Cleaner production center and the montreal protocol
-
Upload
unep-ozonaction -
Category
Technology
-
view
797 -
download
1
description
Transcript of Cleaner production center and the montreal protocol
![Page 1: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/1.jpg)
CLEANER PRODUCTION CENTRE OF SERBIA CLEANER PRODUCTION CENTRE OF SERBIA
AND MONTREAL PROTOCOLAND MONTREAL PROTOCOL
ECA network meeting, Belgrade, Serbia, May 2011
![Page 2: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/2.jpg)
NCPC SERBIA INAUGURATION
• The CPC is inaugurated on October 11, 2007 during 6th Ministerial Conference“Environment for Europe”, Belgrade
ECA network meeting, Belgrade, Serbia, May 2011
“Environment for Europe”, Belgrade
![Page 3: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/3.jpg)
ContextClimate
change
Jobs
Resource
ECA network meeting, Belgrade, Serbia, May 20113
Pollution, chemicals and waste
Productivity and competitiveness
Resource
Use
![Page 4: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/4.jpg)
Cleaner Production
– Continuous application of an integrated preventive environmental strategy
to processes, products and services to increase efficiency and reduce risks
to humans and environment
complexity of environmental issueslow high
ECA network meeting, Belgrade, Serbia, May 20114
UNEP (1994), Government Strategies for Cleaner Production, United Nations Environment Programme, Paris
PollutionDispersion
PollutionControl
Recycling
PollutionPrevention
environmentalpreference
1960 1980 1990
Cleaner Productionand Eco-Efficiency
high
low
SustainableDevelopment
Van Berkel (2007), Cleaner Production and Eco-Efficiency, in International Handbook for Environmental Technology Management
![Page 5: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/5.jpg)
CPC Serbia, Belgrade
Technical Assistance and In-plant
Assessments
Training
CP Technology and Investment Promotion
Information Dissemination
CP Policy Advice
MAIN SERVICES AND
TARGET INDUSTRIES
ECA network meeting, Belgrade, Serbia, May 2011
CP Policy Advice
Chemical Leasing (ChL)
IPPC consulting
Waste management
Corporate Social Responsibility (CSR)
All industry sectors, focus on chemical,
metalworking and food-processing industry
Target industries:
![Page 6: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/6.jpg)
Serbian CPC have not been involved directly in MP
implementation but the key advantages of CPCs
that would facilitate MP implementation at the
national level include:
• excellent rapport with local industries, governments and academia
and other stakeholders;
ECA network meeting, Belgrade, Serbia, May 2011
and other stakeholders;
• ability to adjust and adopt environmental strategies to suit the
local conditions, the culture and manufacturing practices of their
country; and
• support of national and inter-CPC networks of qualified
professionals.
![Page 7: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/7.jpg)
PARTICIPATING COMPANIES
ECA network meeting, Belgrade, Serbia, May 2011
![Page 8: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/8.jpg)
PARTICIPATING COMPANIES – continued...
ECA network meeting, Belgrade, Serbia, May 2011
![Page 9: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/9.jpg)
PARTICIPATING COMPANIES – continued...
ECA network meeting, Belgrade, Serbia, May 2011
![Page 10: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/10.jpg)
MEETING WITH COMPANY’S MANAGEMENT
AND WORKERS
ECA network meeting, Belgrade, Serbia, May 2011
![Page 11: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/11.jpg)
MODUL 1: WORKSHOPS
ECA network meeting, Belgrade, Serbia, May 2011
![Page 12: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/12.jpg)
MODUL 2: COMPANY VISITS
ECA network meeting, Belgrade, Serbia, May 2011
![Page 13: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/13.jpg)
MODUL 3: EVALUATION AND OPTION IMPLEMENTATION
ECA network meeting, Belgrade, Serbia, May 2011
BEFORE AFTER
![Page 14: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/14.jpg)
FINAL CONFERENCE AND AWARD CEREMONY
ECA network meeting, Belgrade, Serbia, May 2011
![Page 15: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/15.jpg)
RESULTS:
•So far, (2006-2010) total of 42 companies participated
with about 8,000 employees
•54 NE trained and certified
ECA network meeting, Belgrade, Serbia, May 2011
•54 NE trained and certified
•Average savings per company: 100,000 EUR/year
•Average decrease of water consumption: 50,000 m3/year
•Average decrease in electrical power consumption: 500
MWh/year
•Average decrease in CO2 emission: 500 t/year
![Page 16: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/16.jpg)
CHEMICAL LEASING – BUSINESS MODEL FOR
SUSTAINABLE MANAGEMENT OF CHEMICALS
ECA network meeting, Belgrade, Serbia, May 2011
![Page 17: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/17.jpg)
Chemical Leasing in a nutshell
Chemical Leasing is a service-oriented business model. It suggests new forms of payments for chemicals that direct the economic interests of all partners towards process optimisation and reduction of chemicals consumption.
Principle
EconomicEnvironmental
Cost reduction/ added value for all involved partners
Reduction of emissions/wasteObjectives/ Benefits
ECA network meeting, Belgrade, Serbia, May 2011
air pollutionwater pollution
waste load
CostsUsers
Costs chemical producer
Costsothers
≈
Chemical user
Equipment/plant supplier
Recycling/disposal companies
OthersActors Chemical supplier/producer
![Page 18: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/18.jpg)
Chemical Leasing: MotivationsTraditional business models:
Contradictory motivations
Chemical leasing models:
Bundled motivations
ECA network meeting, Belgrade, Serbia, May 2011
Material(costs, volume)
supplier
"the more the better"
consumer
"less is more"
Delivery of goods
Life cycle costs(material, work, waste
management)
supplier consumerDelivery of services
"less is more" "less is more"
![Page 19: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/19.jpg)
FACTORY OF ROLLING BEARINGS AND CARDAN SHAFTS (FKL) - SAFECHEM
The chemical will be substituted
Process will be optimized
ECA network meeting, Belgrade, Serbia, May 2011
Process will be optimized
![Page 20: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/20.jpg)
CLEANING OF METAL PARTS BY
TRICHLOROETHYLENE
ECA network meeting, Belgrade, Serbia, May 2011
![Page 21: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/21.jpg)
THE UNIT OF PAYMENT
NUMBER OF
WORKING HOURS
of the cleaning equipment
ECA network meeting, Belgrade, Serbia, May 2011
of the cleaning equipment
![Page 22: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/22.jpg)
EXPECTED RESULTS
• The best practice risk management which is a unique state-of-the art closed loop delivery system
• Consumption of carcinogenic solvent should be 60% less while there is no solvent emissions and lifespan of the product is significantly increased
ECA network meeting, Belgrade, Serbia, May 2011
no solvent emissions and lifespan of the product is significantly increased
• Better occupational health and safety, as the cleaning system will be completely closed
• Waste take-back and recovery
![Page 23: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/23.jpg)
Regional RECP Network:
ECA network meeting, Belgrade, Serbia, May 2011
Albania, Armenia, Bulgaria, Croatia, Czech Republic, Hungary, Montenegro, Republic of Moldova, Romania, Russian Federation, Serbia, Slovakia, Macedonia, Ukraine and Uzbekistan
![Page 24: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/24.jpg)
CONCLUSION:
•CPC SERBIA SUPPORTS MANUFACTURING SECTOR
•PERFORMED OVER 50 CPA
•IMPLEMENTING PROJECT “CHEMICAL LEASING”
•INCLUDING HPMP SUPPORT IN CPC PORTFOLIO BASED ON
ECA network meeting, Belgrade, Serbia, May 2011
THE EXPERIENCE AND NETWORK WE HAVE WITH THE
INDUSTRY SECTOR.
•POTENTIAL AT THE REGIONAL LEVEL AS A MEMBER OF
UNIDO/UNEP RECP Net
![Page 25: Cleaner production center and the montreal protocol](https://reader031.fdocuments.in/reader031/viewer/2022020122/547bffc35806b5e03f8b46c7/html5/thumbnails/25.jpg)
Thank you for your attention!!!
ECA network meeting, Belgrade, Serbia, May 2011
attention!!!