Company Profile & Capability Statement 2016 Submitted to: BACKGROUND Protective Coating Systems (PCS) was established in September of 1996 by Martin Dillon a long term resident of the Bunbury area. Martin had previous experience in refractory, concrete repairs, grouting and epoxy coatings and was looking to start his own company to provide a specialized service within the South West of WA. The company started out completing small works in and around Bunbury before moving to its first major job for ABB at the Collie Power station back in 1997. This job was the stepping stone for the company to specialize in providing large construction projects with a reliable Civil Maintenance Service. “Our main objectives are to create a successful relationship with our clients based on trust, experience and knowledge, in relation to the repair, remediation and maintenance of their assets“We believe that constant training and nurturing of our employees will result in the success of our company and benefits to our clients through safety and skill levels second to none(Martin) MANAGEMENT STRUCTURE Managing Director Martin Dillon 0417 046 067 Director /Office Manager Jacki Dillon 0417 178 640 Operations Manager Shane Power 0417 099 550 Logistics and Purchasing Stephen Rowe 0427 081 251 CV’s can be viewed upon request COMPANY PROFILE AND CAPABILITY STATEMENT 2016

Transcript of COMPANY PROFILE AND CAPABILITY STATEMENT...

Page 1: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

BACKGROUND

Protective Coating Systems (PCS) was established in September of 1996 by Martin Dillon a long term

resident of the Bunbury area. Martin had previous experience in refractory, concrete repairs,

grouting and epoxy coatings and was looking to start his own company to provide a specialized

service within the South West of WA.

The company started out completing small works in and around Bunbury before moving to its first

major job for ABB at the Collie Power station back in 1997. This job was the stepping stone for the

company to specialize in providing large construction projects with a reliable Civil Maintenance

Service.

“Our main objectives are to create a successful relationship with our clients based on

trust, experience and knowledge, in relation to the repair, remediation and

maintenance of their assets”

“We believe that constant training and nurturing of our employees will result in the

success of our company and benefits to our clients through safety and skill levels

second to none”

(Martin)

MANAGEMENT STRUCTURE Managing Director Martin Dillon 0417 046 067 Director /Office Manager Jacki Dillon 0417 178 640 Operations Manager Shane Power 0417 099 550 Logistics and Purchasing Stephen Rowe 0427 081 251 CV’s can be viewed upon request

COMPANY PROFILE AND

CAPABILITY STATEMENT 2016

Page 2: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

ORGANISATIONAL CHART

OPERATIONS MANAGER Responsible to the GM for all operational

aspects

(SHANE POWER)

DIRECTOR / OFFICE MANAGER Responsible to the GM for all Accounts and HR

(JACKI DILLON)

LEADING HAND TEAM 1 Responsible to the OM for all operational elements

(CRAIG DAVENPORT)

LEADING HAND TEAM 2 Responsible to the OM for all operational elements

(MARK JOHNSON)

LEADING HAND TEAM 3 Responsible to the OM for all operational elements

(MATTHEW DYE)

LOGISTICS AND PURCHASING Responsible to OM for all stores, equipment

purchasing and maintenance

(STEPHEN ROWE)

APPLICATORS TEAM 1 APPLICATORS TEAM 2 APPLICATORS TEAM 3

MANAGING DIRECTOR Responsible for Overall Management of PCS

(MARTIN DILLON)

Page 3: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

RESOURCES PCS currently employs 10 fulltime local staff, including tradesmen and specialist applicators with access to additional staffing when required. Each of our staff holds current and relevant tickets in the following aspects:

White/Blue Construction Cards

MSIC

Working and Entry to a Confined Space

Working at Heights

Elevated Work Platform

Excavator and Skid steer Loader

The company and staff are also fully endorsed by the major suppliers we use:

Parchem/Dulux

Sika Australia

Allduro

BASF

ITW/EPIREZ

Crommelin Waterproofing & Sealing The company has an extensive range of fully owned plant and equipment including: Mine spec vehicles & truck, Grout pumps, Trailer mounted pressure cleaning units, Macaden automated membrane layer, 5 – 18 kva Generators, Site offices, Site storage & chemical containers, Mobile product air conditioning units, Large and small airless spray equipment, Mobile abrasive blasting equipment, 175 & 400 cfm air compressors, and Fully enclosed tandem site tool trailers. PCS currently operate from the Head office located on Dryandra Court in Picton, just of the South West Highway. The 200 m2 offices have an adjoining 450 m2 workshop, lunchroom and storeroom located on a 2800 m2 yard. The Picton yard contains the majority of the company’s plant and equipment along with an extensive materials and consumable holding. Further to the Office location the company recently purchased a further 4500 m2 hardstand laydown and storage yard in Nicholson Road East Picton. At this location the company holds site offices, site storage containers and specialty chemical containers. This location also allows an area for large open air or covered works to be conducted remotely from site.

SERVICES PROVIDED

Concrete repair and reinstatement

All facets of Epoxy and Industrial coatings

Expansion jointing

Structural Grout installation Epoxy and Cementitious

Diamond core drilling and cutting

Non-skid industrial epoxy flooring systems

Waterproofing - Liquid and Torch applied membranes

Fire proof Cable coating and Fire rated penetration filling

Soil Stabilization and pressure grout injection

Thermal coatings

Page 4: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

CLIENT BASE Throughout the last 20 Years of operation the company has forged strong ties with local, interstate and overseas clients, these clients include:

ACKER Pty Ltd (Christmas Island) GHD

JLL – Jones Lang LaSalle Manteena

Alcoa Alumina BHP Billiton Worsley

Simcoa Operations Cristal Pigment Australia

Bunbury Port Authority Perkins Builders

Commercial Aquatics Australia Bechtel

Marine & Civil Construction Downer

United Group Limited RCR

Clough IHI Corporation

AQWEST Bunbury BGC Construction

Monodelphous Kirfield Construction

DOF Building Maintenance & Works Franki Pile

Newmont Mining Hitachi Plant Technologies

Leighton Contracting Mitsubishi

Collie Power Station John Holland Group

Muja Power Station TENIX

Western Global Woolworths

GR Electrical Austrian Energy AE&E

Civil and Structural Engineers SGA Southern Gateway Alliance

RELEVANT EXPERIENCE

PCS have assisted these clients on the following Major Projects:

Contract Value

ACKER Pty Ltd, GHD & Manteena – Christmas Island Flying Fish Cove - Jetty Repairs

Extensive Concrete Repairs to the soffit including the following:

Concrete breakout, Reinforcement replacement, Cathodic Protection and Concrete Repair

Impregnating silane protective coating to all concrete surfaces 1,300 m2 $350,000

ACKER Pty Ltd & JLL (Jones Lang LaSalle) – Christmas Island - Australian Federal Police Building

Extensive Concrete Repairs and Waterproofing to the Cell Blocks $50,000

Page 5: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

Commercial Aquatics Australia

We currently hold the contract to repair and waterproof $570,000

the pools Renovated and Constructed by CAA

Recently completed:

Byford Secondary Collage Hydro Pool

Bold Park Aquatic Centre

WA Institute of Sport

Mandurah Aquatic Centre

Fremantle Aquatic Centre

Bilgoman Aquatic Centre

North Butler Primary School

Hale School

Kondinin Shire

Smiths Beach Resort

ALCOA’s Pinjarra and Wagerup Refinery’s $3,500,000

Waterproofing to EDC’s

Large concrete repairs including re enforcement replacement

Combiflex jointing systems

General pad maintenance

Fireproofing to EDC’s

Joint replacement

Non-skid epoxy coatings to chemical areas

Full acid bund refurbishment including hydro demolition,

Reinforcement replacement and concrete re instatement

BGC – Eaton Fair Shopping Centre $2,018,000

26,000 m2 of Torch on waterproofing membrane

PERKINS – Pinjarra Shopping Centre $330,000

5,700 M2 of Torch on waterproofing membrane

Downer/Clough JV – CSBP Kwinana Grouting and Coating $600,000

82 Mechanical Installations grouted using both

Epoxy and Cementitious Grout (15,426 Litres installed)

AJ Lucas – Binningup De Sal Plant Stage 2 $3,263,000

Polyurethane lining to all Backwash and CIP tanks 2,289 m2

Extensive structural concrete repairs

Epoxy coating for concrete protection 650 m2

Dulux Exterior coating to all buildings 9,300 m2

Permeate Tank internal floor protection 590 m2

Page 6: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

Bunbury Port Authority – Berth 1, 5 & 8 $420,000

B1 Removal of old Gatic lids and concrete repairs to deck

Removal of old fender mounts and epoxy installation of new

S/S mounts.

B5 Silane coating to deck surface

Core sampling and patching to piles

B8 Concrete deck repairs including Breakout, Re enforcement cleaning,

Cathodic protection and Microfine Concrete Repair.

Silane coating to deck surface

Rail removal, paint, repair, reinstate and epoxy grout to level

Access gate track replacement

Conveyor tunnel concrete repairs and grouting to drive motor

BHP Billiton Worsley Refinery – E&G Project $5,200,000

Grouting to all mechanical and electrical installations

Grouting of 9 new 12m Precipitation tanks

Concrete patching and repair

Fireproofing to all new electrical cabling

Core drilling and cutting of concrete for site

Small concreting works for plinths, steps and landings

Southern Seawater Alliance – Binningup De Sal stage 1 $660,000

Dulux Exterior coating to all buildings 10,400 m2

Austrian Energy – MFC Project Worsley $1,200,000

Grouting to all mechanical and electrical installations

Core drilling and cutting

Expanding grout demolition of the tower crane base

Fireproofing to EDC’s

CIMECO – Binningup De Sal Plant stage 1 $944,000

Polyurethane lining to all Backwash and CIP tanks 2,289 m2

Epoxy coating for concrete protection 650 m2

Permeate Tank internal floor protection 590 m2

IHI Corporation - Bluewaters Power Station Unit 1 & 2 $3,326,000

All defect painting for both structures

All splice plate painting 14,300 units

Colour coding and tagging of piped services

Epoxy Coating for concrete protection

Large Concrete repairs and epoxy injection to structures

Marine & Civil – Busselton Jetty Repairs $340,000

Supply of 8m work barge

Walkway panel Impregnation coating

Concrete repairs to deck and pile caps

Diamond core drilling

Page 7: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

Newmont Mining – Boddington Gold Mine $644,000

HDPE Lining to Dams

Acid Proof lining to Caustic, Elutions Carbon, Leach/Gold Recovery &

Cyanide bunds.

Protective coating to load out ramps

Southern Gateway Alliance – Forrest Highway Bridge Works $475,000

Pile wrapping and Underwater grouting

Supply of 8m work barge

Concrete crack injection and repair

Diamond core drilling

Pile cutting and demolition (Excavator and breaker)

Patching and repair works

Diamond grinding

Bolt installation

BHP - Ravensthorpe Nickel Project $1,600,000

Structural grouting to Conveyor bases, Crusher’s and screen plant

Epoxy resin injection to structural cracking of bases

Large concrete repairs

BHP Billiton Worsley Refinery – DCP Expansion Project $1,275,000

Grouting to all mechanical and electrical installations

Concrete patching and repair

Fireproofing to all new electrical cabling

Core drilling and cutting of concrete for site

Small concreting works for plinths, steps and landings

SAFETY MANAGMENT

PCS have been operating under an Occupational Health and Safety Management plan since 2010

which is aligned to AS 4801. It is the direct responsibility of the Senior Management Team comprised

of Martin and Shane to ensure that this document is used and integrated into our day to day

activities.

The company prides itself on a near perfect safety record given over 520,000 man hours and lives by

the motto “If It’s Not Safe - Don’t Do It!”

The company’s Safety Management Plan can be viewed upon request

Page 8: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

QUALITY

In order to consistently achieve a high level of performance, PCS have implemented a site specific

Quality Management Plan which complies with the requirements of AS 9001:2000 for all task

performed.

Within the Quality management plan the following document are used to monitor and control the

quality of each job.

Method Statement

ITP’s (Inspection and Test Plans including client hold points)

Daily Conformance Sheets

MDR – Manufacturers Data Reference

Process Control Form

Compliance Inspection Form

QA/QC Documentation

The company’s Quality Management Plan can be viewed upon request

Page 9: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

MANFACTURERS REFERENCE

25/02/2015

To Whom It May Concern:

RE: Approved applicator status

Parchem operates a policy to encourage the use, where possible, of experienced applicators. This ensures that the scope of work is completed satisfactorily so that long-term performance of the materials is assured.

I confirm PCS (Protective Coating Systems) are experienced applicators (over 10 years) of Parchem Industrial Flooring, Concrete repair, Waterproofing, Resin injection, Soil injection and most other construction products.

Yours sincerely

Ron Ierino Account Manager

Business Development / Account Manager Trade / Parchem Construction Supplies Pty

Ltd

M 0411 409 922 T 08 6279 9799 F 08 9277 1445 W www.parchem.com.au

47 Belmont Avenue Belmont WA 6104

Page 10: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

Page 11: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

CLIENT REFFERENCE

Page 12: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

Page 13: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

From: Kevin Bassett

To: Martin

Sent: Monday, October 12, 2009 10:57 AM

To whom it may concern.

Over the last Ten years I have used PCS on Numerous projects varying from medium commercial

projects to large infrastructure Jobs some listed below.

New Perth to Bunbury Highway

Busselton jetty Refurbishment

Worsley, Development capital projects.

Ravensthorpe Nickel

Worsley Boddington Mine site

Quest apartments,Margaret River.

Smiths Beach resort

Bunbury Port Authority

They have demonstrated to be industry leaders in all aspects of specialised coatings, grouting,

concrete cutting and repair, concrete injection systems, polyurethane coatings,

Labour hire and plant hire and fully understand safety expectations and compliance and Deliver

Quality outcomes. I will continue to use them as subcontractor of choice

And have no hesitation in recommending PCS for any project.

Regards

Kevin Bassett

Marine and Civil Construction Co Pty Ltd

Busselton Jetty Refurbishment Project Email: [email protected] | Website: www.marineandcivil.com

Tel+61 8 9751 2375 | Mob 0459 991 527| Fax +61 8 9751 5875 |

the marine infrastructure specialists

Page 14: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

PROJECT PHOTOS

ACKER, GHD & MANTEENA – CHRISTMAS ISLAND FLYING FISH COVE – JETTY REPAIRS

Page 15: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

BEFORE AFTER

ACKER & JLL – CHRISTMAS ISLAND AUSTRALIAN FEDERAL POLICE BUILDING

Page 16: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

CAA – BOLD PARK AQUATIC CENTRE

HOG’S BREATH EATON FAIR – COVING, EPOXY SCREED AND FLOOR FINISHES

CHRISTMAS ISLAND TEMPLE – DECORATIVE CONCRETE COATINGS

Page 17: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

SIMCOA OPERATIONS KEMERTON – QUARTZ PAD REPLACEMENT

BGC EATON FAIR SHOPPING CENTRE – 23,000 M2 OF TWO LAYER TORCH ON

WATERPROOF MEMBRANE

Page 18: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

BUNBURY PORT BERTH 8 DECK REPAIRS

ALCOA PINJARRA SULPHURIC ACID BUND REFERBISHMENT (BEFORE / AFTER)

BUNBURY PORT BERTH 3 PILE CONDITION TESTING (8 METER BARGE AND WORK CAGE)

Page 19: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

WORSLEY E&G PROJECT - EPOXY AND CEMENTITIOUS GROUTING

WORSLEY MFC PROJECT – CRANE BASE DEMOLITON USING EXPANDING GROUT

Page 20: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

DCJV - CSBP KWINANA - EPOXY GROUT INSTALLATION (15,000 L OF PRODUCT)

SSWA BINNINGUP DESAL STAGE 1 & 2 – ALL EXTERIOR PAINTING

SSWA BINNINGUP DESAL STAGE 1 & 2 – TANK LINING BACKWASH AND CIP (2,289 M2)

Page 21: COMPANY PROFILE AND CAPABILITY STATEMENT 2016protectivecoatingsystems.com.au/wp-content/uploads/sites/118/2014/... · Company Profile & Capability Statement 2016 ... 26,000 m2 of

Company Profile & Capability Statement 2016

Submitted to:

CSBP KWINANA – FIREPROOFING TO EDC CABLE PENETRATIONS