHEEAADD--OOFFFFIICCEE OOFF VVIIEETTNNAAMM IINNDDUUSSTTRRIIAALL
CCOONNSSTTRRUUCCTTIIOONN CCOORRPPOORRAATTIIOONN ((VVIINNAAIINNCCOONN))
LLOOCCAATTIIOONN :: BBAA DDIINNHH -- HHAA NNOOII
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: CCOONNDDOOMMIINNIIUUMM HHOOTTEELL -- HHOOAA BBIINNHH GGOOLLFF RREESSOORRTT
LLOOCCAATTIIOONN :: LLUUOONNGG SSOONN –– HHOOAA BBIINNHH
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: MMHHIIVVAA FFAACCTTOORRYY
LLOOCCAATTIIOONN :: TTHHAANNGG LLOONNGG IINNDDUUSSTTRRIIAALL PPAARRKK -- HHAA NNOOII
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: HHUUNNGG YYEENN KKNNIITTTTIINNGG && DDYYEEIINNGG FFAACCTTOORRYY
LLOOCCAATTIIOONN :: PPHHOO NNOOII BB IINNDDUUSSTTRRIIAALL PPAARRKK –– HHUUNNGG YYEENN PPRROOVVIINNCCEE
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Electrical panel work
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Lighting system – fluorescent
Lighting system – high pressure lighting
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
POWER SYSTEM - MAIN DISTRIBUTION PANEL (LOW VOLTAGE)
POWER SYSTEM - POWER CABLE RACK
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Technology pile ERECTION WORK
QUALITY CHECKING WORKSHOP – machine assemble
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: SSUUMMIIDDEENNSSOO VVNN 44 FFAACCTTOORRYY
LLOOCCAATTIIOONN :: NNIINNHH GGIIAANNGG,, HHAAII DDUUOONNGG
Steel structure erection works
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Stiffener works
Flooring & Concrete Works
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: IIKKOO TTHHOOMMPPSSOONN FFAACCTTOORRYY
LLOOCCAATTIIOONN :: NNOOMMUURRAA IIPP,, HHAAII PPHHOONNGG
Steel structure erection works
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
BRICK works
FLOOR Finishing Works
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: CCJJ VVIINNAA AAGGRRII WWAARREEHHOOUUSSEE EEXXPPAANNSSIIOONN
LLOOCCAATTIIOONN :: PPHHOO NNOOII AA IINNDDUUSSTTRRIIAALLPPAARRKK-- HHUUNNGG YYEENN
Concrete FLOOR works
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: KKYYOOCCEERRAA FFAACCTTOORRYY
LLOOCCAATTIIOONN :: TTHHAANNGG LLOONNGG 22 IINNDDUUSSTTRRIIAALLPPAARRKK -- HHUUNNGG YYEENN
Rebar works
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Finishing floor works
TILING works- canteen
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: EEXXPPAANNDD MMAANNUUFFAACCTTUURRIINNGG PPLLAANN –– HHUUNNGG YYEENN
KKNNIITTTTIINNGG && DDYYEEIINNGG FFAACCTTOORRYY
LLOOCCAATTIIOONN :: PPHHOO NNOOII BB IINNDDUUSSTTRRIIAALL PPAARRKK-- HHUUNNGG YYEENN PPRROOVVIINNCCEE..
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: SSHHIIPPPPIINNGG WWAARREEHHOOUUSSEE AANNDD QQUUAALLIITTYY CCOONNTTRROOLL
DDEEPPAARRTTMMEENNTT -- HHUUNNGG YYEENN KKNNIITTTTIINNGG && DDYYEEIINNGG FFAACCTTOORRYY
LLOOCCAATTIIOONN :: PPHHOO NNOOII BB IINNDDUUSSTTRRIIAALL PPAARRKK -- HHUUNNGG YYEENN PPRROOVVIICCEE..
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: LLIINNEEAA AAQQUUAA VVIIEETT NNAAMM GGAARRMMEENNTT FFAACCTTOORRYY
LLOOCCAATTIIOONN :: PPHHOO NNOOII BB IINNDDUUSSTTRRIIAALL PPAARRKK -- HHUUNNGG YYEENN PPRROOVVIICCEE..
(Layout & Perspective View)
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
(Actual Photos Of The Factory)
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: HHOOAANNGG MMAAII GGAARRMMEENNTT FFAACCTTOORRYY
LLOOCCAATTIIOONN :: HHOOAANNGG MMAAII DDIISSTTRRIICCTT,, NNGGHHEEAANN PPRROOVVIICCEE..
PPRROOJJEECCTT :: DDOONNGG XXUUAANN GGAARRMMEENNTT FFAACCTTOORRYY
LLOOCCAATTIIOONN :: KKHHOOAAII CCHHAAUU DDIISSTTRRIICCTT,, HHUUNNGG YYEENN PPRROOVVIICCEE..
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: WWAASSTTEE WWAATTEERR TTAANNKK IINN CCAANNOONN FFAACCTTOORRYY
LLOOCCAATTIIOONN :: CCAANNOONN FFAACCTTOORRYY,, QQUUEE VVOO,, BBAACC NNIINNHH
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
REINFORCED CONCRETE WORK
FORMWORK
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: WWAASSTTEE WWAATTEERR TTAANNKK
LLOOCCAATTIIOONN :: PPHHOO NNOOII BB IIPP,, HHUUNNGG YYEENN
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: CC--TTEECCHH TTAANNKK IINN VVSSIIPP BBAACC NNIINNHH WWTTPP
LLOOCCAATTIIOONN :: VVSSIIPP BBAACC NNIINNHH,, BBAACC NNIINNHH
SLAB REBAR
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: UUNNDDEERRGGRROOUUNNDD SSIILLOO SSYYSSTTEEMM
LLOOCCAATTIIOONN :: KKIINNHH MMOONN IIPP,, HHAAII DDUUOONNGG
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: PPAACCKKAAGGEE 33BB,, 66AA BBAACC NNIINNHH,, PPAACCKKAAGGEE 22 HHAAII PPHHOONNGG
((LLIIGGHHTTIINNGG EELLEECCTTRRIICC,, DDRRAAIINNAAGGEE,, SSEEWWAAGGEE,, WWAATTEERR SSUUPPPPLLYY && AASSPPHHAALLTT))
Sewage pipe work
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Water supply system
Asphalt work
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Drainage trend work
Drainage pipe work
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
Construction of discharging
Material-water pipe
THAI BINH DUONG CONSTRUCTION & INVESTMENT JSC
PPRROOJJEECCTT :: PPAACCKKAAGGEE 11,,22 –– AASSPPHHAALLTT RROOAADD
LLOOCCAATTIIOONN :: VVSSIIPP HHAAII PPHHOONNGG,, HHAAII PPHHOONNGG